DIAGRAMS.pdf
PDF 248 KB Posted
- Solicitation number
- AG-8KAP-S-15-0002
About this file
Diagrams
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SITE_VISIT_QUESTIONS.pdf | ||
| STATEMENT_OF_WORK.pdf | ||
| DAVIS_BACON_WAGE_DETERMINATION.pdf | ||
| SOLICITATION__AG-8KAP-S-15-0002.pdf | ||
| Categories_of_Bio-Based_Products.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fence Construction
R o u n d T o p R o ad
North
M ile
Fe n ce
Fe n ce
Fe n ce
Fence 2
Fence 1 (5270’) From South:
H = Construct 2 post H brace with gate
16’ from metal corner post H = Construct 2 post H brace H = Construct 2 post H brace with gate in line with gate across alley H = Construct 2 post H brace with gate H = Construct 2 post H brace with gate
16’ from existing post P = Set 10’ post at ¼ mile H = Construct 2 post H brace at ½ mile H = Construct 2 post H brace H = Construct 2 post H brace with gate on top of hill 3H = Construct 3 post H brace at corner
N gate gate gate double gate existing post
H
H
H
H
H
H
P existing post gate H 3H
H
N
Fence 2 (4545’ offset approx 3‐4’ South of existing fence) From West:
3H* = Previously constructed 3 post H brace
(from fence 1) P = Set 10’ post at ¼ mile H = Construct 2 post H brace at ½ mile P = Set 10’ post at intersection with existing fence P = Set 10’ post at intersection with existing fence 3H = Construct 3 post H brace at corner
3H* H 3HP PP
Fence 3 (6475’) From North:
3H = Previously constructed 3 post
H brace (from fence 2) H = Construct 2 post H brace with gate at access H = Construct 2 post H brace with gate at access H = Construct 2 post H brace with gate at access H = Construct 2 post H brace at access P = Set 10’ post at intersection with existing fence 3H = Construct 3 post H brace to change fence direction to follow road H = Construct 2 post H brace at
Water Plant Rd
3H*
3H
H
H
H
H
H double gate gate
Water Plant Road
P
Fence 4 (3100’) From North:
H = Construct 2 post H brace at
Water Plant Rd P = Set 10’ post at ¼ mi H = Construct 2 post H brace at intersection with existing fence (roughly ½ mi)
H = Construct 2 post H brace at end of tree line
H
H
Water Plant Road
P
H tr ee s
File details come from the government source that posted it. Updated .