SF-30 Amendment of Solicitation_Mod2.doc
DOC document 67 KB Posted
- Attached to
- Panguitch Administrative Site Waterline-Dixie NF Federal contract opportunity
- Solicitation number
- AG-84N8-S-10-0103
About this file
SF30_Mod 2 to incorporates Site Visit Meeting notes
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2_Panguitch Waterline Drawings.pdf | ||
| 1_RFQ AG84N8S100103 Panguitch Admin Site Waterline.doc | DOC document | |
| 3_Panguitch Waterline Specifications 6_24_2010.docx | DOCX document | |
| RFQ AG84N8S100103 Panguitch Admin Site Waterline.doc | DOC document | |
| Panguitch Waterline Drawings.pdf | ||
| SF-30 Amendment of Solicitation_Mod1.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 84N8 |
| 1 |
| 2 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 2 |
| 08/05/2010 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
USDA- Forest Service R4 - Utah Acquisition Support Center 2222 West 2300 South Salt Lake City, UT 84119-2020
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
| X |
| AG-84N8-S-10-0103 |
9B. DATED (SEE ITEM 11)
07/26/2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (X) |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN |
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
| X |
| D. OTHER (Specify type of modification and authority) |
Attach Site Visit/Pre-Bid meetings notes
E. IMPORTANT: X Contractor _ is not, is required to sign this document and return __copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
1. This amendment is to incorporate the Site Visit notes from August 3, 2010 (page 2-3 to this document)
2. This amendmend is also to attached a revised solicitation (3_Panguitch Waterline Specifications 6-24-2010).
Solcitation response date is NOT extended and all other terms and conditions are to remain the same.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
Elouise Fowler, Contracting Officer
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
08/05/2010
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
PRE-BID TRIP MEETING NOTES
PANGUITCH ADMINISTRATIVE SITE WATERLINE
RFQ# AG-84N8-S-10-0103
CONTRACTOR ATTENDEES:
Tim Strong
Red Rock Earthmovers, Inc
Wayne Olsen
PCI
Fred Barlow
Perco Rock
Neal Barton
Bartons Lot Care
Robert Dennett
Dennett Construction, Inc.
Kevin New
Ron New & Sons
Berklee Holm
Long Horn West (Came after the group had adjourned)
GOVERNMENT ATTENDEES:
Lu Fowler FS Contracting Officer (CO)
Phone # 435-865-3763
Paul Dastrup FS Contracting Officers Representative (COR)
Phone # 435-676-9352 or 435-676-3025 cell
Robert Miller
FS Contract Inspector
Phone # 435-676-9356
The pre-bid meeting was held on August 3, 2010 at 9:00 a.m. We met at the Powell Ranger District Office for a brief meeting then went to the project site and walked through the project. The pre-bid meeting notes are part of an amendment to the above referenced solicitation.
The following is a list of questions and answers:
1. Question. Will the Forest Service pay impact fees relating to the new water meter? Answer. Yes, the Forest Service has already arranged with Panguitch City for installation of the new water meter and has paid the required fees.
2. Question. Will bacteriological tests be required and who is responsible? Answer. Yes, See section 221100 3.6. Bacteriological tests are required and the contractor is responsible for taking samples and paying for the test.
3. Question. Is compaction testing required? Answer. Yes. See Table 014100. Change this specification to require testing only in the road crossing. Trench outside the road crossing still requires compaction as specified in section 312000, but does not require testing.
4. Question. Who pays for the compaction testing? Answer. Contractor
5. Question. Can the line to the trailer pads be moved to avoid crossing the lawn? Answer. The payment for waterline is for actual quantities installed. If lines are moved slightly, payment will be for actual lengths.
6. Comment. This contract is subject to Davis Bacon wage rates. The rates are included in the solicitation.
7. Question. Are bonds required? Answer. A bid bond is not required, but performance and payments bonds are required.
8. Question. What is the requirement for disposal of excess material from the trenching? Answer. Section 024100 requires hauling to a disposal area. The disposal area shall be arranged by the contractor at a site off of National Forest Lands.
9. Question. If Blue Stakes will not mark the electric line from the meter to the trailer pads who is responsible for marking? Answer. Contractor should try and make special arrangements with Blue Stakes or directly with the power company to have the lines marked.
10. Question. What size is the secondary waterline? Answer. The size is not known.
The original solicitation has several typos and is missing several specifications. This will be corrected in Amendment #2.