solicitation page 18 revised.doc
DOC document 61 KB Posted
- Attached to
- New Mexico Thinning IDIQ Federal contract opportunity
- Solicitation number
- AG-8371-S-09-0016
About this file
Soliciation page 18 revised
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT.3.doc | DOC document | |
| AMENDMENT.2.doc | DOC document | |
| COMMERCIAL_ITEMS.revised.clauses.doc | DOC document | |
| AMENDMENT.1.doc | DOC document | |
| COMMERCIAL_ITEMS.revised.clauses.doc | DOC document | |
| solicitation pages 3-10 revised.doc | DOC document | |
| solicitation pages 1-2.pdf | ||
| solicitation pages 3-55.doc | DOC document | |
| wage.determination.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOL NO.AG-8371-S-09-0016
PAGE 18 of 55 revised
NEW MEXICO THINNING
SOL NO.AG-8371-S-09-0016
NEW MEXICO THINNING
PERFORMANCE SUMMARY
| Work Statement |
| Performance Standard |
| Gov’t Method of Assessment |
| Incentive/ |
Deduction
Tree Thinning, Quality meets or exceeds performance standard of 90%.
COR or inspector conduct periodic monitoring of operations and random plots consistent with Thinning Inspection Method described in FSH 2409.17, 6.4 Exhibit 04.
and Section J.
· The Contractor’s quality will be reflected in the performance evaluation either as positive or negative incentive.
· If Contractor achieves 90% or greater quality, the Contractor will receive unit price as incentive.
· If Contractor does not achieve at least 90% quality, deductions as per Section G and adverse performance evaluation.
Slash Treatment
| Meets slash treatment requirements. |
| COR or inspector conduct periodic monitoring |
| · Rework required if Contractor fails to meet standard. |
Quality Control
| Contractor maintains good quality control on all aspects of operation Actions not consistent with contract specifications are corrected as per the Quality Control Plan. |
| COR or inspector randomly sample and observe operations. |
| · The quality of Quality Control provided by the Contractor will be reflected in the performance evaluation as either positive or negative incentive. |
If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective action immediately. Result in adverse performance evaluation.
| Contractor’s plot inspections are +/-5% of Government’s quality. Inspection completed to meet timeframes. |
| COR or inspector randomly observe Contractor inspection. Review Contractor inspection sheets |
| · The ability of the Contractor to meet the standard will be reflected in the performance evaluation as either positive or negative incentive. |
· When Contractor’s plot inspections meet standards, no deduction.
· If quality does not meet standard, pay deduction (Section G) and/or additional costs to the Government will be assessed
Work Plan and Schedule
| Work meets schedule as per the accepted work plan. |
| COR and inspector conduct periodic monitoring. |
| · The Contractor’s ability to maintain the work schedule and complete work on schedule will be reflected in the performance evaluation as either positive or negative incentive. |
· Work not completed on schedule is subject to Default and may result in assessment of actual costs.
| Skid trail locations and closeout |
| Meets skid trail location and closeout requirements |
| COR or inspector randomly sample and observe operations. |
| · Rework required if Contractor fails to meet standard |
| Temporary road creation and location |
| Meets temporary road creation and location requirements |
| COR or inspector randomly sample and observe operations. |
| · Rework required if Contractor fails to meet standard |
| Deck and landing creation and location |
| Meets deck and landing creation and location requirements |
| COR or inspector randomly sample and observe operations |
| · Rework required if Contractor fails to meet standard |
File details come from the government source that posted it. Updated .