AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable) 02/22/2008

6. ISSUED BY

CODE

7. ADMINISTERED BY (If other than Item 6)

CODE

U.S. Department of Agriculture – Forest Service Utah Procurement Center 2222 W. 2300 S.

Salt Lake City, UT 84119

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X)

9A. AMENDMENT OF SOLICITATION NO.

X

AG-84N8-S-08-0014

9B. DATED (SEE ITEM 11)

02/13/2008

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE

FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, X is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 01 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor _ is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

FAR 52.219-14, Limitations on Subcontracting (Dec 1996)(15 U.S.C 637(a)(14)) added to solicitation.

Conference Call Notes are hereby incorporated into the solicitation.

We will accept electronic versions of the sample work projects requested in Section VI as part of the Technical Proposal. All other documents requested should be in printed form.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Tori Blunt, Contract Specialist

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED

16B. UNITED STATES OF AMERICA

16C. DATE SIGNED

/s/Tori Blunt 02/22/2008 (Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable 30-105

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

AG-84N8-S-08-0014 Exhibit/Interpretive Services Conference Call Notes 02/21/2008

Q. What is required to be turned in as part of the proposal?

A. Any Acknowledgments of Amendments to the Solicitation and as stated on page 33:

1 copy of the completed signed offer (SF-1449 pages 1-2) 3 copies of the technical proposal (Instructions in Section VI pages 33-36) 1 copy of the price proposal (Section II page 3)

Faxes will not be accepted. Reference Solicitation Number AG-84N8-S-08-0014 on the envelope and mail to:

USDA Forest Service – GSTC
Attn: Tori Blunt
2222 West 2300 South
SLC, UT 84119

Q. Specific Instructions – Technical Proposal page 33. In what format should the Past Performance Information be presented in?

A. There is not a specific format in which you should present your past performance information. Should be presented in a way the evaluator can obtain information needed.

Q. When do you anticipate contract award?

A. We are anticipating contract award within 30 days.

Q. Any preference of who the prime contractor is, ie fabricator or design firm?

A. NO

Q. What is the Small Business Size for this Solicitation?

A. The size standard for this solicitation is $6.5M per year averaged over the last three years.

Q. How much flexibility will be allowed in committing to exhibit designers, fabricators, and/or installers as part to the proposal? It is difficult if not impossible to suggest all the possible sub-contractors that might be used over the 5-years of the IDIQ with regard to all the specific technical services.

A. We understand that sub-contracts will change thru the life of the IDIQ. For the purpose of the technical proposal we are looking for your ability in the Management of the work to be accomplished. Refer to AGAR 452.237-74 Key Personnel (Feb 1988) clause page 5.

Q. Can applicants be specialists in just several of the categories and still submit an RFQ?

A. We expect the contractor to provide all the services listed in the scope of work, either by doing the work themselves or sub-contracting.

Q. Does each RFQ submittal need to include all categories listed in Section II? In other words, does a complete team need to be assembled in order to be competitive for the RFQ?

A. Yes we expect the contractor to be able to provide all services.

Q. What is the typical project size (dollar amount) for this contract and how many projects, on average, do you think will be issued per year?

A. Based on the minimum guarantee each contractor is guaranteed $5,000.00 for base year plus any renewal option years. We anticipate a couple of projects close to $1M.

Q. What are you looking for in the way of a historian/archivist?

A. If the need arose for conservation of artifacts or research on a history topic.

Q. Is there a reason why you have not included an AV specialist on your hourly rate list when you ask us to provide audiovisual services?

A. Have asked that you please adapt your job titles to those listed as closely as possible.

Q. Are the hourly rates on Attachment 4, Sample Bid Sheet, in accordance with what the government expects to pay?

A. No the hourly rates on Attachment 4 are just an example.

Q. Page 34 notes that we have to provide a Price Proposal from Section B. What is Section B?

A. That should be section II-Schedule of Items.

Q. Do we have to price the sample task order that is listed on pages 20 – 24?

A. No that is just an example of what to expect when asked to respond to a task order.

Q. How many contractors do you intend to select? If more than one, will you have multiple contractors bid on individual task orders? If yes, how many and how will price be evaluated?

A. As noted in the solicitation there may be more then one award made, which will be based on responses received to the solicitation. Yes, tasks will be competed to the best extent practicable. Evaluation will be based on best value to the government, which includes price and delivery/completion schedule.

Q. Why is this solicitation subject to prevailing wage requirements? Are each of the tasks associated with this job subject to prevailing wage? Do prevailing wage rates apply only to work on site? Given the variance in prevailing wage rates in several different counties amongst several different states, how are we to calculate our hourly rates that get incorporated into our contract?

A. This IDIQ will have option years; therefore each year will be subject to the prevailing wage rates at the time of option renewal. The wage rates are subject to where the work is being done. So if the majority of the work is done at your facility the wage rates will be based in your county/state. The installation would be a changing rate based on where the installation was to occur. The requirement is to meet the minimum wage plus fringe for county/state the work is being done in.

Q. Are General Contractor’s licenses required in each state in which we will be doing work?

A. We require that you meet all state requirements, whatever they may be.

Q. Please clarify whether multiple awards may be made.

A. Multiple awards may be made depending on the responses we receive to the solicitation.

Q. Will the successful contractor be able to provide all services in the scope of work?

A. We expect the contractor to provide all the services listed in the scope of work, either by doing the work themselves or sub-contracting.

Q. The interpretive industry is a small community…Can a sub-contractor, such as a fabricator, appear in more than one proposal?

A. Yes, someone could be a sub-contractor for more then one prime contractor.

Q. Available Tasks Section 5.1

Sequence of Task Events (page 10 of 38) Will you consider modifying the order of tasks? Task #12 graphic layouts, in our typical workflow, are typically produced during fabrication. Selections of fonts and colors and preparation of a typical graphic layout for each panel type are completed during design, so an approved graphic design approach is part of the final design products. Would this be acceptable?

A. The sequence of the tasks completed is not as important as the outcome of the end product.

Q. Should we assume that removal and disposal of existing exhibits, minor building remodeling such as adding walls or carpet, adding electrical outlets or data cabling or lighting, might be part of the scope of services under this Solicitation?

A. If the work is incidental to the project it would fall within the scope of services under this solicitation. If the work is not incidental it will not be within scope and will not be apart of the task order but handled thru a separate procurement.

Q. NAICS code for this solicitation is 712110 - Museums with a size standard $6.5 M, is this correct? Would we be willing to change the NAICS code to another code that is 500 employee size standard. Other NAICS codes used on other contracts out there are 339999 – All other Miscellaneous Manufacturing or 321999 – All other Miscellaneous Wood Product Manufacturing.

A. Based on the scope of work for this project the NAICS code is appropriate for this solicitation.

Q. Can a Canadian Based company respond to this RFQ?

A. No. This RFQ has been set aside for total small business. In accordance with the SBA in order to qualify as a small business you must be a US based or have a US based office.

Q. Is this solicitation a part of the Region 2 Center for Design and Interpretation?

A. This solicitation is outside of what Region 2 is doing.

Q. What percentage of work must the prime do on this contract?

A.In accordance with FAR 52.219-14 Limitations on Subcontracting (Dec 1996)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for—

(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.

(2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.

(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.

(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.

(End of Clause) **Further clarification on (1) Services (except construction): Cost being the associated costs incurred for personnel in performance on the contract by the prime.**

Q. What accessibility requirements must be followed?

A. Guidance and resources on accessibility are listed on page 12.

Participants Conference Call List

Forest Service

Tori Blunt, Contract Specialist Bryce Eddy, Contract Specialist Dara Lucero, Purchasing Agent Carol Ryan, Interpretive Specialist

Contractors

Noel Design, LLC Wells Resources, Inc Van Sickle & Rolleri, Ltd Taylor Studios, Inc Main Street Design Cascade Interpretive Consulting Dahn Desing, LLC Split Rock Studios Conservation By Design North Shore Productions H.B. Stubbs Companies Color-Ad, Inc Platypus Turner Exhibits Coulter and Associates Sea Reach ltd Riggs Ward Design Salt Design RRM Design Natural Light Pacific Studio

Other files for this federal contract opportunity

Other files attached to EXHIBIT/INTERPRETIVE SERVICES, newest first.
File Type Posted
AG-84N8-S-08-0014_ExhibitInterpretiveServices.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .