Final MBR-WR LTSC Pink 895 Task Order.docx

DOCX document 193 KB Posted

Attached to
Medicine Bow/Routt/White River (MBR/WR) Long Term Stewardship Contract
Solicitation number
AG-82X9-S-12-9001
Issued by

About this file

Pink Sample Task Order

View the file

Other files

File Type Posted
Amendment_2_SF-30R__July_24_2012.pdf PDF
MBR-WR.LTSC.Spruce.Gulch.530.Task.Order.docx DOCX document
LTSCPink895Finalmap1_11x17.pdf PDF
LTSCPink895Finalmap2_11x17.pdf PDF
MBR.WR.LTSC.West.Grouse.Stewd.Appendix.B.docx DOCX document
sprucegulch530contractmapvicinity1.pdf PDF
NoNameCrFinalSAM11x17.pdf PDF
MBR-WR.LTSC.Spring.Creek.Vicinity.Map.Appendix.F.pdf PDF
spruce_gulch530_5_salemap.pdf PDF
MBR.WR.LTSC.Ophir.North.Stewd.Appendix.B.docx DOCX document
MBR-WR.LTSC.North.Deep.Creek.Vicinity.Map.Appendix.F.pdf PDF
MBR-WR.LTSC.West.Grouse.Vicinity.Map.Appendix.F.pdf PDF
MBR-WR.LTSC.Ophir.North.Vicinity.Map.Appendix.F.pdf PDF
Final MBR-WR LTSC No Name Creek Task Order.docx DOCX document
MBR.WR.LTSC.WRNF.North.Deep.Creek.Stewd.Task.Order.docx DOCX document
MBR.WR.LTSC.Spring Creek.Stewd.Task.Order.docx DOCX document
MBR-WR.LTSC.Ophir.North.Contract.Area.Map.Appendix.F.pdf PDF
MBR.WR.LTSC.West.Grouse.Stewd.Task.Order.docx DOCX document
MBR.WR.LTSC.Ophir.North.Stewd.Task.Order.docx DOCX document
WR.LTSC.North.Deep.Creek.Stewd.sale_te_report.pdf PDF
spruce_gulch530_4_salemap.pdf PDF
LTSCPink895Finalmap3_11x17.pdf PDF
Final MBR-WR LTSC Pink 895 Appendix B.docx DOCX document
MBR-WR.LTSC.Spruce.Gulch.530.Appendix.B.docx DOCX document
MBR-WR.LTSC.West.Grouse.Contract.Area.Map.Appendix.F.pdf PDF
MBR-WR.LTSC.Spring.Creek.Contract.Area.Map.Appendix.F.pg2of2.pdf PDF
spruce_gulch530_3_salemap.pdf PDF
MBR-WR.LTSC.Spring.Creek.Contract.Area.Map.Appendix.F.pg1of2.pdf PDF
spruce_gulch530_2_salemap.pdf PDF
Final MBR-WR LTSC No Name Creek Appendix B.docx DOCX document
MBR.WR.LTSC.Spring Creek.Stewd.Appendix.B.docx DOCX document
MBR-WR.LTSC.North.Deep.Creek.Contract.Area.Map.Appendix.F.pdf PDF
MBR.WR.LTSC.WRNF.North.Deep.Creek.Stewd.Appendix.B.docx DOCX document
LTSC Ophir North cruise final.pdf PDF
Wage Determination.mht MHT file
LTSC.MBR.Spruce.Gulch.530.cruise.pdf PDF
Pre.Bid.Mtg.List.of.Attendees.pdf PDF
SF-30R.doc DOC document
MBRWR.LTSC.Pre.Bid.Mtg.List.of.Attendees.pdf PDF
LTSC_spring_creek_volume_cruise_final.pdf PDF
LTSC_TPA_spring_creek_final cruise.pdf PDF
MBRWR.LTSC.NoName.cruise.pdf PDF
COLORADO PTAC FLYER.pdf PDF
LTSC West Grouse Landing Pile Calculation Spreadsheet Final.pdf PDF
LTSC Ophir North trees per acre cruise.final.pdf PDF
LTSC_north_deep_creek_cruise_volume_final.pdf PDF
MBRWR.LTSC.Pink.895.cruise.pdf PDF
LTSC_TPA_north_deep_creek_cruise_final.pdf PDF
Draft.MBR-WR.LTSC.West.Grouse.Stewd.Task.Order.docx DOCX document
Draft.MBR-WR.LTSC.Spring.Creek.Stewd.Appendix.F.Contract.Map.sheet1of2.pdf PDF
Show 40 more

Latest 50 of 104 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. AG-82X9-S-12-9001 MBR-WR LTSC Pink 895 Stewardship (MBRNF)

MBR-WR LTSC PINK 895 STEWARDSHIP

B.1 SCHEDULE OF SUPPLIES/SERVICES

ITEM N0.
SCHEDULE OF SUPPLIES/SERVICES

(Stewardship Work Activity Description)

QUANTITY
UNIT
UNIT PRICE
AMOUNT

10B

Lodgepole pine, Roadside Hazard Tree Removal - Cut and remove individual non-sawtimber designated trees including boles to a 3” DIB. Remove topwood and defect from designated sawtimber trees to a 3” DIB. Lop and Scatter slash. Estimated 101-200 non-sawtimber cut trees per acre.

73.84

Acre

B.2TIMBER/PRODUCT REMOVAL PRICE SCHEDULE:
Values of timber products removed to be applied at Flat Rates
SPECIES
PRODUCT
ESTIMATED

QUANTITY

UNIT OF MEASURE
BID (Flat) Per Green Ton
Total Value Bid by Species/ Product
Weighted Average Rate per Green Ton
Live and Dead Lodgepole pine
Sawtimber
601
GREEN TON
Live and Dead Engelmann spruce, True Fir
Sawtimber
32
GREEN TON
Live and Dead Lodgepole pine
Non-Sawtimber
1140
GREEN TON
Live and Dead Engelmann spruce and True Fir
Non-Sawtimber
0
GREEN TON
Combined Softwoods
Biomass (Topwood and Defect)
430
GREEN TON

See Appendix B, Division A, Volume Estimate and Utilization Standards.

SECTION C – DESCRIPTION AND SPECIFICATIONS

C.1 STATEMENT OF WORK/SPECIFICATIONS

The contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in the master contract, in this task order and in all attachments. This task order includes project specific requirements which supplement the master contract and all attachments.

C.2 PROJECT DESCRIPTION

C.2.1 PROJECT OBJECTIVES

The objectives of the project which this task order is a part of are to:

· Continue mitigation of undesirable effects of a multi-million acre mountain pine beetle infestation and to augment establishment of the future forest and

· Mitigate unacceptable fuel loading associated with the bark beetle infestation within the Wildland-Urban Interface and

· Treat safety hazards associated with falling dead trees along public travel corridors and around public infrastructure.

C.2.2 DESCRIPTION OF WORK

This task order for the MBR-WR Long Term Stewardship Contract describes the contract requirement and specifications for services for a performance based, construction contract with requirements for forest product removal. Work includes performance of stewardship activities within the boundaries of this project as defined on the “MBR-WR LTSC Pink 895 Stewardship Contract Area Map” located in Appendix F. The work required by this task order includes all of the requirements in the master contract, as well as the requirements within this task order and in the attachments. These requirements include, but are not limited to:

· Lodgepole pine, Roadside hazard tree cutting, removal and associated work. (see Appendix A).

· Forest product removal and related work (see Appendix B).

· Temporary Road Construction, Closure and Obliteration (see Appendix C).

· Road Maintenance T-Specifications (see Appendix D)

1. Project Area Location – This project is located on the Medicine Bow-Routt National Forest and is located approximately 20 miles north of Walden, CO. The project is along NFSR’s 891.1, 894.1, 895.1, 916.1, 921.1, 922.1, 931.1, and 937.1. Treatment units are located within T11N, R79W, portions of sections 3, 4 and 5; T12N, R79W portions of sections 21, 27, 28, 29, 30, 31, 33, and 34; T12N, R80W portion of section 25; 6th PM, Jackson County, Colorado.

2. Access to Project Area Location – Access to the project area from Walden, CO is via Highway 125 north approximately 13 miles to the junction with Highway 127 then north on Highway 127 approximately 7 miles to the junction with NFSR 895.1. Follow NFSR 895.1 west approximately 1.5 miles to the junction with NFSR 891.1. The project area begins at this point.

3. Timing of Access - Contractors should expect limited access to treatment areas for 2-5 months through winter and spring (See F.2 for Normal Operating Season). Other timing restrictions, such as winter recreation, elk calving and winter range protection, may restrict or prohibit operations during specified periods of the year. Refer to F.4.1.2 Contract Operating Restrictions and H.26 Use of Roads By Contractor. The Forest Service assumes no obligation to plow snow or perform special maintenance to keep access routes open for Contractor operations. The Forest Service may have to impose temporary restrictions on travel to minimize damage to and maintenance of system roads.

4. Treatment Area Ground Conditions - Treatments with ground-based equipment will occur on slopes from 0 to 35 percent (with short pitches over 35%, up to 400 feet, in areas that ground-based operations are feasible).

Task Order Treatment Unit Summary – See Appendix F for Contract Area Map. The Contract Area is approximately 276 Acres.

Treatment Unit #

Estimated Acres
Estimated Green Tons Removal
Stewardship Work Activity
Tree Designation

891.1 ROAD

1
0.13
4
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP, ES, TF 7”
2
0.39
12
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP, ES, TF 7”
3
0.81
24
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
4
0.24
7
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
5
0.15
5
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
6
0.03
1
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
7
0.01
1
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
8
0.04
1
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
9
0.32
10
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
10
0.35
10
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
11
1.33
40
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
12
0.14
4
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
13
0.23
7
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
14
0.52
16
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
15
0.31
10
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
16
0.21
7
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”

Treatment Unit #

Estimated Acres
Estimated Green Tons Removal
Stewardship Work Activity
Tree Designation
17
0.13
4
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
18
0.11
4
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
19
0.70
21
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
20
0.36
11
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
21
0.30
9
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
22
0.07
2
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
23
0.11
4
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
24
0.24
7
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
25
0.39
12
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
26
0.05
2
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
27
0.09
3
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
28
6.71
200
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
29
7.09
212
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
30
1.83
55
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
31
1.53
46
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
32
2.51
75
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”

Treatment Unit #

Estimated Acres
Estimated Green Tons Removal
Stewardship Work Activity
Tree Designation
33
3.48
104
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”

922.1 ROAD

34
0.28
9
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”

921.1 ROAD

35
0.21
7
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
36
0.05
2
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
37
0.39
12
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”

916.1 ROAD

38
0.05
2
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
39
0.13
4
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
40
0.25
8
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
41
0.13
4
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
42
0.11
4
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
43
0.17
5
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
44
0.05
2
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”

895.1 ROAD

45
0.46
14
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
46
1.06
32
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
47
0.06
2
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”

Treatment Unit #

Estimated Acres
Estimated Green Tons Removal
Stewardship Work Activity
Tree Designation
48
0.07
2
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
49
1.42
43
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
50
0.10
3
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
51
0.28
9
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
52
0.13
4
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
53
0.36
11
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
54
0.42
13
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
55
0.02
1
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
56
0.32
10
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
57
0.47
14
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
58
0.19
6
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
59
3.68
110
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
60
0.67
20
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
61
5.28
158
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
62
0.70
21
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
63
0.04
1
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”

Treatment Unit #

Estimated Acres
Estimated Green Tons Removal
Stewardship Work Activity
Tree Designation
64
0.83
3
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
65
1.97
59
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
66
0.81
24
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
67
0.21
7
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
68
0.46
14
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
69
0.42
13
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
70
0.16
5
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
71
0.45
14
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
72
2.46
74
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
73
5.09
152
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
74
2.54
76
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
75
0.71
21
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
76
0.95
28
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
77
0.42
13
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
81
0.17
5
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
82
0.09
3
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”

894.1 ROAD

Treatment Unit #

Estimated Acres
Estimated Green Tons Removal
Stewardship Work Activity
Tree Designation
79
0.10
3
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”

931.1 ROAD

80
1.33
40
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”

931.1 ROAD

83
1.33
40
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
84
1.47
44
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
85
0.06
2
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
86
2.28
68
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
87
1.07
32
10B – Roadside hazard tree cutting, removal and associated work
Designation by species and diameter – D x LP,ES,TF 7”
TOTAL
73.84
2203
N/A
N/A

SECTION E - INSPECTION AND ACCEPTANCE

E.1 CONTRACTOR QUALITY CONTROL INSPECTION SYSTEM

The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved. At no time shall the Contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the CO. Inspection records shall be made available upon request of the CO and be maintained until the date of contract closure. The CO may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.

E.2 ACCEPTANCE

The Forest Service shall perform an inspection upon Contractor’s written request and assurance that work has been completed. Request shall be for a reasonable portion of work. Acceptance may be made for all or portions of work.

E.3 GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN

Inspection of the area shall be accomplished by periodic visual inspection of the unit and will be based on adherence to the contract specifications. Full payment will be made if all work in the area meets the acceptable quality level for a task. The Contractor will be required to rework the task to meet the 100% objective and may receive a lower performance rating.

E.4 PERFORMANCE WORK SUMMARY TABLE

Task
Performance

Standard Quality Assurance Process Acceptable Quality Level

(AQL)

Incentive/Disincentive

1. Felling, skidding, limbing, bucking, decking, and product removal

All trees designated for treatment will meet contract specifications. Work completed in accordance with contract specifications.

Contractor records and reports and Government Periodic Inspection.

No instances of noncompliance for entire contract.

Payment shall be made only for work properly accomplished. All nonconforming work shall be corrected. Repeated failure to meet the AQL will result in rework and/or lower performance rating.

2. Mastication

Designated material treated in accordance with contract specifications.

Contractor records and reports and Government Periodic Inspection.

Payment shall be made only for work properly accomplished. All nonconforming work shall be corrected. Repeated failure to meet the AQL will result in rework and/or lower performance rating.

3. Associated work - road maintenance, temporary road work, slash treatment and erosion control
Work completed in accordance with contract specifications.
Contractor records and reports and Government Periodic Inspection.
No instances of noncompliance for entire contract or 1 instance of noncompliance per mile of road.
Payment shall be made only for work properly accomplished. All nonconforming work shall be corrected. Repeated failure to meet the AQL will result in rework and/or lower performance rating.

4. Prevention of Damage to Physical Improvements and Resources to Protect

Any damage to physical improvements is repaired to meet Government Standards.

Visual Inspection by Government

Work not meeting AQL shall be suspended; Contractor may be terminated for repetitive failure to meet AQL. Government may assess damages. Repeated failure to meet the AQL or to correct nonconforming work will result in lower performance rating.

5. Contractor Data, Reports, and Plans

Contractor Progress Schedule, Quality Control Plan, and Safety Plan are followed and Inspection Data is accurate.

Periodic Inspection or Evaluation by the Government

No more than 1 instance of noncompliance per task order.

Contractor’s performance will be rated at end of contract; repeated failure to meet the AQL or to correct nonconforming work will result in lower performance rating.

SECTION F – DELIVERIES OR PERFORMANCE

F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) prosecute the work diligently, and (b) complete the entire work ready for use not later than December 1, 2013. The time stated for completion shall include final cleanup of the premises and hauling of forest products. Timber/Product Removal activities shall be scheduled and carried out in accordance with the Timber Removal Specifications in Appendix B and as approved by the Contracting Officer.

The Notice to Proceed will be issued no later than 30 days after award of the task order or the first day of the Normal Operating Season indicated in the task order, whichever comes first, unless stated elsewhere in the specifications or otherwise mutually agreed. The Normal Operating Season for this task order is June 15 – October 31, annually.

F.3 AGAR 452.211-74 PERIOD OF PERFORMANCE (FEB 1988)

The period of performance is from task order award date to completion date. This contract terminates on December 1, 2013. Contract time for each task order will begin on the date of Award and continue consecutively for the Period of Performance.

F.4 SCHEDULES AND REPORTS

Pursuant to contract requirements, the following submittals are required within 30 days from task order award and prior to issuance of a Notice to Proceed on any task order, for review and/or approval, unless stated elsewhere in the specifications or otherwise mutually agreed.

ITEM DESCRIPTION
COPIES REQUIRED
Proposed progress schedule showing starting and completion dates of various phases of the work
2
List of proposed sub-contractors and their intended work. Sub-contractors must have Contracting Officer’s written approval prior to starting work on the project. Submit on Standard Form 1413
2
Traffic Control Plan, as specified in H.33
2
Soil Erosion and Water Pollution Control Plan, if required
2
Designation of Contractor personnel describing responsibilities and authorities
2
Identification of Stewardship Activities, as specified in B.1
2
The hours and days the Contractor proposes to work.
2

All schedules and reports shall be submitted to the Contracting Officer’s Representative (COR) which will be identified for each task order.

The Contractor shall notify the Contracting Officer or COR of any changes in work schedule.

F.4.1 SCHEDULING OF WORK Scheduling of work identified in a task order may be restricted for reasons stated in the task order.

F.4.1.2 CONTRACT OPERATION RESTRICTIONS – Unless otherwise agreed to in writing, contract operations will be restricted as listed below:

Contract Operation Restriction Schedule
Subdivision/Cutting Unit
Restriction
Purpose
ALL
Cut-tree material, or Forest Products, designated for removal must be removed from Forest within 90 days of decking, piling, or any other form of collection at landings.
To avoid long-term a) concentration of fuels, or b) coverage of vegetation and soils.
ALL
All operations shall be conducted within painted unit boundaries or designated road right-of-ways.
To prevent environmental damage outside of unit boundaries.
ALL
Mechanized harvesting equipment shall be excluded from dry or wet stream channels where these channels exceed 24 inches in depth measured vertically from the top of the slope break on either side of the channel to the lowest point on the channel.
Protect soil, hydro and plant resources.
64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 79, 80
No operations from December 1 to May 31 annually.
Seasonal use restriction for Wildlife Concerns.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.5 PROTECTION MEASURES NEEDED FOR PLANTS, ANIMALS, CULTURAL RESOURCES, AND CAVE RESOURCES Locations of known areas needing special measures for the protection of plants, animals, cultural resources, and/or cave resources are shown on Contract Area Map and/or identified on the ground. Special protection measures needed to protect such known areas are identified.

In addition to any special protection measures noted, Contractor has a general duty to protect all known and identified resources referenced in this Subsection from damage or removal during Contractor’s operations. Discovery of additional areas, resources, or members of species needing special protection shall be promptly reported to the other party, and operations shall be delayed or interrupted at that location, if Contracting Officer determines there is risk of damage to such areas, resources, or species from continued operations.

Wheeled or track-laying equipment shall not be operated in areas identified as needing special measures for the protection of cultural resources, except on roads, landings, tractor roads, or approved skid trails. Unless agreed otherwise, trees will not be felled into such areas. Contractor may be required to backblade skid trails and other ground disturbed by Contractor’s Operations within such areas in lieu of required cross ditching.

Contractor shall immediately notify Forest Service if disturbance occurs to any area identified as needing special protection measures and shall immediately halt operations in the vicinity of the disturbance until Forest Service authorizes Contractor to proceed. Contractor shall bear costs of resource evaluation and restoration to identified sites. Such payment shall not relieve Contractor from civil or criminal remedies otherwise provided by law.

Forest Service has exercised due diligence and followed established protocols in identifying known areas needing special protection measures. Nevertheless, nothing in this provision shall be interpreted as creating any warranty that all locations and special measures for the protection of plants, animals, cultural resources, and cave resources have been described herein, elsewhere in the contract, or designated on the ground.

H.5.1 SITE SPECIFIC SPECIAL PROTECTION MEASURE

Special protection measures needed to protect known areas identified on Contract Area Maps or on the ground include:

Cultural Resource Protection Measures:

N/A

Wildlife and Botanical Protection Measures:

Units
Protection Measure
29, 86, 87
Portions of these units have a protection area as identified on the contract area map. These areas are identified on the ground by yellow and orange paint with a dot facing into the unit and a 1 to 2 foot line on opposites sides of the tree facing the next boundary tree along with a stump mark. Wheels or tracks of ground based equipment are prohibited in the protection area.

Cave Resource Protection Measures:

N/A

H.6 PROTECTION OF IMPROVEMENTS

So far as practicable, Contractor shall protect Specified Roads and other improvements (such as roads, trails, telephone lines, ditches and fences):

(a) Existing in operating area,
(b) Determined to have a continuing need or use, and
(c) Designated on Contract Area Maps.

Contractor shall keep roads and trails needed for fire protection or other purposes and designated on Contract Area Maps reasonably free of equipment and products, slash, and debris resulting from Contractor’s Operations. Contractor shall make timely restoration of any such improvements damaged by Contractor’s Operations and when necessary because of such operations shall move such improvements as specified.

H.6.1 PROTECTION OF FENCES

Unless otherwise agreed to in writing, all fences, as designated on Contract Area Maps, which are required to be cut because of temporary road construction, skid road construction, or other activities, shall not be cut until the fence has first been "line braced" or "fence braced," to prevent loss of tension, on both sides of the wire span or series of short spans to be cut.

The Contractor shall install temporary cattle guards in accordance with attached plans at each location where the fence is cut for temporary road access unless otherwise approved in writing by Forest Service. All fences will be restored promptly after operations are complete to the condition existing immediately prior to operations. Fence repair will be kept current with operations.

H.7 EROSION PREVENTION AND CONTROL

Contractor’s Operations shall be conducted reasonably to minimize soil erosion. Equipment shall not be operated when ground conditions are such that excessive damage will result. The kinds and intensity of erosion control work done by Contractor shall be adjusted to ground and weather conditions and the need for controlling runoff. Erosion control work shall be kept current immediately preceding expected seasonal periods of precipitation or runoff.

If Contractor fails to do seasonal erosion control work prior to any seasonal period of precipitation or runoff, Forest Service may temporarily assume responsibility for the work and any unencumbered deposits hereunder may be used by Forest Service to do the work. If needed for such work, Contractor shall make additional deposits on request by Forest Service. Any money deposited or used for this purpose shall be treated as cooperative deposits.

H.7.1 EROSION PREVENTION AND CONTROL

A. Skidding with tractors within 100 feet of live streams shall not be permitted except in places designated in advance by Forest Service, and in no event shall skid roads be located in live or intermittent stream courses. Skid trails shall be located high enough out of draws, swales, and valley bottoms to permit diversion of runoff water to natural undisturbed forest ground cover.

B. Prior to periods of accelerated water runoff, especially during the spring runoff and periods of heavy rainfall, Contractor shall inspect and open culverts and drainage structures, construct special cross ditches for road runoff, and take other reasonable measures needed to prevent soil erosion and siltation of streams.

C. Unless otherwise agreed in writing, Contractor shall keep erosion control work current with his operations under the contract and in any case not later than 15 days after completion of skidding on each work unit.

H.7.2 EROSION CONTROL SEEDING

Following completion of operations in an area, Contractor shall seed and fertilize all exposed areas of raw soil as designated by the Forest Service on skid trails, landings, firebreaks, slides, slumps, Temporary Roads and traveled ways of Specified Roads.

Road numbers applicable to this closure are N/A. This list may include roads used by Contractor that have been effectively closed by a device located on another road. Following closure, soil on areas to be seeded shall be left in a roughened condition favorable to the retention and germination of the seed. Scarification of traveled ways listed above shall be to a minimum depth of N/A inches and a maximum depth of inches.

(State the desired depth for scarification based on soils and future use of roadbed. Maximum depth should not exceed 14 inches.)

Seed and fertilizer shall be spread evenly at the rate of 21 pounds of seed and 0 pounds of fertilizer per acre.

When fertilizer and seed are applied in separate operations, the second operation shall be carried out within 72 hours of the first.

Seeding shall be done during the period September 15 to December 1 and under the above specified conditions unless otherwise approved.

The kinds and amounts of seed to be sown in terms of pure live seed (PLS) shall be:

Species of SeedPLS Pounds Per Acre
Big bluegrass (Poa ampla)
1
Mountain bromegrass (Bromus marginatus)
8
Blue wildrye (Elymus glaucus)
7
Slender wheatgrass (Elymus trachycaulus)
5

All seed purchased will be certified to be free of the noxious weed seeds from weeds listed on the current "All States Noxious Weeds List." Test results from a certified seed analyst and seed analysis labels attached to the bags will be provided to the Forest Service.

The following kinds and amounts of standard commercial fertilizer shall be used with guaranteed analysis of contents clearly marked on containers:

Type of FertilizerPounds Per Acre
N/AN/A

H.7.3 PROTECTION OF DISTURBED AREAS FROM ESTABLISHMENT OF NOXIOUS WEEDS.

In addition to the requirements of H.7.2, Contractor shall seed and fertilize areas where mineral soil is exposed as designated by the Forest Service.

Unless otherwise agreed to in writing, seeding shall be done in the early spring or fall during weather and moisture conditions favorable for quick germination and growth of the plants. Seeding shall be completed in a timely manner following the last disturbance activity by the Contractor in the disturbed area.

The Certified seed analysis reports from each container shall be provided by Contractor to the Forest Service prior to application of the seed. Seed and fertilizer shall be spread evenly at the rate of 21 pounds of seed and N/A pounds of fertilizer per acre.

When fertilizer and seed are applied in separate operations, the second operation shall be carried out within 72 hours of the first operation. When an adequate seedbed does not exist, Contractor shall scarify to get a 2 inch loose soil seedbed, prior to seeding. The kinds and amounts of seed to be sown in terms of pure live seed (PLS) shall be:

Species of SeedPLS Pounds per Acre
Big bluegrass (Poa ampla)1
Mountain bromegrass (Bromus marginatus)8
Blue wildrye (Elymus glaucus)7
Slender wheatgrass (Elymus trachycaulus)5

All seed purchased will be certified to be free of the noxious weed seeds from weeds listed on the current "All States Noxious Weeds List." Test results from a certified seed analyst and seed analysis labels attached to the bags will be provided to the Forest Service.

The following kinds and amounts of standard commercial fertilizer shall be used with guaranteed analysis of contents clearly marked on containers:

Type of FertilizerPounds Per Acre
N/AN/A

H.8 PROTECTION OF LAND SURVEY MONUMENTS

Forest Service shall appropriately designate on the ground all known survey monuments including but not limited to horizontal control stations (Triangulation Stations), vertical control stations (Bench Marks), property corner monuments, and all Public Land Survey System monuments. This shall include reference monuments, corner accessories such as bearing trees, line trees and line posts. Identifying signs shall be posted by Forest Service on two sides of each known bearing tree, and each line post shall be posted with a metal sign or decal. Line trees may be cut if designated by the Government.

In authorized clearings such as Clear cutting Units and road construction clearings, and in other instances where damage to survey monuments, corners, corner accessories and survey of property line markers is unavoidable, Forest Service shall arrange protective or perpetuative action which does not cause unnecessary delay to Contractor.

Contractor shall protect all known survey monuments, witness corners, reference monuments, bearing trees and line markers against avoidable destruction, obliteration or damage during Contractor's operations. Additional monuments or objects discovered on the area shall be promptly reported to the other party and shall also be protected. If any known monuments, corners, corner accessories, and survey or property line markers are destroyed, obliterated or damaged during Contractor's operations, Contractor shall employ a registered professional land surveyor to reestablish or restore at the same location the monuments, corners, corner accessories or line markers. Such surveyors shall use procedures and monumentation that accords with the Bureau of Land Management Manual of Instructions for the Survey of the Public Lands of the United States for General Land Office surveys and any applicable State statutes concerned with land surveys. Contractor's agent shall record such surveys in accordance with state survey statutes.

H.9 PROTECTION OF RESIDUAL TREES

Contractor's Operations shall not unnecessarily damage young growth or other trees to be reserved.

H.10 OPERATIONS

H.10.1 FELLING AND BUCKING (SPECIAL OBJECTIVES)

Unless otherwise agreed in writing, silvicultural prescriptions and land management objectives shall be conducted and accomplished by the following requirements, methods and procedures:

Unit
Special Objectives
ALL
Trees shall not be felled into streams or standing water.

H.10.2 SKIDDING AND YARDING (SPECIAL OBJECTIVES).

Unless otherwise agreed in writing, silvicultural prescriptions and land management objectives shall be conducted and accomplished by the following requirements, methods and procedures:

Unit
Special Objectives
ALL
Skid trails and landings will be located and approved in advance of felling.
ALL
Trees shall not be skidded across streams or standing water.
ALL
Mechanized harvesting equipment shall be restricted to approved skid trails except where ground is dry or frozen.

H.10.3 UNIT BOUNDARIES.

The boundaries of work units are designated as shown in the following table. The trees used for boundary designation are not to be cut.

Unit Boundary Designation Table

Unit
Paint Color
Designation
All
Orange
Boundaries are designated with ORANGE tracer paint. Boundary trees are marked with two vertical stripes 1 to 2 feet in length on opposite sides of the tree facing the direction of the next boundary tree, one mark facing into the cutting unit, and a stump mark. Unit numbers are painted on approximately every 5th boundary tree. There are no boundary trees along the road except at each end of the unit and the edge of the road surface or pullout closest to the unit is the boundary.

H.10.4 SLASH TREATMENT. Slash is defined as logs, tops, limbs, and other woody material, exclusive of stumps, which is created by the logging operation and remaining on the ground after logging. In areas where Contractor-created slash is intermingled and inseparable from pre-existing slash, slash disposal requirements shall apply to the pre-existing slash as well as the Contractor-created slash. Such areas are designated in the Contractor Slash Responsibility Table herein.

Slash created in the construction of Specified Roads shall not be considered as logging slash in this Section.

Unless otherwise agreed in writing, Contractor shall perform the following work described below and/or as shown on the Contract Area Map and/or Slash Disposal Map.

Forest Service and Contractor shall jointly develop a schedule for completion of slash treatment on the various portions of the contract area.

Contractor's Slash Responsibility Table

Description of Unit(s)
Type of Slash Disposal
ALL
Slash shall be lopped and scattered to within 24 inches or less above the ground.
ALL
Trees damaged through contractor’s operations which are otherwise not designated for cutting, shall be felled and lopped and scattered to lie less than 24 inches above ground level. A damaged tree is one that is taller than 24” in height, 1) has the top knocked out, or 2) leans more than 10 degrees, or 3) has less than 50% of its original limbs, or 4) one with approximately 50 percent of bark removed from circumference of the bole.

Contractor will leave a minimum of N/A pieces and a maximum of N/A pieces of woody material over N/A inches in diameter on the large end and N/A to N/A feet in length scattered over each acre in units N/A .

H.10.5 CHANGE IN SLASH TREATMENTS. Slash treatment measures required in H.10.4 may be changed upon written agreement. The Forest Service shall determine the current cost of performing the work to be deleted and the work to be added. When the cost of work deleted exceeds the cost of work added, the agreement shall provide for a lump sum payment to the Forest Service for the amount of the difference. When the cost of work added exceeds the cost of work deleted, the change may be made only if the Contractor agrees to making the change with no cost adjustment.

H.11 TIMBER DESIGNATIONS. Timber designated for cutting shall be confined to Contract Area, except as otherwise provided. Contract Area Map indicates subdivisions, if any, where Marking is to be done after advertisement, except for construction clearing, minor changes, and damaged timber. The boundaries of cutting units were plainly marked on ground before advertisement and are shown on Contract Area Map.

H.11.2 CONSTRUCTION CLEARING. All timber is designated for cutting that is within the clearing limits of roads constructed hereunder or is in other authorized clearings. All dead or unstable live trees are designated for cutting that are sufficiently tall to reach Contractor’s landings, work areas, or the roadbed of Specified and Temporary Roads when Marked in advance of work in the immediate area. Pieces meeting Utilization Standards from such dead or un-stable live trees shall be removed, unless there is agreement that to do so could damage the road. Such designation may be revised as part of agreed changes in road locations.

H.11.2.2 OTHER AUTHORIZED CLEARINGS. Timber within authorized clearings for Temporary Roads, landings, or other construction clearings is designated for cutting. Quantities of such timber are not included in Appendix B - Division A.

H.11.5 INDIVIDUAL TREES. All trees to be cut, other than in the units described in H.11.1, H.11.2, H.11.3 and H.11.4, are Marked or designated by description or prescription. Trees are “Marked” when individually designated by Forest Service with paint marks above and below stump height. Individual Contract Area Maps indicate areas plainly identified on the ground where leave trees are marked to be left uncut.

H.11.5.4 DESIGNATION BY SPECIES AND DIAMETER.

Trees that meet Utilization Standards in Appendix B, Division A or specifications for cutting in Appendix A are designated for cutting, as shown on the Tree Designation Table and Contract Area Map, except trees Marked with_Orange______ paint or described to be left uncut.

Tree Designation Table

Unit(s)

Designated Species More than Stump Diameter (inches) Less than Stump Diameter (inches)

All
Live and Dead Lodgepole pine, Engelmann Spruce, True Fir
7.0
N/A

Additional trees to be cut, if any, are Marked with _Blue______ paint.

All __N/A_____ shall be left as leave trees, unless Marked with __ N/A_____ paint. Leave _N/A______ trees of the designated cut species, __N/A_____ inches stump diameter or greater, to avoid leave tree spacing greater than __N/A_____ feet. Cutting unit boundaries and other trees that shall be left uncut are Marked with _Orange______ paint.

Stump diameter is measured outside bark at _4.0____ inches above ground on the uphill side of the tree and may be measured using a diameter tape (diameter equivalent of circumference), or caliper according to standard measurement procedures in use by the Forest Service.

H.11.6 MINOR CHANGES. Within Contract Area, the Contracting Officer may authorize minor adjustments in boundaries of cutting units or in the timber individually marked for cutting when acceptable to Contractor and Forest Service.

H.11.7 VOLUME ESTIMATE. The estimated volumes of timber by species designated for cutting and expected to be cut under Utilization Standards are listed in Appendix B - Division A for each individual task order and are not to be construed as guarantees or limitations of the timber volumes to be designated for cutting under the terms of this contract.

H.12 SANITATION AND SERVICING

Contractor shall take all reasonable precautions to prevent pollution of air, soil, and water by Contractor's Operations. If facilities for employees are established on Contract Area, they shall be operated in a sanitary manner. Contractor shall not service tractors, trucks, or other equipment on National Forest lands where servicing is likely to result in pollution to soil or water. Contractor shall remove from National Forest lands all refuse resulting from use, servicing, repair, or abandonment of equipment. In the event that Contractor's Operations or servicing of equipment result in pollution to soil or water, Contractor shall conduct cleanup to restore the polluted site to the satisfaction of Forest Service.

H.13 PREVENTION OF OIL SPILLS

If Contractor maintains storage facilities for oil or oil products on Contract Area, Contractor shall take appropriate preventive measures to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual States.

If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.

H.15 MEADOW PROTECTION

Reasonable care shall be taken to avoid damage to the cover, soil, and water in meadows shown on Contract Area Map. Vehicular or skidding equipment shall not be used on meadows, except where roads, landings, and tractor roads are approved. Unless otherwise agreed, trees felled into meadows shall be removed by endlining. Resulting logging slash shall be removed where necessary to protect cover, soil, and water.

H.16 WETLANDS PROTECTION

Wetlands requiring protection under Executive Order 11990 are shown on Contract Area Map. Vehicular or skidding equipment shall not be used in such wetlands, except where roads, landings, and tractor roads are approved elsewhere. Additional measures needed to protect such areas are provided in H.16.1.

H.17 STREAMCOURSE PROTECTION

“Stream courses” that are subject to provisions of this Section are shown on Contract Area Map. Unless otherwise agreed, the following measures shall be observed to protect Stream courses:

(a)Contractor’s Operations shall be conducted to prevent debris from entering Stream courses, except as may be authorized under paragraph (d). In event Contractor causes debris to enter Stream courses in amounts that may adversely affect the natural flow of the stream, water quality, or fishery resource, Contractor shall remove such debris as soon as practicable, but not to exceed 48 hours, and in an agreed manner that will cause the least disturbance to Stream courses.
(b)Culverts or bridges shall be required on Temporary Roads at all points where it is necessary to cross Stream courses. Such facilities shall be of sufficient size and design and installed in a manner to provide unobstructed flow of water and to minimize damage to Stream courses. Trees or products shall not be otherwise hauled or yarded across Stream courses unless fully suspended.

(c) Wheeled or track-laying equipment shall not be operated in Stream courses, except at crossings designated by Forest Service or as essential to construction or removal of culverts and bridges.

(d) Flow in Stream courses may be temporarily diverted only if such diversion is necessary for Contractor’s planned construction and Forest Service gives written authorization. Such flow shall be restored to the natural course as soon as practicable and, in any event, prior to a major storm runoff period or runoff season.

H.17.1 STREAMSIDE MANAGEMENT ZONES.

A Streamside Management Zone (SMZ) is a zone that contains riparian vegetation and other special characteristics. Areas identified as Streamside Management Zones (SMZ's) are shown on the Contract Area Map and designated with orange and yellow paint. Boundary marking is the same as the unit marking. .

Timber designation, conduct of logging, and/or slash treatment may differ in the SMZ from the rest of the unit. Unless otherwise agreed to in writing and notwithstanding the contract requirements otherwise applicable to each cutting unit, the following special requirements apply to the SMZ of the cutting units specified below:

Streamside Management

Unit(s)
Zone Requirements
11, 12, 14, 29, 45, 47, 48, 49, 50, 52, 60, 61, 63, 70, 71,81, 82, 86
All or portions of these units have a SMZ as identified on the contract area map. These areas are identified on the ground by yellow or orange paint with a dot facing into the unit and a 1 to 2 foot line on opposites sides of the tree facing the next boundary tree along with a stump mark. Wheels or tracks of ground based equipment are prohibited in the SMZ.

H.22 FIRE PRECAUTIONS AND CONTROL

Fire Precautionary Period: May 1 thru November 15 annually.

Plans. Prior to initiating Contractor’s Operations during Fire Precautionary Period, Contractor shall file with Forest Service a Fire Prevention and Control Plan providing for the prevention and control of fires on Contract Area and other areas of Contractor’s Operations. Such Plan shall include a detailed list of personnel and equipment at Contractor’s disposal for implementing the Plan. This requirement may be met by preparing a single Plan for more than one contract.

Fire Precautions. Specific fire precautionary measures shall be applicable during Contractor’s Operations in “Fire Precautionary Period”. Contracting Officer may change the dates of Fire Precautionary Period by advance written notice, if justified by unusual weather or other conditions. Required tools and equipment shall be kept in serviceable condition and immediately available for fire fighting at all times during Contractor’s Operations in Fire Precautionary Period.

Substitute Precautions. Forest Service may authorize substitute measures or equipment, or waive specific requirements by written notice, if substitute measures or equipment will afford equal protection or some of the required measures and equipment are unnecessary.

Emergency Precautions. Forest Service may require the necessary shutting down of equipment on portions of Contractor’s Operations, as specified by the emergency fire precautions schedule. Under such conditions, after Contractor ceases active operations, Contractor shall release for hire by Forest Service, if needed, Contractor’s shutdown equipment for fire standby on Contract Area or other areas of Contractor’s Operations and personnel for fire standby or fire patrol, when such personnel and equipment are not needed by Contractor for other fire fighting or protection from fire. Equipment shall be paid for at fire fighting equipment rates common in the area or at prior agreed rates and, if Contractor requests, shall be operated only by personnel approved by Contractor.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .