Attachment3_General Decision Number.pdf

PDF 123 KB Posted

Attached to
DAKOTA PRAIRIE GRASSLANDS -Burning Coal Vein Campground Aggregate Removal and Replacement
Solicitation number
AG-87BJ-S-10-0019
Issued by

About this file

Attachment 3 - Wage Determination

View the file

Other files

File Type Posted
COVER_SHEET.pdf PDF
Attachment1_ SPS_sps.pdf PDF
AG_87BJ_S_10_0019_CONST_RFQ.pdf PDF
Attachment2_BCV Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3 AG-87BJ-S-10-0019 Burning Coal Vein Campground Aggregate Removal and Replacement

General Decision Number: ND100002 07/23/2010 ND2

Superseded General Decision Number: ND20080002

State: North Dakota

Construction Type: Highway

Counties: North Dakota Statewide.

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date

0 03/12/2010

1 04/02/2010

2 05/07/2010

3 05/28/2010

4 06/04/2010

5 07/23/2010

ELEC0714-002 07/01/2009

ADAMS, BILLINGS, BOTTINEAU, BOWMAN, BURKE, BURLIEGH, DIVIDE,

DUNN, EMMONS, GOLDEN VALLEY, GRANT, HETTINGER, MCHENRY,

MCKENZIE, MCLEAN, MERCER, MORTON, MOUNTRIAL, OLIVER, PIERCE,

RENVILLE, ROLLETTE, SHERIDAN, SOIUX, SLOPE, STARK, WARD, &

WILLIAMS COUNTIES:

Rates Fringes

ELECTRICIAN

CABLE SPLICER...............$ 34.46 11.66

ELECTRICIAN.................$ 34.06 11.61

ELEC0714-003 10/01/2009

LINE CONSTRUCTION:

Line Construction

CABLE SPLICER...............$ 31.16 29.5%+4.75

GROUNDMAN...................$ 18.70 29.5%+4.75

LINE EQUIPMENT OPERATOR.....$ 28.04 29.5%+4.75

LINEMAN.....................$ 31.16 29.5%+4.75

ELEC1426-002 06/01/2009

BARNES, BENSON, CAVALIER, DICKEY, EDDY, FOSTER, GRAND FORKS,

GRIGGS, KIDDER, LAMOURE, LOGAN, MCINTOSH, NELSON, PEMBINA,

RAMSEY, RANSOM, RICHLAND, SARGENT, STEELE, STUTSMAN, TOWNER,

TRAILL, WALSH, & WELLS COUNTIES:

ELECTRICIAN

CABLE SPLICER...............$ 26.00 7.46+12%

ELECTRICIAN.................$ 24.76 7.46+12%

ENGI0049-001 10/01/2009

Power equipment operators:

GROUP 1.....................$ 22.15 12.45

GROUP 2.....................$ 21.25 12.45

GROUP 3.....................$ 21.00 12.45

GROUP 4.....................$ 20.85 12.45

GROUP 5.....................$ 20.00 12.45

GROUP 6.....................$ 18.70 12.45

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: All Cranes 60 tons and over, Cranes doing piling, sheeting, dragline/clam work, Derrick(Guy & Stiff), Gentry

Crane Operator, Helicopter Operator, Mole Operator or

Tunnel Mucking Machine, Power Shovel 3-1/2 CY. and over and

Traveling Tower Crane.

GROUP 2: All Cranes 21 tons and up to 59 tons, Backhoe

Operator 3 CY. and over, Creter Crane, Dredge Operator 12' and Over, Equipment Dispatcher, Finish Motor Grader, Front

End Loader Operator 8 CY. and over, Master Mechanic (When supervising 5 or more Mechanics), Mon-o-rail Hoist

Operator, Power Shovel up to and including 3-1/2 CY. and

Tugboat.

GROUP 3: Cranes 20 tons and under, Asphalt Paving Machine

Operator, Asphalt Plant Operator, Automated Grade Trimmer, Backhoe Operator 1 CY. up to and including 2-1/2 CY., Boom

Truck Hydraulic (8 Tons & over), Cableway Operator, Concrete Batch Plant Operator(electronic or manual), Concrete Mixer Paving Machine Operator, Concrete Paver-

Bridge Decks, Concrete Pump, Concrete Spreader Operator &

Belt Placer, Crushing Plant Operator, Dozer Operator, Dredge Operator or Engineer 11'' and under, Drill Rigs, Heavy Duty Rotary or Chum or Cable Drill, Front End Loader

(3-1/2 CY. up to and including 7-1/2 CY.), Gravel Washing &

Screening Plant Operator, Locomotive, all types, Mechanic or Welder(heavy duty), Motor Grade Operator, Pavement

Breaker (Non-Hydro Hammer type, Pipeline Wrapping, Cleaning

& Bending Machine Operator, Power Actuated Auger and

Horizontal Boring Machine Operator 6'' and over, Refrigeration Plant Engineer, Roto Milling Machine (Surface

Planer) 43'' & over, Scraper Operator, Slip Form Concrete

Paving Operator, Tandem Pushed Quad 9 or similar, Tractor with Boom Attachment, Trenching Machine- 100 HP. and over.

GROUP 4: Articulated/Off Road Hauler, Asphalt Dump Person, Asphalt Paving Screed Operator, Backhoe - up to and including 1/2 CY., Console Board Operator, Distributor

Operator (Bituminous), Forklift Operator, Front End Loader-

1-1/2 CY. up to and including 3 CY., Grade Person, Gravel

Screening Plant Operator (not Crushing or Washing), Greaser, Lazer-Screed Operator, Longitudinal Float and

Spray Operator, Motor Grade Operator-Hual Roads, Paving

Breaker- Hydro Hammer Type, Pugmill Operator, Push Tractor, Roller, Steel & Rubber on Hot Mix Asphalt Paving, Rotomill

Machine (Surface Planer), up to and including 42'', Sand and Chip Spreader, Self-propelled Sheepsfoot Packer with or without Blade attachment, Self-propelled Traveling Soil

Stabilizer, Sheepsfoot Packer with Dozer attatchment- 100

HP and over, Shouldering Machine, Slip Form, Curb & Gutter

Operator,Tamping Machine Operator, Tie Tamper and Ballast

Machine, Trenching Machine Operator- 46 HP up to and including 99 HP, Truck Mechanic, Well Points, Tub Grinder.

GROUP 5: Boom Truck- A- Frame or Hydraulic 2 tons up to and including 7 tons, Broom-Self propelled, Concrete Saw (Power

Operated), Front End Loader Operator, less than 1-1/2 CY., Mobile Cement Mixer, Power Actuated Auger & Horizontal

Boring Machine Operator up to and including 5", Roller, on other than Hot Mix Asphalt Paving, Oilers, Vibrating Packer

Operator (Pad Type) Self-propelled, Water Spraying

Equipment-Self Propelled.

GROUP 6: Brakeman or Switchman, Curb Machine Operator

(Manuel), Dredge or Tugboat Deckhand, Drill Truck

Gravel/Testing Operator, Form Trench Digger (Power), Gunite

Operator Gunall, Paint Machine Striping Operator, Pick-up

Sweeper, 1CY. & over Hopper Capacity, Scissor Jack-Self

Propelled Platform Lift, Straw Mulcher and Blower, Stump

Chipper Operator, Tractor Pulling Compaction or Aerating

Equipment, Trenching Machine Operator- up to and including

45 HP.

SUND2002-001 09/02/2009

Electrician

Cass County.................$ 14.72 3.40

CARPENTER........................$ 22.50 3.65

Cement Mason/Finisher............$ 22.50 3.65

Laborers:

GROUP 1:....................$ 15.40

GROUP 2.....................$ 15.65

GROUP 3.....................$ 15.80

GROUP 4.....................$ 16.55

LABORERS CLASSIFICATIONS

GROUP 1: General Construction Laborers: Sack Shaker (cement and mineral filler): Pipe Handler: Drill Runner Tender:

Salamander Heater and Blower Tender, Light truck, Pickup

Driver, Flaggers and Pilot Car Drivers.

GROUP 2: Semi Skilled Laborer: Bulk Cement Handler: Conduit

Layer, Telephone or Electrical: Form Setter (pavement): Gas

Electric or pneumatic tool operator: Chipping Hammer, Grinders and Paving Brakers (tamper-drit) Concrete Vibrator

Operator: Chain Saw Operator: Concrete Saw Operator:

Concrete Curing Man (not water): Bituminous worker

(Shoveler, Dumper, Raker and Floated): Kettleman

(bituminous or lead): Concrete Bucket Signlman: Power Buggy

Operator: Brick and Mason Tender: Multiplate Pipelayer:

Culvert Pipe Layers: Concrete Finishers Tender. Carpenters

Tenders.

GROUP 3: Caisson Worker: Bottom Man (sanitary sewer, storm sewer water and gas liners): Concrete Mixer Operator (one bag capacity): Mortar Mixer.

GROUP 4: Pipe Layers (sanitary sewer, storm sewer, water and gas lines): Drill runner (includes Wagon Churn or Air

Track) Powderman, Gunite and Sandblast, Nozzleman, Reinforcing Steel Setters/Tiers.

TEAM0638-002 10/01/2009

TRUCK DRIVER

Euclid over 20 yds..........$ 22.22 9.45

Single Axle Trucks..........$ 21.02 9.45

Tandem Tri Axle Semi, Low

Boy and Off Road Heavy

Duty End Dunmps 20 yds & under.......................$ 21.45 9.45

Tandem Tri Axle Trucks......$ 21.14 9.45

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .