Wage Decision.pdf
PDF 24 KB Posted
- Attached to
- Handy Man IDIQ for Maintenance, Repair and Minor Construction for the San Juan National Forest
- Solicitation number
- AG-82X9-S-11-0049
About this file
Attachment 1 - Wage Decision
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DATB_DumpsterPad_Scope-Specs.pdf | ||
| AG-82X9-S-11-0049.pdf | ||
| Fire Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: CO100017 11/05/2010 CO17
Superseded General Decision Number: CO20080017
State: Colorado
Construction Type: Residential
Counties: Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley, Custer, Delta, Dolores, Eagle, Elbert, Fremont, Garfield, Gilpin, Grand, Gunnison, Hinsdale, Huerfano, Jackson, Kiowa, Kit Carson, La Plata, Lake, Las Animas, Lincoln, Logan, Mineral, Moffat, Montezuma, Montrose, Morgan, Otero, Ouray, Park, Phillips, Pitkin, Prowers, Rio Blanco, Rio Grande, Routt, Saguache, San Juan, San Miguel, Sedgwick, Summit, Teller, Washington and Yuma Counties in Colorado.
RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date 0 03/12/2010 1 09/10/2010 2 10/08/2010 3 10/29/2010 4 11/05/2010
ELEC0012-008 06/01/2009
ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CONEJOS, COSTILLA,
CROWLEY, CUSTER, FREMONT, HUERFANO, KIOWA, LAS ANIMAS, MINERAL,
OTERO, PROWERS, RIO GRANDE AND SAGUACHE COUNTIES
Rates Fringes
Electricians:
(Including Low Voltage Wiring and Installation of Fire Alarms)
Electrical work $150,000 or less.....................$ 22.85 10.79 Electrical work over $150,000....................$ 27.00 10.91
* ELEC0068-015 11/01/2010
CLEAR CREEK, EAGLE, GILPIN, GRAND, JACKSON, LAKE, LOGAN,
MORGAN, PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON AND YUMA COUNTIES
ELECTRICIAN
(Including Low Voltage Wiring and Installation of Fire Alarms)................$ 24.59 8.06
ELEC0113-008 06/01/2010
CHEYENNE, ELBERT, KIT CARSON, LINCOLN, PARK AND TELLER COUNTIES
Rates Fringes
ELECTRICIAN
(Including Low Voltage Wiring and Installation of Fire Alarms)................$ 21.60 11.88
ELEC0969-008 12/01/2009
DELTA, DOLORES, GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT,
MONTEZUMA, MONTROSE, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN JUAN
AND SAN MIGUEL COUNTIES
ELECTRICIAN
(Including Low Voltage Wiring and Installation of Fire Alarms)................$ 20.75 3%+1.00
IRON0024-001 11/01/2009
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 24.80 9.91
SUCO2001-004 12/20/2001
Rates Fringes
CARPENTER........................$ 17.86
Laborers:
Common......................$ 10.33
Painters:
Brush, Spray & Roller.......$ 15.00
PLUMBER
(Including HVAC pipe).......$ 18.06 2.78
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .