3_Panguitch Waterline Specifications 6_24_2010.docx

DOCX document 147 KB Posted

Attached to
Panguitch Administrative Site Waterline-Dixie NF Federal contract opportunity
Solicitation number
AG-84N8-S-10-0103
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

3_Panguitch Waterline Specifications (approx 61 pages)

View the file

Other files for this federal contract opportunity

Other files attached to Panguitch Administrative Site Waterline-Dixie NF, newest first.
File Type Posted
SF-30 Amendment of Solicitation_Mod2.doc DOC document
2_Panguitch Waterline Drawings.pdf PDF
1_RFQ AG84N8S100103 Panguitch Admin Site Waterline.doc DOC document
RFQ AG84N8S100103 Panguitch Admin Site Waterline.doc DOC document
Panguitch Waterline Drawings.pdf PDF
SF-30 Amendment of Solicitation_Mod1.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Important Information (this text is hidden):

1- Tracking changes – Microsoft Word has problems merging document in which track changes is turned on or where it has been on and the changes have not all been accepted. Before merging any documents make sure track changes is off and all changes have been accepted.

a. Ctrl+shift+E toggles “Track Changes” also you can toggle them through the menu pulldown “Tools – Track Changes”. When you toggle them the “Reviewing” toolbar is activated and which allows you to see and accept or reject changes.

2- When creating or editing specs, do not type notes or comments in or before the “PART-1 GENERAL” line. These may cause problems in specs reading in correctly.

a. Do not worry about those written by Masterspec. We know how to ignore them.

b. You can write all you want throughout the rest of the Spec, including loading up the end of the spec if you would like.

3- Contracting:

a. We try to save this first sheet for whatever contracting would like to add.

b. The header is also left blank for contracting. Edit the header anywhere and it will affect the header throughout this document. The footer is ours.

4- Section C and other non-specs must be added manually (see 3.a above).

5- Adding specs requires updating the list of specs, this may be done automatically through the “Specs” toolbar “TableOfContents” and “Update TOC” Buttons.

6- Be consistent when creating specs. Using different formatting within a single spec causes confusion for Microsoft Word and it will mess up your formatting.

7- This is created using 12 point font. Reading in specs of other font sizes will create minor font inconsistencies. You can change the font size upon completion of the spec package manually to whatever size you want for consistency sake.

8- Other Regions can use this; it is a minor programming change to correct R4 to something else. Send a request and a faxed picture of a large Hawaiian pizza to me and I will get right on it.

Section C - Description/Specifications/Statement of Work

GENERAL SPECIFICATIONS

Panguitch Administrative Site Waterline

1.1 Scope of Contract

This project will replace a majority of the waterline at the Panguitch Administrative Site. Work for the project will include:

Base Bid:

· Installation of new waterline throughout the administrative site, including new waterline of varying sizes, new valves and valve boxes, new yard hydrants, and connecting to service.

· Removal and salvage of old hydrants.

· Removal and disposal of old concrete valve box.

Option(s):

1. Furnish and install a new water filling station.

2. Move and make new connection to an existing water filling station.

3. Construct Lateral D and connect to existing facility.

4. Furnish and place sod on trenches located in lawn areas.

(Note: Either option 1 or option 2 will be awarded, not both)

1.2 Project Location

The Panguitch Forest Service Administrative Site is located at approximately 450 West and Center Street in Panguitch, Utah.

1.3 Site Information and Limitations

The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:

1. Construction sites will be closed to the public during construction but open to authorized government employees. The Contractor will be responsible for signing, limiting public access and safety of public and/or government employees in the area.

2. Water for compaction and dust abatement can be obtained from the existing water system at the site.

3. There are no public restrooms at the site.

1.4 Coordination

The water system provides service to 3 homes, 1 bunkhouse, 2 trailer connections, a warehouse, and multiple yard hydrants. Interruptions to service shall be kept to a minimum.

1. Contractor shall provide the CO with a written plan of how they intend to transfer service from the old system to the new system.

2. Contractor shall provide a minimum of 48 hours warning before shutting off existing service.

3. Interruption to service shall not exceed 2 hours to any one facility.

4. Coordinate with Panguitch City in making connection to the new meter.

1.5 Staging and Storage Areas

1. Areas of staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work or housing) on site.

1.6 Inspection of Worksite

1.The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
1.7Start Date

Work is expected to begin in late summer or early fall of 2010.

1.8 Contract Time

1. Base: 30 Calendar Days

2. Option1: 2 Calendar Days

3. Option 2: 2 Calendar Days

4. Option 3: 4 Calendar Days

5. Option 4: 1 Calendar Day

1.9 Specifications & Drawings

Include listing of Special Project Specifications or CSI Specifications.

Specification #
Specification Title
02822
Sodding
011250
Measurement & Payment
011900
Mobilization
013300
Submittal Procedures
014100
Quality Control
024100
Waste Material Disposal
024102
Removal & Disposal of Existing Structures and Obstructions
033000
Cast in Place Concrete
033020
Concrete From Packaged Dry Mix For Minor Structures
221100
Water Distribution Systems
221102
Curb Valves & Boxes
221105
Water Hydrants
311000
Clearing and Grubbing
312000
Earthwork

Include the following drawings:

Sheet 1 – Cover Sheet
Sheet 2 – Vicinity Map & Project Description
Sheet 3 –Site Plan, Schematic, and Summary of Quantities
Sheet 4 – Plan View – Mainline 0+00 – 2+80
Sheet 5 – Plan View – Mainline 2+80 – 5+60
Sheet 6 – Plan View – Mainline 5+60 – 6+91
Sheet 7 – Plan View – Lateral A
Sheet 8 – Plan View – Lateral B & C
Sheet 9 – Plan View – Lateral D, E, E1, F
Sheet 10 – Valves, Thrust Blocks, Trench, and Filling Station

AGAR 452.211-72 Statement of Work/Specifications (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

GENERAL SPECIFICATIONS C-3

USDA FOREST SERVICE, R-4

PANGUITCH ADMINISTRATIVE SITE WATERLINE

SECTION 02822 - SODDING

1. GENERAL

1.1 SUMMARY

0. This work shall consist of preparing the sod bed; furnishing, cutting, hauling, and laying live sod of perennial turf-forming grasses.

1.2 MEASUREMENT

0. Area computations will be based upon surface measurement.

1.3 PAYMENT

The accepted quantities will be paid for at the contract unit price for each pay item shown in the BID SCHEDULE.

PRODUCTS

5.1 REQUIREMENTS

A. Materials shall meet the requirements of the following Subsections:

Fertilizer:

Fertilizer shall be a standard commercial grade and designated as starter fertilizer, such as Scotts Starter Fertilizer 24-24-4 or equivalent.

Fertilizer shall be furnished in new, clean, and sealed containers with the name, weight, and guaranteed analysis of contents clearly marked. Fertilizer failing to meet the specified analysis may be used providing sufficient materials are applied to supply the specified nutrients without additional cost to the Government.

A liquid form of fertilizer containing the minimum percentage of available nutrients may be used.

Water:

Water used in the planting or care of vegetation shall be free of oils, acids, alkalies, salts, or any substance injurious to plant life. The Engineer shall approve water sources.

Sod:

Sod shall be living, vigorously growing, and predominantly of the grass and thickness shown below having a dense root system contained in suitable sod and reasonably free from noxious weeds and grasses. When the sod is cut, its top growth shall not be more than 3 inches in height and it shall have a minimum of 1 inch of soil and root zone backing. Sod from other than commercial sources will be inspected by the Contracting Officer (CO) at the source and shall not be cut prior to approval.

EXECUTION

3.1 SOURCES OF SOD

The CO shall approve sod obtained from other than commercial sources before cutting and delivery to the project. The contractor shall notify the Engineer at least 5 days before cutting begins.

SOIL PREPARATION & CLEANUP

Before delivery of sod, areas to be sodded shall be brought to grades that will provide a finish matching surrounding lawn and then plowed, disked, or harrowed or otherwise loosened. Cleanup shall include removal of stones larger than 2 inches in diameter, sticks, stumps, and other debris that might interfere with the proper laying or subsequent growth of sod.

TOPSOILING

All topsoil from excavations shall be kept separately from other soils, then placed in the top layers of the trench.

APPLYING FERTILIZER

Following soil preparation, cleanup, and topsoiling, fertilizer shall be uniformly spread at the suppliers recommended rate. Mechanical spreaders, blower equipment, or other approved methods may be used for spreading fertilizer, after which the materials shall be incorporated into the soil by raking.

LAYING SOD

Sod shall be laid on the prepared sod bed within 24 hours after cutting, except when stored in stacks or piles, grass to grass and roots to roots for not more than 5 days. Sod shall be protected against drying from sun or wind and from freezing. The moving and laying of sod shall be done when weather conditions and soil moisture are favorable.

Sod shall be laid when soils are moist. Dry sod bed areas shall be well moistened before sod is laid. Sections of solid sod shall be laid edge to edge with staggered joints. Openings shall be plugged with sod or filled with acceptable loamy topsoil. After laying and joint filling, the sod shall be rolled or tamped to eliminate air pockets and provide an even surface.

CARE DURING CONSTRUCTION, WATERING, & TEMPORARY MAINTENANCE OF SODDED AREAS

Sod shall be watered when laid and kept moist until final acceptance of the contract. Water shall be evenly distributed at a measured rate per unit of area. Watering shall be done so as to avoid erosion and prevent damage to sodded areas.

Replacement of dried-out or damaged sod shall be at the contractor's expense.

spec writer: fill in method below:

END OF SECTION 02822

June 2010

02822-2

SODDING

USDA FOREST SERVICE, R-4

PANGUITCH ADMINISTRATIVE SITE WATERLINE

SECTION 011250 - MEASUREMENT AND PAYMENT

1. GENERAL

0. SUMMARY

A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.

B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.

0.1 DETERMINATION OF QUANTITIES

A. The following measurements and calculations shall be used to determine contract quantities for payment.

1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.

2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.

3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.

5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

B. Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."

0.2 UNITS OF MEASUREMENT

A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:

1. Acre: Make longitudinal and transverse measurements for area computations horizontally.

2. 50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout.

3. 94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.

4. Cubic Yard (CY): A measurement computed by one of the following methods:

a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.

c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

5. Each (EA): One complete unit, which may consist of one or more parts.

6. Gallons (GAL): The quantity shall be measured by any of the following methods:

a. Measured volume in container.

b. Metered volume by approved metering system.

c. Commercially package volume.

7. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.

8. Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the base or foundation. Do not measure overlaps.

9. Lump Sum (LS): One complete unit.

10. Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.

11. Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.

12. Square Foot (SF): Measured on a plane parallel to the surface being measured.

13. Square Yard (SY): Measured on a plane parallel to the surface being measured.

14. Ton: Measured as a short ton consisting of 2,000 pounds.

0.3 METHOD OF MEASUREMENT

A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.

2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:

a. As a result of changes in the work authorized by the CO.

b. As a result of the CO determining that errors exist in the original design that causes a pay item quantity to change by 15 percent or more.

c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

4. STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.

5. VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.

PART 1 - PRODUCTS (NOT APPLICABLE)

PART 2 - EXECUTION (NOT APPLICABLE)

END OF SECTION 011250

MAY 2006

11250-1

MEASUREMENT AND PAYMENT

USDA FOREST SERVICE, R-4

PANGUITCH ADMINISTRATIVE SITE WATER SYSTEM

SECTION 011900 - MOBILIZATION

1. GENERAL

SUMMARY

This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.

MEASUREMENT AND PAYMENT

The measurement shall be lump sum for mobilization. Payment shall be as follows:

Bond premiums will be reimbursed after receipt of the evidence of payment.

50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.

Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.

Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.

Progress payments for mobilization and preparatory work shall be subject to retainage.

PRODUCTS (NOT USED)

EXECUTION (NOT USED)

END OF SECTION 011900

July 2005

MOBILIZATION 011900-1

USDA FOREST SERVICE, R-4

PANGUITCH ADMINISTRATIVE SITE WATER SYSTEM

SECTION 013300 - SUBMITTAL PROCEDURES

1. GENERAL

SUMMARY

This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.

See other specification section within this package for additional requirements on submittal.

SUBMITTAL PROCEDURES

Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.

Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

If intermediate submittal is necessary, process it in same manner as initial submittal.

Allow 14 days for processing each re-submittal.

No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.

Identification: Place a permanent label or title block on each submittal for identification.

Indicate name of firm or entity that prepared each submittal on label or title block.

Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.

Include the following information on label for processing and recording action taken:

Project name.

Date.

Name and address of Contractor.

Name of manufacturer.

Unique identifier, including revision number.

Number and title of appropriate Specification Section.

Drawing number and detail references, as appropriate.

If more than one item is shown on submittal sheet, identify item.

Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.

MEASUREMENT AND PAYMENT

No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.

PRODUCTS

ACTION SUBMITTALS – (Submittals requiring CO approval) General: Prepare and submit Action Submittals required by individual Specification Sections.

Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.

Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

Mark each copy of each submittal to show which products and options are applicable.

Include the following information, as applicable:

Manufacturer's written recommendations.

Manufacturer's product specifications.

Manufacturer's installation instructions.

Manufacturer's catalog cuts.

Wiring diagrams showing factory-installed wiring.

Compliance with recognized trade association standards.

Compliance with recognized testing agency standards.

Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

Preparation: Include the following information, as applicable:

Dimensions.

Identification of products.

Fabrication and installation drawings.

Roughing-in and setting diagrams.

Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.

Notation of dimensions established by field measurement.

Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.

Samples: Prepare physical units of materials or products, including the following:

Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval) General: Prepare and submit Informational Submittals required by other Specification Sections.

Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.

Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

Test and Inspection Reports: Comply with requirements in Section 014130 "Contractor’s Quality Control."

Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.

Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.

Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.

Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. Comply with requirements in Division 1 Section "Closeout Procedures."

Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.

EXECUTION

GENERAL

Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.

Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.

Submittals not required by the Contract Documents will not be reviewed and may be discarded.

Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.

Requests for substitutions will only be considered if contractor submits the following:

Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.

Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.

A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.

The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.

SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive – additional submittals may be required by specific specifications:

TABLE 013000-1

Spec. Section
Section Title
Subsection
Required Submittal
014100
Quality Control
1.3 A
Contractor quality control plan
014100
Quality Control
1.3 B
Permits, Licenses, and Certificates
014100
Quality Control
1.3 C
Test and inspection reports
014100
Quality Control
1.3 D
As-Built drawings
033000
Cast-in-Place Concrete
1.3A
Product Data
033000
Cast-in-Place Concrete
1.3B
Design Mix
221100
Water Distribution Systems
1.3 A1
Pipe & fittings
221102
Water Distribution Systems
2.1
Curb Valves and Boxes
221105
Water Hydrants
1.3 A
Manufacturer’s Literature & Maintenance Data
221105
Water Hydrants
1.3 B
Certification that washed rock meets gradation requirements

END OF SECTION 013300

MARCH 2009

SUBMITTAL PROCEDURES 013300-1

USDA FOREST SERVICE, R-4

PANGUITCH ADMINISTRATIVE SITE WATERLINE

SECTION 014100 – QUALITY CONTROL

PART 1 - GENERAL

1.1 This work shall consist of providing quality control in conformance with the inspection, testing, and product certification requirements of this contract to ensure compliance with the drawings and specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of the contract.

1.2 QUALITY CONTROL

A. The Contractor shall provide and maintain a quality control system that will ensure all services, supplies, and construction work required under this contract conforms to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all services, supplies, and construction conform to the contract requirements.

B. Special Tests and Inspections: Contractor will engage a testing agency to conduct required special tests and inspections. The Contractor shall authorize the testing agency to perform the required testing and inspections on the work completed. The authority shall include:

1. Testing agency will interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents.

2. Testing agency will re-test and re-inspect corrected work.

C. Retesting/Reinspecting: Contractor shall provide quality-control services for retesting and reinspection for replaced construction work or for work that failed to comply with the requirements under the contract.

1.3 SUBMITTALS

A. Contractor Quality Control Plan B. Permits, Licenses, and Certificates C. Test and Inspection Reports D. As-Built Drawings

1.4 MEASUREMENT AND PAYMENT

A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 QUALITY CONTROL SYSTEM

A. General: Perform required testing, inspections, sampling, and similar services per direction specified in the contract drawings and specifications and in accordance with established industry standards.

3.2 CONTRACTOR QUALITY CONTROL PLAN

A. At the time of the preconstruction conference, the Contractor shall submit for approval a written Contractor Quality Control Plan.

1. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.

2. The Government reserves the right to require changes in the plan during the contract period as necessary.

3. No change in the approved plan may be made without written concurrence by the Contracting Officer.

4. At a minimum, the plan shall include the following:

a. A list of personnel responsible for quality control and assigned duties. Include each person's qualifications.

b. A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.

c. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.

d. Methods of performing, documenting, and enforcing quality control of all work.

e. Methods of monitoring and controlling environmental pollution and contamination as required by all applicable regulations and laws.

3.3 TEST AND INSPECTION REPORTS

A. Submit three copies of complete test results no later than three calendar days after the test was performed.

B. Submit failing test results and proposed remedial actions within four hours of noted deficiency.

C. Testing and Inspection Reports shall include the following:

1. Date of issue.

2. Project title and number.

3. Name, address, and telephone number of testing agency.

4. Dates and locations of samples, tests, or inspections.

5. Names of individuals performing tests and inspections.

6. Reference Specification Section(s).

7. Complete test or inspection data.

8. Test and inspection results and an interpretation of test results.

9. Ambient conditions at time sample was taken, tested, or inspected.

10. Comments or professional opinion on whether tested or inspected work complies with the Contract Document requirements.

11. Name and signature of laboratory inspector.

12. Recommendations on retesting and reinspecting.

3.4 PERMITS, LICENSES, AND CERTIFICATES

A. For Contracting Officer’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations relevant to the on performance of the work.

3.5 AS-BUILT DRAWINGS

A. The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from the original contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the Contracting Officer.

3.6 SAMPLING, TESTING, AND CERTIFICATION REQUIREMENTS

A. Sampling, testing, and Certification requirements and frequency for specific items shall be as specified in the drawings and specification. The following table is a summary of the required sampling, testing, and certification for the project - the table is to assist the Contractor, but may not be all inclusive – additional submittals may be required by specific specification section:

TABLE 014100-1

Item

Subsection Certification or Test Required

Frequency

033000
2.12
Mixing and Delivery
Each Truck
221100
3.2N
HDPE Pipe - Bent Strap Test
Once Daily
221100
3.5A
Hydrostatic Testing of Water System
See Spec.
221100
3.5B
Pressure and Leakage Test – Water Line
See Spec.
221100
3.6A
Bacteriological Examination
After disinfection, before use
312000
3.12C
Compaction Test – at Pipe Zone
One test per 200 feet of trench
312000
3.12D
Compaction Test – above Pipe Zone
Two tests every lift – at the road crossing in Lateral E and E1
312000
3.12I
Tracer Wire Conductivity Test
Until Passing
312000
3.18D
Compaction Test – Exterior Concrete Slabs
1 per slab

END OF SECTION 014100

MARCH 2010

QUALITY CONTROL 014100-3

USDA FOREST SERVICE, R-4

PANGUITCH ADMINISTRATIVE SITE WATER SYSTEM

SECTION 024100 - WASTE MATERIAL DISPOSAL

1. GENERAL

SUMMARY

This Section includes the loading, handling, hauling, and placing of excess excavation material, unsuitable excavation material, clearing and grubbing debris, construction debris and demolition materials.

MEASUREMENT AND PAYMENT

There will be no separate measurement or payment for work in this Section. Waste material disposal is considered incidental to other items of work shown in the Schedule of Items.

PRODUCTS – NOT APPLICABLE

EXECUTION

Waste material to be removed:

CHOOSE APPLICABLE PARAGRAPHS:

All excavated material not used in the construction of embankments or backfilling of trenches, or other excess material resulting from the excavation and embankment operation shall be hauled to a disposal area.

All unsuitable excavated material, oversize boulders, stumps, slash and other clearing and grubbing debris shall be hauled to a disposal area.

The Contractor does have the option of breaking oversized boulders into sizes small enough to incorporate into the embankment according to Specification 312225.

All demolition materials, garbage, and other refuse generated shall be removed from the project site and legally disposed off of Government property in an approved landfill.

The contractor is responsible for all costs and permits associated with landfill disposal.

The Government is not responsible for waste material upon its departure from the project site.

REVISION HISTORY:

Adapted for R4 during the Water/Wastewater spec-writing session in January, 2004. Primary author: Ronald Lange.

REPLACES: R4 CSI Section 02135 (Landfill and Forest disposal).

12/2004: REVIEWED AND EDITED BY D. WEWER

3/20/2006: D. Wewer - Updated Section to new numbering system.

END OF SECTION 024100

APRIL 2009

WASTE MATERIAL DISPOSAL 024100-1

USDA FOREST SERVICE, R-4

PANGUITCH ADMINISTRATIVE SITE WATER SYSTEM

SECTION 024102 - REMOVAL, DISPOSAL, & SALVAGE OF EXISTING STRUCTURES

1. GENERAL

SUMMARY

Work includes the removal and disposal of existing structures, obstructions, constructed features and elements designated for removal. Items to remain will be designated by the Contracting Officer prior to demolition work.

Removal and Disposal - Items designated for removal and disposal shall include but is not limited to:

Concrete Valve Box Concrete Sidewalk

Removal and Salvage - Items designated for removal and salvage:

Water Hydrants Curb Valves and Boxes

The work also includes the excavation, backfill, scarifying, and re-contouring of the areas around features and elements removed.

Related Sections Include the Following:

Section 024100 “Waste Material Disposal.”

MEASUREMENT AND PAYMENT

Measurement and Payment shall be lump sum for the work associated with removal, disposal, and salvage of all existing structures, obstructions, constructed features and elements.

PRODUCTS – not applicable

EXECUTION

REMOVAL

The Contractor may elect to use any means to remove the structures or constructed features, as long as he provides for the safety of the public, preservation of the surrounding site and structures to remain, and does not damage the items to be salvaged.

BACKFILL

Backfill for removed items may be excess material from other excavation or borrow from an approved source.

Backfilling shall not be done when the depression is saturated or flooded with water. Puddling methods of backfill consolidation will not be permitted.

Backfilling shall not be done when the depression is saturated or flooded with water. Puddling methods of backfill consolidation will not be permitted.

Backfill shall be brought up in 12-inch compacted layers.

Compaction shall be by mechanical tampers, with at least three passes over the entire surface.

Maximum size of rock in backfill shall be 8 inches.

Backfill shall be compacted and rounded 6 inches above the natural ground.

When topsoil replacement is required, backfill and compaction shall be as specified above, except the backfill shall terminate 6 inches below the natural ground. Placement of topsoil, when required, shall comply with the applicable specification.

Excessive settlement or other evidence of improper backfill shall be corrected by reopening the excavation to the depth required for proper refilling and compaction.

DISPOSAL

All concrete shall be removed from the project site and legally disposed off of Government property in an approved landfill.

The contractor is responsible for all costs and permits associated with landfill disposal.

The Government is not responsible for waste material upon its departure from the project site.

SALVAGE

Items requiring salvage shall be removed and transported by method that will not cause damage to the item. Items shall be moved to the storage area at the administrative site.

FINISHING AND CLEANUP

After the area has been backfilled, the disturbed area shall be finish graded to present a natural appearance, scarified to accept seeding, and cleaned up by removing of all debris and material.

REVISION HISTORY:

Primary Author: Ronald Lange. Written during the water/wastewater spec-writing session in January, 2004.

REPLACES: CSI Section 02119

12/2004: REVIEWED AND EDITED BY D. WEWER

4/26/05 D. WEWER – CHANGED “DIVISION XX” DESIGNATION TO SECTION “XXXXX.” ALSO REMOVED REFERENCE TO “SITE CLEARING” SPEC SINCE IT WAS REPLACED BY 02230 “CLEARING AND GRUBBING.”

3/20/2006: D. Wewer - Updated Section to new numbering system.

END OF SECTION 024102

MARCH 2009

REMOVAL, DISPOSAL, & SALVAGE OF EXISTING STRUCTURES 024102-2

USDA FOREST SERVICE, R-4

PANGUITCH ADMINISTRATIVE SITE WATER SYSTEM

SECTION 033000 - CAST-IN-PLACE CONCRETE

1. GENERAL

SUMMARY

This Section specifies cast-in place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes.

DEFINITIONS

Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash and other pozzolans, ground granulated blast-furnace slag, and silica fume; subject to compliance with requirements.

SUBMITTALS

Product Data: For each type of product indicated.

Design Mixtures: For each concrete mixture. Indicate amounts of mixing water to be withheld for later addition at Project site.

Steel Reinforcement Shop Drawings when project design requires special consideration.

Field quality-control test reports.

MEASUREMENT AND PAYMENT

Except as listed otherwise in the section, no separate measurement or payment will be made for work in this section. Payment will be included at the contract unit price for items shown on the Schedule of Items. Except for the following item listed in the Schedule of Items.

Concrete Sidewalk – Measurement and payment, as shown in the Schedule of Items, shall be Square Yards (SY) of concrete placed and finished as measured in place.

PRODUCTS

CONCRETE MATERIALS

Cementitious Material: Use the following cementitious materials, of the same type, brand, and source, throughout Project:

Select type and color of portland cement from options in subparagraph below.

Portland Cement: ASTM C 150, Type II.

Select class of aggregate from options in paragraph below or revise to suit Project. ASTM C 33 limits deleterious substances in coarse aggregate depending on climate severity and in-service location of concrete. Classes in first set of options are ASTM C 33 default classes for concrete exposed to weather for Severe, Moderate, and Negligible weathering regions, respectively. Revise first two options to Class 4S or 4M if concrete will be exposed to frequent wetting. Retain last option if damage caused by concrete expansion from alkali silica or alkali carbonate reactions is anticipated.

Normal-Weight Aggregates: ASTM C 33, graded, from a single source.

Maximum Coarse-Aggregate Size: 1 inch nominal.

Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.

Water: ASTM C 94/C 94M and potable.

Fly ash, ground iron blast-furnace slag, or silica fume may partially replace cement in any mix as follows:

Fly Ash:

Class F – Not more than 20 percent of the minimum mass of portland cement may be replaced with class F fly ash.

Class C – Not more than 25 percent of the minimum mass of portland cement may be replaced with class F fly ash.

Ground Iron Blast-Furnace Slag: Not more than 25 percent of the minimum mass of portland cement may be replaced with ground iron blast-furnace slag.

Silica Fume (microsilica): Not more than 10 percent of the minimum mass of portland cement may be replaced with silica fume.

Additionally, fly ash, slag, and silica fume will constitute no more than 50 percent of the total replacement weight.

ADMIXTURES

Air-Entraining Admixture: ASTM C 260.

Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible with other admixtures and that will not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride.

Retarding Admixture: ASTM C 494/C 494M, Type B.

Retain paragraph and subparagraphs below for integrally colored concrete.

Synthetic Fiber: Monofilament or fibrillated polypropylene fibers engineered and designed for use in concrete pavement, complying with ASTM C 1116, Type III, 1/2 to 1-1/2 inches long.

Revise fiber type if adding polyester or nylon fibers. Monofilament fibers help reduce plastic shrinkage cracking. Manufacturers claim fibrillated fibers also improve hardened concrete properties.

Retain one of three paragraphs and associated subparagraphs below if plastic water vapor retarders are required. ASTM E 1745 sets three performance classes for plastic water vapor retarders: Classes A, B, and C. The water-vapor permeance value is the same for each class. Class A sets the highest tensile-strength and puncture-resistance requirements, while Class C sets the lowest. Thickness is not governed by ASTM E 1745.

Penetrating liquid floor treatment in paragraph below is commonly applied to harden and densify floors of warehouses and distribution facilities, imparting a clear satin sheen to finished floor. Pigmented products may also be available. Although formulations vary, manufacturers claim these nonfluosilicate liquids improve abrasion and chemical resistance and dustproof concrete surface. When approved by manufacturers, these products may be installed over mineral dry-shake floor hardeners or integrally colored concrete.

CURING MATERIALS

If subparagraphs titled "Available Products" or "Products" are retained in this Article, coordinate with Part 2 "Manufacturers" Article. Retain "Available" for nonproprietary and delete for semiproprietary specifications.

Select curing aids and materials from remaining paragraphs.

Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.

Water: Potable.

Retain paragraph and subparagraphs below if a dissipating-type, waterborne, membrane-forming curing compound is required. Although the EPA mandates maximum VOC emissions of 350 g/L for curing compounds, verify VOC emission limits of authorities having jurisdiction. If slow breakdown of curing membrane could interfere with bonding of floor coverings, retain removal subparagraph in "Concrete Protecting and Curing" Article in Part 3.

Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, dissipating or nondissipating. Liquid Membrane-Forming Compounds. Material shall be certified by curing compound manufacturer to not interfere with bonding of floor covering.

REPAIR MATERIALS

Repair Underlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/8 inch and that can be feathered at edges to match adjacent floor elevations.

Cement Binder: ASTM C 150, portland cement or hydraulic or blended hydraulic cement as defined in ASTM C 219.

Primer: Product of underlayment manufacturer recommended for substrate, conditions, and application.

Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand as recommended by underlayment manufacturer.

Compressive Strength: Not less than 4100 psiat 28 days when tested according to ASTM C 109/C 109M.

Retain paragraph and subparagraphs below as a repair material for floor or slab areas remaining exposed and not receiving floor coverings. Typical self-leveling floor toppings or overlayment products include "Levelayer III" by Dayton Superior, "Levelex HS" by L&M Construction, "Concrete Top" by Symons, and "Certi-Vex SLU TC" by Vexcon. Similar products that exceed 5000 psi (34 MPa) include "Mastertop 112 Topping" by Master Builders and "Quikrete Self-Leveling Floor Resurfacer Fast-Set" by Quikcrete.

Repair Overlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/8 inch and that can be feathered at edges to match adjacent floor elevations.

Cement Binder: ASTM C 150, portland cement or hydraulic or blended hydraulic cement as defined in ASTM C 219.

Primer: Product of topping manufacturer recommended for substrate, conditions, and application.

Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand as recommended by topping manufacturer.

Compressive Strength: Not less than 5000 psi at 28 days when tested according to ASTM C 109/C 109M.

CONCRETE MIXTURES, GENERAL

Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301.

Use a qualified independent testing agency for preparing and reporting proposed mixture designs based on laboratory trial mixtures.

Retain paragraph and subparagraphs below if limiting percentage of cementitious material that can replace portland cement. Neither ACI 301 nor ACI 318 (ACI 318M) limit amount of cementitious material that can replace portland cement unless concrete is exposed to deicing chemicals. Identify parts of building or structure affected by these limits unless extending them to all concrete.

Retain appropriate option in first paragraph below for chloride limits. Identify portions of building with different limits if required. Percentages below repeat ACI 301 limits, respectively, for prestressed (post-tensioned) concrete, reinforced concrete exposed to chloride, reinforced concrete that will not be dry or protected from moisture, and reinforced concrete that will be dry or protected from moisture. ACI 301 and ACI 318 (ACI 318M) express this percentage by weight of cement, not cementitious material.

Limit water-soluble, chloride-ion content in hardened concrete to 0.06 percent by weight of cement.

Admixtures: Use admixtures according to manufacturer's written instructions.

Retain paragraph below if integrally colored concrete is required, and indicate locations here or on Drawings.

Color Pigment: Add color pigment to concrete mixture according to manufacturer's written instructions and to result in hardened concrete color consistent with approved mockup.

CONCRETE MIXTURES FOR BUILDING ELEMENTS

Select strength from five options in subparagraph below or revise to suit Project. Coordinate compressive strength with water-cementitious materials ratio if concrete will be subject to special exposure conditions or sulfate exposure as identified in ACI 318 (ACI 318M).

Slabs-on-Grade: Proportion normal-weight concrete mixture as follows:

Minimum Compressive Strength: 3500 psi at 28 days.

Minimum Cementitious Materials Content: 540 lb/cu. yd.

Slump Limit: 4 inches plus or minus 1 inch.

Air Content: 5 percent, plus or minus 1 percent at point of delivery for 1-inch nominal…

This is the start of the file's text. The full file is on GovTribe.