penn sum TO.pdf

PDF 935 KB Posted

Attached to
White River Forest IDIQ Stewardship Task Orders Federal contract opportunity
Solicitation number
AG-82X9-S-11-9009
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

Penn Sum TO

View the file

Other files for this federal contract opportunity

Other files attached to White River Forest IDIQ Stewardship Task Orders, newest first.
File Type Posted
11_HT13_brush_creek_CAM_3_of_3_amended.pdf PDF
HT8 Nolan Creek task order amended 082511.pdf PDF
HT13 Brush Creek taskorder amended 082511.pdf PDF
HT9 Lost Lake task order amendment 082511.pdf PDF
amend2.pdf PDF
11_HT13_BrushCreek_Vicinity_Map_amended.pdf PDF
11_HT13_brush_creek_CAM_2_of_3_amended.pdf PDF
HT14 Peak7 South TASK ORDER amendment 082511.pdf PDF
HT6 Peaks Gold Hill Task Order amended 082511.pdf PDF
HT7 Hardscrabble_Stewd TASK ORDER amended 082511.pdf PDF
amend1.pdf PDF
maryland TO.pdf PDF
hardscrabble task order.pdf PDF
e.harrigan task order.pdf PDF
aqueduct task order.pdf PDF
76-1351_38.mht MHT file
nolan creek TO.pdf PDF
sol_12_task_orders.pdf PDF
peak 7 south TO.pdf PDF
peaks gold hill TO.pdf PDF
lost lk TO.pdf PDF
brush ck task order.pdf PDF
martin ck TO.pdf PDF
miners TO.pdf PDF
return_12_task_orders.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Penn Sum Task Order 1

WORK ACTIVITY ITEMS – TERMS AND SPECIFICATIONS

1. Scope of Work

This solicitation describes the contract requirement and specifications for services for a performance based, fixed price contract for hazard tree and hazardous fuel reduction, treatment of biomass, slash treatments in the contract units within the WRNF IDIQ Haztree and Fuels – HT11 PennSum Task Order. This task order requires vegetation manipulation in compliance with its terms, specifications and provisions. The contractor shall provide any and all labor, supervision, transportation, operating supplies, equipment, services, permits, insurance, licenses and incidentals required to fell and limb designated timber on approximately 1.75 miles of Forest System Roads within the contract area on the Dillon Ranger District of the White River National Forest.

Contractor is also required to perform hazardous fuel reduction and slash treatments.

Complete all work by December 31, 2012.

The services in this contract are designed to:

1) Improve public and firefighter safety by:

a) Reducing the risk of people or property being struck by falling trees; and

b) Keeping travel corridors open

2) Minimize the effects of tree mortality on the overall health, scenic quality, and condition of forested areas along roads and trails

The timber harvest and removal requirements of this contract are outlined here and in the solicitation. Appendix B and Appendix C is not applicable.

2. Project Location and Description

Project Location Description – This project is on the White River National Forest. The HT11 PennSum, Schedule 1a contract area (Pennsylvania Creek) is located approximately 3 miles south of Breckenridge, Colorado in portions of Sections 20 and 21, T7S, R77W, 6th Principal Meridian. The project area can be accessed from Highway 9 near the Town of Blue River.

The HT11 PennSum, Schedule 1b contract area (Summit Gulch) is located approximately 4 miles northeast of Breckenridge, Colorado in Section 16 and 21, T6S, R77W, 6th Principal Meridian. The project area can be accessed from Highway 9 and County Road 6 (Tiger Run). Go approximately 2.75 miles on County Road 6 to Galena Gulch Road, Go south on Galena Gulch Road approximately ¼ mile to Summit Gulch road and the start of the project area.

See Attachment for Map.

Penn Sum Task Order 2

a) Project Description – The project, as described, includes mitigating hazardous trees along Forest System Roads by felling and limbing. The project may also require slash treatments to meet land management objectives. The following table shows the estimated quantities and units of work.

Road # Road or Trail Name

Unit Miles Est.

Acres

FSR 611 Pennsylvania Creek

1 0.9 26

FSR 611 Pennsylvania Creek

2 0.7 17

FSR 352 Summit Gulch 1 0.15 4 Total 1.75 47

b) Accessibility –All work areas on Forest System Roads may be reached by Forest or County roads that are accessible by standard four-wheel drive pickup during normal operating season. Contractor shall be required to keep vehicles on established roads. The Forest Service assumes no obligation to plow snow or do special maintenance to keep roads open. Spring and fall road conditions usually necessitate the use of a 4-wheel drive vehicle. During the Spring break up the Forest Service reserves the right to suspend harvest operations to protect forest road surfaces.

c) Restrictions – Timber Removal Specifications and road maintenance specifications do not will apply. Other project specific restrictions may be included in the solicitation.

1) Temporary road closures (1 day to 2 weeks) to the public may be approved during contractor operations.

2) For hazard trees within 100 feet of streams, wetlands or riparian areas, directionally fell by hand toward the stream where practical, except within 200 feet upstream of culvert or bridge. Within 200 feet upstream of culvert or bridge, hand fell hazard trees away from streams, wetlands or riparian areas.

3) Ground based logging equipment is not permitted within 100 feet of streams, wetlands or riparian areas unless the equipment is positioned on the roadbed within the felling corridor.

4) Skidding along or across roadside drainage ditches shall not be allowed.

5) Roads shall be maintained for through traffic during felling, slash treatment and/or removal operations.

Penn Sum Task Order 3

6) Roads shall be left in an operational condition that will adequately accommodate traffic at the end of each work day. All felled trees and slash shall be removed from the road surface and ditches.

7) To minimize conflicts with recreational traffic and to provide for public safety on weekends: tree felling and slash treatment will be restricted on weekends (Saturday and Sunday), unless otherwise agreed to in writing.

8) To minimize conflicts with recreational traffic and to provide for public safety on

Federal recognized holidays; tree felling and slash treatment will be restricted on Federally observed holidays, unless otherwise agreed to in writing.

9) To minimize disturbance with elk and deer on winter range, log hauling will be restricted December 1 – April 14, unless otherwise agreed to in writing.

10) To minimize disturbance to elk during calving seasons; tree felling and slash treatment will be restricted May 15 to June 20, unless otherwise agreed to in writing.

Boundaries – The beginning and end points of cutting unit boundaries are marked with a combination of orange paint and yellow cutting unit signs. Orange Streaks of paint on three sides of the cutting unit boundary trees. The middle streak of paint faces the area to be cut. The outside streaks of paint extend below stump height to a height of six feet or more. Boundary trees are marked at the beginning and end of each cutting unit. Cutting unit boundaries between beginning and end of cutting unit are not marked with orange paint and described as 120 feet either side from the edge of the road.

Yellow cutting unit boundary signs are placed on boundary trees at the beginning and end of each cutting unit. Cutting unit numbers are on yellow boundary signs.

The contract area boundary is not marked and described as 200 feet either side of the road as measured from the centerline of the road. The contract area encompasses approximately 80 acres.

3. Contractor-furnished Equipment and Services

a) The Contractor shall provide sufficiently skilled labor, experienced supervision, transportation, equipment, operating supplies, incidentals and inspection services, except those items listed as Government-Furnished property, to perform the work in compliance with the contract.

b) The Contractor shall notify the CO/COR of any changes in work schedule.

4. Definitions

Penn Sum Task Order 4

a) Acceptable Quality Level (AQL) – The maximum percentage or proportion of nonconformities in a lot or batch that can be considered satisfactory as a process average.

b) Average Spacing – The distance in feet between leave trees as defined in the thinning specifications.

c) Accessible - Road access to a unit. Unit will be considered accessible when road access is within 1/2 mile of the unit.

d) Basal Area – The cross section of a tree at dbh, measured as square feet per acre, a measure of stand density.

e) Biomass – Any portion of a tree (trunks, branches and tops) not meeting merchantability specifications for sawtimber and POL including 1.) topwood from POL and sawtimber; 2.) any residue material from cut trees; 3.) any trees removed less than the minimim diameter for POL products, 4.) any material removed in the form of chips or mulch.

f) Biomass Material (Included in Division A) - Sawlog and POL topwood to 3.0” DIB for all species and defect portions of each product to a 3.0” top.

g) Biomass Material (Subject to Agreement) - Any portion of a tree (trunks, branches and tops), non-merchanteable trees, dead down logs or trees; where the anticipated product is wood chip fuel or mulch. This material includes non-sawlog quality products.

h) Bucking – The cutting of tree boles to a designated length. Bucking requires saw to pass completely through the tree bole.

i) Canopy Cover – The percentage of a fixed area covered by crowns of plants delimited by a vertical projection of the outermost perimeter of the spread of foliage.

j) CCF – hundred cubic feet

k) Chipping – The reduction of woody residue by a portable chipper to chips that are left to decay on the forest floor, or removed to produce pulp, hog fuel, etc

l) Conifer – A cone-bearing tree with needles or leaf scales, usually evergreen, (e.g.

pines, fires, spruces, junipers).

m) Contracting Officer (CO) – A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.

n) Contracting Officer Representative (COR) – A Government employee appointed by the Contracting Officer (CO) to help the CO with the contract administration and surveillance.

o) Contractor – Term used to represent the prime individual or organization that is awarded the contract, who is also responsible for the work and conduct of all partners, employees, equipment, and subcontractors assigned by the prime to perform on the contract.

p) Created Slash - Debris created from work under this contract including all cut trees and their tops, trunks, and branches.

q) Cultural and/or Threatened and endangered (T&E) Sites – Locations where special protection is required to preserve and protect cultural values and species of plants or animals listed on the T&E list.

Penn Sum Task Order 5

r) Cut Trees – Trees designated for cutting. Cut trees include diseased, damaged, defective trees and undesirable species provided in the specifications.

s) Damage Trees and/or Defective Trees - Includes any defect of deformity of a trees resulting from such agents as wind, snow, animals, insects, disease, and equipment;

and evidenced by such things as dead or broken tops or trunks, crooks, forks, and deep scars. Examples of excessive damage and unhealthy conifers:

a. Trees with crook, sweep, or snow bend (damaged). Crooks or bends in the main bole which are less than 9 feet from the ground and offset more than 45 degrees from the vertical axis.

b. Leaner Trees –Leaner trees are those where the main bole is offset more than 45 degrees from the vertical axis.

c. Damaged Trees –

i. Trees that have been severely scarred or cut through the cambium for ½ or greater the circumference of the tree.

ii. Trees with broken boles up to 9 feet high or more than two thirds of the live limbs are broken or missing.

iii. Trees that have been pushed over or are partially uprooted.

t) DBH (Diameter at Breast Height) – Outside diameter of the tree stem at a point 4-1/2 feet above the ground, measured from the high side of the base of the tree.

u) Deck – An organized stack of trees or logs.

v) Decked Timber – designated trees or portions of trees accumulated from skidding and/or yarding operations which are stored in organized piles at landing locations prior to being loaded and hauled to a manufacturing facility.

w) Diameter Stump Height – Outside diameter of tree stem measured from the maximum stump height allowed in Division A. Generally 12” from ground level for sawlogs and 4” from ground level for Products other than Logs or Biomass.

x) DIB (Diameter Inside Bark) - Diameter measurement of a standing tree or log in which the estimated or actual thickness of the bark is discounted.

y) Erosion control – Activities designed to prevent/reduce the delivery of sediment to area streams as a result of road building and/or timber harvest. Activities typically include grass seeding and/or installation of structures to trap moving sediment.

z) Excess Trees:

a. All uncut trees not needed to meet average spacing requirements and those trees defined as cull trees.

b. Trees suspended in or leaning into leave trees.

c. Trees not completely severed from the stump.

d. Trees not cut below the lowest live limb.

e. Stumps taller than specifications.

aa) Existing Down Wood – Woody material that is dead and lying on the forest floor, pre-existing to present management activity.

bb) Felling corridor - The felling corridor is defined as an area along the length of roads, trails, trailheads, developed recreation sites and administrative sites the width of “the height of the tallest tree plus an additional 10 percent for a safety margin, provided no trees fall on the roadway, ditch, and/or cut or fill slope.”

cc) Fuel Loading - Weight of hazardous fuels per unit area.

Penn Sum Task Order 6

dd) Hand Felling – severing a tree at a designated height with a chainsaw or other hand held tool.

ee) Hand Pile – Hand placement of slash into compact piles not less than 300 cubic feet or approximately 10’W x 10’L x 7’H.

ff) Haul or Hauling - transporting all included timber or forest products from landing to final disposal point.

gg) Hazard - The existence of a fuel complex that constitutes a threat of wildfire ignition, unacceptable fire behavior and severity, or suppression difficulty.

hh) Hazardous Fuels-All live and dead trees (including tops, limbs and branches), excess trees, existing down wood and damaged trees designated for removal.

ii) Hazard Reduction - The planned treatment or manipulation of naturally growing vegetation or any other flammable material for the purpose of reducing rate of spread and output of heat energy from any wildfire occurring in the area treated.

jj) Hazard Tree - any tree that may fail due to a structural defect and, as a result, may cause property damage or personal injury. Tree failure is difficult to predict with certainty due to the complex interaction between a tree and its environment. Every tree will eventually fail; therefore, knowledge of tree species, site characteristics, and local weather conditions and patterns are essential when evaluating tree hazards. A defective tree is hazardous only when its failure could result in damage to something of value.

1) The following tree specific criteria will be used to determine hazardous trees:

a) Dead trees of any species.

b) Trees with significant defects

c) Canker rots

d) Root rots

e) Trunk Injuries (mechanical damage, stem decay, etc)

f) Crown defects (broken or damaged branches, forked tops, dead tops, etc)

g) Exposed damaged roots in cut banks of roads/trails

h) Dying lodgepole pine trees

1. About 1/3+ dead limbs and branches

2. Foliage transparency 40% (thin crown, off-color, or dwarfed foliage)

3. Borer attacks obvious and abundant - the presence of insect activity, such as bark beetles or mountain pine beetles, may indicate that a tree has been weakened by other agents

kk) Landing – A cleared area to which logs are yarded or skidded for loading onto trucks for transport.

ll) Landing Pile – logging slash that is piled at the landing. See also Machine Pile for size limitations.

mm) Leave Tree – Any live tree that is selected or required to be left standing as provided in the specifications.

nn) Level of Difficulty – An evaluation of the site condition that requires varying amounts of time and effort to complete a task.

oo) Linear Foot-Twelve (12) inches.

pp) Limb and Top Removal – The moving, during yarding/skidding, of cut tree with tops to a designated location.

Penn Sum Task Order 7

qq) Live Crown Ratio – Percent of live crown in relation to the total height of the tree.

rr) Load or Loading - process of transferring forest products decked at landings on log trucks or similar vehicles for transportation.

ss) Logging Slash – Any portion of a tree (tops, limbs, branches, cull) that does not meet merchantability specifications for sawtimber or POL and is not removed from the area after completion of a harvest operation.

tt) Lopping and Scattering – The cutting of branches from the tree bole and the moving and/or rearranging of slash to meet a specified slash height.

uu) Lop and Scatter Pull Back- the cutting of branches from the tree bole and placing them a minimum described distance from an area.

vv) Masticate – mechanical destruction of undesirable vegetation, which may include but is not limited to mowing, mulching, chipping, chewing, grinding, etc.

ww) Mechanized - Use of motorized equipment to perform logging operations.

xx) Machine Pile – A method of piling slash with the use of mechanized equipment. Piles shall be compact and free of dirt. Maximum size 45’L x 20’W x 15’H equaling approximately 7068 cubic feet.

yy) Mastication (Masticate) - The mowing/mulching/chipping of undesirable vegetation.

Slash created during mastication shall not exceed 6 inches diameter and 36 inches in length and shall be spread to a depth of no more than 6 inches in depth.

zz) Merchantability Specifications - R2 Supplement 2409.12-2010-2, 02/17/10

Species Product (Live & Dead)

DBH

(inch)

DIB

(inch)

Min.

Piece (ft)

Merchantability Factor

Lodgepole pine (LP) Sawtimber 7.0 6.0 8.0 10.67 or 34% sound

Engelmann spruce (ES) Sawtimber 8.0 6.0 8.0 10.67 or 34% sound

Blue Spruce (BS) Sawtimber 8.0 6.0 8.0 10.67 or 34% sound

Douglas Fir (DF) Sawtimber 8.0 6.0 8.0 10.67 or 34% sound

Sub-alpine fir (TF) Sawtimber 8.0 6.0 8.0 10.67 or 34% sound

Aspen (AS) Sawtimber 5.0 5.0 8.0 10.67 or 34% sound

LP POL 5.0 4.0 N/A N/A

ES,BS,DF,TF POL 5.0 4.0 N/A N/A

All Biomass VAR VAR VAR N/A aaa) Non-saw timber – Trees to be cut that are less than 7.0” DBH.

Penn Sum Task Order 8 bbb) Normal Operating Season– Generally, ground conditions are favorable for logging operations June 20-October 31, annually. This time period may be extended or shortened based on local ground conditions. See also Operating Season.

ccc) Operating Season– Time period when logging operations may be conducted when ground conditions are suitable to protect soil/hydrology, watershed, recreation and wildlife resources. Restrictions pertaining to logging operations are provided for in Design Criteria associated with soils, watershed, recreation and wildlife resources.

ddd) Performance Requirements Summary (PRS) – Identifies the key service outputs of the contract that will be evaluated by the Government to assure contract performance standards are met by the contractor.

eee) Products Other than Logs (POL) – Trees to be cut that are greater than or equal to 5.0” DBH and less than 6.9” DBH.

fff) Removal – Transportation of cut whole trees, boles, slash, and/or equipment on designated haul roads from landings within the contract area to be completely off of the National Forest, usually within a specified time frame.

ggg) Reserve Trees – Individual species of trees within a treatment unit that the contract or COR designates are reserved from treatment.

hhh) Roadside – A general term denoting the area adjoining the outer edge of the roadway.

iii) Salvage - The removal of dead trees or trees damaged or dying because of injurious agents other than competition, to recover economic value that would otherwise be lost.

jjj) Shrubland – A plant community in which, in contrast to a typical forest, the trees are often small, characteristically short-boled relative to their crown depth, and forming only an open canopy with the intervening area being occupied by lower vegetation, commonly grass.

kkk) Skidding – The yarding of trees or logs by pulling or towing them across the ground.

lll) Slash – See logging slash.

mmm) Slash Removal- All created slash to be removed from contract area.

nnn) Slashing – Reducing the height and continuity of hazardous fuels to meet a specified slash objective.

ooo) Snag - A standing dead or living tree that has 10 percent or less live crown.

ppp) Sorting – arrange timber or logs according to forest product characteristics qqq) Spacing – The horizontal distance from the trunk of one leave tree to the trunk of the next nearest leave tree.

rrr) Special Protection Area - A zone that has special characteristics such as riparian vegetation, wildlife calving areas, etc. Special protection areas are noted on the project maps and they may require special treatment such as an alteration to the tree cutting, slash treatment, vehicle travel, or fueling of saws.

sss) Stream Course - The area along a stream that has riparian vegetation and other riparian characteristics. Stream courses are noted on the project maps. They typically require special treatment which may include alteration to the tree cutting, slash treatment, vehicle travel, or fueling of saws.

ttt) Stump – The lower end of a tree remaining in the ground after the tree has been cut.

uuu) Stump Height – The acceptable maximum stump level left above ground, measured from the uphill side, after a tree is felled.

Penn Sum Task Order 9

vvv) Sub-merchantable – Trees or portions of trees that do not meet merchantability specifications for sawtimber or POL. This includes trees less than 5.0” DBH, topwood and defect (cull) associated with designated timber.

www) Surplus Vegetation/Slash – Surplus vegetation includes standing vegetation (conifers and hardwoods) greater than 1 foot tall and shrubs less than 12 inches diameter at ground level; when not selected as leave trees, reserved, or needed to meet spacing requirements. Standing dead conifers, hardwoods, and shrubs shall be included as surplus when not reserved. Surplus vegetation becomes slash when it is cut. Slash can include any existing natural (dead and down) woody debris.

xxx) Temporary Roads – Roads other than Specified Roads that are constructed by the Contractor for the purpose of transporting harvested timber out of the units.

yyy) Tons/Acre - Unit of measurement of fuel, usually but not always, of dead and down woody debris (slash). Tons/Acre is generally determined by using a Photo Series, such as USDA Forest Service RMRS GTR-172 (2006). These documents are available for review by the contractor by contacting the issuing office.

zzz) Total Percent Cover – Portion of the project area or treatment unit beneath the dripline of vegetation to be cut, Does not include reserve vegetation.

aaaa) Tree Designation – the method of identifying which trees are specified to be cut or left under the contract.

bbbb) Water Bar – A drainage structure constructed across the surface of a road, skid trail, or constructed fireline to divert water from the surface. The purpose is not to block vehicular passage.

cccc) Water Influence Zone (WIZ) - The land next to water bodies where vegetation plays a major role in sustaining long-term integrity of aquatic systems. It includes the geomorphic floodplain (valley bottom), riparian ecosystem, and inner gorge. Its minimum horizontal width (from top of each bank) is generally 100 feet or the mean height of mature dominant late-seral vegetation, whichever is most.

dddd) Wetland - A transitional area between aquatic and terrestrial ecosystems that is inundated or saturated for periods long enough to produce hydric soils and support hydrophytic vegetation.

eeee) Wildlife Trees - Standing dead or live trees left for nesting, feeding, perching and shelter for birds and mammals. Trees may be marked with paint and/or designated with a tag stating it is a wildlife tree or as identified by the Forest Service.

ffff) Whole Tree Removal – remove Standard Timber (C1.1) and portions of Standard Timber that do not meet Utilization Standards in A Division for all designated trees 7.0 inch DBH and greater to a 3 inch top; and, all designated trees 5.0-6.9 inch DBH to a 3 inch top.

gggg) Whole Tree Yarding - after severing tree from stump, the moving or skidding of the entire tree (bole, limbs, tops) to a landing location for removal.

hhhh) Woodland – A plant community in which, in contrast to a typical forest, the trees are often small, characteristically short-boled relative to their crown depth, and forming only an open canopy with the intervening area being occupied by lower vegetation, commonly grass.

iiii) Yard tops attached – The moving, during yarding/skidding, of cut tree with tops to a designated location at the landing.

Penn Sum Task Order 10 jjjj) Yarding - The movement of logs from the place they are felled to a landing. Generally implemented using mechanical equipment.

5. Performance Standards

Hazard Tree Reduction, Slash Treatment and Hazardous Fuels Reduction.

Proposal may include use of manual or ground base equipment to accomplish task. Forest product removal is not anticipated within cutting units. Ground based equipment shall not be permitted on slopes greater than 40 percent or within 100 feet of the streamcourses designated on the contract area map.

5.1 Task – Hazard Tree Removal, Slash Treatments and Hazardous Fuels Reduction:

Hazardous trees will be cut and felled in an organized manner within the felling corridor.

Slash will be treated in accordance with specifications in 5.1.3. It is anticipated that mechanized logging operation machinery could be used in portions of the cutting units.

The Forest Service will determine the width of the treatment by designation through marking or by description, to include all hazardous trees along roads that are the height of the tallest tree plus an additional 10 percent for a safety margin.

Salvage or removal rights to forest products are not included.

5.1.1 Cutting Methods

a) Trees designated for cutting and felling through description, are to be felled and limbed to a 3 inch top.

b) Trees shall be directionally felled and bucked to lay on the ground and not stacked on top of one another.

c) Protect seedlings and saplings.

d) Other trees that shall be left uncut are Marked with ORANGE paint.

e) Stump height of cut trees shall be cut as close to the ground as practical, but shall be no higher than 12 inches above ground level (measured from uphill side of stump) for stump diameters >6.9 inches; and 4 inches above ground level for stump diameters <7.0 inches.

f) Stump height of cut trees within 15 feet either side of the trail shall be cut as close to the ground as practical.

g) Trees shall be completely severed from the stump.

h) No cut tree shall be left suspended in or leaning against a leave tree or tree outside the unit boundary.

5.1.2 Hazardous Tree Removal

Penn Sum Task Order 11

Unless specified different on Unit Data Sheet, hazard tree removal refers to the reduction of all live and dead hazard trees designated for cutting and damaged trees designated for felling.

Hazard Tree Removal Treatment type is specified in the Unit Data Sheet. Criteria listed below will be followed for the appropriate treatment. In addition, criteria listed in Performance Standard 5.1.3, (a.) thru (c.) will be followed for the appropriate hazard tree removal treatment as identified in the Unit Data Sheet.

a) Hazard Tree Felling – fell all designated hazard trees within cutting unit in accordance with 5.1.1 (a) through (h).

5.1.3 Slash Treatment

Unless specified different on Unit Data Sheet, slash refers to contractor created debris from work under this contract including all cut trees and their tops, trunks, and branches.

Slash Treatment criteria listed in a) through c) will be followed for all treatment units.

a) No slash shall be allowed outside the cutting unit boundary, unless otherwise approved by the Contracting Officer.

b) Contractor shall treat all logging slash in the following areas:

1,) Roads – All NFSR roads identified on the Contract Area Map with “KO” (Keep Open) shall be kept free of slash.

2.) Trails designated on the Contract Removal Map with “PI” to be protected. Slash shall be less than 18” from ground level within 100 feet of trails or within the cutting unit boundary.

3.) Utility Lines – within the untility corridor and 10 feet either side of the utility corridor.

4.) Land Survey Monuments – lop and scatter pullback within 15 feet.

c) Lop and Scatter to 18” depth – All residual logging slash shall be lopped and scattered so that it lies no higher than 18 inches above the ground. Cut material shall not lean against an uncut tree, stump, log, or any obstacle. It shall be secure and not able to roll down the hill.

5.1.4 INOPERABLE AREAS

In-operable areas within stands designated for treatment. The contractor shall identify on the ground with flagging all areas deemed to be in-operable for safe operations in service work activities. If the government agrees that the area is in-operable the contractor may: 1) Propose an alternate treatment that alleviates the safety concern; if the government agrees with the proposal the area will be treated as agreed and the contractor will receive full payment at the normal contract rate, or 2) Request that the area be removed from the contract, in which case the government will use GPS or tally the designated trees to measure the affected area and remove it from the contract. The contractor will receive no

Penn Sum Task Order 12 payment for in-operable areas that are removed from the contract. For payment purposes in-operable areas that are removed from the contract will be rounded to the nearest ¼ acre if based on an acreage estimate. If based on a mileage estimate, a total cost per tree will be calculated using the contractor price per mile divided by the estimated trees per mile. The cost per tree will be multiplied by the tally count of trees that were deleted from the in-operable areas. Payment will be rounded to the nearest dollar based on the per tree estimate.

6. Government Quality Assurance Surveillance Plan

Inspection of the area shall be accomplished by periodic visual inspection of the unit and will be based on adherence to the contract specifications. Full payment will be made if all work in the area meets the acceptable quality level for task. Disincentive is Contractor rework to meet the 100% objective.

7. Performance Work Summary Table

Task Performance

Standard

Quality Assurance

Process

Acceptable Quality Level

(AQL)

Incentive/Disincentive

1. Felling and limbing

All designated trees will meet contract specifications stated in the Performance Standards table.

Contractor records and reports and Government Periodic Inspection.

No more than 2 instances of noncompliance per acre.

Payment shall be made only for work properly accomplished. All nonconforming work shall be corrected.

Repeated failure to meet the AQL will result in lower performance rating.

2. Slash Treatment

Slash treated in accordance with contract specifications stated in the

Standards table.

Contractor records and reports and Government

Inspection.

No more than 2 instances of noncompliance per acre

Payment shall be made only for work properly accomplished. All nonconforming work shall be corrected.

Repeated failure to meet the AQL will result in lower performance rating.

Penn Sum Task Order 13

Task

Standard

Quality Assurance

Process

Acceptable Quality Level

(AQL)

Incentive/Disincentive

3. Prevention of Damage to Physical Improvements and Resources to Protect

Any damage to physical improvements is repaired to meet Government Standards.

Visual Inspection by

No instances of noncompliance for entire contract.

Work not meeting AQL shall be suspended;

Contractor may be terminated for repetitive failure to meet AQL.

Government may assess damages. Repeated failure to meet the AQL or to correct nonconforming work will result in lower performance rating.

4. Contractor Data, Reports, and Plans

Contractor Progress Schedule, Quality Control Plan, and Safety Plan are followed and Inspection Data is accurate.

Inspection or Evaluation by the

No more than 1 instance of noncompliance per unit.

Contractor’s performance will be rated at end of contract; repeated failure to meet the AQL or to correct nonconforming work will result in lower performance rating.

8. Unit Data Sheet

HT11 PennSum Task Order Unit

Schedule

Item Miles Cutting Prescription Slash Treatment

Prescription

6a 6a

0.9 0.7

See Performance Standard 5.1.1, (a) through (h).

HAZARD TREES are designated for cutting by description. All HAZARD TREES, as defined and described in Section 4 Definitions shall be felled.

Approximately 530 hazard trees to be felled.

Approximately 43 acres.

See Performance Standard 5.1.2,

(a) Hazard Tree Felling.

See Performance Standard 5.1.3, (a)-(c).

Lop and Scatter Slash to 18 inch depth above ground

1 6b 0.15 See Performance Standard 5.1.1, (a) through (h).

See Performance Standard 5.1.2,

(a) Hazard Tree Felling.

Penn Sum Task Order 14

Unit

Schedule Item

Miles Cutting Prescription Slash Treatment Prescription

HAZARD TREES are designated for cutting by description. All HAZARD TREES, as defined and described in Section 4 Definitions shall be felled.

Approximately 268 hazard trees to be felled.

Approximately 4 acres.

See Performance Standard 5.1.3, (a)-(c).

Lop and Scatter Slash to 18 inch depth above ground

OPERATIONS

27. EROSION PREVENTION AND CONTROL

Contractor’s Operations shall be conducted reasonably to minimize soil erosion. Equipment shall not be operated when ground conditions are such that excessive damage will result. The kinds and intensity of erosion control work done by Contractor shall be adjusted to ground and weather conditions and the need for controlling runoff. Erosion control work shall be kept current immediately preceding expected seasonal periods of precipitation or runoff.

If Contractor fails to do seasonal erosion control work prior to any seasonal period of precipitation or runoff, Forest Service may temporarily assume responsibility for the work and any unencumbered deposits hereunder may be used by Forest Service to do the work. If needed for such work, Contractor shall make additional deposits on request by Forest Service. Any money deposited or used for this purpose shall be treated as cooperative deposits.

A. Prior to periods of accelerated water runoff, especially during the spring runoff and periods of heavy rainfall, Contractor shall inspect and open culverts and drainage structures, construct special cross ditches for road runoff, and take other reasonable measures needed to prevent soil erosion and siltation of streams.

B. Unless otherwise agreed in writing, Contractor shall keep erosion control work current with his operations under the sale and in any case not later than 15 days after completion of skidding on each payment unit or cutting unit.

C. Skidding with tractors within 100 feet of live streams, riparian areas, wetlands or fens shall not be permitted except in places designated in advance by Forest Service, and in no event shall skid roads be located in live or intermittent stream courses. Skid trails shall be located high enough out of draws, swales, and valley bottoms to permit diversion of runoff water to natural undisturbed forest ground cover.

Penn Sum Task Order 15

D. Landing locations within 100 feet of live streams, riparian areas, wetlands or fens shall not be permitted, and in no event shall landings be located in live or intermittent stream courses. Landings shall be located high enough out of draws, swales, and valley bottoms to permit diversion of runoff water to natural undisturbed forest ground cover.

E. Contractor shall seed all exposed areas of raw soil as designated by the Forest Service on skid trails, landings, firebreaks, slides, slumps, temporary toads and traveled ways of Specified Roads. Seed mix shall be spread at a rate of 20 pounds per acre consisting of 25% Idaho Fescue, 20% Slender Wheatgrass, 20% Rocky Mountain Fescue, 20% Mountain Brome and 15% Western Wheatgrass. Seed shall be certified weed free and labels presented to COR for verification. Seeding shall be done between June 1 and September 1.

27a. EROSION CONTROL SEEDING Following completion of skidding and yarding operations in an area, Contractor shall seed and fertilize all exposed areas of raw soil as designated by the Forest Service on skid trails, landings, firebreaks, slides, slumps, Temporary Roads and traveled ways of Specified Road following closure.

Specified roads following closure needed to be seeded - None

Soil on areas to be seeded shall be left in a roughened condition favorable to the retention and germination of the seed. Scarification of traveled ways on Specified Roads listed above shall be to a minimum depth of N/A inches and a maximum depth of N/A inches

Seed and fertilizer shall be spread evenly at the rate of 20 pounds of seed and N/A pounds of fertilizer per acre.

When fertilizer and seed are applied in separate operations, the second operation shall be carried out within 72 hours of the first.

Seeding shall be done during the period June 1 to September 1 and under the above specified conditions unless otherwise approved.

The kinds and amounts of seed to be sown in terms of pure live seed (PLS) shall be:

Species of Seed PLS Pounds Per Acre Idaho Fescue 5.0 Slender Wheatgrass 4.0 Rocky Mountain Fescue 4.0 Mountain Brome 4.0 Western Wheatgrass 3.0

TOTAL 20

All seed purchased will be certified to be free of the noxious weed seeds from weeds listed on the current "All States Noxious Weeds List." Test results from a certified seed analyst and seed analysis labels attached to the bags will be provided to the Forest Service.

Penn Sum Task Order 16

The following kinds and amounts of standard commercial fertilizer shall be used with guaranteed analysis of contents clearly marked on containers:

Type of Fertilizer Pounds Per Acre N/A N/A

27b. PROTECTION OF DISTURBED AREAS FROM ESTABLISHMENT OF

NOXIOUS WEEDS

In addition to the requirements of 16a. Contractor shall seed and fertilize areas where mineral soil is exposed as designated by the Forest Service. Unless otherwise agreed to in writing, seeding shall be done in the early spring or fall during weather and moisture conditions favorable for quick germination and growth of the plants. Seeding shall be completed in a timely manner following the last disturbance activity by the Contractor in the disturbed area.

The Certified seed analysis reports from each container shall be provided by Contractor to the Forest Service prior to application of the seed. Seed and fertilizer shall be spread evenly at the rate of 20 pounds of seed and N/A pounds of fertilizer per acre.

When fertilizer and seed are applied in separate operations, the second operation shall be carried out within 72 hours of the first operation.

When an adequate seedbed does not exist, Contractor shall scarify to get a 2 inch loose soil seedbed, prior to seeding.

The kinds and amounts of seed to be sown in terms of pure live seed (PLS) shall be:

Species of Seed PLS Pounds Per Acre Idaho Fescue 5.0 Slender Wheatgrass 4.0 Rocky Mountain Fescue 4.0 Mountain Brome 4.0 Western Wheatgrass 3.0

TOTAL 20

All seed purchased will be certified to be free of the noxious weed seeds from weeds listed on the current "All States Noxious Weeds List." Test results from a certified seed analyst and seed analysis labels attached to the bags will be provided to the Forest Service.

The following kinds and amounts of standard commercial fertilizer shall be used with guaranteed analysis of contents clearly marked on containers:

Type of Fertilizer Pounds Per Acre

Penn Sum Task Order 17

N/A N/A

28.a PROTECTION OF IMPROVEMENTS So far as practicable, Contractor shall protect Specified Roads and other improvements such as roads, trails, telephone lines, ditches, and fences:

(a) Existing in the operating area,

(b) Determined to have a continuing need or use, and

(c) Designated on Contract Area Map.

Contractor shall keep roads and trails needed for fire protection or other purposes and designated on Contract Area Map reasonably free of equipment and products, slash, and debris resulting from Contractor’s Operations. Contractor shall make timely restoration of any such improvements damaged by Contractor’s Operations and, when necessary because of such operations, shall move such improvements.

29. PROTECTION OF RESIDUAL TREES

Contractor's Operations shall not unnecessarily damage young growth or other residual trees.

Residual trees are defined as POL and Sawtimber size trees.

29a. RESERVE TREES Notwithstanding the designations for cutting under C.3.1, C.3.2, C.3.3, or C.3.4, live or dead Wildlife reserve trees or groups of reserve trees within such cutting units or clearings shall be left uncut. Reserve trees are identified by ORANGE PAINT at eye level and at the Stump and shall be protected. Units with reserve trees are shown on Contract Area Map.

29b. PROTECTION OF RESERVE TREES.

Contractor’s damage or destruction of reserve trees described in 29a. will cause serious and substantial silvicultural or other damage to the National Forest. It will be difficult if not impossible to determine the amount of such damage. Therefore, Contractor shall pay as fixed, agreed, and liquidated damages $50 for each WILDLIFE_ reserve tree and $_N/A_ for each __N/A_ reserve tree damaged or destroyed by Contractor's Operations. Damage, as used herein, includes any injury to the living crown, bole, or roots of reserve trees. If areas are marked on the ground around such reserve trees, operation of heavy equipment or skidding of products within the area shall be considered to be damage to the tree.

29.1a UNIT BOUNDARIES. (11/06) The boundaries of cutting units are designated as shown in the following table. The trees used for boundary designation are not to be cut.

Cutting Unit Boundary Designation Table

Cutting Unit Paint Color Designation ALL ORANGE The beginning and end points of cutting unit boundaries are marked with a combination of

Penn Sum Task Order 18 orange paint and yellow cutting unit signs. Orange Streaks of paint on three sides of the cutting unit boundary trees. The middle streak of paint faces the area to be cut.

The outside streaks of paint extend below stump height to a height of six feet or more.

Boundary trees are marked at the beginning and end of each cutting unit. Cutting unit boundaries between beginning and end of cutting unit are not marked with orange paint and described as 100 feet either side from the edge of the road.

Yellow cutting unit boundary signs are placed on boundary trees at the beginning and end of each cutting unit. Cutting unit numbers are located on yellow boundary signs.

35. STREAMCOURSE PROTECTION

“Streamcourses” that are subject to provisions of this Section are shown on Contract Area Map.

Unless otherwise agreed, the following measures shall be observed to protect Streamcourses:

(a) Contractor’s Operations shall be conducted to prevent debris from entering Streamcourses, except as may be authorized under paragraph (d). In event Contractor causes debris to enter Streamcourses in amounts that may adversely affect the natural flow of the stream, water quality, or fishery resource, Contractor shall remove such debris as soon as practicable, but not to exceed 48 hours, and in an agreed manner that will cause the least disturbance to Streamcourses.

(b) Culverts or bridges shall be required on Temporary Roads at all points where it is necessary to cross Streamcourses. Such facilities shall be of sufficient size and design and installed in a manner to provide unobstructed flow of water and to minimize damage to Streamcourses. Trees or products shall not be otherwise hauled or yarded across Streamcourses unless fully suspended.

(c) Wheeled or track-laying equipment shall not be operated in Streamcourses, except at crossings designated by Forest Service or as essential to construction or removal of culverts and bridges.

Penn Sum Task Order 19

(d) Flow in Streamcourses may be temporarily diverted only if such diversion is necessary for Contractor’s planned construction and Forest Service gives written authorization. Such flow shall be restored to the natural course as soon as practicable and, in any event, prior to a major storm runoff period or runoff season.

38. USE OF ROADS BY CONTRACTOR

Contractor is authorized to maintain roads, bridges, and other transportation facilities, as needed for harvesting Included Timber on National Forest and other lands where Forest Service has such authority. The location and clearing widths of all Temporary Roads or facilities shall be agreed to before construction is started. Contractor is authorized to cut and use for construction without charge construction timber designated by agreement.

Except as provided herein, Contractor is authorized to use existing National Forest roads and Specified Roads, when such use will not cause damage to the roads or National Forest resources and when hauling can be done safely. If Contractor’s use of an existing temporary or National Forest system road cannot be satisfactorily accommodated without reconstruction, Contractor shall be authorized to use such road upon agreement as to the minimum reconstruction work that Contractor shall perform before hauling.

The Contract Area Map shows existing temporary or permanent roads that for such reasons as limitations in structural capacity, safety, and protection of soil, water, and roads:

(a) Cannot be used for log hauling or

(b) May be used only under the restrictive limitations stated therein.

Contractor's use of existing roads identified on Contract Area Map by the following codes is prohibited or subject to restrictive limitations, unless agreed otherwise:

Code Use Limitations X Hauling prohibited R Hauling restricted U Unsuitable for hauling prior to completion of agreed reconstruction P Use prohibited A Public use restriction W Regulation waiver

Roads coded A will be signed by the Forest Service to inform the public of use restrictions.

Contractor's use of roads coded R, A, or W shall be in accordance with the following restrictions:

Restricted Road List

Road Termini Map Description of Number Road Name From To Legend Restrictions

Penn Sum Task Order 20

Road Termini Map Description of Number Road Name From To Legend Restrictions

611 Pennsylvania Creek 0.0 End X Hauling Prohibited 352 Summit Gulch 0.0 End X Hauling Prohibited

42. SAFETY

Contractor’s Operations shall facilitate Forest Service’s safe and practical inspection of Contractor’s Operations and conduct of other official duties on Contract Area. Contractor has all responsibility for compliance with safety requirements for Contractor's employees. In the event that a conflict develops between the requirements of this contract or agreed upon methods of proceeding hereunder and State or Federal safety requirements, the contract shall be modified and Contractor may request an equitable adjustment.

Unless otherwise agreed in writing, when Contractor’s Operations are in progress adjacent to or on Forest Service controlled roads and trails open to public travel, Contractor shall furnish, install, and maintain all temporary traffic controls that provide the user with adequate warning of hazardous or potentially hazardous conditions associated with Contractor’s Operations.

Contractor and Forest Service shall agree to a specific Traffic Control Plan for each individual project prior to commencing operations. Devices shall be appropriate to current conditions and shall be covered or removed when not needed. Except as otherwise agreed, flagmen and devices shall be as specified in the “Manual on Uniform Traffic Control Devices for Streets and Highways” (MUTCD) and as shown on Plans, Contract Area Map, Traffic Control Plan, or in specifications attached hereto.

Project specific traffic safety signing:

Traffic Sign Requirements/Plan

Warning of hazardous or potentially hazard conditions associated with the contractor operations are needed. These signs must meet MUTCD (Manual on Uniform Traffic Devices) standards.

Unless otherwise agreed upon, a minimum of 2 signs are required on open roads and trails with reflective orange background and black legend & border. All signs are on National Forest System Roads (NFSR). Placement of signs on existing posts with existing signs will not be allowed.

Signs need to be mounted on 4”x 4” posts, 6 to 12 feet from edge of road/trail and 7 foot to bottom of sign from the road surface, per EM-7100-15 (Sign and Poster Guidelines for the Forest Service). Theft prevention bolts and nuts are recommended to secure signs to posts. Locations for signs are:

Suggested Safety Sign Suggested Location

Penn Sum Task Order 21

“Felling Operations” black legend and border on reflectorized orange

FG-20-3-48”

One sign placed at the beginning of NFSR 1000.

One sign placed on the trail approximately 75 yards on either side of the active tree felling and slashing operations.

(If agreed to by Contracting Officer, the warning signs may be substituted with similar warning message.)

Traffic Control Roads and trails are to remain open unless otherwise agreed to in advance. Operations signs will be needed on both ends of active felling and slash treatment operations segments warning the public that tree felling, logging operations and removal actions are taking place.

Contractor shall provide flaggers or guards during active felling operations to stop trail traffic from entering into tree felling zone. Other methods of traffic control during felling operations proposed by contractor may be agreed to in writing by the COR.

Written requests for road closures will be submitted 2 days in advance to the CO. Temporary road closures would be addressed through the COR authorities.

Logging Operations Logging operations, tree felling, slash treatments and roadwork are inherently hazardous.

Conditions, which are inherently hazardous, that could lead to serious injury or loss of life include, but are not limited to:

1. Traffic hazards 5. Heavy equipment operations

a. Narrow gravel or native surface forest roads

a. Backing into objects

b. Long, steep grades (less than 20%) b. Steep side slopes or soft ground for rollovers

c. Logging Traffic c. Refueling hazards

d. Unskilled visitor traffic d. Exceeding equipment limitations

e. Dusty conditions hindering visibility behind vehicles

e. Unsafe equipment / lack of safety equipment

2. Work environment f. Operator fatigue

a. Inclement weather for potential hypo/hypothermia

6. Excavation

b. High winds that can bring down trees a. Slope or trench wall instability

b. High pressure gas lines and other utilities

c. Wet, snowy or ice conditions making ground unstable

7. Truck Driving & Trailer Towing

Penn Sum Task Order 22

d. High db noise a. Increased stopping distance

e. Insects, plants, animals b. Loads insecurely lashed

f. Hazardous footing/terrain c.