About this file

Attachment 2 - Diagrams

View the file

Other files

File Type Posted
SITE_VISIT_Q A.pdf PDF
DAVIS_BACON_WAGE_DETERMINATION.pdf PDF
CATEGORIES_OF_BIO-BASED_PRODUCTS.pdf PDF
STATEMENT_OF_WORK.pdf PDF
PICTURES.pdf PDF
SOLICITATION__AG-8KAP-S-16-0004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H

H

H

3H gate

N

From west:

H = Construct 2 post H brace at existing fence H = Construct 2 post H brace for gate at road H = Construct 2 post H brace for gate at road 3H = Construct 3 post H brace to turn corner H = Construct 2 post H brace with gate at existing fence ga te

Water Plant Road fence (approx 1900’)

Water Plant Road

Ro un d To p Ro ad gate gate

Hildreth Road fence (approx. 3300’)

H

H

H

3H

H

3H

H

H

N

Hildreth Road

From west:

H = Construct 2 post H brace for gate at road 3H = Construct 3 post H brace to turn fence H = Construct 2 post H brace with 16’ gate across from existing gate H = Construct 2 post H brace 3H = Construct 3 post H brace to turn fence H = Construct 2 post H brace with 16’ gate H = Construct 2 post H brace H = Construct 2 post H brace at existing fence

N

Round Top Road

H

3H

3H

3H ga te

P

Round Top Road fence (approx 4800’)

From north:

H = Construct 2 post H brace at existing corner 3H = Construct 3 post h brace to turn fence 3H = Construct 3 post h brace to turn fence 3H = Construct 3 post h brace to turn fence P = Set 10’ post at ¼ mile (or approx mid-point) H = Construct 2 post H brace with 16’ gate at existing corner

Slide Number 1
Slide Number 2
Slide Number 3

File details come from the government source that posted it. Updated .