Attach.2 Drawings Pg.1-16.pdf
PDF 918 KB Posted
- Attached to
- HARDY TIBMER SALE AREA ROADS
- Solicitation number
- AG-82X9-S-08-0226
About this file
Attach.2 Drawings Pgs. 1-16
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend.1.rtf | RTF text file | |
| Clauses.doc | DOC document | |
| Attach.5 Fire Plan.rtf | RTF text file | |
| Attach.3 Drawings Pg. 17-30.pdf | ||
| Attach.6 Instructions to Offeror.doc | DOC document | |
| Attach.1 Specifications.pdf | ||
| Attach.4 Wage Determination.doc | DOC document | |
| SF-1442.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Black Hills National Forest
U.S. Department of Agriculture Forest Service
Rocky Mountain Region
Crook County South Dakota
Drawings for
Hardy Stewardship Sale Area Roads
BEARLODGE RANGER DISTRICT
I approve the Engineering aspect of these drawings.
Signature Title Date
These drawings comply with land and resource management plans.
Signature Title Date
I approve this project and certify that adequate funding is available.
Signature Title Date
NZEROADS
Sheet Numbers Description
1 Title sheet
2 Index to Sheets
3 Road Listing
4 Forest Location Map
5 Project Location Map
6-7 Estimate of Quantities by Road
8 Linear Grading
9 Reconditioning of Roadbed
10 Typical Surfacing
11-12 Construction Signs
13 Field Guide for Staking
14 Rolling Dip
15 T-Turnaround
16 Typical Intersection Type I and II
17 Turnouts
18 Rolling Dip - Sediment Basin
19 Summary of Abbreviations
19 Summary of Construction Methods
20 Project Notes
22-30 Descriptions of Work
INDEX TO SHEETS
Index To Sheets Hardy Stewardship Sale Area Roads Page 2 of 30
Road Number Station To Station Lin. Feet Mile
Const Reconst Surface
808.1 41+59 136+81 9522 1.80 R 808.1A 0+00 203+50 20350 3.85 R 808.1C 48+91 77+85 2894 0.55 R 808.1D 0+00 51+31 5131 0.97 C 808.2B 0+00 12+88 1288 0.24 C
TOTALS 1.21 6.20 0.00
Type of Work
Road Listing Hardy Stewardship Sale Area Roads Page 3 of 30
PAY ITEM DESCRIPTION
MTD OF
MEAS
PAY
UNIT 808.1 808.1A
151(01) Mobilization LSQ LS 0.5 0 152(17) Establish clearing limits C.Q. Mile 1 0.26 204(20)A Drainage excavation, type rolling dip C.Q. Each 0 3 204(20)B Drainage excavation, type sediment basin C.Q. Each 0 1 212(01)C Linear grading, New Construction C.Q. Mile 0 0 212(01)R Linear grading, Reconstruction C.Q. Mile 1 0.26
301(11)Q Aggregate surface course, grading Q, compaction method A C.Q.
Cubic Yard 752 536
303(18) Road reconditioning, roadbed, compaction method A C.Q. Mile 0.8 3.6
Estimate of Quantities by Road Hardy Stewardship Sale Area Roads Page 6 of 30
PAY ITEM DESCRIPTION
151(01) Mobilization 152(17) Establish clearing limits 204(20)A Drainage excavation, type rolling dip 204(20)B Drainage excavation, type sediment basin 212(01)C Linear grading, New Construction 212(01)R Linear grading, Reconstruction
301(11)Q Aggregate surface course, grading Q, compaction method A 303(18) Road reconditioning, roadbed, compaction method A
808.1C 808.1D 808.2B Total
0 0.5 0 1
0.55 0.97 0.24 3.02
0 0 0 3 2 1 1 5 0 0.97 0.24 1.21
0.55 0 0 1.81
305 40 56 1689 0 0 0 4.4
Estimate of Quantities by Road Hardy Stewardship Sale Area Roads Page 7 of 30
File details come from the government source that posted it. Updated .