sf-301.doc

Standard Form DOC document 73 KB Posted

Attached to
Mesa Campground Toilet Retrofit
Solicitation number
AG-8399-S-12-0019
Issued by

About this file

AMENDMENT 1 (One)

View the file

Other versions and copies of SF 301

File Revision Posted Attached to
SF301.pdf Revision not stated Repair West Building Exterior Windows at the Metropolitan Detention Center (MDC) Brooklyn, New York
SF301.pdf Revision not stated Repair West Building Roof Phase I at the Metropolitan Detention Center (MDC) Brooklyn, New York
SF301.pdf Revision not stated Installation of Above Ground Fuel Storage Tanks and Piping System at the Federal Correctional Institution (FCI) McKean, Pennsylvania
SF301.pdf Revision not stated Replace Complex Warehouse Roof at the Federal Correctional Complex (FCC) Oakdale, Louisiana
SF301.pdf Revision not stated Renovate Control Room at the United States Penitentiary (USP) Lewisburg, Pennsylvania
SF301.pdf Revision not stated Upgrade PLC System at the Federal Correctional Complex (FCC) Allenwood, Pennsylvania
SF301.pdf Revision not stated Repair Plumbing at the Metropolitan Correctional Center (MCC) New York
SF301.pdf Revision not stated Replace Camp Water Line at the Federal Correctional Institution (FCI) Danbury, Connecticut
SF301.pdf Revision not stated Upgrade PLC System at the Federal Correctional Institution (FCI) Schuylkill, Pennsylvania
SF301.pdf Revision not stated Repair the RDAP Roof at the United States Penitentiary (USP) Lewisburg, Pennsylvania
SF301.pdf Revision not stated Replace Roofs Phase 3 at the Federal Correctional Institution (FCI) Ray Brook, New York
SF301.pdf Revision not stated Replace Fire Sprinklers at the Federal Correctional Institution (FCI) Ft. Dix, New Jersey
SF301.pdf Revision not stated Replace Perimeter Detection Systems at the Federal Correctional Institution (FCI) Danbury, Connecticut
SF301.pdf Revision not stated Install Snow Canopies at the Federal Correctional Institution (FCI) Berlin, New Hampshire
SF301.pdf Revision not stated Replace Camp Water Main at the Federal Correctional Institution (FCI) Danbury, Connecticut
SF301.pdf Revision not stated Upgrade Sewage Treatment Plant at the Federal Correctional Institution (FCI) Loretto, Pennsylvania
SF301.pdf Revision not stated Replace Door Controls at the Federal Correctional Institution (FCI) Ray Brook, New York
SF301.pdf Revision not stated Replace Dialysis Water Treatment System at the Federal Medical Center (FMC) Devens, MA
SF301.pdf Revision not stated Upgrade to Institution Mission Change
SF301.pdf Revision not stated Repair/Rebuild Elevators at the Federal Medical Center (FMC) Devens, MA
Show all 20

Who attaches SF 301

Other files

File Type Posted
Title Sheet Mesa Toilet Retro-Model.pdf PDF
MesaFinalSF 1442.pdf PDF
Mesa 1 Toilet Retrofit-Model.pdf PDF
Concrete Demo-DEMOLITION.pdf PDF
Concrete Layout-CONCRETE.pdf PDF
MesaCampgroundToiletRetrofitRFQ.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE
PAGE OF PAGES
1
1
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
1 (one)
08/01/2012
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

USDA Forest Service

ATTN: Contracting Officer 3005 E. Camino Del Bosque Silver City, NM 88061

Same As Block 6.

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.
FORMCHECKBOX

AG-8399-S-12-0019

9B. DATED (SEE ITEM 11)

07/17/2012

FORMCHECKBOX

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

FORMCHECKBOX

FORMCHECKBOX

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

FORMCHECKBOX

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

FORMCHECKBOX

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

The following clarifications are hereby incorporated into Section C--Description/Specifications/Statement of Work:

Light switches are to be motion sensor activated. When Activated, lights and exhaust fan are to turn on.

Waste lines are to be replaced in chase area. Underground waste lines will be replaced up to 3-5 feet away from building. New waste lines will be properly connected to the existng line. PVC pipe may be used.

Water lines are to be replaced in chase area, all the way down to ground level. PVC pipe may be used.

Vent pipes are to be replaced. PVC pipe may be used.

Interior of restrooms wood backing panes shall be replaced if damaged.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105
STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

(a) Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

(b) Item 3 (Effective Date).

(1) For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

(2) For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

(3) For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

(4) For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

(5) For a modification confirming the contacting officer’s determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(c) Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

(d) Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor’s name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

(e) Item 9, Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. – Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the orginal solicitation, contract, or order.

(f) Item 12 (Accounting and Appropriation Data). When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.

(1) Accounting classification __________ Net increase $__________

(2) Accounting classification __________ Net decrease $__________ NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words “See continuation sheet”.

(g) Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

(h) Item 14 (Description of Amendment/Modification.

(1) Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

(2) Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $________

(ii) Total contract price decreased by $________

(iii) Total contract price unchanged.

(3) State reason for modification.

(4) When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(5) When the SF-30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to –

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(6) Include subject matter or short title of solicitation/contract where feasible.

(i) Item 16B. The contracting officer’s signature is not required on solicitation amendments. The contracting officer’s signature is normally affixed last on supplemental agreements.

STANDARD FORM 30 BACK (REV. 10-83)

File details come from the government source that posted it. Updated .