Attachment 3 - Task 1 SOW/Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Decision.pdf | ||
| AG-82X9-S-11-0049.pdf | ||
| Fire Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture
Forest Service
Region 2
San Juan National Forest
May 2011
Concrete Dumpster Pad - Durango Air Tanker Base
Index:
Bid Schedule
Specifications:
010250 Definition of Bid Items &
Measurement and Payment 011000 Summary of Work 011700 Accident Prevention 013300 Submittal Procedures 014300 Contractor Quality Control 015000 Temporary Facilities &
Controls 017329 Cutting and Patching 017700 Closeout Procedures
033010 Concrete
Drawings:
T1.1 Title Sheet & Drawing Index C1.1 Dumpster Site Plan & Existing
Photographs.
AUSD
San Juan National Forest Durango Tanker Airbase – Dumpster Pad
05/2011 010250 - 1 Definition of Bid Items & Measurement and Payment
SECTION 010250
DEFINITION OF BID ITEMS
AND
MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.1 SUMMARY
A. The intent of this section is to explain, in general; what is and what is not included in a bid item; the limits or cut-off points where one bid item ends and another begins; and method of measurements and basis of payment for work items listed in the Bid Item Schedule.
B. Work:
1. Furnishing all labor, materials, equipment, and other incidentals necessary to successfully complete the project or any portion of it, and carrying out all duties and obligations imposed by the contract on the Contractor.
2. For each individual item listed here and in the Schedule of Items, payment shall be full compensation for all work related to the particular item in accordance with these specifications, as shown on the drawings, and as staked in the field.
3. Measurement and payment for contract work shall be made only for and under those pay items included in the Schedule of Items. All other work and materials shall be considered incidental or as included in the payment for items shown.
1.2 DETERMINATION OF QUANTITIES
A. The contractor shall perform, or cause to be performed, all measurement of quantities of materials incorporated into the work processes that are to be measured under the provisions of the contract.
B. Quantity Measurements:
1. The Contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Lump Sum Quantity
(LSQ).
2. The contractor shall compute the quantities for periodic progress payments; the Contracting Officer shall compute the quantities for the final payment based on measurements taken by the Contractor.
3. All Contractor measurements are subject to verification.
4. The Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities.
5. The Contractor shall certify in writing as to the accuracy of the measurements and computations submitted.
05/2011 010250 - 2 Definition of Bid Items & Measurement and Payment
C. The following measurements and calculations are used to determine contract quantities.
1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.
2. The average end area method shall be used to compute volumes of excavation or embankment. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three dimensional methods.
3. Structures shall be measured according to neat lines shown on the drawings or as altered by the Contracting Officer, in writing, to fit field conditions.
1.3 UNITS OF MEASUREMENT
A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:
B. Cubic Yard: A measurement computed by one of the following methods:
1. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.
2. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.
3. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery.
Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
C. Each: One complete unit, which may consist of one or more parts.
D. Linear Foot: Linear feet measured horizontally.
E. Lump Sum: Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item.
F. Where tolerances are shown in the contract, they are intended to define reasonably close conformity. Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed roadway sections and to balance earthwork. Such adjustments shall not be considered as “Changes.”
PART 2 - METHOD OF MEASUREMENT
2.1 GENERAL
05/2011 010250 - 3 Definition of Bid Items & Measurement and Payment
A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:
B. LUMP SUM QUANTITIES (LSQ)
1. These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall be measured complete and in-place.
PART 3 – DEFINITION OF BID ITEMS
3.1 SCHEDULE OF ITEMS
A. The project Schedule of Items includes several sections to organize the bid items into Base Bid Items and Optional Bid Items. When a pay item is described as a Base Bid Item, the description will be the same when that item or a similar item is included as an Optional Bid Item. Contractor shall provide item pricing for all items listed in the Schedule of Items. Contract award will be made for all Base Bid Items. Those items listed as Optional Bid Items will be awarded based on available project funding. The Optional Bid Items are not listed in priority order and may be awarded in any combination of individual items.
BASE BID ITEMS (BBI)
Base Bid Item No. 1 – Mobilization.
a. Measurement: This item is measured as a lump sum quantity.
b. Payment: The contract lump sum price shown in the Schedule of Items shall include all activities necessary to accomplish the work at the project site, including but not limited to the following: move personnel, equipment, material, and incidentals to the project, obtain permits, insurance and bonds.
Base Bid Item No. 2 – Demolition & Removal of existing Asphalt Paving.
c. Measurement: This item is measured as a lump sum quantity.
d. Payment: The contract lump sum price shown in the Schedule of Items shall include all materials, equipment, labor and incidentals required to perform all operations necessary for removal of the asphalt paving as specified and shown in the construction documents.
Base Bid Item No. 3 – Testing.
a. Measurement: This item is measured as a lump sum quantity.
05/2011 010250 - 4 Definition of Bid Items & Measurement and Payment
b. Payment: The contract lump sum price shown in the Schedule of Items shall include all materials, equipment, labor and incidentals required to perform all operations necessary for testing of concrete slab and base course as specified and shown in the construction documents.
Base Bid Item No. 4 – Concrete Pad and Curb.
c. Measurement: This item is measured as a lump sum quantity.
d. Payment: The contract lump sum price shown in the Schedule of Items shall include all materials, equipment, labor and incidentals required to perform all operations necessary for installation of a concrete pan with curb as specified and shown in the construction documents.
END OF SECTION 010250
05/2011 011000 - 1 Summary of Work
SECTION 011000
SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Work for this project requires the Contractor to be responsible for supplying all labor, materials, equipment, freight and delivery, and all necessary, valid licenses and permits required to install a 40.5’ x 18’ x 6” (approximate size) concrete trash dumpster pad and apron at the Durango Tanker Airbase.
1.2 LOCATION
A. This project is located at 100 County road 309A, Ignacio, Colorado 81303, next to the Durango-La Plata County Airport. The campus consists of a 3,800 SF Office/Control Center building, a 1,200 SF Warehouse building, a tank farm for retardant storage and loading operations, two aircraft loading pads and two taxiways that connect to the existing taxiway on 7.46 acres.
1.3 GENERAL SITE CONDITIONS AND WEATHER
A. The elevation of the site is approximately 6,685 feet above mean sea level. The construction site experiences snowfall and cold temperatures, with snow on the ground typically from mid-December through March.
B. The Government may have soil surveys from when the building was constructed.
Disposal of debris shall be in the nearest sanitary landfill.
1.4 WORK PHASES
A. The Work shall be conducted in one phase.
B. Before commencing Work, submit a schedule showing the sequence, commencement and completion dates, and move-out and -in dates of Government's personnel for the
1.5 WORK TRIPS AND MEETINGS
A. Pre-Bid walk through.
B. Pre-Work meeting.
C. Punch list.
D. Operations and Maintenance Training.
E. Close-Out.
05/2011 011000 - 2 Summary of Work
1.6 WORK UNDER OTHER CONTRACTS
A. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract.
Coordinate the Work of this Contract with work performed under separate contracts.
1.7 USE OF PREMISES
A. General: Contractor shall have limited use of premises for construction operations as indicated on Drawings by the Contract limits.
B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees.
C. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Government Occupancy: Allow for Government occupancy of Project site and use by the public.
2. Driveways and Entrances: Keep driveways loading areas, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
a. Schedule deliveries to minimize use of driveways and entrances.
b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
D. Use of Existing Building: Repair damage caused by construction operations. Protect building and its occupants during construction period.
1.8 GOVERNMENT'S OCCUPANCY REQUIREMENTS
A. Full Government Occupancy: Government will occupy site and building during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.
1.9 WORK RESTRICTIONS
05/2011 011000 - 3 Summary of Work
A. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes.
1.10 CONTRACTOR’S RESPONSIBILITIES
A. Confine storage of materials to areas as approved by the CO.
B. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.
C. Preservation of Natural Features: Confines all operations to work limits of the project.
Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
D. Existing Utilities: Notify CO and utility companies of proposed locations and times for excavation.
1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
2. Interruption of Existing Utility Service: Notify CO, 48 hours in advance of any interruption of existing utilities.
3. Coordination with Utility Companies:
Electrical power – La Plata Electric Association, Inc.: 970-247-5786 Water – Durango – LaPlate Airport
1.1 CONSTRUCTION ADMINISTRATION
A. Materials for construction and construction vehicles and equipment may be stockpiled and staged at the project site in an area designated by the Contracting Officer.
B. The Contractor shall take precautions to protect all work during the construction period.
C. The Contractor is responsible for safeguarding the public and employees from construction operations.
1.2 FIELD VERIFICATION
A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
1.3 PERMITS
A. Special permits for electrical work or any other permits required by County, State, or Federal laws or regulations shall be obtained by the Contractor.
05/2011 011000 - 4 Summary of Work
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION 011000
05/2011 011700 - 1 Accident Prevention
SECTION 011700
ACCIDENT PREVENTION
PART 1 - GENERAL
1.1 DESCRIPTION
A. The work of this section consists of establishing an effective accident prevention program and providing a safe environment for all personnel and visitors.
1.2 SUBMITTALS
A. Injury and Illness Prevention Plan: Before on-site work begins, submit a company executive approved Injury and Illness Prevention Plan that will be posted in the contract file. This Injury and Illness Prevention Plan shall address all Federal, State, and Local Occupational Safety and Health that apply to this project. No progress payments will be processed until the plan is received. As a minimum, the plan shall include:
1. Name, position title and point of contact information of company executive responsible for approving the Injury and Illness Prevention Plan.
2. Name and point of contact information of supervisor responsible to carry out the
Injury and Illness Prevention Plan.
3. Specific contingency plans for emergency action purposes such as medical, fire, hazard material spills and other contract assessed hazard prevention and abatement requirement needs that apply to this project.
1.3 QUALITY ASSURANCE
A. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the General Provisions. In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work.
B. Qualifications of Employees
1. Ensure that employees are physically qualified to perform their assigned duties in a safe manner.
2. To as great an extent as possible, do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
3. Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment. Newly hired operators shall be individually tested by an experienced
05/2011 011700 - 2 Accident Prevention operator or supervisor to determine if they are capable of safely operating equipment.
1.4 ACCIDENT REPORTING
A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires. Within 7 days of a reportable accident, fill out and forward to the CO a CA-1 form, which may be obtained from CO.
B. All Other Accidents: The Contractor shall report all other accidents to the CO as soon as possible and assist the CO and other officials as required in the investigation of the accident.
PART 2 – PRODUCTS
2.1 FIRST AID FACILITIES: provide adequate facilities for the number of employees and the type of construction at the site.
2.2 PERSONNEL PROTECTIVE EQUIPMENT: meet requirements of NIOSH and MSHA, where applicable, as well as ANSI.
2.3 BARRIERS: see division 1 section “Temporary Facilities and Controls” for barriers.
PART 3 – EXECUTION
3.1 EMERGENCY INSTRUCTIONS: post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
3.2 ESCAPE ROUTES: provide and maintain adequate escape routes at all times in accordance with the Life Safety Code (NFPA 101-91). No corridor, aisle, stairway, door, or exit shall be obstructed or used in a manner that interferes with escape routes.
3.3 PROTECTIVE EQUIPMENT
A. Inspect personal protective equipment daily and maintain in a serviceable condition.
Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.
B. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
3.4 SAFETY MEETINGS
05/2011 011700 - 3 Accident Prevention
A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.
B. Conduct monthly safety meetings for all levels of supervision. Notify the CO so that he may attend. These meetings shall be used to review the effectiveness of the Contractor's safety effort, to resolve current health and safety problems, to provide a forum for planning safe construction activities, and for updating the accident prevention program.
The CO will enter the results of the meetings into his daily log.
3.5 HARD HATS AND PROTECTIVE EQUIPMENT AREAS
A. A hard hat area will be designated by the CO. The hard hat area shall be posted by the Contractor in a manner satisfactory to the CO.
B. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary protective equipment at all times.
3.6 TRAINING
A. First Aid: Provide adequate training to ensure prompt and efficient first aid.
B. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.
END OF SECTION 011700
05/2011 013300 - 1 Submittal Procedures
SECTION 013300
SUBMITTAL PROCEDURES
PART 1- GENERAL
1.1 REQUIREMENTS
A. The Contractor shall submit all information necessary to insure compliance. The Con-tractor shall submit information at least five (5) working days prior to beginning the associated work.
B. Submittals and approvals by the Contracting Officer (CO) shall be required for all products not specified in the Contract or where the Contractor wishes to use an ap-proved equal. Submittals are not required where Contractor proposed to use exact product specified (i.e. exact model and manufacturer specified).
C. Products installed by the Contractor and not approved by the CO are subject to remov-al and reinstallation with an approved product at the Contractor’s expense.
1.2 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
B. Processing Time: Allow enough time for submittal review, including time for resub-mittals, as follows. Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Allow 10 working days for initial review of each submittal. Al-low additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. If intermediate submittal is necessary, process it in same manner as initial sub-mittal.
3. Allow 10 working days for processing each resubmittal.
4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
C. Identification: Place a permanent label or title block on each submittal for identifica-tion.
1. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Other necessary identification.
05/2011 013300 - 2 Submittal Procedures
D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
E. Additional Copies: Unless additional copies are required for final submittal, and un-less CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
PART 2 – PRODUCTS
2.1 SUBMITTALS
A. Submit two (2) copies (manufacturer’s literature, shop drawings, samples, test reports, etc.) to the CO for approval on the items required herein.
B. Information must be adequate to determine compliance with specifications.
C. Material Test Reports: Prepare reports written by a qualified testing agency, on test-ing agency's standard form, indicating and interpreting test results of material for compliance with requirements.
D. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed ei-ther during installation of product or after product is installed in its final location, for compliance with requirements.
PART 3 – EXECUTION
3.1 GENERAL
A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submit-tal has been reviewed, checked, and approved for compliance with the Contract Doc-uments.
C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.
END OF SECTION 013300
05/2011 014300 - 1 Contractor Quality Control
SECTION 014300
CONTRACTOR QUALITY CONTROL
PART 1 GENERAL
1.1 DESCRIPTION
A. Provide certification that the quality and quantity of construction conforms to the drawings, specifications, and requirements of the contract.
1.2 SUBMITTALS
A. As specified in Division 1 Section “Submittal Procedures”.
B. Contractor's Quality Control Daily Reports: Submit showing all inspections and tests on the first workday following the date covered by the report.
C. Test Reports:
1. Submit Daily Test Information Sheets with Quality Control Daily Reports.
2. Submit failing test results and proposed remedial actions within four hours of noted deficiency.
3. Submit three copies of complete test results not later than three calendar days after the test was performed.
D. Off-Site Inspection Reports: Submit prior to shipment.
1.3 QUALITY ASSURANCE
A. General:
1. The quality of all work shall be the responsibility of the Contractor. Testing shall be the responsibility of an independent testing laboratory
2. Inspect and test all work often enough to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and drawings.
3. Quality Control Daily Reports shall be completed by the Contractor.
4. Test reports shall be completed by person performing the test.
5. The CO may designate locations of tests.
1) Design and complexity of the project.
2) Location of the project.
3) Characteristics of area construction labor market.
4) Duration of project.
5) Cost and type of contract.
6) Amount and type of off-site fabrication.
05/2011 014300 - 2 Contractor Quality Control
B. Testing Laboratory and Equipment:
1. Employ certified independent laboratories to perform sampling and testing. The testing laboratory organization shall be certified for the type of testing work to be done.
2. All measuring devices, laboratory equipment, and instruments shall be calibrated at established intervals against certified standards in accordance with NBS requirements. Upon request, measuring and testing devices shall be made available for use by the Government for verification tests.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 OFF-SITE CONTROL
A. Furnish certificates executed by the manufacturer supplier, or vendor, stipulating that all materials produced off site that are incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications. Make each certificate apply to a single commodity or invoice. Certify all incidental purchases needed to remedy minor shortages of material.
3.2 ON-SITE CONTROL
A. Notification:
1. Notify the CO at least 48 hours in advance of the preparatory phase meeting.
2. Notify the CO at least 24 hours in advance of the initial and follow-up phases.
B. Preparatory Phase: Perform before beginning each feature of work.
1. Review control submittal requirements with personnel directly responsible for the quality control work.
2. Review all applicable specifications sections and drawings related to the feature of work.
3. Ensure that copies of all referenced standards related to sampling, testing, and execution for the feature of work are available on site.
4. Ensure that provisions have been made for field control testing.
5. Examine the work area to ensure that all preliminary work has been completed.
6. Verify all field dimensions and advise the CO of discrepancies with contract documents.
7. Ensure that necessary equipment and materials are at the project site and that they comply with approved shop drawings and submittals.
8. Prepare a report on all preparatory phase activities and discussions. Attach report to Contractor's Quality Control Daily Report.
05/2011 014300 - 3 Contractor Quality Control
C. Initial Phase:
1. As soon as work begins, inspect and test a representative portion of a particular feature of work for quality of workmanship.
2. Review control-testing procedures to ensure compliance with contract requirements.
3. Prepare a report on all initial phase activities and discussions. Attach report to Contractor's Quality Control Daily Report. Exact location of initial phase shall be indicated for future reference and comparison with follow-up phases.
D. Follow-Up Phase: Inspect and test as work progresses to ensure compliance with contract requirements until completion of work.
E. Additional Preparatory and Initial Phases: Additional preparatory and initial phases may be required on the same feature of work for the following reasons:
1. Quality of on-going work is unacceptable.
2. Changes occur in the applicable quality control staff, on-site production supervision, or work crew.
3. Work on a particular feature of work is resumed after a substantial period of inactivity.
3.3 DOCUMENTATION
A. Maintain Quality Control Daily Reports and Daily Test Report Information Sheets (samples attached) of quality control activities and tests.
B. Quality Control Daily Reports may not be substituted for other written reports required under clauses of the contract, such as Disputes, Differing Site Conditions, or Changes.
3.4 ENFORCEMENT
A. The Contractor shall stop work on any item or feature pending satisfactory correction of any deficiency noted by the quality control staff or the CO.
END OF SECTION 014300
CONTRACTOR’S QUALITY CONTROL DAILY REPORT
REPORT NO. SHEET 1
OF
PROJECT
CONTRACT NO.
DATE
FOREST
CONTRACTOR'S REPRESENTATIVE ON THE JOB
WEATHER (Rain, Snow, Cloudy, Windy, etc.)
RAINFALL
Inches
TEMPERATURE GROUND CONDITIONS (Dry, Damp, Wet, Frozen, etc.)
MAX.
MIN.
1. PRIME CONTRACTOR
NO. EMPLOYEES BY JOB CATEGORIES Hours HEAVY EQUIPMENT ON
JOB
NO.
UNITS
HRS. WORKING
YES NO Comments
WORK PERFORMED BY PRIME CONTRACTOR:
MATERIALS DELIVERED OFFICIAL VISITORS TO SITE
2A. SUBCONTRACTOR, _____________________________________________: (If more than one subcontractor use copies of following page.)
NO. EMPLOYEES BY JOB CATEGORIES Hours HEAVY EQUIPMENT ON
JOB
NO.
UNITS
WORK PERFORMED BY SUBCONTRACTOR:
3. SPECIFIC INSPECTIONS: (Inspections performed, results, and corrective actions)
4. TESTING: 1 Check if any testing was performed today. (Complete and attach Test Report Information Sheets.)
Type and Location of Testing: ____________________________________________________________________________________
5. VERBAL INSTRUCTION RECEIVED FROM GOVERNMENT ON CONSTRUCTION DEFICIENCIES OR RE-TESTING
REQUIRED:
6. REMARKS:
7. CERTIFICATION:
I certify that the above report is complete and correct and that I, or my authorized representative, have inspected all work performed this day by the prime contractor and each subcontractor and determined that all materials, equipment, and workmanship are in strict compliance with the plans and specifications except as may be noted above. ____________________________________________________________ Contractor's Quality Control Representative
SUBCONTRACTOR WORK CONTINUED:
CONTRACT NO. REPORT NO. _______
SHEET ____ OF ____
2 SUBCONTRACTOR,
NO. EMPLOYEES BY JOB CATEGORIES Hours HEAVY EQUIPMENT ON
JOB
NO.
UNITS
2 SUBCONTRACTOR,
JOB
NO.
UNITS
JOB
NO.
UNITS
JOB
NO.
UNITS
YES NO COMMENTS
DAILY TEST REPORT INFORMATION SHEET
CONTRACT NO. REPORT NO. _____________
SHEET _____ OF _________
1. Individual Making Inspection or Test:
2. Testing Laboratory; Name: Phone #:
Address:
3. Description of Work and Test Method:
4. Location of Samples and Tests or Inspections:
5. Specification Section:
6. Inspection or Test Data:
7. Test Results and Interpretations of Test Results:
8. Comments or Professional Opinion About Compliance of Inspected Work or Tested Work with contract Document Requirements:
9. Recommendations:
10. Corrective Actions Taken:
CERTIFICATION:
I certify that the above testing report is complete and correct and that all testing performed this day for this contract is in strict compliance with the plans and specifications except as noted above.
Signature of Inspector
05/2011 015000 - 1 Temporary Facilities and Controls
SECTION 015000
TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes requirements for temporary facilities and controls, including temporary utilities, support facilities, and security and protection facilities.
1.2 USE CHARGES
A. Water Service: Use water from Government’s existing water system without metering and without payment of use charges.
B. Electric Power Service: Use electric power from Government existing system without metering and without payment of use charges.
1.3 PROJECT CONDITIONS
A. Conditions of Use: The following conditions apply to use of temporary services and facilities by all parties engaged in the Work:
1. Keep temporary services and facilities clean and neat.
2. Relocate temporary services and facilities as required by progress of the Work.
PART 2 – PRODUCTS
2.1 MATERIALS
A. General: Provide new materials. Undamaged, previously used materials in servicea-ble condition may be used if approved by CO. Provide materials suitable for use in-tended.
PART 3 – EXECUTION
3.1 TEMPORARY UTILITY INSTALLATION
A. Sewers and Drainage:
1. Filter out excessive soil, construction debris, chemicals, oils, and similar conta-minants that might clog sewers or pollute waterways before discharge.
2. Provide temporary filter beds, settlement tanks, separators, and similar devices to purify effluent to levels acceptable to authorities having jurisdiction.
05/2011 015000 - 2 Temporary Facilities and Controls
B. Water Service: Use of Government existing water service facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion, restore these facilities to condition existing before initial use.
1. Provide rubber hoses as necessary to serve Project site.
C. Sanitary Facilities:
1. Toilets: Use of Government existing toilet facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Sub-stantial Completion, restore these facilities to condition existing before initial use.
D. Electric Power Service: Use of Government's existing electric power service will be permitted, as long as equipment is maintained in a condition acceptable to CO.
E. Telephone Service: Use of Government's existing telephone service will not be per-mitted. Contractor will need to provide own telephone service.
1. Provide a portable cellular telephone for superintendent's use in making and re-ceiving telephone calls when in the field.
3.2 SUPPORT FACILITIES INSTALLATION
A. General: Comply with the following:
B. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste.
1. If required by authorities having jurisdiction, provide separate containers, clear-ly labeled, for each type of waste material to be deposited.
3.3 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Environmental Protection: Provide protection, operate temporary facilities, and con-duct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects. Avoid using tools and equipment that produce harmful noise. Restrict use of noisemaking tools and equipment to hours that will minimize complaints from persons or firms near Project site.
B. Stormwater Control: Provide earthen embankments and similar barriers in and around excavations and subgrade construction, sufficient to prevent flooding by runoff of stormwater from heavy rains.
C. Barricades, Warning Signs: Comply with standards and code requirements for erect-ing structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and public of possible hazard.
05/2011 015000 - 3 Temporary Facilities and Controls
3.4 OPERATION, TERMINATION, AND REMOVAL
A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, limit availability of temporary facilities to essential and intended uses.
B. Maintenance: Maintain facilities in good operating condition until removal. Protect from damage caused by freezing temperatures and similar elements.
END OF SECTION 015000
05/2011 017329 - 1 Cutting and Patching
SECTION 017329
CUTTING AND PATCHING
PART 1 - GENERAL
1.1 GENERAL
A. This Section includes procedural requirements for cutting and patching.
B. Requirements in this Section apply to electrical installations. See Division 03 Sections for other requirements and limitations applicable to cutting and patching mechanical and electrical installations.
1.2 SUBMITTALS
A. Cutting and Patching Proposal: Submit a proposal describing procedures at least 10 days before the time cutting and patching will be performed, requesting approval to proceed. Include the following information:
1. Extent: Describe cutting and patching, show how they will be performed.
2. Products: List products to be used and firms or entities that will perform the
Work.
3. Dates: Indicate when cutting and patching will be performed.
4. Utilities: List utilities that cutting and patching procedures will disturb or affect.
List utilities that will be relocated and those that will be temporarily out of ser-vice. Indicate how long service will be disrupted.
5. Contracting Officer’s (CO) Approval: Obtain approval of cutting and patching proposal before cutting and patching. Approval does not waive right to later re-quire removal and replacement of unsatisfactory work.
PART 2 – PRODUCTS
2.1 MATERIALS
A. General: Comply with requirements specified in other Sections of these Specifica-tions.
B. Existing Materials: Use materials identical to existing materials. For exposed surfac-es, use materials that visually match existing adjacent surfaces to the fullest extent possible.
1. If identical materials are unavailable or cannot be used, use materials that, when installed, will match the visual and functional performance of existing materials.
PART 3 – EXECUTION
05/2011 017329 - 2 Cutting and Patching
3.1 EXAMINATION
A. Examine surfaces to be cut and patched and conditions under which cutting and patch-ing are to be performed.
1. Compatibility: Before patching, verify compatibility with and suitability of sub-strates, including compatibility with existing finishes or primers.
2. Proceed with installation only after unsafe or unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Protection: Protect existing construction during cutting and patching to prevent dam-age. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.
B. Adjoining Areas: Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.
3.3 PERFORMANCE
A. General: Employ skilled workers to perform cutting and patching. Proceed with cut-ting and patching at the earliest feasible time, and complete without delay.
1. Cut existing construction to provide for installation of other components or per-formance of other construction, and subsequently patch as required to restore surfaces to their original condition.
B. Cutting: Cut existing construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations.
1. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.
2. Proceed with patching after construction operations requiring cutting are com-plete.
C. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other Work. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other Sections of these Specifications.
1. Inspection: Where feasible, test and inspect patched areas after completion to demonstrate integrity of installation.
05/2011 017329 - 3 Cutting and Patching
2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.
END OF SECTION 017329
05/2011 017700 - 1 Closeout Procedures
SECTION 017700
CLOSEOUT PROCEDURES
PART - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for contract clo-seout, including, but not limited to, the following:
1. Inspection procedures.
2. Project Record Documents.
3. Final cleaning.
1.2 SUBSTANTIAL COMPLETION
A. Preliminary Procedures: Before requesting inspection for determining date of Sub-stantial Completion, complete the following. List items below that are incomplete in request.
1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.
2. Advise Contracting Officer (CO) of pending insurance changeover require-ments.
3. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certif-icates, and similar releases.
4. Prepare and submit final record information.
5. Complete final cleaning requirements.
6. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
B. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of un-fulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous in-spections as incomplete is completed or corrected.
2. Results of completed inspection will form the basis of requirements for Final Completion.
1.3 FINAL COMPLETION
05/2011 017700 - 2 Closeout Procedures
A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:
1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise re-solved for acceptance.
2. Submit evidence of final, continuing insurance coverage complying with insur-ance requirements.
B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled re-quirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certifi-cate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous in-spections as incomplete is completed or corrected.
1.4 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Preparation: Submit three copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are out-side the limits of construction.
PART 2 – PRODUCTS
2.1 MATERIALS
A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are poten-tially hazardous to health or property or that might damage finished surfaces.
PART 3 – EXECUTION
3.1 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and anti-pollution regulations.
B. Cleaning: Employ experienced workers or professional cleaners for final cleaning.
Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.
05/2011 017700 - 3 Closeout Procedures
1. Complete the following cleaning operations before requesting inspection for cer-tification of Substantial Completion for entire Project or for a portion of Project:
a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste ma-terial, litter, and other foreign substances.
b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.
c. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.
d. Remove tools, construction equipment, machinery, and surplus material from Project site.
e. Leave Project clean and ready for occupancy.
C. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harm-ful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.
END OF SECTION 017700
05/2011 033010 - 1 Concrete, Formwork, and Reinforcement
SECTION 033010
CONCRETE, FORMWORK, AND REINFORCEMENT
PART 1 GENERAL
1.01 SCOPE
A. Applies to steel-reinforced concrete pad.
PART 2 PRODUCTS
2.01 FORMS
A. Plywood, hardboard, wood, metal, or other approved material to yield the required finish. Free of bulge, warp, or other defects, which would cause blemishes. Forms shall be thoroughly clean.
2.02 STEEL BAR REINFORCEMENT
A. Deformed bars of intermediate grade with minimum yield stress of 40,000 pounds per square inch (psi), conforming to AASHTO M-31, M-42; or M-53; or ASTM A-615, A-616; or A-617, respectively.
2.03 PORTLAND CEMENT
A. AASHTO M-85 or ASTM C-150, type I.
2.04 AGGREGATES
A. Maximum size 1" for reinforced work and 1-1/2" for non-reinforced. AASHTO
M-6 and M-80, or ASTM C-33.
2.05 WATER
A. Clean, fresh, and free from injurious amounts of mineral and organic substances.
2.06 ADMIXTURES
A. Air-entraining admixtures shall conform to ASTM C-260 (AASHTO M-154).
B. When approved for use, water-reducing admixtures, retarding admixtures, and accelerating admixtures shall conform to ASTM C-494 (AASHTO M-194).
05/2011 033010 - 2 Concrete, Formwork, and Reinforcement
2.07 CONCRETE MIX DESIGN
A. Proportion and mix to obtain concrete of 4,000 psi minimum compressive strength at 28 days. Water/cement ratio shall not exceed 0.46 by weight, including free surface moisture on the aggregates and liquid admixtures. Slump shall not exceed 4" or be less than 1".
B. Add air-entraining admixtures to the concrete mix in an amount to produce for
1" aggregate 6 percent + 1 percent, for 1-1/2" aggregate 5 percent + 1 percent air by volume.
C. Use of other admixtures not permitted unless written approval is obtained from the CO.
2.08 CURING COMPOUNDS
A. Liquid membrane-forming compounds suitable for application on horizontal and vertical concrete surfaces complying with ASTM C-309-74, type I.
2.09 BED COURSE
A. 4” bed course per CDOT class 6 aggregate base course.
2.10 JOINT FILLER STRIPS: ASTM D 1751, asphalt-saturated cellulosic fiber.
PART 3 EXECUTION
3.01 FORMWORK
A. Form to shapes, lines, and dimensions shown on the drawings. Brace or tie forms tightly together to maintain position and shape, and to prevent leakage of mortar.
B. Do not remove forms until the concrete has hardened sufficiently to resist damage from removal operations. Construction loads shall not be placed upon, or any forms removed from, the concrete until it has attained sufficient strength to safely support its weight and construction loads.
C. Prior to placing the steel reinforcement; clean and seal forms with form oil, form sealer, or an approved non-absorptive liner.
3.02 REINFORCEMENT
A. Bending: Reinforcement shall be bent cold. Do not bend reinforcement partially embedded in concrete. Bend bars and fabric in accord with ACI 318, 05/2011 033010 - 3 Concrete, Formwork, and Reinforcement
Chapter 7.
B. Surface Conditions: Reinforcement shall be free from dirt, oil, paint, grease, loose mill scale, and loose or thick rust when placed.
C. Tie all bar-to-bar crossings with wire.
D. Splice steel bar reinforcement with an overlap of not less than 18".
3.03 PLACING
A. Notify the CO 24 hours in advance of any concrete placing. Do not place concrete except in the presence of the CO. Temperature of fresh concrete at placement shall be between 55º and 80º F.
B. Place only upon clean, damp surfaces free from debris, frost, ice, and water, and never upon mud or dried, porous earth.
C. Consolidate by thoroughly working around reinforcement and embedded items, and into corners of forms, eliminating all air or stone pockets. Method of consolidation shall be approved by the CO.
1. Stop consolidation before any segregation of concrete occurs.
2. Where a surface mortar is to be the basis of the finish, work the coarse aggregate back from the forms to bring a full surface of mortar against the forms without the formation of voids.
3.04 CONCRETE WORK IN COLD WEATHER
A. During cold weather, maintain temperatures of concrete at 70º F for 3 days, or
50º F for 5 days. Do not allow concrete to freeze during the next 4 days.
B. Frozen concrete shall be removed at the Contractor's expense.
3.05.1 JOINTS: Construct joints true to line with faces perpendicular to surface plane of concrete.
a. Construction Joints: Locate and install so as not to impair strength or appearance of concrete, at locations indicated or as approved by CO.
b. Isolation Joints: Install joint-filler strips at junctions with slabs-on-grade and vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated.
i. Extend joint fillers full width and depth of joint, terminating flush with finished concrete surface, unless otherwise indicated.
05/2011 033010 - 4 Concrete, Formwork, and Reinforcement
c. Contraction Joints in Slabs-on-Grade: Form weakened-plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one-fourth of the concrete thickness, as follows:
i. Grooved Joints: Form contraction joints after initial floating by grooving and finishing each edge of joint with groover tool to a radius of 1/8 inch (3 mm). Repeat grooving of contraction joints after applying surface finishes.
Eliminate groover marks on concrete surfaces.
i. Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch- (3-mm-) wide joints into concrete when cutting action will not tear, abrade, or otherwise damage surface and before concrete develops random contraction cracks.
3.06 CONCRETE FINISHING
A. Horizontal surfaces shall receive a rough broom finish. Surfaces shall drain away from building.