AG-87BJ-S-15-0023_Revised.pdf
PDF 458 KB Posted
- Solicitation number
- AG-87BJ-S-15-0023
About this file
Revised AG-87BJ-S-15-0023
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J.4_Revised-Drawings.pdf | ||
| AG-87BJ-S-15-0023-0001.pdf | ||
| J-5_SF-1413.pdf | ||
| J.4_Drawings.pdf | ||
| AG-87BJ-S-15-0023.pdf | ||
| J.3_Special-Project-Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-87BJ-S-15-0023
1. REQUEST NO.
5a. ISSUED BY
NAME
a. NAME
c. STREET ADDRESS
d. CITY
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE IN BLOCK 5a ON
OR BEFORE CLOSE OF BUSINESS (Date)
2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG.1
RATING
6. DELIVERY BY (Date)
7. DELIVERY
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
PAGE OF PAGES
5b. FOR INFORMATION CALL: (No collect calls)
TELEPHONE NUMBER
AREA CODE NUMBER
8. TO:
b. COMPANY
e. STATE f. ZIP CODE
c. CITY
d. STATE e. ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
THIS RFQ
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
IS IS NOT A SMALL BUSINESS SET ASIDEX
08/10/2015 758977
1 34
EAST SIDE ACQUISITION TEAM (ESAT)
CUSTER GALLATIN NATIONAL FOREST
PO BOX 130 10 EAST BABCOCK AVENUE
BOZEMAN MT 59771
07/01/2016
USDA FOREST SERVICE
DAKOTA PRAIRIE- MCKENZIE RNGR DIST
1901 S MAIN ST
WATFORD CITY
ND 58854
406 587-6920ALANE FITZPATRICK
08/21/2015 1600 MD
FOB DESTINATION
OTHER
(See Schedule)X
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
NFSR 863 ERFO Road Repair Dakota Prairie Grasslands, McKenzie Ranger District; McKenzie County, ND
001 NFSR 863 ERFO ROAD REPAIR PROJECT
Product/Service Code: Z2LB Product/Service Description: REPAIR OR ALTERATION
OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Delivery: 07/01/2016
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations
13. NAME AND ADDRESS OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
a. NAME OF QUOTER
AREA CODE
NUMBER
15. DATE OF QUOTATION
b. TELEPHONE are are not attached
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA - FAR (48 CFR) 53.215-1(a)
REVISED AG‐87BJ‐S‐15‐0023
DAKOTA PRAIRIE GRASSLANDS
NFSR 863 ERFO Road Repair
NFSR 863 ERFO ROAD REPAIR (REVISED)
TABLE OF CONTENTS
SECTION B ‐ Supplies or Services and Prices/Costs Schedule of Items SECTION C ‐ Description/Specifications/Statement of Work SECTION D ‐ Packaging and Marking SECTION E ‐ Inspection and Acceptance SECTION F ‐ Deliveries or Performance SECTION G ‐ Contract Administration Data SECTION H ‐ Special Contract Requirements SECTION I ‐ Contract Clauses SECTION J ‐ List of Documents, Exhibits, and Other Attachments SECTION K ‐ Representations, Certifications, and Other Statements of Offerors SECTION L ‐ Instructions, Conditions, and Notices to Offerors or Respondents SECTION M ‐ Evaluation Factors for Award
NFSR 863 ERFO Road Repair
PART I – THE SCHEDULE
SECTION B ‐ SUPPLIES OR SERVICES AND PRICES/COSTS
B‐1 SCHEDULE OF ITEMS: NFSR 863 ERFO Road Repair; McKenzie County, North Dakota; McKenzie Ranger District, Dakota Prairie Grasslands.
ITEM DESCRIPTION
MEASUMENT ESTIMATED
QTY
UNIT TOTAL
METHOD* UNIT** PRICE PRICE
NFRS 863 – ERFO Repair
151 Mobilization LSQ EA 1 $ XX.XX $
303a Road Reconditioning CQ MI 3.5 $ $
TOTAL, Items 151 & 303a – NFRS 863 $
Site 1 – DSR‐8.35
203a Removal of Structures (24‐inch x 30‐foot CMP) LSQ EA 1 $ XX.XX $
203b Removal of Structures (18‐inch x 30‐foot CMP) LSQ EA 1 $ XX.XX $
301 Aggregate CQ CY 40 $ $
303.1 Road Reconditioning‐ Slump Removal CQ CY 400 $ $
602a Furnish and Install 24‐inch CMP AQ LF 40 $ $
602b Furnish and Install 18‐inch CMP AQ LF 40 $ $
TOTAL Site 1 – DSR‐8.35 $
Site 2 – DSR‐8.80
Removal of Structures
(18” CMP) LSQ EA 3 $ XX.XX $
301 Aggregate CQ CY 60 $ $
303.2 Road Reconditioning‐ Ditch Restore CQ LF 700 $ $
602 Furnish and Install 18‐inch CMP AQ LF 120 $ $
TOTAL Site 2 – DSR‐8.80 $
Site 3 – DSR‐9.35
Removal of Structures (18‐inch CMP) LSQ EA 1 $ XX.XX $
301 Aggregate CQ CY 40 $ $
303.3 Road Reconditioning‐ Ditch Restore CQ LF 800 $ $
602 Furnish and Install 18‐inch CMP AQ LF 40 $ $
TOTAL Site 3 – DSR‐9.35 $
Site 4 – DSR‐10.17
Removal of Structures (18‐inch CMP) LSQ EA 1 $ XX.XX $
251 Rip Rap CQ CY 40 $ $
301 Aggregate CQ CY 60 $ $
303.4 Road Reconditioning‐ Re‐establish Roadway Template CQ LF 300 $ $
602 Furnish and Install 18‐inch CMP AQ LF 60 $ $
TOTAL Site 4 – DSR‐10.17 $
TOTAL PRICE – All Sites/All Items: $
NFSR 863 ERFO Road Repair
Special Notes
1. The bidder must bid on all items. Round to the nearest cent.
2. In the event of an error in extending the bid prices, unit prices will govern, unless otherwise determined by the
Contracting Officer, in accordance with applicable regulations.
3. Offers for Quantities less than those listed in the numbered items may be rejected.
4. The pay items in the Schedule of Items have suffixes that do not appear on the pay items in the specifications. The suffixes pertain only to sizes, classes, and/or types indicated in the item ‘Descriptions,’ and are used by the Government for computer tabulation of bid schedules. For the abbreviations in schedule descriptions, reference Special Project Specification, SPS 101 (07/07/1997).
5. Payment for bond premiums in accordance with FAR 52.232‐5. Payments under Fixed‐Price Construction Contracts shall not be in addition to the contract price but can be included under Mobilization.
6. One contract will be awarded to the responsive and responsible bidder offering the best value to the Government (see Section M – Evaluation Factors for Award).
7. The successful Contractor must be registered in the System for Award Management (SAM) data base (reference Section I, FAR 52.204‐7) before an award is issued.
8. This is a Request for Quotation (RFQ); no public opening will be held. Results will not be made public prior to award. Quotes submitted in response to this RFQ will not be returned and will be retained by the USDA Forest Service for official record purposes. This RFQ does not commit the Government to pay any costs incurred in the preparation or the submission of a quote, or to make any award.
9. Vendors are urged to thoroughly read the solicitation and to review all attachments prior to preparing and submitting a quote. Instructions for submitting a quote are located in Section L. Questions regarding quote submission may be directed to Alane Fitzpatrick, Contracting Officer, at 406‐587‐6920.
Price quotation furnished by (provide complete business name and address):
Name: _____________________________________ Phone: ________________________________
Address: _____________________________________ Cell: ________________________________
_____________________________________ FAX: ________________________________
DUNS: _____________________________________ E‐Mail: ________________________________
*DESIGNATED METHOD OF MEASUREMENT **PAY UNIT ABBREVIATIONS
AQ ‐‐‐‐‐‐ Actual Quantity LF ‐‐‐‐‐‐‐‐Linear Feet
CQ‐‐‐‐‐‐‐ Contract Quantity MI ‐‐‐‐‐‐‐Mile
CY‐‐‐‐‐‐‐‐Cubic Yard
LF ‐‐‐‐‐‐‐‐Linear Feet
LSQ ‐‐‐‐‐ Lump Sum Quantity EA ‐‐‐‐‐‐‐Each
NFSR 863 ERFO Road Repair
SECTION C ‐ DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C‐1 PROJECT DESCRIPTION AND LOCATION
a. Scope of Contract/Description of Work: NFSR (National Forest System Road) 863 ERFO (Emergency Relief for
Federally Owned Roads) Repair – This is a road repair project which includes the following four items. The Forest Service will provide the construction staking.
Item 1: Remove and dispose of existing 24‐inch CMP; furnish and install a new 24‐inch CMP; remove and dispose of 18‐inch CMP; furnish and install a new 18‐inch CMP; remove slump; reshape road template including ditch to typical section in the plans; and resurface the construction area with surfacing.
Item 2: Remove and dispose of 18‐inch CMP; furnish and install a new 18‐inch CMP; recondition 700 feet of ditch line to typical section in the plans; and resurface the construction area with surfacing.
Item 3: Remove and dispose of 18‐inch CMP; furnish and install a new 18‐inch CMP; recondition 800 feet of ditch line to typical section in the plans; and resurface the construction area with surfacing.
Item 4: Reconstruct 300 feet of road as staked by the Forest Service; furnish and install a new 18‐inch CMP;
reshape channel meander; place geotextile and rip rap; and resurface the constructed road with surfacing.
Mobilization is encompassing for all Items, 1‐4, in addition to 3.5 miles of road reconditioning as delineated on the map and staked on the ground (Note: this 3.5 miles of road reconditioning is not included with the road reconditioning on Items 1‐4). The road travelway surfacing shall be bladed and reshaped from the beginning point, through the repair areas, and to the ending point. In addition to the travelway surfacing, ditch lines shall be reestablished, culvert catch basins reshaped, minor slumps/slides removed, and drainage patterns reestablished.
The successful Contractor shall furnish all labor, equipment (fully operated), supervision, transportation, operating supplies, and incidentals necessary to complete the work. All work shall conform to the Plans, Drawings, Specifications, and Special Project Provisions of the solicitation and any resultant contract.
b. Project Location and Directions: The project is located on the McKenzie Ranger District of the Little Missouri
National Grassland in McKenzie County, North Dakota.
Access to the project site: From Grassy Butte, North Dakota head eight (8) miles west on County Road 50, turn right on NFSR 863, and proceed eight (8) miles NW to the project location in Sections 3 and 4, T146N, R101W, 5th P.M., McKenzie County, North Dakota.
c. Price Range: Between $25,000 and $100,000.
d. Pre‐bid Tour: No pre‐bid tour will be conducted. Interested parties may contact Curt Grudniewski at the Medora
Ranger District Office, at 701‐227‐7856, with questions or for directions to view the project site on their own.
Contractors are urged to inspect the site where the work will be performed.
Interested parties shall take reasonable steps to ascertain the nature and location of the project area and the work to be completed, as well as the general and local site conditions which can affect the work and cost of performance. Failure to take the actions described in this paragraph will not relieve the Contractor from the responsibility of properly estimating the difficulty and cost to successfully perform the work, or from successful completion of the work without additional expense to the Government.
e. Subcontractors: All subcontractors must be identified by the time of the pre‐work meeting at the latest, and must be approved prior to the issuance of the Notice to Proceed. Contractors shall submit a completed SF‐1413 form to the Contracting Officer for each subcontractor. (An SF‐1413 form is attached in Section J.)
f. Pre‐bid Tour: No pre‐bid tour will be conducted. Interested parties may contact Curt Grudniewski at the Medora
Ranger District Office, Dickinson, ND at 701‐227‐7837 for information. A Firm‐Fixed Price contract is expected to result from this solicitation.
Interested parties shall take reasonable steps to ascertain the nature and location of the project area and the work to be completed, as well as the general and local site conditions which can affect the work and cost of performance.
Failure to take the actions described in this paragraph will not relieve the Contractor from the responsibility of properly estimating the difficulty and cost to successfully perform the work, or from successful completion of the work without additional expense to the Government.
g. Pre‐bid Conference: No pre‐bid conference will be conducted.
h. Start Work Date: It is anticipated that work can begin in September, 2015. The start work date shall be coordinated following contract award. Once the Notice to Proceed is issued, all work shall be completed within 60 days.
i. Period of Performance: All work shall be completed, including final inspection and Government acceptance, no later than 1 July 2016.
C‐2 SPECIAL PROJECT SPECIFICATIONS
The following Special Project Specifications are hereby made part of this solicitation and any resulting contract, and are located in Section J as a separate attachment:
SPECIAL PROJECT SPECIFICATIONS
Section Number Description
SPS 101 Terms, Format, and Definitions 3/12 DPG
SPS 102‐108 General Requirements 3/12 DPG
SPS 109 Measurement and Payment 3/12 DPG
SPS 155 Schedules for Construction Contracts 3/12 DPG
SPS 209
Structure Excavation and Backfill for Minor Structures
6/12 DPG
SPS 251 Rip Rap 3/12 DPG
SPS 301 Aggregate 6/12 DPG
SPS 303 Roadway Reconditioning 7/15 DPG
SPS 602 Culverts and Drains 3/12 DPG
C‐3 STANDARD SPECIFICATIONS
"Standard Specifications for Construction of Roads & Bridges of Federal Highway Projects" (FP‐03, U.S. Customary Units) are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made part of this solicitation and any resultant contract.
Electronic versions of the "Standard Specifications for Construction of Roads & Bridges on Federal Highway Projects" FP‐03, U.S. Customary Unit, are available on the U.S. DEPARTMENT OF TRANSPORTATION Federal Highways Administration website at http://flh.fhwa.dot.gov/business/resources/specs/fp‐03.htm.
The following Standard Specifications are applicable to this project:
STANDARD SPECIFICATIONS
Section Number Description
101 Terms, Format, and Definitions 2003
NFSR 863 ERFO Road Repair
STANDARD SPECIFICATIONS
103‐107 General Items 2003
109 Measurement and Payment 2003
151 Mobilization 2003
153 Contractor Quality Control 2003
Note: Any additional specifications referenced in the above standard specifications are also applicable to this contract.
C‐4 PROJECT DRAWINGS
The following drawings are hereby made part of this solicitation and any resultant contract, and are located in Section J as a separate attachment:
PROJECT DRAWINGS – NFSR 863 ERFO ROAD REPAIR
Page No. DESCRIPTION
1 Title Sheet
2 Project Area Map
3‐10 Sites 1‐4 DSR Sketches/Photos
11 Road Typical Detail
12 Drainage Construction Detail
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.211‐72 Statement of Work/Specifications (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
(End of Clause)
452.211‐73 Attachments to Statements of Work/Specifications (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
(End of Clause)
BIOBASED PRODUCTS
The contractor must comply with the Agriculture Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 9FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation;
Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance”, dated October 2, 2009; EO 13423, “Strengthening Federal Environmental, Energy and Transportation Management”, dated January 24, 2007;
and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products.
All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of biobased and recycled products.
The following is a list of categories for biopreffered products that are required for performance of this construction contract: Equipment Lubricants, Hydraulic Fluids, Fuel Additives, Engine Oils, Office Products (Ink, paper, cleaning products).
For more information regarding the Department of Agriculture Biobased Program go to: http://www.biopreferred.gov.
SECTION D ‐ PACKAGING AND MARKING
For this solicitation, there are no clauses included in this section.
SECTION E ‐ INSPECTION AND ACCEPTANCE
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246‐12 Inspection of Construction (APR 1996)
52.252‐2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/vffara.htm;
http://www.dm.usda.gov/procurement/policy/agar.html.
(End of clause)
SECTION F ‐ DELIVERIES OR PERFORMANCE
52.242‐14 Suspension of Work (APR 1984)
52.211‐10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 1 July 2016. The time stated for completion shall include final cleanup of the premises.
SECTION G ‐ CONTRACT ADMINISTRATION DATA
G‐1 GOVERNMENT FURNISHED PROPERTY
The Government will provide the following items of Government Furnished Property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with FAR 52.245‐1, Government Property, located in Section I.
NONE
452.215‐73 Post‐award Conference (NOV 1996)
A post‐award conference with the successful offeror is required. It will be scheduled within seven days after the date of contract award. The conference will be held at the Custer Gallatin National Forest, Supervisor’s Office, 10 E Babcock Avenue, Bozeman, MT 59715 or at another location agreed to by the parties.
(End of Clause)
SECTION H ‐ SPECIAL CONTRACT REQUIREMENTS
H‐1 SUBMITTALS
The Contractor must submit certifications for Erionite free aggregate and certifications for gradation and quality of aggregate before it can be accepted for use on this project.
H‐2 NOXIOUS WEED CONTROL
In order to prevent the potential spread of noxious weeds, the Contractor shall be required to furnish proof of weed‐free equipment. All dirt, plant parts, and any material that may carry noxious weed seeds into the construction area must be removed from all equipment prior to initial move‐in. The contractor shall make equipment available for Forest Service inspection at an agreed upon location. All necessary and subsequent move‐ins shall be treated the same as the initial move‐in.
H‐3 CAMPING
Prior to camping on National Grasslands, the Contractor shall obtain a Camping Permit from the Medora Ranger District through the Contracting Officer. Permits will be issued at the discretion of the District Ranger. The Contractor must submit camping requests before or during the post‐award conference. Contractors are expected to keep a clean camp at all times and to adhere to all applicable National Grassland/Ranger District policies in effect.
a. A camp is interpreted to include any location occupied by the Contractor or Contractor’s agents for the purpose of overnight occupancy. This encompasses any tent sites, camp trailers, etc. which also includes residing at designated campsites or campgrounds that are open to the public.
b. Unless otherwise allowed in the Camping Permit, the contractor will abide by all rules applicable to the general public.
c. Arrangements for camping on local private lands will be the responsibility of the Contractor.
PART II – CONTRACT CLAUSES
SECTION I ‐ CONTRACT CLAUSES
52.252‐2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/vffara.htm;
http://www.dm.usda.gov/procurement/policy/agar.html.
(End of clause)
52.204‐7 System for Award Management (JUL 2013) 52.204‐9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.209‐6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or
Proposed for Debarment (AUG 2013) 52.211‐18 Variation in Estimated Quantity (APR 1984) 52.215‐8 Order of Precedence ‐ Uniform Contract Format (OCT 1997) 52.219‐6 Notice of Total Small Business Set‐Aside (NOV 2011) 52.222‐3 Convict Labor (JUN 2003) 52.222‐6 Construction Wage Rate Requirements (MAY 2014) 52.222‐7 Withholding of Funds (MAY 2014) 52.222‐8 Payrolls and Basic Records (MAY 2014) 52.222‐9 Apprentices and Trainees (JUL 2005) 52.222‐10 Compliance with Copeland Act Requirements (FEB 1988) 52.222‐11 Subcontracts (Labor Standards) (MAY 2014) 52.222‐12 Contract Termination ‐ Debarment (MAY 2014) 52.222‐13 Compliance With Construction Wage Rate Requirements and Related Regulations (MAY 2014) 52.222‐14 Disputes Concerning Labor Standards (FEB 1988) 52.222‐15 Certification of Eligibility (MAY 2014) 52.222‐21 Prohibition of Segregated Facilities (FEB 1999) 52.222‐26 Equal Opportunity (MAR 2007) 52.222‐27 Affirmative Action Compliance Requirements for Construction (FEB 1999) 52.222‐35 Equal Opportunity for Veterans (JUL 2014) 52.222‐36 Equal Opportunity for Workers with Disabilities (JUL 2014) 52.222‐37 Employment Reports on Veterans (JUL 2014) 52.222‐50 Combating Trafficking in Persons (FEB 2009) 52.223‐2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013) 52.223‐5 Pollution Prevention and Right‐to‐Know Information (MAY 2011) 52.223‐6 Drug‐Free Workplace (MAY 2001) 52.224‐1 Privacy Act Notification (APR 1984) 52.224‐2 Privacy Act (APR 1984) 52.225‐13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227‐4 Patent Indemnity‐‐Construction Contracts (DEC 2007) 52.228‐2 Additional Bond Security (OCT 1997) 52.228‐5 Insurance ‐ Work on a Government Installation (JAN 1997) 52.228‐11 Pledges of Assets (JAN 2012) 52.228‐14 Irrevocable Letter of Credit (NOV 2014) 52.232‐5 Payments Under Fixed‐Price Construction Contracts (MAY 2014) 52.232‐18 Availability of Funds (APR 1984)
NFSR 863 ERFO Road Repair
52.232‐23 Assignment of Claims (MAY 2014) 52.232‐27 Prompt payment for construction contracts (MAY 2014) 52.232‐33 Payment by Electronic Funds Transfer ‐ System for Award Management (JUL 2013) 52.233‐1 Disputes (MAY 2014) 52.233‐3 Protest after Award (AUG 1996) 52.233‐4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236‐2 Differing Site Conditions (APR 1984) 52.236‐3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236‐5 Material and Workmanship (APR 1984) 52.236‐6 Superintendence by the Contractor (APR 1984) 52.236‐7 Permits and Responsibilities (NOV 1991) 52.236‐8 Other Contracts (APR 1984) 52.236‐9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) 52.236‐10 Operations and Storage Areas (APR 1984) 52.236‐11 Use and Possession Prior to Completion (APR 1984) 52.236‐12 Cleaning Up (APR 1984) 52.236‐13 Accident Prevention (NOV 1991) 52.236‐16 Quantity Surveys (APR 1984) 52.236‐17 Layout of Work (APR 1984) 52.236‐21 Specifications and Drawings for Construction (FEB 1997) 52.236‐26 Preconstruction Conference (FEB 1995) 52.243‐5 Changes and Changed Conditions (APR 1984) 52.244‐6 Subcontracts for Commercial Items (OCT 2014) 52.245‐1 Government Property (APR 2012) 52.245‐9 Use and Charges (APR 2012) 52.246‐21 Warranty of Construction (MAR 1994) 52.249‐1 Termination for Convenience of the Government (Fixed‐Price) (Short Form) (APR 1984) 52.249‐10 Default (Fixed‐Price Construction) (APR 1984) 52.253‐1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232‐70 Reimbursement for Bond Premiums ‐ Fixed‐Price Construction Contracts (NOV 1996) 452.236‐70 Additive or Deductive Items (FEB 1988) 452.236‐71 Prohibition Against the Use of Lead‐Based Paint (NOV 1996) 452.236‐72 Use of Premises (NOV 1996) 452.236‐73 Archaeological or Historic Sites (FEB 1988) 452.236‐74 Control of Erosion, Sedimentation, and Pollution (NOV 1996) 452.236‐76 Samples and Certificates (FEB 1988)
52.225‐9 Buy American ‐ Construction Materials (MAY 2014)
(a) Definitions. As used in this clause‐
Commercially available off‐the‐shelf (COTS) item‐ (1) Means any item of supply (including construction material) that is‐
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means‐
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty‐free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means‐
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if‐
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that‐
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6
NFSR 863 ERFO Road Repair percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including‐
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty‐free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of Payments Program.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON
Construction Material Description Unit of Measure Quantity (dollars)*
Price
Item 1:
Foreign construction material
Domestic construction material
Item 2:
NFSR 863 ERFO Road Repair
Foreign construction material
Domestic construction material
* Include all delivery costs to the construction site and any applicable duty (whether or not a duty‐free entry certificate is issued).
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include other applicable supporting information.
52.228‐13 Alternative Payment Protections (JUL 2000)
(a) The Contractor shall submit one of the following payment protections:
A Payment Bond; or An Irrevocable Letter of Credit (ILC); or A Certificate of Deposit.
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within seven days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one‐year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
52.232‐40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013)
(a) Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.
(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.
(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.
(End of clause)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
AGAR 452.209‐71 – Assurance Regarding Felony Conviction or Tax Delinquent Status for Corporate Applicants, Alternate 1 (FEB 2012)
a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No. 112‐74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies.
Accordingly, by accepting this award the contractor acknowledges that it –
(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and
(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.
b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.
(End of Clause)
452.236‐77 Emergency Response (NOV 1996)
(a) Contractor's Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR clause 52.236‐9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.
(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(c) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243‐4.
NFSR 863 ERFO Road Repair
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J ‐ LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
J‐1 Experience Questionnaire (pp. 17‐18)
J‐2 Wage Determination – Davis Bacon; General Decision Number ND150002 07/10/2015 ND2 (pages 19‐24)
J‐3 NFSR 863 ERFO Road Repair – Special Project Specifications (Attached as a separate document;
11 pages)
J‐4 NFSR 863 ERFO Road Repair –Standard Drawings Rev. (Attached as a separate document; 12 pages)
J‐5 SF‐1413 Statement and Acknowledgment (Attached as a separate document; 1 page)
J – 1 EXPERIENCE QUESTIONNAIRE
1. CONTRACTOR NAME, ADDRESS, & TELEPHONE NUMBER:
2. BUSINESS TYPE
COMPANY
INDIVIDUAL
CORPORATION
CO-PARTNERSHIP
NON-PROFIT ORGANIZATION
3. HOW MANY YEARS DOES YOUR BUSINESS HAVE IN THE LINE OF
WORK CONTEMPLATED BY THIS SOLICITATION?
4. HOW MANY YEARS EXPERIENCE IN CONTRACTING HAS YOUR BUSINESS HAD AS AN (a) PRIME CONTRACTOR __________ AND/OR (b) SUB-CONTRACTOR __________? IS THIS TIME
CONCURRENT? YES NO
5a. LIST BELOW SIMILAR PROJECTS YOUR BUSINESS HAS COMPLETED WITHIN THE LAST THREE
YEARS:
CONTRACT
AMOUNT
TYPE OF PROJECT DATE
COMPLETED
NAME, ADDRESS & TELEPHONE NUMBER OF
OWNER/PERSON TO CONTACT FOR INFO.
5b. LIST BELOW THE PROJECTS THAT ARE INCOMPLETE:
CONTRACT
NUMBER
DOLLAR AMT.
OF AWARD
NAME, ADDRESS & PHONE
NO. OF AGENCY INVOLVED
PERCENT
COMPLETED
DATE
COMPLETED
UNITS
AWARDED
6a. HAVE YOU EVER FAILED TO COMPLETE ANY WORK AWARDED TO YOU? YES NO 6b. HAS WORK EVER BEEN COMPLETED BY PERFORMANCE BOND? YES NO 6c. IF “YES” TO EITHER ITEM 6a OR 6b, SPECIFY LOCATION(S) AND REASONS(S) WHY:
NFSR 863 ERFO Road Repair
7. ORGANIZATION AND WORK THAT WILL BE AVAILABLE FOR THIS PROJECT:
a. (1) MINIMUM NO. OF EMPLOYEES: __________
AND
b. (2) MAXIMUM NO. OF EMPLOYEES: __________
b. ARE EMPLOYEES REGULARLY ON YOUR PAYROLL: YES NO
c. SPECIFY EQUIPMENT AVAILABLE FOR THIS CONTRACT:
d. ESTIMATE RATE OF PROGRESS BELOW (SUCH AS 2.0 ACRES/MAN/DAY:
(1) MINIMUM PROGRESS RATE: (2) MAXIMUM PROGRESS RATE:
8. LIST BELOW THE EXPERIENCE OF THE PRINCIPAL INDIVIDUALS OF YOUR BUSINESS:
INDIVIDUALS NAME PRESENT POSITION
YEARS
OF EXP.
MAGNITUDE AND TYPE OF WORK
9. REMARKS – SPECIFY BOX NUMBERS (also use this area to address any problems with past performance not noted in item 6):
(Vendor may attach additional pages if extra space is needed.)
10. THE BIDDER SHALL INDICATE WHETHER OR NOT HE/SHE HAS EXAMINED THE AREAS FOR WHICH
THIS BID IS SUBMITTED: YES NO
IF YES, THE DATE AREA WAS EXAMINED:
CERTIFICATION: I CERTIFY THAT ALL OF THE
STATEMENTS MADE BY ME ARE COMPLETE
AND CORRECT TO THE BEST OF MY
KNOWLEDGE AND THAT ANY PERSONS
NAMED AS REFERENCES ARE AUTHORIZED
TO FURNISH THE FOREST SERVICE WITH
INFORMATION NEEDED TO VERIFY MY
CAPABILITY TO PERFORM THIS PROJECT.
11a. CERTIFYING OFFICIAL’S NAME & TITLE
11b. SIGNATURE (Sign in ink)
11c. DATE
NFSR 863 ERFO Road Repair
J‐2 WAGE DETERMINATION – Construction Wage Rate Requirements (www.dol.gov)
General Decision Number: ND150002 07/10/2015 ND2 Superseded General Decision Number: ND20140002 State: North Dakota Construction Type: Highway
Counties: North Dakota Statewide.
HIGHWAY CONSTRUCTION PROJECTS
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/02/2015 1 06/05/2015 2 07/10/2015
* ELEC0714-002 06/29/2015
ADAMS, BILLINGS, BOTTINEAU, BOWMAN, BURKE, BURLIEGH, DIVIDE,
DUNN, EMMONS, GOLDEN VALLEY, GRANT, HETTINGER, MCHENRY,
MCKENZIE, MCLEAN, MERCER, MORTON, MOUNTRIAL, OLIVER, PIERCE,
RENVILLE, ROLLETTE, SHERIDAN, SOIUX, SLOPE, STARK, WARD, &
WILLIAMS COUNTIES:
Rates Fringes
ELECTRICIAN
CABLE SPLICER...............$ 33.29 10.5%+8.62
ELECTRICIAN.................$ 32.89 10.5%+8.62
ELEC0714-003 12/01/2014
LINE CONSTRUCTION:
Rates Fringes
Line Construction
CABLE SPLICER...............$ 34.15 29.5%+5.00
GROUNDMAN...................$ 21.78 29.5%+5.00
LINE EQUIPMENT OPERATOR.....$ 32.67 29.5%+5.00
LINEMAN.....................$ 36.30 29.5%+5.00
ELEC1426-002 06/01/2014
NFSR 863 ERFO Road Repair
BARNES, BENSON, CAVALIER, DICKEY, EDDY, FOSTER, GRAND FORKS,
GRIGGS, KIDDER, LAMOURE, LOGAN, MCINTOSH, NELSON, PEMBINA,
RAMSEY, RANSOM, RICHLAND, SARGENT, STEELE, STUTSMAN, TOWNER,
TRAILL, WALSH, & WELLS COUNTIES:
Rates Fringes
ELECTRICIAN
CABLE SPLICER...............$ 28.30 11.26
ELECTRICIAN.................$ 27.59 11.37
ENGI0049-001 10/01/2014
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 26.45 14.35
GROUP 2.....................$ 25.55 14.35
GROUP 3.....................$ 25.30 14.35
GROUP 4.....................$ 25.15 14.35
GROUP 5.....................$ 24.30 14.35
GROUP 6.....................$ 23.00 14.35
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: All Cranes 60 tons and over, Cranes doing piling, sheeting, dragline/clam work, Derrick(Guy & Stiff), Gentry Crane Operator, Helicopter Operator, Mole Operator or Tunnel Mucking Machine, Power Shovel 3-1/2 CY. and over and Traveling Tower Crane.
GROUP 2: All Cranes 21 tons and up to 59 tons, Backhoe Operator 3 CY. and over, Creter Crane, Dredge Operator 12' and Over, Equipment Dispatcher, Finish Motor Grader, Front End Loader Operator 8 CY. and over, Master Mechanic (When supervising 5 or more Mechanics), Mon-o-rail Hoist Operator, Power Shovel up to and including 3-1/2 CY. and Tugboat.
GROUP 3: Cranes 20 tons and under, Asphalt Paving Machine Operator, Asphalt Plant Operator, Automated Grade Trimmer, Backhoe Operator 1 CY. up to and including 2-1/2 CY., Boom Truck Hydraulic (8 Tons & over), Cableway Operator, Concrete Batch Plant Operator(electronic or manual), Concrete Mixer Paving Machine Operator, Concrete Paver- Bridge Decks, Concrete Pump, Concrete Spreader Operator & Belt Placer, Crushing Plant Operator, Dozer Operator, Dredge Operator or Engineer 11'' and under, Drill Rigs, Heavy Duty Rotary or Chum or Cable Drill, Front End Loader (3-1/2 CY. up to and including 7-1/2 CY.), Gravel Washing & Screening Plant Operator, Locomotive, all types, Mechanic or Welder(heavy duty), Motor Grade Operator, Pavement Breaker (Non-Hydro Hammer type, Pipeline Wrapping, Cleaning & Bending Machine Operator, Power Actuated Auger and Horizontal Boring Machine Operator 6'' and over, Refrigeration Plant Engineer, Roto Milling Machine (Surface Planer) 43'' & over, Scraper Operator, Slip Form Concrete Paving Operator, Tandem Pushed Quad 9 or similar, Tractor
NFSR 863 ERFO Road Repair with Boom Attachment, Trenching Machine- 100 HP. and over.
GROUP 4: Articulated/Off Road Hauler, Asphalt Dump Person, Asphalt Paving Screed Operator, Backhoe - up to and including 1/2 CY., Boring Machine locator, Console Board Operator, Distributor Operator (Bituminous), Forklift Operator, Front End Loader- 1-1/2 CY. up to and including 3 CY., Grade Person, Gravel Screening Plant Operator (not Crushing or Washing), Greaser, Lazer-Screed Operator, Longitudinal Float and Spray Operator, Micro surfacer Machine, Motor Grade Operator-Hual Roads, Paving Breaker- Hydro Hammer Type, Pugmill Operator, Push Tractor, Roller, Steel & Rubber on Hot Mix Asphalt Paving, Rotomill Machine (Surface Planer), up to and including 42'', Rumble Strip Machine, Sand and Chip Spreader, Self-propelled Sheepsfoot Packer with or without Blade attachment, Self-propelled Traveling Soil Stabilizer, Sheepsfoot Packer with Dozer attatchment- 100 HP and over, Shouldering Machine, Slip Form, Curb & Gutter Operator, Slurry Seal Machine, Tamping Machine Operator, Tie Tamper and Ballast Machine, Trenching Machine Operator- 46 HP up to and including 99 HP, Truck Mechanic, Well Points, Tub Grinder, Fuel/Lube Operator.
GROUP 5: Boom Truck- A- Frame or Hydraulic 2 tons up to and including 7 tons, Broom-Self propelled, Concrete Saw (Power Operated), Cure Bridge Operator, Front End Loader Operator, less than 1-1/2 CY., Mobile Cement Mixer, Power Actuated Auger & Horizontal Boring Machine Operator up to and including 5", Roller, on other than Hot Mix Asphalt Paving, Oilers, Vibrating Packer Operator (Pad Type) Self-propelled, Water Spraying Equipment-Self Propelled, Skidsteer Operator with Attachments.
GROUP 6: Brakeman or Switchman, Curb Machine Operator (Manuel), Dredge or Tugboat Deckhand, Drill Truck Gravel/Testing Operator, Form Trench Digger (Power), Gunite Operator Gunall, Paint Machine Striping Operator, Pick-up Sweeper, 1CY. & over Hopper Capacity, Scissor Jack-Self Propelled Platform Lift, Straw Mulcher and Blower, Stump Chipper Operator, Tractor Pulling Compaction or Aerating Equipment, Trenching Machine Operator- up to and including 45 HP., Assistant/Apprentice Operator.
TEAM0638-002 10/01/2014
Rates Fringes
TRUCK DRIVER
Euclid over 20 yds..........$ 27.62 11.20 Single Axle Trucks..........$ 25.67 11.20 Tandem Tri Axle Semi, Low Boy and Off Road Heavy Duty End Dumps 20 yds & under.......................$ 26.10 11.20 Tandem Tri/ Axle Truck......$ 25.79 11.20
SUND2002-001 09/06/2013
NFSR 863 ERFO Road Repair
Rates Fringes
Electrician Cass County.................$ 14.72 3.40
CARPENTER........................$ 26.40 4.90
Cement Mason/Finisher............$ 26.40 4.90
Laborers:
GROUP 1:....................$ 18.80 1.00
GROUP 2.....................$ 19.05 1.00
GROUP 3.....................$ 19.20 1.00
GROUP 4.....................$ 19.95 1.00
LABORERS CLASSIFICATIONS
GROUP 1: General Construction Laborers: Sack Shaker (cement and mineral filler): Pipe Handler: Drill Runner Tender:
Salamander Heater and Blower Tender, Light truck, Pickup Driver, Flaggers and Pilot Car Drivers.
GROUP 2: Semi Skilled Laborer: Bulk Cement Handler: Conduit Layer, Telephone or Electrical: Form Setter (pavement): Gas Electric or pneumatic tool operator: Chipping Hammer, Grinders and Paving Brakers (tamper-drit) Concrete Vibrator Operator: Chain Saw Operator: Concrete Saw Operator:
Concrete Curing Man (not water): Bituminous worker (Shoveler, Dumper, Raker and Floated): Kettleman (bituminous or lead): Concrete Bucket Signlman: Power Buggy Operator: Brick and Mason Tender: Multiplate Pipelayer:
Culvert Pipe Layers: Carpenters Tenders.
GROUP 3: Caisson Worker: Bottom Man (sanitary sewer, storm sewer water and gas liners): Concrete Mixer Operator (one bag capacity): Mortar Mixer.
GROUP 4: Pipe Layers (sanitary sewer, storm sewer, water and gas lines): Drill runner (includes Wagon Churn or Air Track) Powderman, Gunite and Sandblast, Nozzleman, Reinforcing Steel Setters/Tiers, Concrete Finishers Tender.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
NFSR 863 ERFO Road Repair
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .