REGION 4 UTAH ACQUISTION SUPPORT CENTER INSTRUCTIONAL COVER SHEET

ISSUING OFFICE:

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

UTAH ACQUISITION SUPPORT CENTER

2222 WEST 2300 SOUTH

SALT LAKE CITY, UT 84119

FAX (801) 975-3483

SOLICITATION NO. AG-84N8-S-14-0166

PROPOSALS ARE SOLICITED FOR: MIDDLE FORK BLACK FORKS AGGREGATE CRUSHING

IMPORTANT – NOTICE TO OFFEROR:

OFFEROR SHALL SUBMIT THE FOLLOWING DOCUMENTS WITH THEIR RESPONSE TO THIS SOLICITATION:

1. SF 1442 (Complete, date, and sign)

2. Schedule of Items (Attachment 01)

3. Section K (Pages 51-62)

4. Delinquent Tax and Criminal Activity Certification (Attachment 05)

5. Subcontractor Reporting Form (Attachment 04)

6. Original plus 2 copies of technical proposal that identifies the criteria to be evaluated as noted in Section M.

IT IS REQUIRED YOU WRITE THE SOLICITATION NUMBER ON THE OUTSIDE OF YOUR ENVELOPE. FAXED

PROPOSALS WILL NOT BE ACCEPTED.

Return to:

Shawn Atkinson, Contracting Officer

Utah Acquisition Support Center

2222 West 2300 South

Salt Lake City, UT 84119

Solicitation Number: AG-84N8-S-14-0166

IT IS REQUIRED THAT ALL CONTRACTOR’S BE REGISTERED IN THE SYSTEM FOR AWARD MANAGEMENT

DATABASE (WWW.SAM.GOV) PRIOR TO AWARD UNDER THIS SOLICITATION. SEE CLAUSE 52.204-7 SYSTEM FOR

AWARD MANAGEMENT FOR DETAILS ON HOW TO APPLY.

http://www.sam.gov/

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-84N8-S-14-0166

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

Oct 8th, 2014

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

7. ISSUED BY CODE 8. ADDRESS OFFER TO

UTAH ACQUISITION SUPPORT CENTER

2222 WEST 2300 SOUTH

SALT LAKE CITY, UTAH 84119

UTAH ACQUISITION SUPPORT CENTER

ATTN: Shawn Atkinson

2222 WEST 2300 SOUTH

SALT LAKE CITY, UTAH 84119

9. FOR INFORMATION

CALL:

A. NAME

Shawn Atkinson

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

801-975-3445

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

See below and attachments

In accordance with FAR 36.204, the estimated magnitude of this requirement is between $250,000 and $500,000.

A mandatory organized site visit has been scheduled for Thursday, October 16 th , 2014 at 11:00 am MDT. Participants will meet at the project site, which is located on the Middle Fork of the Blacks Fork Road, NFSR #80064, approximately ¼ mile southeast of the North Slope road, NFSR #80058, along East Fork Blacks Fork Road, NFSR #80065. Map location is approximately 35 miles southwest of Mountain View, Wyoming or 48 miles southeast of Evanston, Wyoming. Latitude and Longitude of the pit location is approximately 400 56’ 38.4”N, and 1100 34’ 46.6”W.

Proposals will only be accepted from offerors that attend the scheduled site visit.

11. The Contractor shall begin performance within TBD calendar days and complete it within 45 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable.

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?(If

“YES,” indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

Ten (10)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offer to perform the work required are due at the place specified in Item 8 by 3:00 pm local time November 10th, 2014. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Computer Generated Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

AG-84N8-S-14-0166

Middle Fork Black Forks Aggregate Crushing

Computer Generated STANDARD FORM 1442 BACK

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the

Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D.

Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO

SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

AG-84N8-S-14-0166

PART 1 – THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEM

See Attachment 01 – Schedule of Items

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 Scope of Contract

AGGREGATE CRUSHING PROJECT 2014: Middle Fork Blacks Fork Gravel Pit. This project is for minor pit development, crushing, stockpiling of road surfacing material and pit reclamation. This pit was used in 2007 as a source of material for aggregate crushing. This project is estimated to be completed by the end of field season in 2015.

C.2 Project Description

Middle Fork Blacks Fork Gravel Pit. This project is for minor pit development, crushing and stockpiling of surfacing aggregate material, pit development and stabilization.

The material for this project shall be produced by deepening the excavation in the pit area. Any small trees that exist in the proposed excavation area shall be piled on site at an approved location.

This project has been allocated for one mobilization. If the project exceeds the contract time and is delayed into the next season, the contractor will assume responsibility for unforeseen mobilization to the site. These costs are not including any cost for Contract Administration due to the delay of the project.

All finished slopes shall be 3:1 (H:V). The bottom of the excavation that is not used for floor of stockpile shall be scarified and sloped to drain out of the pit.

C.3 Project Location

The Middle Fork Blacks Fork pit is located on the Middle Fork of the Blacks Fork Road, NFSR

#80064, approximately ¼ mile southeast of the North Slope road, NFSR #80058, along East

Fork Blacks Fork Road, NFSR #80065. Map location is approximately 35 miles southwest of

Mountain View, Wyoming or 48 miles southeast of Evanston, Wyoming. Latitude and Longitude of the pit location is approximately 40 56’ 38.4”N, and 110

34’ 46.6”W.

C.4 Pit Development

All finished pit side slopes shall be 3:1 (H:V). The bottom of the excavation that is not used for the floor of the stockpile shall be scarified and sloped to drain.

AG-84N8-S-14-0166

All work required under this contract, and not identified as a work item under the Schedule of

Items, is considered incidental to work listed in the Schedule of Items and no separate payment will be made.

C.5 Contract Time

45 Calendar Days from Notice to Proceed (NTP)

C.6 Contract Specifications

Include listing of Special Project Specifications or CSI Specifications.

Table of Contents

Standard Specifications for Construction of Roads and Bridges on Federal Highway

Projects, FP-03

Section 151-Mobilization

Section 320-Stockpiled Aggregates

Section 651- Development of Pits and Quarries

Forest Service Supplemental Specifications to Standard Specifications for Construction of

Roads and Bridges on Federal Highway Projects, FP-03

Preface

Section 101- Terms, Format and Definitions

Section 102- Bid, Award and Execution of Contract

Section 103- Scope of Work

Section 104- Control of Work

Section 105- Control of Material

Section 106- Acceptance of Work

Section 107- Legal Relations and Responsibility to the Public

Section 108- Prosecution and Progress

Section 109- Measurement and Payment

Section 153- Contractor Quality Control

Section 155- Schedules for Construction Contracts

Section 156-Public Traffic

Section 703-Aggregate

SPECIAL PROJECT SPECIFICATIONS

Section 301- Untreated Aggregate Courses

Section 320- Stockpiled Aggregates

Section 651- Development of Pits and Quarries

Table of Contents

Table of Contents

Preface

101 - Terms, Format, and Definitions

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid, Award, and Execution of Contract

102 Bid, Award, and Execution of Contract

103 - Scope of Work

Deletions

104 - Control of Work

Deletions

104.06 Use of Roads by Contractor

105 - Control of Material

105.02 Material Sources

105.02(a) Government-provided sources

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.07 Delete

107 - Legal Relations and Responsibility to the Public

107.05 Responsibility for Damage Claims

107.06 Contractor’s Responsibility for Work

107.09 Legal Relationship of the Parties

107.10 Environmental Protection

108 - Prosecution and Progress

108 Delete

109 - Measurement and Payment

109 Deletions

109.02 Measurement Terms and Definitions

AG-84N8-S-14-0166

155 - Schedules for Construction Contracts

155 Delete

301 - Untreated Aggregate Courses

Table 301-1

301.08 (b)

320 - Stockpiled Aggregates

320.01

320.02

651 - Development of Pits & Quarries

703 - Aggregate

Table 703-3. Gradation TV ranges for surface courses

Table 703-3. Gradation ranges for Size Ratio surface courses

Add Table 703-16:

718 - Traffic Signing and Marking Material

718.05 Aluminum Panels

SPECIAL PROJECT SPECIFICATIONS

301 - Untreated Aggregate Courses

Table 301-1

301.08 (b)

320 - Stockpiled Aggregates

651 - Development of Pits & Quarries

Preface

Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of

National Forest System Roads.

101 - Terms, Format, and Definitions

101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association

Mine Safety and Health Administration

National Institute of Standards and Technology

National Electrical Safety Code

West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

AG-84N8-S-14-0166

Middle Fork Black Forks Aggregate Crushing http://www.nist.gov/

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition

Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or

“design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96

Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the

Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36

CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work

103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work

104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material

105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

Exact time and location of spill including a description of the area involved.

Containment procedures.

Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

AG-84N8-S-14-0166

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress

108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment

109.00_nat_us_02_17_2005

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

155 - Schedules for Construction Contracts

155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

301 - Untreated Aggregate Courses

301.08_0114_us_08_04_2005

Table 301-1

Delete “From windrow or roadbed after processing” from row titled “Surface course aggregate” and “Point of Sampling” column

And add the following:

“From an approved sampling device on the crusher”

301.08_1005_us_05_20_2005

301.08 (b)

Delete 301.08 (b)

320 - Stockpiled Aggregates

320.00_nat_us_12_19_2008

Description

320.01 This work consists of furnishing and placing aggregate in a stockpile at an existing site or constructing a new site and placing the aggregate at the new site.

Material

320.02 Conform to the following Section:

Aggregate 703

Provide the gradation and quality requirements specified in the Section identified in the pay item.

Construction Requirements

320.03 Stockpile Site. Prepare existing sites as necessary to accommodate the quantity of aggregate to be stockpiled.

For new sites, clear and grub according to Section 201. Grade and shape the site to a uniform cross-section that drains. Compact the floor of the site with at least three passes using compaction equipment conforming to Subsection 204.11. Place, compact, and maintain a minimum 6 inches of crushed aggregate over the stockpile site and access roads. Prevent contamination of the stockpiles.

320.04 Stockpile. After a representative quantity of aggregate is produced, submit proposed target values for the appropriate sieve sizes along with a representative 350-pound sample.

Set target values within the gradation ranges shown in Table 703-2 or 703-3 for the required grading.

Request site approval before stockpiling aggregates. Make the stockpiles neat and regular in shape. Make the side slopes no flatter than 1:1.5.

Build the stockpiles in layers not exceeding 3 feet thick. Complete each layer before depositing aggregates in the next layer. Do not allow aggregates from the one layer to run down over lower

AG-84N8-S-14-0166

layers of the stockpile. Do not drop aggregates from a bucket or spout in one location to form a cone-shaped pile.

Construct stockpile layers by spreading aggregates with trucks or other approved pneumatic-tired equipment. Do not push aggregates into piles.

When operating trucks on stockpiles, avoid tracking dirt or other deleterious material onto the stockpiled material.

Space stockpiles far enough apart or separate stockpiles by suitable walls or partitions to prevent the mixing of the different aggregate gradations.

320.05 Acceptance. Aggregate for stockpiling will be evaluated under Subsection 301.08 and

Table 301-1. The point of sampling will be the belt or stockpile.

Preparation of stockpile sites and construction of stockpiles will be evaluated under Subsections

106.02 and 106.04.

Clearing will be evaluated under Section 201.

Measurement

320.06 Measure the 320 items listed in the bid schedule according to subsection 109.02.

Payment

320.07 The accepted quantities, measured as provided in subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 320 pay items listed in the bid schedule except the stockpiled aggregate.

651 - Development of Pits & Quarries

651.00_nat_us_03_02_2005

Description

651.01 This work consists of clearing, grubbing, stripping topsoil, removing overburden, constructing access roads, conducting restoration activities, and performing other incidental work required for pit or quarry development.

651.02 General. Submit a plan of operations according to Section 105. Perform all work in accordance with Sections 105, 201, 203, 204, 625, and 635, landscape preservation requirements, and the approved pit and quarry development plan of operations. Perform the work in accordance with MSHA 30 CFR, part 56.

651.03 Acceptance. Developing pits and quarries will be evaluated under Subsections 106.02 and 106.04.

Measurement

651.04 Measure the Section 651 items listed in the bid schedule according to Subsection 109.02.

Payment

651.05 The accepted quantities will be paid at the contract price per unit of measurement for the

Section 651 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

AG-84N8-S-14-0166

703 - Aggregate

703.20_01_us_10_12_2006

Replace Table 703-3 with the following:

Table 703-3. Gradation TV ranges for surface courses.

% by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation

Sieve Size F G H S T U

1 ½ in. 100 100

1 in. 97-100 100 72-92 (6) 100

¾ in. 76-89 (6) 97-100 97-100 - - 100

½ in. - - - - 71-91 (6) -

3/8 in. 56-68 (6) 70-80 (6) 80-92 (6) 51-71 (6) - 71-90 (6)

No. 4 43-53 (7) 51-63 (7) 58-70 (7) 36-53 (7) 43-60 (7) 50-68 (7)

No. 8 - - - 26-40 (6) 30-46 (6) 34-51 (6)

No. 16 23-32 (6) 28-39 (6) 28-40 (6) - - -

No. 30 15-23 (5) 19-27 (5) 16-26 (5) - - -

No. 40 - - - 14-25 (5) 16-28 (5) 19-30 (5)

No. 200 10-16 (4) 10-16 (4) 9 14 (4) 8-15 (4) 8-15 (4) 8-15 (4)

Note: Allowable deviations (±) from TV are shown in parentheses. If the plasticity index (PI) is greater than 0, the TV range for the No. 200 sieve size is 6-12 (4).

Table 703-3. Gradation ranges for Size Ratio surface courses.

% by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation

Sieve Grading Grading Grading Grading

Size F-SR F-SR with

Bentonite

G-SR G-SR with

Bentonite

1 ½ in. 100 100

1 in. 97-100 97-100 100 100

¾ in. 70 - 98 70 - 98 97-100 97-100

½ in. 58 - 88 58 - 88 70 - 98 70 - 98

No. 4 36 - 60 36 - 60 44 - 70 44 - 70

No. 16 25 - 47 25 - 47 30-54 30-54

No. 30 12 - 31 12 - 31 15 - 34 15 - 34

No. 200 8 –20 (a) 6 - 15 8 – 20 (a) 6 - 15

Note: SR and PI are abbreviations for Size Ratio and Plasticity Index.

(a) If the minus No. 40 material in finished product has a PI greater than 0, the percent pass No. 200 range is 6 to 15%.

The gradation shall closely parallel the specification gradation curves. Percent passing ½ inch, No. 4, and No. 30 sieves shall all be in either the upper, middle, or lower portion of the specification band. Size ratios, as defined below, shall be determined for each sieve analysis test. The maximum difference between the ½ inch and No. 4 size ratio, the No 4 and No. 30 size ratio, and the ½ inch and No. 30 size ratio, shall not exceed 0.50.

½ inch size ratio = (Test % Pass ½ inch) - (Min % Pass 1/2 inch)

(Max % Pass 1/2 inch) - (Min % Pass 1/2 inch)

No.4 size ratio = (Test % Pass No.4) - (Min % Pass No.4)

(Max % Pass No.4) - (Min % Pass No.4)

No.30 size ratio = (Test % Pass No.30) - (Min % Pass No.30)

(Max % Pass No.30) - (Min % Pass No.30)

Add Table 703-16:

Table 703-16

Gradation Requirements for Screened Aggregate

Sieve Size

Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation

L M N O P Q R

6 inch 100 100

4 inch 100 100

3 inch 100 100

2 inch 100

No. 4 15-45 15-45 15-45

718 - Traffic Signing and Marking Material

718.05_nat_us_08_05_2009

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.

SPECIAL PROJECT SPECIFICATIONS

Middle Fork Blacks Fork Crushing

SPECIAL PROJECT SPECIFICATION

301 - Untreated Aggregate Courses

301.08_0114_us_08_04_2005

Table 301-1

Delete “From windrow or roadbed after processing” from row titled “Surface course aggregate” and “Point of Sampling” column

And add the following:

“From an approved sampling device on the crusher”; AASHTO T 2-91, ASTM D 75-87.

301.08_1005_us_05_20_2005

301.08 (b)

Delete 301.08 (b)

320 - Stockpiled Aggregates

320.03 Stockpile Site. Prepare existing sites as necessary to accommodate the quantity of aggregate to be stockpiled.

For new sites, clear and grub according to Section 201. Grade and shape the site to a uniform cross-section that drains.

Place, compact, and maintain a minimum 6 inches of crushed aggregate over the stockpile site and access roads. Prevent contamination of the stockpiles.

651 - Development of Pits & Quarries

651.02 General. Delete this paragraph and add the following:

Perform all work In accordance with sections 105, 201, 203, 204, 635. The material for the McKenzie Creek project shall come from deepening the existing excavation in the disturbed area. See drawings, Sheet 4. Small trees exist in the proposed excavation area.

They shall be piled on site at an approved location. The excavation floor/stockpile floor shall slope to the north east corner. All finished slopes shall be 3:1 (H:V). The bottom of the excavation that is not used for floor of stockpile shall be scarified.

Perform the work in accordance with MSHA 30 CFR, part 56

Meet clearing, grubbing, and slash cleanup requirements as specified in Section 201.

SECTION D - Packaging and Marking

{For this Solicitation, there are NO clauses for this Section}

SECTION E – INSEPCTION AND ACCEPTANCE

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

SECTION F – DELIVERIES OR PERFORMANCE

52.242-14 Suspension of Work (APR 1984)

52.242-17 Government Delay (APR 1984)

52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within seven (7) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 45 days after receipt of Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

PERIOD OF PERFORMANCE (AGAR 452.211-74) (FEB 1988)

The period of performance of this contract is TBD (one year from date of award). Completion time is 180 days after receipt of Notice to Proceed.

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 CONTRACTING OFFICE

The Utah Acquisition Support Center of the United States Forest Service, Department of Agriculture is responsible for this solicitation, award and administration of the contract. All written correspondence shall reference the contract number and/or solicitation number. Communications shall be directed to:

Utah Acquisition Support Center

Shawn Atkinson, Contracting Officer

2222 West 2300 South, 2nd Floor

Salt Lake City, UT 84119

G.2 CONTRACTING OFFICER’S REPRESENTATIVE

This contract will have a Contracting Officer’s Representative (COR) designated by appointment letter.

G.3 SUBCONTRACTS

Before entering into a subcontract covering any part of the work called for, the Contractor shall inform the Contracting Officer and submit information required by the Contracting Officer.

G.4 INVOICES

Submission of Invoices

1. Invoice Processing Platform (IPP)

The Contractor shall utilize the Invoice Processing Platform (IPP) for the electronic submission and tracking of purchase orders, invoices, and payment information. IPP is a secure Governmentwide, Web-based invoice processing service offered free of charge to Government Agencies and their suppliers.

A one-time enrollment in IPP will generate a series of emails that will be sent to the point of contact established in your SAM.gov account. The first email will be from “IPP User Administration” and will contain the IPP login ID and link to the IPP Website. A second email from “Treasure UPS User

Administration” containing the password will be sent within 24 hours. Once both emails are received, the Contractor will login to the IPP application and complete the registration process. After login, you will be able to access IPP training information.

IPP System benefits include the ability to create invoices directly from a contract award and submit them electronically, as well as:

Email notification when invoice(s) are paid

Online payment history

Email notification when you are awarded a new contract

The email notification of payment is sent when a payment is distributed to your bank account and will include all pertinent payment information. For additional information, please visit the www.ipp.gov website to learn more. The IPP Customer Support Desk is available to assist users Monday through

AG-84N8-S-14-0166

Middle Fork Black Forks Aggregate Crushing http://www.ipp.gov/

Friday (excluding Federal holidays) from 8 a.m. to 6 p.m. ET, to answer questions related to accessing

IPP or completing the registration process. Their toll-free number is 1-866-973.3131 or they can be reached at IPPCustomerSupport@fms.treas.gov.

2. Proper Invoice

When accessing the IPP system, Contractors will be required to provide information necessary for the creation of a proper invoice. A proper invoice shall contain, at a minimum, the following information:

Name and address of the contractor

Invoice date and invoice number

Contract number or other authorization for supplies delivered or services performed

Description, quantity, unit of measure, unit price and extended price of supplies delivered or services performed

Shipping and payment terms

Name and address of contractor office to whom payment is to be sent

Name, title, phone number, and mailing address of person to notify in the event of a defective invoice

Taxpayer Identification Number if required by agency

Electronic funds transfer banking information (only if required by agency)

G.5 POST AWARD CONFERENCE (AGAR 452.215-73) (NOV 1996)

A post award conference with the successful offeror(s) is required. It will be scheduled within seven

(7) days after the date of contract award. The conference will be held at a location to be determined.

G.6 PERFORMANCE AND PAYMENT BONDS

In accordance with FAR 52.228-15, Performance and Payment Bonds- Construction, performance and/or payment bonds are required for this contract.

mailto:IPPCustomerSupport@fms.treas.gov

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 KEY PERSONNEL

The Contractor shall assign to this contract a: Project Manager and Site Superintendent or Contractor

Representative.

In addition, the key personnel specified in the Offeror’s Technical Proposal are considered to be essential to the work being performed hereunder. Prior to diverting any of the specified individuals to other programs, the

Contractor shall notify the Contracting Officer reasonably in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the contract. No diversion shall be made by the Contractor without the written consent of the Contracting Officer: Provided that the Contracting

Officer may ratify in writing such diversion and such ratification shall constitute the consent of the Contracting

Officer required by this clause. The contract may be amended from time to time during the course of the contract to either add or delete personnel, as appropriate.

H.2 WAGE DETERMINATION

The wage determination applicable to this contract resulting from this solicitation is determined by the location of the Contractor’s establishment. See Section J, Attachment 03, Wage Determination.

H.3 FIRE PRECAUTIONS

This plan outlines the channels of responsibility for fire prevention and suppression activities and sets up an attack procedure in the event of fire within the Project Area. The Project Area is defined as that area which is in and adjacent to the project rights-of-way and work areas and all roads used in connection with the work.

I. RESPONSIBILITIES

A. Contractor

Fire Suppression

1. It is understood and agreed that the Contractor will do all in his power to prevent and suppress fires on or adjacent to the Project Area, as stipulated in the contract.

2. Is responsible for and will direct all fires activities on the project until relieved by a Forest

Officer and will insure that prevention and suppression action are in accordance with contract requirements, including this fire plan. He will delegate the next higher in authority on the job to be responsible for the above activities when he is not on the project.

3. In line with this agreement, men will be supplied from the Contractor's crew to fight fires on the project area up to the total number of men employed by the Contractor as they are needed by the Fire

Boss. The Forest Service will make every effort to avoid calling on the Contractor for action on fires outside the Contract project area except in emergencies and will call out all needed available help to control fires in the general area.

AG-84N8-S-14-0166

4. The Contractor issures that this Fire Plan will be complied with by him and his employees for the duration of the contract.

B. Forest Service District Ranger

1. Is responsible for all fire activities on the Ranger District on which the contract project is located. He or his representative will discuss the fire plan with the Contractor and will discuss with him the equipment and manpower action to be taken when a fire occurs. He will notify the Contractor through the Contracting Officer's Representative (COR) to take correction measures when fire requirements are not complied with.

II. CONTRACTOR'S RESPONSIBILITY WHEN A FIRE OCCURS WITHIN THE CONTRACT

PROJECT AREA

A. He will immediately send the entire contract crew with tools and equipment to the fire and take initial-attack suppression action.

B. Immediately notify the nearest Forest Service Fire Control Officer or other Forest Service employee of fire location and action taken.

C. Designate a man to act as dispatcher who will handle messages and initiate action upon request until relieved.

III. CONTRACTOR FURNISHED MANPOWER, TOOLS, AND EQUIPMENT REQUIRED ON ALL

CONTRACTS (PROJECTS) DURING FIRE SEASON

A. The Contractor shall furnish to the COR a list of manpower and equipment used on the contract on forms furnished by the Forest Service. Changes in Contractor's personnel shall be reflected in amendment to the list.

Fire Prevention

Smoking. Will be prohibited in the woods during the fire season, May 10 through October 20, except in areas agreed upon by the Contractor and Contracting Officer's Representative. No smoking is permitted while walking or working in the woods.

Refueling Chainsaw/Soil Auger. Refueling will be confined to a six-foot diameter cleared to mineral earth. Chainsaws/soil auger sparks arrester shall be U.S. Forest Service approved, and will be cleaned daily. A size "0" or larger round-pointed shovel with a minimum of a 38-1/2" handle and a fire extinguisher shall be within 10 feet of actual point of chainsaw/soil auger operation.

Burning, Blasting, or Welding. Permit will be required and will contain special stipulations pertinent to the particular job.

Spark Arresters. All internal combustion power equipment used by the Contractor on the project shall be equipped with an approved spark arrester as set forth in the publication of the USDA Forest Service, entitled "Standard 5100-1a for Spark Arresters for Internal Combustion Engines" as amended under date of July 1970, and be listed in the most recent "Spark Arrester Guide" as having been approved as meeting above standard. They shall be cleaned regularly and maintained in satisfactory working condition. The following are exempt from the requirements of the rule:

AG-84N8-S-14-0166

(a) Turbo-charged internal combustion engines in which 100 percent of the exhaust gasses pass through a turbo-charged;

(b) Engines of passenger carrying vehicles and light trucks equipped with a muffler with baffles that are kept in good repair (glass packs are not an approved muffler for wildland work);

(c) Water pumping equipment used in firefighting.

Spark arresters must comply with all State and Federal fire requirements.

Lunch and Warming Fires. Cooking and warming fires will not normally be permitted and then only by written permit by the COR which contain stipulations regulating use of such fires.

Hand Tools. The Contractor shall furnish one size "0" shovel (38-1/2" handle minimum) or larger, one axe, or pulaski with 26" handle or larger, and one 5 BC or larger rated pressurized fire extinguisher for each truck, each personal vehicle, each tractor, and each grader. For each welder he shall furnish one size

"0" shovel and one backpump pump. For each gasoline power tools (power saw, soil auger, etc.), one shovel (38-1/2" handle minimum) and one 8-ounce or larger BC rated chemical-pressurized fire extinguisher.

Contractor shall also furnish any other equipment called for elsewhere in the contract. The shovel and fire extinguisher will be located within 10 feet of the operating chainsaw/power auger.

Storage and Parking Areas. Equipment service area, parking area, and gas and oil drum storage areas will be cleared of all flammable material for a radius of at least fifty feet. These areas must be approved in writing by the Contracting Officer's Representative in advance of use. Small stationary engine sites shall be cleared of flammable material for a radius of at least fifteen feet from such engine.

Fire Tool Box. A red fire tool box will be required to be on each work site while work is being performed. This fire tool box will contain sufficient tools to equip all persons engaged in Contractor's operation. Fire tools shall be used only for suppressing wildfires. Tools shall be stored in fireboxes provided by the Contractor and readily available to employees. Each tool box shall be marked, "Tools for

Fire Only." The COR will inspect the fire tool box and then seal the box.

SECTION I – CONTRACT CLAUSES

52.202-1 Definitions. (Nov 2013)

52.203-2 Certificate of Independent Price Determination (APR 1985)

52.203-3 Gratuities. (APR 1984)

52.203-5 Covenant Against Contingent Fees. (APR 1984)

52.203-6 Restrictions on Subcontractor Sales to the Government. (SEP 2006)

52.203-7 Anti-Kickback Procedures. (OCT 2010)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (Jan

1997)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (JAN 1997)

52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (OCT 2010)

52.203-14 Display of Hotline Poster(s) (DEC 2007)

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. (May 2011)

52.204-7 System for Award Management (Jul 2013)

52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (AUG 2012)

52.204-13 Central Contractor Registration Maintenance (DEC 2012)

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (DEC 2010)

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (MAY 2012)

52.211-18 Variation in Estimated Quantity. (APR 1984)

52.215-2 Audit and Records - Negotiation. (OCT 2010)

52.215-8 Order of Precedence – Uniform Contract Format (OCT 1997)

52.217-07 Option for Increased Quantity – Separately Priced Line Item (MAR 1989)

52.219-6 Notice of Total Small Business Set-Aside. (NOV 2011)

52.219-8 Utilization of Small Business Concerns. (JAN 2011)

52.219-9 Small Business Subcontracting Plan (JAN 2011)

52.219-14 Limitations on Subcontracting. (NOV 2011)

52.222-1 Notice to the Government of Labor Disputes (FEB 1997)

52.222-3 Convict Labor. (JUN 2003)

52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (JUL 2005)

52.222-5 Davis-Bacon Act--Secondary Site of the Work. (JUL 2005)

52.222-6 Davis-Bacon Act. (JUL 2005)

52.222-7 Withholding of Funds. (FEB 1988)

52.222-8 Payrolls and Basic Records. (JUN 2010)

52.222-9 Apprentices and Trainees. (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)

52.222-11 Subcontracts (Labor Standards). (JUL 2005)

52.222-12 Contract Termination - Debarment. (FEB 1988)

52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)

52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

52.222-15 Certification of Eligibility. (FEB 1988)

52.222-21 Prohibition of Segregated Facilities. (FEB 1999)

52.222-26 Equal Opportunity (MAR 2007)

52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)

52.222-35 Equal Opportunity for Veterans. (SEP 2010)

52.222-36 Affirmative Action for Workers with Disabilities. (OCT 2010)

52.222-37 Employment Reports on Veterans. (SEP 2010)

52.222-50 Combating Trafficking in Persons (FEB 2009)

AG-84N8-S-14-0166

52.222-54 Employment Eligibility Verification (JAN 2009)

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction

Contracts (JUL 2012)

52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011)

52.223-6 Drug-Free Workplace. (MAY 2001)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011)

52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)

52.228-2 Additional Bond Security. (OCT 1997)

52.228-5 Insurance – Work on Government Installation (JAN 1997)

52.228-11 Pledges of Assets (JAN 2012)

52.228-12 Prospective Subcontractor Requests for Bonds. (OCT 1995)

52.228-14 Irrevocable Letter of Credit. (DEC 1999)

52.228-15 Performance and Payment Bonds - Construction. (OCT 2010)

52.229-3 Federal, State, and Local Taxes. (FEB 2013)

52.232-1 Payments. (APR 1984)

52.232-5 Payments under Fixed-Price Construction Contracts. (SEP 2002)

52.232-16.a1 Progress Payments (APR 2012)

52.232-17 Interest (OCT 2010)

52.232-18 Availability of Funds. (APR 1984)

52.232-23 Assignment of Claims. (JAN 1986)

52.232-27 Prompt Payment For Construction Contracts. (OCT 2008)

52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration. (OCT 2003)

52.233-1 Disputes. (JUL 2002)

52.233-3 Protest after Award. (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)

52.236-2 Differing Site Conditions. (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)

52.236-5 Material and Workmanship. (APR 1984)

52.236-6 Superintendence by the Contractor. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.236-8 Other Contracts. (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

(APR 1984)

52.236-10 Operations and Storage Areas. (APR 1984)

52.236-11 Use and Possession Prior to Completion. (APR 1984)

52.236-12 Cleaning Up. (APR 1984)

52.236-13 Accident Prevention. (NOV 1991)

52.236-15 Schedules for Construction Contracts. (APR 1984)

52.236-16 Quantity Surveys. (APR 1984)

52.236-16 Quantity Surveys. (APR 1984) - Alternate I (APR 1984)

52.236-17 Layout of Work. (APR 1984)

52.236-21 Specifications and Drawings for Construction. (FEB 1997)

52.236-26 Preconstruction Conference. (FEB 1995)

52.237-2 Protection of Government Buildings, Equipment, and Vegetation. (APR 1984)

52.242-13 Bankruptcy. (JUL 1995)

52.243-4 Changes. (JUN 2007)

52.244-6 Subcontracts for Commercial Items (DEC 2010)

52.245-1 Government Property. (APR 2012)

52.245-9 Use and Charges (APR 2012)

52.246-21 Warranty of Construction. (MAR 1994)

52.246-21.a1 Warranty of Construction (ALT 1) (MAR 1994)

AG-84N8-S-14-0166

52.248-3 Value Engineering - Construction. (OCT 2010)

52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) - Alternate I

(SEP 1996)

52.249-10 Default (Fixed-Price Construction). (APR 1984)

52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)

52.252-2 Clauses Incorporated by Reference (Feb 1998)

52.253-1 Computer Generated Forms. (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996)

452.236-72 Use of Premises. (NOV 1996)

452.236-73 Archaeological or Historic Sites. (FEB 1988)

452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996)

452.237-75 Restrictions Against Disclosure. (FEB 1988)

452.236-76 Samples and Certificates. (FEB 1988)

I.1 OPTION TO EXTEND SERVICES (FAR 52.217-8)(NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within sixty (60) calendar days.

I.2 AFFIRMATIVE PROCUREMENT OF BIOBASED PROEDUCTS UNDER SERVICE

AND CONSTRUCTION CONTRACTS (FAR 52.223-2)(SEP 2013)

(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—

(1) The product cannot be acquired—

(i) Competitively within a time frame providing for compliance with the contract performance schedule;

(ii) Meeting contract performance requirements; or

(iii) At a reasonable price.

(2) The product is to be used in an application covered by a USDA categorical exemption (see 7

CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:

AG-84N8-S-14-0166

(i) Spacecraft system and launch support equipment.

(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.

(b) Information about this requirement and these products is available at http://www.biopreferred.gov.

(c) In the performance of this contract, the Contractor shall—

(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and

(2) Submit this report no later than—

(i) October 31 of each year during contract performance; and

(ii) At the end of contract performance

I.3 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

OPPORUTNITY FOR CONSTRUCTION (FAR 52.222-23)(FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action

Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered are, are as follows:

Goals for minority participation for each trade Goals for female participation for each trade

___________5.1%___________________ __________6.9%_________________

These goals are applicable to all the Contractor's construction work performed in the covered area. If the

Contractor performs construction work in a geographical area located outside of the covered area, the

Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .