davis wage_determination_UT116_dvb.doc

DOC document 8 KB Posted

Attached to
Shingle Creek Road Reconstruction Federal contract opportunity
Solicitation number
AG-84N8-S-11-0089
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

Davis Bacon Wage Determination

View the file

Other files for this federal contract opportunity

Other files attached to Shingle Creek Road Reconstruction, newest first.
File Type Posted
sf-25a_Payment Bond Form.rtf RTF text file
SpecsRevisedAug23.docx DOCX document
RFQ_Shingle_Creek_Road_RevisedAug23.docx DOCX document
sf-30_Amendment 0002.rtf RTF text file
ShinglePlanSetRevisedAug23.pdf PDF
ShinglePlanSetRevised.pdf PDF
sf-30.rtf RTF text file
corrected_specs.doc DOC document
RFQ Shingle Creek Road.doc DOC document
experience_equipment_questionnaire.rtf RTF text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

From: <Saved by Windows Internet Explorer 8> Subject:

Date: Mon, 1 Aug 2011 15:41:01 -0600 MIME-Version: 1.0 Content-Type: text/html;

charset="Windows-1252" Content-Transfer-Encoding: 7bit Content-Location: http://www.wdol.gov/wdol/scafiles/davisbacon/UT116.dvb X-MimeOLE: Produced By Microsoft MimeOLE V6.00.2900.6109

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">

<HTML><HEAD>

<META content="text/html; charset=windows-1252" http-equiv=Content-Type> <META name=GENERATOR content="MSHTML 8.00.6001.19088"></HEAD> <BODY><PRE>General Decision Number: UT100116 06/17/2011 UT116

Superseded General Decision Number: UT20080116

State: Utah

Construction Type: Highway

County: Sevier County in Utah.

Modification Number Publication Date 0 03/12/2010 1 07/09/2010 2 10/29/2010 3 11/19/2010 4 12/31/2010 5 01/21/2011 6 06/17/2011

CARP0184-002 11/01/2007

Rates Fringes

CARPENTER (Including Form Work)............................$ 20.19 6.74

ENGI0003-059 07/01/2010

Rates Fringes

OPERATOR: Power Equipment

(3) Backhoe Loader Combination.................$ 24.93 13.26

(4) Asphalt Laydown Machine, Oil Distributor....$ 23.93 13.26 Crane (Under 35 tons)-3...$ 25.26 13.26 Crane (35 to 100 tons)-2...$ 26.55 13.26 Crane (Over 100 tons)-1....$ 27.89 13.26

* IRON0027-003 01/01/2011

Rates Fringes

IRONWORKER, STRUCTURAL

(Excluding Fence Erection and Guard Rail Installation).........$ 25.11 11.85

IRON0847-001 01/01/2010

Rates Fringes

IRONWORKER, REINFORCING..........$ 26.61 11.60

LABO0295-033 07/01/2008

Rates Fringes

LABORER

(4)Asphalt Shoveler.........$ 18.16 5.40

SUUT2008-070 09/10/2008

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 17.36 2.04

INSTALLER - GUARDRAIL............$ 13.11 0.00

LABORER (Fence Erector)..........$ 15.27 2.79

LABORER: Asphalt Raker..........$ 12.18 2.60

LABORER: Common or General......$ 13.37 2.65

LABORER: Flagger................$ 8.77 2.53

LABORER: Landscape..............$ 14.45 2.79

LABORER: Mason Tender - Cement/Concrete..................$ 9.00 0.36

LABORER: Pipelayer..............$ 15.52 2.79

LABORER: Power Tool Operator:

(Chain/Concrete Saw, Hand Held Drill and Jackhammer/Tamper Only)..........$ 14.47 3.01

OPERATOR: Asphalt Paver.........$ 20.59 6.67

OPERATOR: Asphalt Roller........$ 15.82 4.00

OPERATOR: Backhoe/Excavator.....$ 19.71 5.99

OPERATOR: Blade/Grader..........$ 19.42 5.95

OPERATOR: Broom.................$ 15.88 5.65

OPERATOR: Bulldozer.............$ 21.78 7.04

OPERATOR: Crusher...............$ 24.64 4.76

OPERATOR: Grade Setter..........$ 20.21 7.08

OPERATOR: Mechanic..............$ 19.10 5.71

OPERATOR: Oiler.................$ 20.74 5.89

OPERATOR: Roller (Dirt and Grade Compaction)................$ 16.39 6.12

OPERATOR: Rotomill..............$ 24.25 6.00

OPERATOR: Scraper...............$ 21.51 5.57

OPERATOR: Screed................$ 15.88 4.04

OPERATOR: Trackhoe..............$ 16.00 1.59

OPERATOR: Front End Loader.......$ 20.63 6.92

PAINTER, Including Parking Lot and Highway Line Striping....$ 14.05 1.62

SIGN Installer (Permanent and Temporary Road Signs)............$ 15.40 2.79

Traffic Control: Sets Cones and Barrels......................$ 17.14 2.79

TRUCK DRIVER.....................$ 15.25 1.59

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

</PRE></BODY></HTML>

File details come from the government source that posted it. Updated .