Appendix_B_Tree_Measurement_Reed_Valley.doc
DOC document 448 KB Posted
- Attached to
- Reed Valley Stewardship
- Solicitation number
- AG-84M8-S-17-0007
- Issued by
-
Department of Agriculture Forest Service
About this file
Appendix B Tree Measurement Reed Valley
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-84M8-S-17-0007_Amendment_01_Signed.pdf | ||
| Appendix_D_Reed_Valley.pdf | ||
| Logging_Map_Reed_Valley.pdf | ||
| Contract_Area_Map_Service_Items_1-3_and_5-9.pdf | ||
| AG-84M8-S-17-0007.docx | DOCX document | |
| Appendix_C_Reed_Valley.docx | DOCX document | |
| Davis-Bacon_WD__UT79.pdf | ||
| SCA_Wage_Determination.pdf | ||
| Appendix_A_Reed_Valley.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reed Valley Stewardship
APPENDIX B
STEWARDSHIP CONTRACT TIMBER REMOVAL SPECIFICATIONS
GENERAL INSTRUCTIONS; The following is a complete list of standard clauses that maybe used for the IRSC. Eliminate all those that do not apply. As an example; if there is no Overstory Removal Units, eliminate CT.3.3 Overstory Removal Units from the list and remove the clause. CLAUSES MARKED WITH AN ‘*’ ARE MANDATORY AND MAY NOT BE DELETED. The clause marked with “**” is mandatory for forests west of the 100th meridian.
*BT.0 CONTRACT AREA
*BT.2 Claims
*CT.0 TIMBER SPECIFICATIONS
*CT.1 Included Timber
*CT.1.1 Standard Timber
*CT.1.2 Substandard Timber
*CT.1.3 Damaged Timber
*CT.1.3.1 Damaged by Contractor
*CT.1.3.2 Negligent or Willful Damage
*CT.1.3.4 Minor Damage by Natural Causes
*CT.1.4 Unintentionally Cut Timber
CT.1.5 Construction Timber
*CT.1.6 Other Material
*CT.2 Utilization and Removal of Included Timber
*CT.3 Timber Designations
CT.3.1 Clearcutting Units
CT 3.2 Construction Clearing
CT 3.2.1 Road Clearings
*CT 3.2.2 Other Authorized Clearings
CT.3.3 Overstory Removal Units
CT.3.4 Understory Removal Units
CT.3.5 Individual Trees
*CT.3.7 Minor Changes
*CT.4 Volume Estimate
*DT.0 RATES OF PAYMENT
*DT.1 Current Contract Rates
*DT.4 Other Payment Rates
*DT.4.1 Material and Quantities Not in Division AT *DT.4.2 Timber Cut Through Mistake
*DT.4.2.1 Designated Timber Cut But Not Removed
*DT.4.3 Undesignated Timber Damaged Without Negligence
*DT.4.4 Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut
*DT.4.5 Liquidated Damages
ET.0 PAYMENTS
*ET.1 Amount Payable for Timber
*ET.2 Integrated Resource Account *ET.3 Deposits When Payment Guaranteed
GT.0 OPERATIONS
*GT.4 Conduct of Logging
*GT.4.1 Felling and Bucking
*GT.4.1.1 Felling in Clearings
*GT.4.1.2 Stump Heights
*GT.4.1.3 Limbing
*GT.4.2 Skidding and Yarding
GT.4.2.1 Rigging
*GT.4.2.2 Landings and Skid Trails
*GT.4.2.3 Skidding on Roads
GT.4.2.4 Arches and Dozer Blades
*GT.6.3 Temporary Roads
*GT.6.4 Landings
*GT.6.5 Skid Trails and Fire Lines
*GT.6.6 Current Operating Areas
*GT.6.7 Erosion Control Structure Maintenance
*GT.7 Slash Disposal
*GT 8 Measuring
**GT.8.1 Product Identification
IT.0 OTHER CONDITIONS
*IT.1 Title and Liability
*IT.1.1 Title Passage
*IT.1.2 Liability for Loss
*IT.5 Sale of Other Materials
THE FOLLOWING IS A COMPLETE LIST OF WO KT CLAUSES THAT CAN BE USED FOR THE TREE MEASUREMENT VERSION OF THE IRSC. LIST ONLY WO OR REGIONAL K CLAUSES THAT ARE DEEMED APPLICABLE AND NOT IN CONFLICT WITH SECTIONS IN PART I.
WO-KT-CT.1.1# Timber Subject to Agreement (9/04)
WO-KT-CT.3# Reserve Trees (9/04) RO-KT-CT.3.0.1# Cutting Unit Boundaries (11/06)
WO-KT-CT.3.5.2# Designation by Species and Diameter (9/04) WO-KT-GT.3.2# Protection of Reserve Trees (9/04) RO-KT-FT-.3.4# Obliteration of Temporary Road Skid Trails and Landings (11/06)
RO-KT-FT-.3.6# Snow Removal (11/06)
RO-KT-FT.4.1# Closure to Use by Others (11/06) RO-KT-GT.2.2.3 Protection of Fences (11/06) RO-KT-GT.4.2# Skidding and Yarding (Specials Objectives). (11/06) RO-KT-GT.6# Erosion Prevention and Control (11/06)
RO-KT-GT.6.0.1# Erosion Control Seeding (11/06) RO-KT-GT 6.312# Sale Operation Restrictions ((11/06)
RO-KT-GT 7# Slash Treatment (11/06) RO-KT-GT.7.1 Change in Slash Treatment (11/06)
RO-KT-GT.7.2# Temporary Road Construction and Slash Disposal (11/06) RO-KT- GT.8# Measuring (11.06)
RO-KT-GT.8.1# Accountability (5/09) WO-KT-IT.6.8 Use of Timber (Option 2) (9/04) Division AT
Location and Area:
| This Contract Area of |
| 4085 |
| acres more or less is located in: |
| Sections 1, 2, 10, 11, 12, 13, 14, 15, 16, 21, 22, |
23; T37S, R8W; SLBM
Volume Estimate and Utilization Standards
| Species Group |
| Product |
| Estimated |
Quantity * Unit of
Measure Minimum Specifications
| Merchantable Tree |
| Piece Required to be Removed |
Diameter Breast High (d.b.h.)
(inches) Number of Minimum Pieces per Tree Length (feet) Diameter Inside Bark at Small End (inches) 1/
Aspen, White fir & Other Cutting Units 12 – 18
| Sawtimber |
| 1,350.40 |
| CCF |
| 8 |
| 1 |
| 8 |
| 6 |
| 10.67 |
Combined Softwoods (All Species Live & Standing Dead) Cutting Units 12-18 All Species Standing Dead Cutting Units 1-18
Non-saw Non-saw 206.79 6,821.14
CCF
CCF
N/A* N/A*
Timber Subject to Agreement
Aspen, White-fir and other (Downed Dead) Cutting Units 1-18
| Non-saw |
| unestimated |
| CCF |
| 5 |
| 1 |
| 6 |
| 4 |
| N/A |
Total Quantity
8,378.33
1/ Enter Merchantability Factor (Merch. Factor) or Net Scale in % of Gross Scale, whichever is appropriate.
* Refer RO-KT-GT.4.1.1#
Timber Designations, acres are approximate:
Number
Acres
Clearcutting Units (CT.3.1)
Overstory Removal Units (CT.3.3)
Understory Removal Units (CT.3.4)
Individual Trees (CT.3.5)
Incompletely Measured (CT.3)
| Designation by Description or Prescription (KT-CT.3) |
| 18 |
885.01
High Stumps
| Species |
| Product |
| Maximum Stump Height |
(inches)
| All |
| All |
| 12 inches for trees greater than 8” DBH |
6 inches for trees less than 7.9” DBH
Roads
| Name and Date of Governing Road Specifications: |
| Road reconditioning will done under mandatory service items |
All road reconditioning will be done before any included timber is removed from the area.
| Project |
| Design |
Class Approx.
Length (mi./km.)
Sheet Numbers and Approval Date Performance Responsibility
| Survey |
| Design |
| Const. |
Staking1/
| Road No. |
| Name |
30196
| D |
| 0.57 |
| 1 of 5 - 2/24/2016 |
| FS |
| FS |
| BC |
30240
| D |
| 2.12 |
| 1 of 5 - 2/24/2016 |
| FS |
| FS |
| BC |
30381
| D |
| 1.70 |
| 1 of 5 - 2/24/2016 |
| FS |
| FS |
| BC |
1/ Indicate timing, i.e., before clearing (BC) or after clearing (AC).
Specification sheets with itemized construction codes are found in the road package
Schedule of Payment Units
Payment
Unit
Number Approx.
Acres To be Paid for at Flat Rates
Total
Flat
Rate
Payment
Total
Required
Deposits For Slash
Disposal $
| Species |
| Products |
| Quantity |
| Unit of |
Measure
(Cutting Unit 1)
| 102.95 |
| Standing Dead |
(All Species)
| Non-saw |
| 793.48 |
| CCF |
N/A
(Cutting Unit 2)
| 56.05 |
| Standing Dead |
(All Species
| Non-saw |
| 432.00 |
| CCF |
N/A
(Cutting Units 3-5)
| 55.05 |
| Standing Dead |
(All Species)
| Non-saw |
| 424.30 |
| CCF |
N/A
(Cutting Unit 6)
| 63.00 |
| Standing Dead |
(All Species)
| Non-saw |
| 485.57 |
| CCF |
N/A
(Cutting Units 7-8)
| 130.43 |
| Standing Dead |
(All Species
| Non-saw |
| 1005.28 |
| CCF |
N/A
(Cutting Unit 9)
| 89.64 |
| Standing Dead |
(All Species)
| Non-saw |
| 690.89 |
| CCF |
N/A
(Cutting Unit 10)
| 198.50 |
| Standing Dead |
(All Species
| Non-saw |
| 1530.46 |
| CCF |
N/A
(Cutting Unit 11)
| 69.80 |
| Standing Dead |
(All Species)
| Non-saw |
| 537.98 |
| CCF |
N/A
(Cutting Units 12-13)
| 15.46 |
| Aspen, White-fir and Other |
Standing Dead (All Species)
Combined Softwoods (All Species, Live and Standing Dead) Sawtimber
Non-saw Non-saw 174.67 119.15 26.75
CCF
CCF
CCF
N/A
N/A N/A
(Cutting Units 14-16, 18
| 64.58 |
| Aspen, White-fir and Other |
Standing Dead (All Species) Combined Softwoods (All Species Live and Standing Dead)) Sawtimber
Non-saw Non-saw 729.66 497.75 111.73
CCF
CCF
CCF
N/A
N/A N/A
(Cutting Unit 17)
| 39.48 |
| Aspen, White-fir and Other |
Standing Dead (All Species)
Combined Softwoods (All Species Live and Standing Dead) Sawtimber
Non-saw Non-saw 446.07 304.28 68.31
CCF
CCF
CCF
N/A
N/A N/A
APPLICABLE REGIONAL CLAUSES MAY BE ADDED
UNITED STATES DEPARTMENT OF AGRICULTURE
Forest Service
TIMBER REMOVAL SPECIFICATIONS
CLAUSES FOR TREE MEASUREMENT TIMBER REMOVAL CONTRACTS
(Applicable to Contracts to be Measured Before Felling) This Division is organized into Parts, Sections, Subsections, and Items. These are numbered in accordance with the following scheme: Part BTl.0, Section BTl.1, Subsection BTl.11, and Item BTl.111. References to a Part include all Sections, Subsections, and Items within that Part; references to a Section include all Subsections and Items within that Section; and references to a Subsection include all Items within that Subsection. Cross references within this contract cite the reference number of the applicable Division, Part, Section, Subsection, and Item. Descriptive headings used are not to be considered in determining the rights and obligations of the parties hereunder. The Standard Clauses in this Division are subject to Specific Conditions of the contract stated in Division AT. Wherever appropriate, Specific Conditions established in Division AT are herein cited by reference number. References to Standard Clauses also apply to Special KT Clauses with the same numbers. These clauses are applicable only to the timber removal portion of the Reed Valley Stewardship Contract except where otherwise specifically referenced. “Timber” when used in this appendix includes timber and other products.
BT.0—CONTRACT AREA
BT.2 Claims. Valid claims are excluded from Contract Area, except those on which timber cutting is authorized in writing by the claimant and except mining claims on which cutting is authorized by the Act of July 23, 1955 (30 USC 614). Claims that limit Contractor’s rights to operate under this contract and that Forest Service has been able to identify are shown on Contract Area Map. Contractor is not obligated to operate contrary to existing claim limitations. Forest Service shall designate boundaries of claims on the ground to the extent necessary to identify Included Timber.
CT.0—TIMBER SPECIFICATIONS
CT.1 Included Timber. “Included Timber” consists of:
CT.1.1 Standard Timber. Live and dead trees and portions thereof that meet Utilization Standards and are designated for cutting.
CT.1.2 Substandard Timber. Live and dead trees that:
(a) Do not meet Utilization Standards and
(b) Are located in Clearcutting Units or construction clearings or are otherwise designated for cutting.
CT.1.3 Damaged Timber.
CT.1.3.1 Damaged by Contractor. Undesignated live trees meeting Utilization Standards (a) within 200 feet slope distance from centerline of roads constructed hereunder which are damaged by Contractor's construction to the extent that considerable deterioration or mortality is imminent and are designated by Forest Service for felling before the nearest road segment is substantially completed; or (b) which are damaged by Contractor in logging and are subsequently Marked before Contractor has completed skidding or yarding operations in the immediate area. By agreement, such trees may be left without charge if their removal would cause undue damage or be grossly uneconomic.
CT.1.3.2 Negligent or Willful Damage. Undesignated timber meeting Utilization Standards and unnecessarily damaged or negligently or willfully cut by Contractor, if included by Forest Service.
CT.1.3.4 Minor Damage by Natural Causes. Undesignated trees within Contract Area and meeting Utilization Standards, that become insect infested, windthrown, suffer serious damage, or die, as designated by agreement.
CT.1.4 Unintentionally Cut Timber. Trees within or immediately adjacent to Contract Area or to road construction or other authorized clearing outside Contract Area, not designated for cutting but that are cut through mistake by Contractor, when included by Forest Service.
CT.1.5 Construction Timber. Trees to be used for construction under this contract.
CT.1.6 Other Material. Species or products not listed in the contract, upon written approval of Forest Service.
CT.2 Utilization and Removal of Included Timber. “Utilization Standards” for trees and minimum pieces are stated in Division AT. To meet minimum tree specifications, trees must equal or exceed tree diameters listed in Division AT and contain at least one minimum piece. Except for timber required or authorized to be left, Contractor shall fell and buck such trees and shall remove from Contract Area all pieces that:
(a) Meet minimum piece standards in Division AT or
(b) Do not meet such standards, but would have qualified as part of minimum pieces if bucking lengths were varied to include such material.
CT.3 Timber Designations. Timber designated for cutting shall be confined to Contract Area, except as otherwise provided. Contract Area Map indicates Payment Units, if any, where Marking is to be done after solicitation, except for construction clearing, minor changes, and damaged timber. The boundaries of cutting units were plainly marked on ground before solicitation and are shown on Contract Area Map. The number of units and approximate acreage of timber designations are stated in Division AT.
CT.3.1 Clearcutting Units. All trees that meet Utilization Standards within “Clearcutting Units” are designated for cutting.
CT.3.2 Construction Clearing. All timber is designated for cutting that is within the clearing limits of roads constructed hereunder or is in other authorized clearings. All dead or unstable live trees are designated for cutting that are sufficiently tall to reach Contractor’s landings, work areas, or the roadbed of Specified and Temporary Roads when Marked in advance of work in the immediate area. Pieces meeting Utilization Standards from such dead or unstable live trees shall be removed, unless there is agreement that to do so could damage the road. Such designation may be revised as part of agreed changes in road location.
CT.3.2.1 Road Clearings. Timber within the clearing limits of Roads is within separate Payment Units, as shown on Contract Area Map, and the quantities are in Division AT. The quantities of dead or unstable trees designated outside the clearing limits are not included in Division AT.
CT.3.2.2 Other Authorized Clearings. Timber within authorized clearings for Temporary Roads, landings, or other construction clearings is designated for cutting. Quantities of such timber are not included in Division AT.
CT.3.3 Overstory Removal Units. All trees within “Overstory Removal Units” are designated for cutting when they meet Utilization Standards and equal or exceed the diameter limits shown on Contract Area Map.
CT.3.4 Understory Removal Units. All trees within “Understory Removal Units” are designated for cutting when they meet Utilization Standards and are smaller than the diameter limits shown on Contract Area Map.
CT.3.5 Individual Trees. All trees to be cut, other than in the units described in CT.3.1, CT.3.2, CT.3.3, and CT.3.4, are Marked or designated by description. Trees are “Marked” when individually designated by Forest Service with paint marks above and below stump height. Contract Area Map indicates areas plainly identified on the ground where leave trees are Marked to be left uncut.
CT.37 Minor Changes. Within Contract Area, minor adjustments may be made in boundaries of cutting units or in the timber individually Marked for cutting when acceptable to Contractor and Forest Service.
CT.4 Volume Estimate. The estimated volumes of timber by species designated for cutting and expected to be cut under Utilization Standards are listed in Division AT. The estimated volumes stated are not to be construed as guarantees or limitations of the timber volumes to be designated for cutting under the terms of this contract.
DT.0—RATES OF PAYMENT
DT.1 Current Contract Rates. Included Timber that is Released for Cutting shall be paid for at Current Contract Rates determined under this Section. “Current Contract Rates” shall be Flat Rates. Flat Rates shall be those listed in Division AT or B2 of the Schedule of Items. In the event contract time is adjusted, Current Contract Rates shall be continued in the same manner as immediately prior to the adjustment period.
DT.4 Other Payment Rates.
DT.4.1 Material and Quantities Not in Division AT. Incidental amounts of products or portions of trees of species that do not meet Utilization Standards may be removed without charge. Such material from Clearcutting Units and construction clearings may be purposely removed in more than incidental amounts without charge subject to agreement on deposits for road maintenance and use. Such material from other than Clearcutting Units and construction clearings may be purposely removed in more than incidental amounts without charge upon written approval of Contracting Officer, and subject to agreement on deposits if needed for road maintenance and use. Other species or products not listed may, upon written approval of Contracting Officer, be cut and removed without charge other than Required Deposits established by agreement. Timber for which the quantity is not included in the estimate, shall be paid for at Current Contract Rates and Required Deposits.
DT.4.2 Timber Cut Through Mistake. Undesignated timber meeting Utilization Standards, cut by Contractor through mistake and included by the Forest Service, shall be removed and paid for at Current Contract Rates and Required Deposits, unless such material is not listed. In such event, Forest Service, in accord with standard Forest Service methods, shall establish rates to be paid.
DT.4.2.1 Designated Timber Cut But Not Removed. Standard timber shall be removed prior to acceptance of a Subdivision for completion of logging. There shall be no charge when (a) leaving the incidental material is justified under existing conditions, or (b) Cut timber is left by option or requirement.
DT.4.3 Undesignated Timber Damaged Without Negligence. Undesignated timber meeting Utilization Standards, damaged without negligence by Contractor and designated by Forest Service, shall be cut, removed, and paid for at Current Contract Rates and Required Deposits.
DT.4.4 Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut. Undesignated timber meeting Utilization Standards and unnecessarily damaged or negligently or willfully cut by Contractor, if included by Forest Service shall be cut, removed, and paid for at Current Contract Rates and Required Deposits that are in addition to liquidated damages. If such timber is of a species or size not listed in Division AT or is of a quality different from designated timber, Contracting Officer shall establish payment rates in accord with standard Forest Service methods.
DT.4.5 Liquidated Damages. Unnecessary damage to or negligent or willful cutting of undesignated timber, on portions of Contract Area cut over under this contract is likely to cause substantial silvicultural or other damage to the National Forest. It will be difficult, if not impossible, to determine the amount of such damage. Therefore, Contractor shall pay as fixed, agreed, and liquidated damages an amount equivalent to the amount payable at Current Contract Rates. If designated by the Forest Service, Contractor shall remove such damaged timber.
ET.0—PAYMENTS
ET.1 Amount Payable for Timber. Current Contract Rates and Required Deposits in effect when a Payment Unit is Released for cutting shall be applied to the timber quantities to determine the amount Contractor shall pay. Payment shall be in the form of Stewardship Credits or cash.
E.2 Stewardship Account
“Stewardship Account” is an account of all Contractor’s deposits, credits, Payment Guarantees, and the charges for:
a. Timber, or other Products at rates specified in contract
b. Slash disposal and road maintenance at Required Deposit rates,
c. Stewardship Credits established,
d. Contract Scaling Deposits, and
e. Other Charges provided in this contract.
Cash deposits and Stewardship Credits earned shall be recorded currently in such account.
Charges for timber cut shall be made when Forest Service prepares and furnishes to Contractor periodic statements of volume and value of such timber cut and scaled. Charges against Stewardship Credits shall be limited to timber value in excess of Required Deposits. Required Deposits and Other Charges shall be paid in cash.
Contractor shall make cash deposits to meet Contractor’s obligations within 15 days of billing by the Forest Service. Deposits shall be made to Forest Service, USDA, by mail or delivery to the address shown on the bill for collection.
ET.3 - Deposits When Payment Guaranteed. (05/10) To the extent payment guarantee is provided under Clause entitled, “PRODUCT PAYMENT GUARANTEE” requirements for advance cash deposits shall be waived for the value of Product on contract area that is cut, but not removed, and for the value of Products removed from contract area, up to limit of remaining stewardship credits to be earned and exchanged for value of included product except for Required Deposits and Associated Charges. Associated charges shall be waived for not more than one monthly billing period.
GT.0—OPERATIONS
GT.4 Conduct of Logging. Unless otherwise specifically provided herein, Contractor shall fell trees designated for cutting and shall remove the portions which meet Utilization Standards, except for occasional trees inadvertently not cut or trees or pieces not removed for good reason, including possible damage to forest resources or gross economic impracticability at the time of removal of other timber. Logging shall be conducted in accordance with the following, unless other clauses set forth requirements to meet special or unusual logging conditions:
GT.4.1 Felling and Bucking. Felling shall be done to minimize breakage of Included Timber and damage to residual timber. Unless agreed otherwise, felling shall be done by saws or shears. Bucking shall be done to permit removal of all minimum pieces set forth in Division AT. Contractor may buck out cull material when necessary to produce pieces meeting Utilization Standards. Such bucked out material shall contain a minimum amount of sound wood, not in excess of the net Measure in percentage of gross Measure, or based on the merchantability factor, whichever is stated in Division AT. If necessary to assess extent of defect, Contractor shall make sample saw cuts or wedges.
GT.4.1.1 Felling in Clearings. Insofar as ground conditions, tree lean and shape of clearings permit, trees shall be felled so that their tops do not extend outside construction clearings and areas of regeneration cutting.
GT.4.1.2 Stump Heights. Stumps shall not exceed, on the side adjacent to the highest ground, the maximum heights set forth in Division AT, except that occasional stumps of greater heights shall be acceptable when necessary for safe and efficient conduct of logging. Except for acceptable high stumps stated above, Contractor shall re-cut high stumps so they will not exceed heights specified in Division AT and shall dispose of severed portions in the same manner as other logging debris or as otherwise agreed. The stump heights shown in Division AT were selected with the objective of maximum reasonable utilization of the timber unless Contract Area Map shows special areas where stump heights are lower for aesthetic, land treatment or silvicultural reasons.
GT.4.1.3 Limbing. When Forest Service determines it is necessary to minimize damage to the residual stand during skidding, Contractor shall cut exposed limbs from products prior to skidding. Contractor may leave uncut those limbs that cannot be cut with reasonable safety.
GT.4.2 Skidding and Yarding. Methods of skidding or yarding specified for particular areas, if any, are indicated on Contract Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding.
GT.4.2.1 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees designated for cutting.
GT.4.2.2 Landings and Skid Trails. Location of all landings, tractor roads, and skid trails shall be agreed upon prior to their construction. The cleared or excavated size of landings shall not exceed that needed for efficient skidding and loading operations.
GT.4.2.3 Skidding on Roads. Products may be skidded on permanent roads authorized for hauling only by prior written agreement.
GT.4.2.4 Arches and Dozer Blades. Skidding tractors equipped with pull-type arches or dozer blades wider than tractor width or C-frame width, whichever is greater, shall not be used in residual timber outside Clearcutting Units and other authorized clearings, except on constructed tractor roads or landings, unless there is written agreement that residual timber will not be damaged materially by such use.
GT.6.3 Temporary Roads. As necessary to attain stabilization of roadbed and fill slopes of Temporary Roads, Contractor shall employ such measures as outsloping, drainage dips, and water-spreading ditches.
After a Temporary Road has served Contractor’s purpose, Contractor shall give notice to Forest Service and shall remove bridges and culverts, eliminate ditches, outslope roadbed, remove ruts and berms, effectively block the road to normal vehicular traffic where feasible under existing terrain conditions, and build cross ditches and water bars, as staked or otherwise marked on the ground by Forest Service. When bridges and culverts are removed, associated fills shall also be removed to the extent necessary to permit normal maximum flow of water.
GT.6.4 Landings. After landings have served Contractor’s purpose, Contractor shall ditch and slope them to permit water to drain or spread. Unless agreed otherwise, cut and fill banks around landings shall be sloped to remove overhangs and otherwise minimize erosion.
GT.6.5 Skid Trails and Fire Lines. Contractor shall construct cross ditches and water-spreading ditches on tractor roads and skid trails, where staked or otherwise marked on the ground by Forest Service. Forest Service shall designate cross ditching on Contractor-built fire lines prior to or during construction. By agreement, Contractor may use other comparable erosion control measures, such as back blading skid trails, in lieu of cross ditching.
GT.6.6 Current Operating Areas. Where logging, road construction, or other stewardship project work is in progress but not completed, unless agreed otherwise, Contractor shall, before operations cease annually, remove all temporary log culverts and construct temporary cross drains, drainage ditches, dips, berms, culverts, or other facilities needed to control erosion.
Such protection shall be provided, prior to end of October 31 , for all disturbed, unprotected ground that is not to be disturbed further prior to end of operations each year, including roads and associated fills, tractor roads, skid trails, and fire lines. When weather permits operations during Nov. 1 – July 1, Contractor shall keep such work on any additional disturbed areas as up to date as practicable.
GT.6.7 Erosion Control Structure Maintenance. During the period of this contract, Contractor shall provide maintenance of soil erosion control structures constructed by Contractor until they become stabilized, but not for more than 1 year after their construction. Contractor shall not be responsible for repair of such structures damaged by other National Forest users whose activities are not a part of Contractor’s Operations.
GT.7 Slash Disposal. Contractor’s timing of product removal and preparatory work shall not unnecessarily delay slash disposal. Specific slash disposal measures to be employed by Contractor are stated in elsewhere herein and are in addition to Required Deposits for slash disposal.
GT.8 Measuring. “Measuring” is the estimation of timber quantities using certain dimensions and applicable volume tables or formulae to determine the contents of trees or stands in a standard manner. Sampling may be on an individual tree or area basis. Examples of standard procedures are tree measurement, sample tree measurement, and area estimate. The quantity of timber designated or to be designated for cutting has been or shall be Measured, as specified in this contract GT.8.1 Product Identification. For contracts west of the 100th meridian, before removal from Contract Area, unless Contracting Officer determines that circumstances warrant a written waiver or adjustment, Contractor shall:
(a) Hammer brand all products that are eight (8) feet or more in length and one-third (1/3) or more sound, on each end that is seven (7) inches or more in diameter
(b) Paint with a spot of highway-yellow paint all domestic processing products that are eight (8) feet or more in length and one-third (1/3) or more sound, on each end that is seven (7) inches or more in diameter. Each paint spot must be not less than three (3) square inches in size.
Contracting Officer shall assign brands and, if Contract Area is within a State that maintains a log brand register, brands shall be registered with the State. Contractor shall use assigned brand exclusively on logs from this contract until Contracting Officer releases brand. Contractor will furnish and apply highway-yellow paint of a lasting quality (oil-base or equivalent).
All hammer brands and/or highway-yellow paint must remain on logs until they are domestically processed. Contractor shall replace identifying marks if they are lost, removed, or become unreadable. Contractor may remanufacture products into different log lengths. Except for logs remanufactured as part of the mill in-feed process immediately before processing, remanufactured products must be rebranded with the assigned contract brand and repainted with highway-yellow paint, unless otherwise agreed to in writing by Contracting Officer. For such remanufactured products, Contracting Officer may approve use of a brand to be used exclusively as a catch brand, in lieu of the assigned contract brand.
IT.0—OTHER CONDITIONS
IT.1 Title and Liability.
IT.1.1 Title Passage. All right, title, and interest in and to any Included Timber shall remain in Forest Service until it has been cut, removed from Contract Area or other authorized cutting area, and paid for, at which time title shall vest in Contractor. Timber cut under the terms of clause Product Payment Guarantee, shall be considered to be paid for. Title to any Included Timber that has been cut and paid for, but not removed from Contract Area or other authorized cutting area by Contractor on or prior to contract termination, shall remain in Forest Service.
IT.1.2 Liability for Loss. If Included Timber is destroyed or damaged by an unexpected event that significantly changes the nature of the Included Timber, such as fire, wind, flood, insects, disease, or similar cause, the party holding title shall bear the timber value loss resulting from such destruction or damage; except that such losses caused by insect or disease after felling of timber shall be borne by Contractor, unless Contractor is prevented from removing such timber by the Forest Service. Deterioration or loss of value of salvage timber is not an unexpected event. In the event Included Timber to which Forest Service holds title is destroyed, Contractor will not be obligated to remove and pay for such timber. In the event Included Timber to which Forest Service holds title is damaged, Contracting Officer shall make an appraisal to determine for each species the difference between the appraised unit value of Included Timber immediately prior to the value loss and the appraised unit value of timber after the loss. Current Contract Rates in effect at the time of the value loss shall be adjusted by said differences to become the redetermined rates.
There shall be no obligation for Forest Service to supply, or for Contractor to accept and pay for, other timber in lieu of that destroyed or damaged. This Subsection shall not be construed to relieve either party of liability for negligence.
IT.5 Sale of Other Materials. Forest Service reserves the right to sell from Contract Area during the period of this contract any materials or products not subject to its terms, but shall not permit removal, possession or use thereof which will materially interfere with Contractor's Operations. Contractor shall not be obligated to do any work made necessary by the action of others.
WO-KT-CT.1.1# – TIMBER SUBJECT TO AGREEMENT. (9/04) In addition, there is within the Contract Area an unestimated quantity of:
| Species |
| Product |
Aspen, White-fir and Other (Downed Dead) Cutting Units 1-18
Non-saw that shall be Included Timber upon written agreement.
WO-KT-CT.3# – RESERVE TREES. (9/04) Notwithstanding the designations for cutting under CT.3.1, CT.3.2, CT.3.3, or CT.3.4, live or dead _Ponderosa pine greater than 24” DBH and Wildlife reserve trees or groups of reserve trees within such cutting units or clearings shall be left uncut. Reserve trees are identified by Orange (including Ponderosa pine greater than 24” DBH) paint and shall be protected. Units with reserve trees are shown on Contract Area Map.
RO-KT-CT.3.0.1# - CUTTING UNIT BOUNDARIES. (11/06) The boundaries of cutting units are designated as shown in the following table. The trees used for boundary designation are not to be cut.
Cutting Unit Boundary Designation Table Cutting Unit Paint Color
Designation All Orange Trees are painted with 3 vertical stripes on the bole of the tree and stump marks. The cutting unit number is painted randomly along the boundary; above the middle stripe, facing in to the unit.
WO-KT-CT.3.5.2# – DESIGNATION BY SPECIES AND DIAMETER. (9/04) Trees that meet Utilization Standards are designated for cutting, as shown on the Tree Designation Table and Contract Area Map, except trees Marked with 4/__Orange_____ paint or described to be left uncut.
Tree Designation Table
| Unit(s) |
| Designated |
Species 1/ More than
Stump Diameter
(inches) 2/ Less than
Stump Diameter
(inches) 2/
Sawtimber
Cutting Units 12-18
Live Aspen, White fir and Other
Non-saw Cutting Units 12-18
Combined Softwoods All Species Live and Standing Dead
| 6 |
| 10 |
Non-saw Cutting Units 1-18
Standing Dead
(All Species)
Additional trees to be cut, if any, are Marked with 4/_Green______ paint.
All Live Ponderosa Pine in Units 12-18 over 24 inches DBH____ shall be left as leave trees, unless Marked with 4/___Green____ paint. Leave 1/___N/A____ trees of the designated cut species, 2/__N/A_____ inches stump diameter or greater, to avoid leave tree spacing greater than 3/___N/A____ feet.
Distances are measured horizontal distance, outside bark stump height to outside bark stump height. Stump diameter is measured outside bark at stump height in a horizontal plane and is the average of a measurement across the short axis through the true center of the stump and a second measurement at right angles to the short axis.
Contractor and Forest Service shall agree to skid trail location under GT.4.2.2. Quantities of trees located in skid trails (are) Included Timber under AT.2.
WO-KT-GT.3.2# – PROTECTION OF RESERVE TREES. (9/04) Contractor’s damage or destruction of reserve trees will cause serious and substantial silvicultural or other damage to the National Forest. It will be difficult if not impossible to determine the amount of such damage. Therefore, Contractor shall pay as fixed, agreed, and liquidated damages $__200.00 for each __Wildlife_____________ reserve tree damaged or destroyed by Contractor's Operations, in addition to amounts payable under DT.4.4 and DT.4.5. Damage, as used herein, includes any injury to the living crown, bole, or roots of reserve trees. If areas are marked on the ground around such reserve trees, operation of heavy equipment or skidding of products within the area shall be considered to be damage to the tree.
RO-KT-FT.3.4# - OBLITERATION OF TEMPORARY ROADS, SKID TRAILS AND LANDINGS. (11/06) Unless otherwise agreed in writing, temporary roads, skid trails and landings associated with the cutting unit(s) listed in the following table shall be obliterated using the method described.
Cutting Unit(s) Type of Facility
Closure Method
All Temporary Roads Temporary roads will be closed according to GT.6.3 (Temporary Roads). In addition slash will be placed on the roads.
All Skid Trails
Skid trails will be closed according to GT.6.5 (Skid Trails & Firelines). Skid trails will be closed by covering with slash.
RO-KT-FT.3.6# - SNOW REMOVAL. (11/06) Snow removal shall be done in a manner to preserve and protect the roads to insure safe and efficient transportation and to prevent unacceptable erosion damage to roads, streams, and adjacent lands.
A. Description. Snow removal work by Contractor shall include:
1. Removal of snow from entire road surface width including turnouts.
2. Removal of snow slides, minor earth slides, fallen timber and boulders that obstruct normal road surface width including turnouts.
3. Maintain drainage so that the drainage system will function efficiently.
B. Performance. All items of snow removal shall be done currently as necessary to insure safe, efficient transportation. Work shall be done in accordance with the following minimum standards of performance.
1. Removal of material. All debris, except snow and ice, that is removed from the road surface and ditches shall be deposited away from stream channels at agreed locations.2. During snow removal operations, banks shall not be undercut nor shall gravel or other selected surfacing material be bladed off the roadway surface.
3. Ditches and culverts shall be kept functional during and following roadway use.
4. Snow berms shall not be left on the road surface. Berms left on the shoulder of road shall be removed and/or drainage holes shall be opened and maintained. Drainage holes shall be spaced as required to obtain satisfactory surface drainage without discharge on erodible fills.
5. Dozers and skidders shall not be used to plow snow on system roads without written approval of Forest Service. Upon approval, dozers and skidders must be equipped with shoes or runners to keep the plow blade a minimum of 6 inches above the road surface unless specifically removed from the requirements in writing.
6. Snow must not be removed to the road surface. A minimum 6 inch depth must be left to protect the roadway.
7. Contractor's damage from, or as a result of, snow removal shall be restored in a timely manner.
RO-KT-GT.2.2.3 – PROTECTION OF FENCES. (11/06) Unless otherwise agreed to in writing, all fences, as designated on Contract Area Map, which are required to be cut because of temporary road construction, skid road construction, or other logging activities, shall not be cut until the fence has first been "line braced" or "fence braced," to prevent loss of tension, on both sides of the wire span or series of short spans to be cut.
The Contractor shall install temporary cattleguards in accordance with attached plans at each location where the fence is cut for temporary road access unless otherwise approved in writing by Forest Service. All fences will be restored promptly after logging to the condition existing immediately prior to logging. Fence repair will be kept current with logging operations.
RO-KT-GT.4.1.1# - FELLING AND BUCKING (SPECIAL OBJECTIVES). (11/06) Unless otherwise agreed in writing, silvicultural prescriptions and land management objectives shall be conducted and accomplished by the following requirements, methods and procedures:
Cutting Unit Special Objectives______________________________________________________________ All Units Any given 6 foot piece containing 50% or more of rot, may be left at the landings. Crooks, sweeps and cracks are not included in this bucking exception, and must be removed from the sale area.
RO-KT-GT.4.2# - SKIDDING AND YARDING (SPECIAL OBJECTIVES). (11/06) Unless otherwise agreed in writing, silvicultural prescriptions and land management objectives shall be conducted and accomplished by the following requirements, methods and procedures:
Cutting Unit
Special Objectives
All Units Whole Tree Yarding (yard tops and boles to the landings) All skid trails will be placed at least 300 feet from fish bearing streams and 150 feet from non fish bearing streams, wetlands, ponds and intermittent streams.
RO-KT-GT.6# - EROSION PREVENTION AND CONTROL. (11/06)
A. Contractor shall locate Temporary Roads on locations approved by the Forest Service. Such location shall include the marking of road centerline or grade-line and the setting of such construction stakes as are necessary to provide a suitable basis for economical construction and the protection of National Forest lands.
B. Skidding with tractors within 150 feet of live streams shall not be permitted except in places designated in advance by Forest Service, and in no event shall skid roads be located in live or intermittent streamcourses. Skid trails shall be located high enough out of draws, swales, and valley bottoms to permit diversion of runoff water to natural undisturbed forest ground cover.
C. Prior to periods of accelerated water runoff, especially during the spring runoff and periods of heavy rainfall, Contractor shall inspect and open culverts and drainage structures, construct special cross ditches for road runoff, and take other reasonable measures needed to prevent soil erosion and siltation of streams.
D. Temporary Road surface width shall be limited to truck bunk width plus four (4) feet, except for needed turnouts which shall not exceed two (2) times the bunk width plus four (4) feet. If shovels or cranes with revolving carriage are used to skid or load, Temporary Road surface width equal to track width plus tail swing shall be permitted.
E. Unless otherwise agreed in writing, Contractor shall keep erosion control work current with his operations under the contract and in any case not later than 15 days after completion of skidding on each payment unit or cutting unit.
RO-KT-GT.6.0.1# - EROSION CONTROL SEEDING. (11/06) Following completion of skidding and yarding operations in an area, Contractor shall seed and fertilize all exposed areas of raw soil as designated by the Forest Service on skid trails, landings, firebreaks, slides, slumps, Temporary Roads and traveled ways of Specified Roads :
| Road Number |
| Description |
| 32251 |
| By termination of the contract, the road will have a water bar placed at the beginng to |
prevent use. The road will also be ripped and seeded as agreed upon by Forest Service.
| 32255 |
| By termination of the contract, the road will have a water bar placed at the beginng to |
prevent use. The road will also be ripped and seeded as agreed upon by Forest Service.
| 32256 |
| By termination of the contract, the road will have a water bar placed at the beginng to |
prevent use. The road will also be ripped and seeded as agreed upon by Forest Service.
| 32258 |
| By termination of the contract, the road will have a water bar placed at the beginng to |
prevent use. The road will also be ripped and seeded as agreed upon by Forest Service.
| 32259 |
| By termination of the contract, the road will have a water bar placed at the beginng to |
prevent use. The road will also be ripped and seeded as agreed upon by Forest Service.
Following closure specified in KT-FT.4.1#. Soil on areas to be seeded shall be left in a roughened condition favorable to the retention and germination of the seed. Scarification of traveled ways on Specified Roads listed above shall be to a minimum depth of 4 inches and a maximum depth of 12 inches.
Seed shall be spread evenly at the rate of 17 pounds of seed and NA pounds of fertilizer per acre.When fertilizer and seed are applied in separate operations, the second operation shall be carried out within 72 hours of the first.
Seeding shall be done during the period Oct 1 to Nov 30 and under the above specified conditions unless The kinds and amounts of seed to be sown in terms of pure live seed (PLS) shall be:
Species of Seed
PLS Pounds Per Acre
Species
35%
Quickguard (Sterile triticale hybrid)
25%
Elymus trachycaulus (Slender wheatgrass)
20%
Bromus marginatus (Mountain brome)
5%
Poa fendleriana (Muttongrass)
2.5%
Symphoricarpos oreophilus (Mountain snowberry) 0.5
5%
Purshia tridentata (Antelope bitterbrush)
2.5%
Viguera multiflora (Showy goldeneye)
0.5
Erigeron speciosus (Aspen daisey)
0.5
Linum lewisii (Blue flax)
0.5
Certified Noxious Weed Free. Broadcast @17 lbs/acre.
All seed purchased will be certified to be free of the noxious weed seeds from weeds listed on the current "All States Noxious Weeds List." Test results from a certified seed analyst and seed analysis labels attached to the bags will be provided to the Forest Service.
The following kinds and amounts of standard commercial fertilizer shall be used with guaranteed analysis of contents clearly marked on containers:
Type of Fertilizer
Pounds Per Acre
NA
NA
RO-KT-GT6.312# - SALE OPERATION RESTRICTIONS. (11/06) Unless otherwise agreed in writing, sale operations will be restricted as listed below:
Sale Operation Restriction Schedule Payment Unit/Cutting Unit Restriction
Purpose Payment Units 1, 2 ,3
(Cutting units 1-5)
No activity March 1-September 30 Wildlife Nesting Period
RO-KT-GT.7# - SLASH TREATMENT. (11/06) Slash is defined as logs, tops, limbs, and other woody material, exclusive of stumps, which is created by the logging operation and remaining on the ground after logging. In areas where Contractor-created slash is intermingled and inseparable from pre-existing slash, slash disposal requirements shall apply to the pre-existing slash as well as the Contractor-created slash. Such areas are designated in the Contractor Slash Responsibility Table herein.
Slash created in the construction of Specified Roads shall not be considered as logging slash in this Section.
Forest Service and Contractor shall jointly develop a schedule for completion of slash treatment on the various portions of the sale area.
Contractor's Slash Responsibility Table
Description of Unit(s)
Type of Slash Disposal
Landing Cleanup
Lopping
Fell Damaged Trees
Landing Cleanup A landing is considered a place where any logs or products are gathered for loading. Logs not meeting utilization standards accumulated at landings shall be decked at locations as agreed to by the Forest Service. All slash accumulated at landings shall be piled.
Piles shall be reasonably compact and free of soil to facilitate burning. Piles will not be less than 6 feet in height. Piles shall be of a size and location which will not impair road use or result in damage to residual timber.
Landing debris along temporary roads within the cutting units may be piled in conjunction with temporary road construction slash. Landing piles shall be placed along the lower side of the road.
All objects which extend more than 1.5 feet in any direction pile profile will be cut off and returned to the pile Lopping
Limbs and remaining tops, will not extend over 2 feet in height above the ground.
Fell Damaged Residual Contractor shall fell all species over 6 feet in height not meeting minimum diameter specifications for Included Timber that are damaged beyond recovery by the Contractor's Operations. Such trees shall be limbed to a stem diameter of approximately 4 inches, at which point the top shall be cut from the remainder of the stem.
RO-KT-GT.7.1 – CHANGE IN SLASH TREATMENTS. (11/06) Slash treatment measures required in KT-GT.7# may be changed upon written agreement. The Forest Service shall determine the current cost of performing the work to be deleted and the work to be added. When the cost of work deleted exceeds the cost of work added, the agreement shall provide for a lump sum payment to the Forest Service for the amount of the difference. When the cost of work added exceeds the cost of work deleted, the change may be made only if the Contractor agrees to making the change with no cost adjustment.
RO-KT-GT.7.2# - TEMPORARY ROAD CONSTRUCTION SLASH DISPOSAL. (11/06) Slash treatment methods of Temporary Road slash shall be agreed to in writing prior to construction. Temporary Road slash shall be treated in accordance with the following:
A. All timber within the road clearing limits which contains a product meeting the minimum piece specifications stated in AT.2 shall be felled (not pushed over) and bucked in advance of road construction. All timber shall be felled within the clearing limits whenever it is feasible to do so.
B. Timber within the clearing limits not meeting minimum piece specifications in AT.2 and other debris from the clearing and grubbing operations more than 5 inches in diameter and 6 feet in length shall either be (a) utilized and removed from Contract Area, (b) burned within the right-of-way, (c) removed to designated locations shown on Contract Area Map for burying or later burning, (d) buried, (e) processed through a chipping machine, (f) scattered in such a manner as to avoid concentrations of slash and without damaging other trees or resource values, (g) windrowed (h) decked, or (i) a combination thereof.
C. All material to be treated or disposed of shall be bucked into lengths not to exceed N/A feet before being piled or buried.
D. If debris is to be burned, burning shall be complete and shall be done at such times and in a manner approved in writing by Forest Service. Residual construction slash from burning shall be buried, scattered or removed to agreed locations.
E. Debris to be buried shall be placed in prepared holes, benches, or trenches at agreed locations and covered with not less than 2 feet of native soil or rock. Slash and debris may be buried in the roadway providing hauling can be supported and providing there is little probability or hazard of slope failure.
F. If debris is to be chipped, the chips shall be spread over the surface of the ground in such a manner that their loose depth does not exceed N/A inches. Chips may be mixed with soil within roadway.
G. Slash and debris may be scattered in those situations where the volume of slash or residual slash is relatively light and the adjacent stands of timber are sufficiently open to accommodate the scattering without damage.
H. When slash is to be windrowed, the windrow area shall be cleared. Windrows shall be placed parallel to and along the embankment toe. Windrows shall not be placed against trees.
I. If material is decked, logs not meeting Utilization Standards that are N/A inches or more in diameter shall be bucked into lengths not to exceed N/A feet and piled at agreed locations.
RO-KT-GT .8# - MEASURING. (11/06) The estimated quantity of timber in AT.2 has been determined by standard procedures described in FSH 2409.12, Timber Cruising Handbook.
The following table describes the type of cruising method used to determine quantities:
Payment Unit/Cutting Unit Cruising Method
Variable Plot Cruise
All Additional Volume
100% Cruise Estimated quantities of timber subsequently included under CT.1.3, CT.1.4, CT.3.1, CT.3.2, CT.3.3, CT.3.4, CT.3.5 or CT.3.7 not previously measured will be determined using the standard cruise methods as described in FSH 2409.12, Timber Cruising Handbook, or, if attached, using the Additional Volume Calculation Table based on information generated from the timber cruise.
Additional Volume Calculation Table Reed Valley Stewardship Sale Unit #: ________ Date:___________ Measured by:________________________
Note: Volumes…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .