Attachment_5_-_Mechanical_(M0.1-M9.4)_Plumbing_(P0.1-P9.1)_Fire(F0.1-F9.1)_Electrical_(DE1.1-E9.4).pdf
PDF 6 MB Posted
- Attached to
- ALWRI Renovation
- Solicitation number
- AG-82FT-S-17-0005
About this file
Attachment 5 - Mechanical, Plumbing, Fire, and Electrical
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SPECIFICATIONS
A. ALL WORK ON THE PROJECT SHALL CONFORM TO ALL LOCAL CITY, STATE AND
NATIONAL CODES AND REGULATIONS, INCLUDING BUT NOT LIMITED TO THE
N.F.P.A., N.E.C., U.B.C., I.E.C.C., I.M.C., U.P.C., THE LOCAL UTILITY SERVING
COMPANIES AND THE AUTHORITY HAVING JURISDICTION.
B. THE WORK ON THIS PROJECT SHALL CONSIST OF ALL ITEMS, ARTICLES,
MATERIALS, EQUIPMENT, AND LABOR FURNISHED TOGETHER ALONG WITH ALL
INCIDENTAL ITEMS REQUIRED BY GOOD PRACTICE AND WORKMANSHIP TO
PROVIDE A SATISFACTORY, COMPLETE AND FUNCTIONAL SYSTEM IN
ACCORDANCE WITH THE DRAWINGS AT NO ADDITIONAL COST TO THE
CONTRACTING OFFICER.
C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND PAY FOR ALL FEES AND
PERMITS REQUIRED FOR WORK UNDER THEIR CONTRACT AND UNDER THEIR
SUPERVISION BY SUBCONTRACT.
D. MANUFACTURER'S TRADE NAMES AND CATALOG NUMBERS ARE LISTED TO
INDICATE SPECIAL CONDITIONS AND QUALITY OF MATERIALS OR EQUIPMENT
SUPPLIED. ALTERNATIVE EQUIPMENT OR MATERIALS MAY BE SUBMITTED
DURING SHOP DRAWING REVIEW PROCESS AFTER AWARD OF BIDS.
E. ALL WORK BY THE CONTRACTOR IS SUBJECT TO REVIEW AT ANY TIME BY THE
CONTRACTING OFFICER.
F. ALL WORK TO BE PERFORMED SHALL FIRST BE SCHEDULED AND SUBMITTED TO
THE CONTRACTING OFFICER FOR ACCEPTANCE.
G. SMOKING SHALL NOT BE PERMITTED ANYWHERE IN THIS FACILITY.
H. THE CONTRACTOR SHALL BE CAREFUL NOT TO BLOCK ANY PATHS OF EGRESS
WHILE PERFORMING THE WORK SPECIFIED.
I. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP OF ALL MATERIALS
RESULTING FROM HIS/HER WORK. CLEANUP SHALL BE PERFORMED TO THE
LEVEL OF ACCEPTANCE OF THE CONTRACTING OFFICER.
J. THE CONTRACTOR SHALL AND HEREBY DOES WARRANT AND GUARANTEE THAT
ALL WORK EXECUTED UNDER HIS/HER CONTRACT SHALL BE FREE OF DEFECTS
OF MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE
DATE OF SUBSTANTIAL COMPLETION.
K. SUBMIT ALL SHOP DRAWINGS FOR ALL EQUIPMENT ASSOCIATED WITH THIS
PROJECT TO THE CONTRACTING OFFICER FOR REVIEW/APPROVAL PRIOR TO
ORDERING ANY EQUIPMENT. U.N.O., ALL MATERIALS AND EQUIPMENT SHALL BE
NEW.
L. UPON SUBSTANTIAL COMPLETION THE CONTRACTOR SHALL SUBMIT AN
OPERATIONS AND MAINTENANCE (O&M) MANUAL/BROCHURE OF ALL EQUIPMENT
TO THE CONTRACTING OFFICER FOR REVIEW/APPROVAL. AFTER RECEIVING
APPROVAL FROM CONTRACTING OFFICER, PROVIDE (2 APPROVED COPIES) TO
CONTRACTING OFFICER AND PROVIDE THE NECESSARY TRAINING TO THE
FACILITIES PERSONNEL REGARDING ALL EQUIPMENT ASSOCIATED WITH THIS
PROJECT.
SEISMIC GENERAL NOTES
A. ALL MECHANICAL AND PLUMBING EQUIPMENT SHALL BE SEISMICALLY BRACED
PER THE 2012 INTERNATIONAL BUILDING CODE. SEISMIC DESIGN
REQUIREMENTS FOR THE PROJECT ARE AS FOLLOWS:
• SEISMIC DESIGN CATEGORY: D
• IMPORTANCE FACTOR (Ip): 1.0
• IMPORTANCE FACTOR FOR GAS PIPING: 1.5
B. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE TO INCLUDE BRACING
AND RESTRAINTS. BRACING & RESTRAINT DETAILS SHALL BE INCLUDED IN SHOP
DRAWING SUBMITTAL FOR REVIEW AND BY THE ENGINEER.
18x12
16 �
RECTANGULAR DUCTWORK
ROUND DUCTWORK
AIR DEVICE NUMBER AND CFM
CEILING SUPPLY DIFFUSER
CEILING RETURN GRILLE
CEILING EXHAUST GRILLE
CEILING SLOT DIFFUSER
FLOOR REGISTER
SIDEWALL DIFFUSER OR GRILLE
VERTICAL TRANSITION-
RECTANGULAR SUPPLY DUCT
VERTICAL TRANSITION-
ROUND SUPPLY DUCT
VERTICAL TRANSITION-
RECTANGULAR RETURN DUCT
VERTICAL TRANSITION-
ROUND RETURN DUCT
VERTICAL TRANSITION-
RECTANGULAR EXHAUST DUCT
VERTICAL TRANSITION-
ROUND EXHAUST DUCT
TURNING VANE
MANUAL VOLUME DAMPER
REMOTE VOLUME DAMPER
MOTORIZED DAMPER
ZONE DAMPER
FIRE DAMPER
SMOKE DAMPER
FIRE/SMOKE DAMPER
HVAC LEGEND
MARK
CFM
T
C
H
SP
D S
THERMOSTAT
CARBON DIOXIDE SENSOR
HUMIDISTAT
WALL SWITCH
STATIC PRESSURE SENSOR
DUCT SMOKE DETECTOR
HVAC CONTROLS LEGEND
AIR SEPARATOR
AUTOMATIC AIR VENT
MANUAL AIR VENT
AUTOFLOW VALVE
BACKFLOW PREVENTER
BALL VALVE
BUTTERFLY VALVE
CIRCUIT SETTER
CHECK VALVE
COMBINATION FLOW CONTROL
VALVE
COMBINATION STRAINER VALVE
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
HOSE END DRAIN
FLEXIBLE CONNECTOR
FLOW METERING STATION
FLOW SWITCH
GATE VALVE
MULTI-PURPOSE VALVE
PIPE WELL- EMPTY
PRESSURE GAUGE AND COCK
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
PRESSURE SENSOR
PRESSURE SWITCH
PRESSURE/TEMPERATURE PORT
SOLENOID VALVE
STRAINER
STRAINER W/ BLOWOUT
TEMPERATURE SENSOR
THERMOMETER
THREE-WAY VALVE
HVAC PIPING SPECIALTIES LEGEND
PROJECT LOCATION: MISSOULA, MT
PROJECT ALTITUDE: 3,200 FEET ABOVE SEA LEVEL
SUMMER DESIGN TEMP: 92.8°F DRY BULB, 62.1°F WET BULB (ASHRAE 0.4% DESIGN)
WINTER DESIGN TEMP: -20°F DRY BULB
TEMP. CONTROL GEN'L NOTES
A. THE MECHANICAL CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE
SUCCESSFUL OPERATION OF THE MECHANICAL INSTALLATION AND SYSTEMS
INCLUDING CONTROLS. THE M.C. SHALL HIRE AN ELECTRICAL CONTRACTOR AS
NECESSARY TO ACHIEVE THE SPECIFIED SEQUENCE OF OPERATIONS.
CONTROL WIRING IS NOT SHOWN ON THE ELECTRICAL DRAWINGS.
ELECTRICAL WORK REQUIRED FOR SYSTEM OPERATION BUT NOT SHOWN ON
THE ELECTRICAL DRAWINGS SHALL BE THE RESPONSIBILITY OF THE
MECHANICAL CONTRACTOR TO HIRE AN ELECTRICIAN INDEPENDENT FROM
THIS PROJECT'S CONTRACT DOCUMENTS.
B. IN GENERAL ALL TEMPERATURE CONTROLS ARE STAND-ALONE FOR EACH
SPECIFIC PIECE OF MECHANICAL EQUIPMENT. THERE IS NOT A CENTRAL
BUILDING MANAGEMENT SYSTEM. ROUGH-IN WIRING FOR THERMOSTATS,
SENSORS, AND OTHER CONTROL COMPONENTS ARE THE RESPONSIBILITY OF
THE MECHANICAL CONTRACTOR.
HVAC GENERAL NOTES
A. ALL NEW PIPING, DUCTWORK AND EQUIPMENT TO BE INSTALLED IN
ACCORDANCE WITH THE 2012 INTERNATIONAL MECHANICAL CODE AND THE 2012
INTERNATIONAL BUILDING CODE REQUIREMENTS.
B. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT NECESSARILY SHOW
EXACT LOCATIONS AND SIZES OF ALL EXISTING DUCTWORK, PIPING, SYSTEM
AND EQUIPMENT UNLESS SPECIFICALLY DIMENSIONED. IT IS NOT THE INTENT OF
THESE DRAWINGS TO GRAPHICALLY REPRESENT ALL OF THE WORK REQUIRED
FOR A COMPLETE INSTALLATION IN EVERY RESPECT. THE PURPOSE OF THESE
PLANS IS TO INDICATE THE INTENDED SIZES, APPROXIMATE LOCATION AND
ROUTING OF MAJOR COMPONENTS. ADJUST TO FIELD CONDITIONS. ACTUAL
CONDITIONS AND LOCATIONS SHALL BE FIELD-VERIFIED.
C. EXAMINE AND REFER TO ALL ARCHITECTURAL, STRUCTURAL, ELECTRICAL,
MECHANICAL, FIRE PROTECTION AND SITE CIVIL DRAWINGS FOR
CONSTRUCTION CONDITIONS WHICH MAY AFFECT THE CONTRACTOR'S WORK.
INSPECT THE EXISTING FACILITIES FOR VERIFICATION OF CONDITIONS AND
SYSTEMS WHICH MAY HAVE AN EFFECT ON WORK PROR TO SUBMISSION OF BID.
D. IT IS NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE WITH EACH
OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,
CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS PROJECT
BEFORE FINAL PLACEMENT OF MATERIALS. REFER TO ARCHITECTURAL,
STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND FIRE
PROTECTION SHOP DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
E. THE CONTRACTOR SHALL PROVIDE MATERIALS, LABOR, TRANSPORTATION,
TOOLS, PERMITS, FEES, INSPECTIONS, UTILITIES AND INCIDENTALS NECESSARY
FOR THE COMPLETE INSTALLATION OF THE WORK INDICATED AND DESCRIBED
IN THESE CONTRACT DOCUMENTS.
F. LOCATIONS AND DIMENSIONS OF EXISTING FACILITIES IDENTIFIED ON THIS
DRAWING ARE APPROXIMATE AND REPRESENT THE BEST AVAILABLE
INFORMATION AVAILABLE AT THE TIME OF DESIGN. FIELD VERIFY LOCATIONS
AND DIMENSIONS PRIOR TO ORDERING EQUIPMENT AND DURING
PERFORMANCE OF THE WORK. PROVIDE ALL DEMOLITION WORK, NECESSARY
FITTINGS, TRANSITIONS, AND OTHER COMPONENTS AS REQUIRED FOR A
COMPLETE AND FUNCTIONAL INSTALLATION OF NEW SYSTEMS AT NO
ADDITIONAL COST TO THE OWNER.
G. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL DETAILS OR
SPECIAL CONSTRUCTION REQUIRED IN ORDER TO COMPLETE THE
INSTALLATION, WHETHER MENTIONED OR NOT. THE CONTRACTOR SHALL
PROVIDE ALL MATERIALS AND EQUIPMENT FOR THE PROPER INSTALLATION OF
THE TYPE OF EQUIPMENT AND SYSTEMS INDICATED AT NO ADDITIONAL COST TO
C.O.
H. ALL EQUIPMENT SHALL BE INSTALLED LEVEL, PLUMB, AND FIRMLY ANCHORED IN
LOCATIONS INDICATED. OBSERVE MANUFACTURER'S INSTALLATION
INSTRUCTIONS AND RECOGNIZED INDUSTRY PRACTICES TO INSURE THAT
PRODUCTS SERVE THEIR INTENDED FUNCTION.
I. FOLLOW MANUFACTURE'S WRITTEN INSTALLATION INSTRUCTIONS FOR
RUNNING THE COMBUSTION AIR AND VENT PIPING AS WELL AS THE
TERMINATION THROUGH THE ROOF OR WALL. FOLLOW ALL SAFETY
INSTRUCTIONS.
J. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL FIRE BARRIERS,
FIRE PARTITIONS, FIRE WALLS OR ANY OTHER FIRE AND/OR SMOKE SEPARATION
WITHIN THE BUILDING AS DEFINED BY THE ARCHITECTURAL CODE PLAN WITH A
UL LISTED FIRE AND/OR SMOKE STOP SYSTEM.
K. ALL MATERIAL IN A PLENUM RATED SPACE SHALL HAVE A SPREAD RATING NOT
EXCEEDING 25 AND A SMOKE DEVELOPMENT RATING NOT EXCEEDING 50.
L. PROVIDE ACCESS DOORS TO ALLOW SERVICE AND INSPECTION OF EQUIPMENT,
VALVES, DAMPERS, & DEVICES INSTALLED ABOVE NON-REMOVABLE CEILINGS.
M. ALL ELEMENTS PENETRATING BUILDING COMPONENTS (ROOF ASSEMBLIES,
WALL ASSEMBLIES, ETC.) SHALL BE SEALED WEATHER AND WATER TIGHT.
N. ALL NEW PIPING SHALL BE IDENTIFIED WITH SETON SETMARK PIPE MARKERS,
LETTERED TO MATCH EXISTING AND MARKED AT A MAXIMUM OF EVERY 25 FT.
ALSO, ALL NEW VALVES SHALL BE IDENTIFIED WITH BRASS OR ALUMINUM VALVE
TAGS.
O. PROVIDE PIPE GUIDES, EXPANSION JOINTS, AND HANGERS PER
MANUFACTURER'S RECOMMENDATIONS.
P. ALL PIPING WALL PENETRATIONS SHALL HAVE A CHROME ESCUTCHEON PLATE.
ALL SOLDER TO BE LEAD-FREE TYPE.
Q. VERIFY THE LOCATION OF ALL THERMOSTATS AND SENSORS WITH THE
ENGINEER AND ARCHITECT PRIOR TO INSTALLATION. INSTALL THERMOSTATS 60"
ABOVE FINISHED FLOOR PER ADA REQUIREMENTS.
R. ALL DUCT WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE LATEST
REQUIREMENTS OF SMACNA DUCT WORK CONSTRUCTION MANUALS, MINIMUM
GAUGE OF 24, GALVANIZED STEEL. DUCTWORK SHALL BE AIRTIGHT (5%
LEAKAGE). ALL TRANSVERSE JOINTS AND LONGITUDINAL SEAMS SHALL BE
SEALED. FABRICATE ELBOWS WITH CENTERLINE RADIUS EQUAL TO 1.5 TIMES
THE DUCT WIDTH IN THE PLANE OF THE TURN; AND FABRICATE TO INCLUDE
FACTORY MANUFACTURED TURNING VANES IN ELBOWS WHERE SHORTER
RADIUS IS NECESSARY.
S. PROVIDE FLEX CONNECTIONS FROM ALL DUCT WORK TO EQUIPMENT
CONNECTIONS ON THIS PROJECT.
T. FLEXIBLE DUCT SHALL NOT BE USED IN PLACE OF ELBOWS.
U. A COMPLETE AIR AND WATER SYSTEM TEST AND BALANCE (T&B) SHALL BE
PERFORMED BY A NEBB OR AABC CERTIFIED T&B CONTRACTOR FOR ALL NEW
AND MODIFIED DEVICES. MECHANICAL CONTRACTOR SHALL MODIFY EQUIPMENT
AS DIRECTED BY BALANCING CONTRACTOR, IF REQUIRED, TO ACHIEVE DESIGN
PARAMETERS WITH NO EXTRA COST TO THE C.O. T&B REPORT SHALL BE
PREPARED AND SUBMITTED TO C.O. REPORT SHALL INCLUDE ALL AIR AND
WATER FLOW READINGS, ALL TEMPERATURE AND PRESSURE SETPOINTS AND
ALL ELECTRICAL CONDITIONS FOR ALL DEVICES. REPORT SHALL ALSO VERIFY
PROPER OPERATION OF ENTIRE CONTROL SYSTEM. WHERE REQUIRED FOR AIR
BALANCING, INSTALL ADDITIONAL MANUAL VOLUME DAMPERS & BALANCING
VALVES.
V. THE MECHANICAL CONTRACTOR SHALL PROVIDE THE C.O.'S REPRESENTATIVES
WITH UP TO 4 HOURS OF TRAINING TO ENSURE PROPER OPERATION AND
MAINTENANCE OF THE SYSTEMS.
PROJECT INFORMATION
HEAT PUMP RETURN
HEAT PUMP SUPPLY
HOT WATER RETURN
HOT WATER SUPPLY
REFRIGERANT
CONDENSATE
HVAC PIPING SYSTEMS LEGEND
HVAC DEMO NOTES
A. IT IS THE INTENT OF THIS PROJECT TO DEMOLISH
EXISTING MECHANICAL SYSTEMS. COORDINATE ALL
UTILITY OUTAGES WITH THE OWNER PLANNING
DESIGN AND CONSTRUCTION THROUGHOUT THE
DURATION OF CONSTRUCTION.
B. ALL EXISTING MECHANICAL EQUIPMENT, DUCTWORK,
PIPING SHOWN HATCHED AND NOTED FOR
DEMOLITION SHALL BE DEMOLISHED. EXISTING
MECHANICAL EQUIPMENT SHOWN GRAY, UNHATCHED,
AND NOT NOTED FOR DEMOLITION IS TO REMAIN
UNCHANGED. PROTECT ALL EXISTING EQUIPMENT TO
REMAIN.
C. PRESENT ALL DEMOLISHED EQUIPMENT TO THE
OWNER FOR SALVAGE. REMOVE ANY UNWANTED
EQUIPMENT FROM SITE.
D. COORDINATE WITH THE GENERAL CONTRACTOR TO
PATCH AND REPAIR THE FLOORS, ROOF, WALLS AND
ALL OTHER ARCHITECTURAL ASSEMBLIES
ASSOCIATED WITH THE MECHANICAL DEMOLITION.
GEN. SYMBOLS LEGEND
KEY NOTE SYMBOL
TERMINATION POINT OF DEMOLITION WORK
POINT OF CONNECTION TO EXISTING WORK
AC ALTERNATING CURRENT (OR) AIR CONDITIONER
AHU AIR HANDLING UNIT
ADJ ADJUSTABLE
AV AIR VENT
AWG AMERICAN WIRE GAUGE
B.D.D. BACKDRAFT DAMPER
BMS BUILDING MANAGEMENT SYSTEM
BOD BASIS OF DESIGN
BTU/HR BRITISH THERMAL UNITS PER HOUR
C COMMON
CD CONDENSATION DRAIN (OR ) CONTROL DAMPER
CFM CUBIC FEET PER MINUTE
C.O. CONTRACTING OFFICER
CxA COMMISSIONING AUTHORITY / AGENT
(D) DEMOLISH / DEMOLITION
CUH CABINET UNIT HEATER
DSF DESTRATIFICATION FAN
(E) EXISTING
EA EXHAUST AIR / EACH
EAT ENTERING AIR TEMPERATURE
E.C. ELECTRICAL CONTRACTOR
EF EXHAUST FAN
ESP EXTERNAL STATIC PRESSURE
EWH ELECTRIC WALL HEATER
EWT ENTERING WATER TEMPERATURE
(F) FUTURE
FPM FEET PER MINUTE
GUH GAS UNIT HEATER
G.C. GENERAL CONTRACTOR
HGB HOT GAS BYPASS
HW S/R HOT WATER SUPPLY/RETURN
HWP HOT WATER PUMP
HWUH HOT WATER UNIT HEATER
IN INCHES
IN WG INCHES WATER GAUGE
LAT LEAVING AIR TEMPERATURE
LWT LEAVING WATER TEMPERATURE
M.C. MECHANICAL CONTRACTOR
MBH THOUSANDS OF BTU/HR
(N) NEW
NC NORMALLY CLOSED
NG NATURAL GAS
NO NORMALLY OPEN
N.T.S. NOT TO SCALE
OA OUTDOOR AIR
O&M OPERATIONS & MAINTENANCE
PG PROPYLENE GLYCOL
PSIG POUNDS PER SQUARE INCH (GAUGE)
RA RETURN AIR
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RTU ROOFTOP UNIT
SA SUPPLY AIR
T.C. TEMPERATURE CONTROL
T.B.D. TO BE DETERMINED
TSP TOTAL STATIC PRESSURE
T-STAT THERMOSTAT
TYP. TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
UH UNIT HEATER
UV UNIT VENTILATOR
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
MECHANICAL ABBREVIATIONS
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
THOMAS R.
COBURN
No. 20022 PE
I S
S
E F
O R
P
LANO EN
G
IN
E E R
ON
T
M
ANA
LICENSED
3/ 8/ :1 8:
P M
M0.1
3.10.17C O N S T R U C T
IO
N D O C U M E N T S
MECH NOTES & LEGENDS
16079
ALWRI RENOVATION
FOREST SERVICE / ROCKY MOUNTAIN RESEARCH STATION
EJW
REB
TRC
smoses Text Box smoses Text Box
ACCESSORIES:
1. INCLUDE FUSED DISCONNECT, ECM FAN MOTORS & SPEED CONTROL FOR BALANCING, DOUBLE-WALL
INSULATED CABINET, MOTORIZED ISOLATION DAMPERS ON OA & EA AIR STREAMS, AND 14" INSULATED CURB.
2. PROVIDE MERV-13 FILTER ON OUTDOOR AIR AND MERV-8 FILTER ON EXHAUST AIR, BOTH UPSTREAM OF HEAT EXCHANGER. PROVIDE NEW FILTERS UPON COMPLETION OF WORK, PLUS ONE SET OF SPARE FILTERS.
3. FANS SHALL NOT NEED TO CYCLE FOR DEFROST. DRAIN CONNECTION SHALL NOT BE REQUIRED. NO
LIQUID CONDENSATE SHALL FORM AT HEAT EXCHANGER CORE.
CONTROL:
1. PROVIDE STAND-ALONE CONTROLLER BY MANUFACTURER TO CONTROL BLOWERS, AND OA AND EA DAMPERS, WITH FACTORY-MOUNTED ALARMS.
2. PROVIDE DIGITAL PROGRAMMABLE TIME-CLOCK, WALL-MOUNTED IN MECHANICAL ROOM, BY UNIT MANUFACTURER.
3. PROVIDE TRANSFORMERS AND RELAYS AS REQUIRED FOR LOW VOLTAGE CONTROL.
4. ERV SHALL CONTINUE TO RUN THROUGH LOW AMBIENT CONDITIONS WITHOUT CYCLING TO DEFROST.
DUCT MATERIAL SCHEDULE
DESCRIPTION SHAPE APPLICATION MATERIAL
PRESSURE
CLASS
INSULATION JACKET R-VALUE ADDITIONAL DETAILS
SUPPLY AIR RECTANGULAR INDOOR - CONDITIONED SHEET METAL 2" WRAP FACTORY APPLIED R-5 SEE BELOW
SUPPLY AIR ROUND INDOOR - CONDITIONED SPIRAL SHEET METAL 2" WRAP FACTORY APPLIED R-5 SEE BELOW
RETURN AIR RECTANGULAR INDOOR - CONDITIONED SHEET METAL 2" NONE - - SEE BELOW
RETURN AIR ROUND INDOOR - CONDITIONED SPIRAL SHEET METAL 2" NONE - - SEE BELOW
FRESH SUPPLY AIR FROM ERV RECTANGULAR INDOOR - CONDITIONED SHEET METAL 2" WRAP FACTORY APPLIED R-8 SEE BELOW
FRESH SUPPLY AIR FROM ERV ROUND INDOOR - CONDITIONED SPIRAL SHEET METAL 2" WRAP FACTORY APPLIED R-8 SEE BELOW
5' LENGTH MAX - SUPPLY ROUND INDOOR - CONDITIONED FLEX 2" INTEGRAL FACTORY APPLIED R-5 SEE BELOW
ROOFTOP DUCTWORK - FRESH SUPPLY AIR FROM ERV RECTANGULAR OUTDOOR - UNCONDITIONED SHEET METAL 2"
PROVIDE FACED CLOSED CELL FOAM
INSULATION BOARD WRAPPED WITH
POLYGUARD ALUMAGUARD COOLWRAP.
FACTORY APPLIED R-14 SEE BELOW
GENERAL NOTES:
1. PROVIDE SEISMIC BRACING OF ALL DUCTWORK AS REQUIRED BY LOCAL CODES.
2. ALL SHEET METAL DUCTWORK SHALL BE A MINIMUM OF 24 GAGE SHEET METAL.
3. ALL DUCTWORK SHALL BE CONSTRUCTED AND INSTALLED PER SMACNA GUIDELINES.
4. SEAL AND INSULATED ALL DUCTWORK PER 2012 I.E.C.C.
5. INSULATE EXHAUST DUCTWORK NOT ASSOCIATED WITH ERV WITHIN 10 FT OF PENETRATION THROUGH BUILDING ENVELOPE.
JACKET:
1. FACTORY APPLIED ALL SERVICE JACKETS (ASJ) SHALL BE FOIL SCRIM KRAFT
(FSK). SEAL AT ALL EXPOSED SEAMS/ EDGES/ CORNERS WITH FSK ADHESIVE TAPE,
REFER TO "DUCT INSULATION" SPECIFICATIONS FOR MORE INFORMATION
ROOFTOP TOTAL ENERGY RECOVERY VENTILATOR SCHEDULE
MARK MANUFACTURER
MODEL
NUMBER
TYPE DRIVE
SUPPLY
CFM
SUPPLY
ESP (IN
WG)
SUPPLY
FAN HP
EXHAUST
CFM
EXHAUST
FAN HP
EXHAUST
ESP (IN
WG)
WINTER SUMMER
HEATING
SECTION
COOLING
SECTION
UNIT PHYSICAL DATA
ADDITIONAL
DETAILS
OUTDOOR AIR EXHAUST OUTDOOR AIR EXHAUST
EAT DB / WB (°F) LAT DB / WB (°F) EAT DB / WB (°F) EAT DB / WB (°F) LAT DB / WB (°F) EAT DB / WB (°F) LENGTH (IN) WIDTH (IN) HEIGHT (IN)
WEIGHT
(LBS)
ERV-1 RENEWAIRE HE1XRT
STATIC
PLATE
DIRECT 840 1.5 0.5 725 0.5 1.5 -20 / -21 37.6 / 31.4 70 / 54.4 92.8 / 62.1 81.4 / 59.8 75 / 62.6 NONE NONE 81" 22.6" 39.5" 330 SEE BELOW
ACCESSORIES:
1. UNIT MOUNTED (INTEGRAL) T-STAT
2. INTEGRAL DISCONNECTING MEANS AND OVERLOADS
3. INTEGRAL FAN
ELECTRICAL DATA:
SEE MEP COORDINATION SCHEDULE
FOR STARTER/DISCONNECT AND ALL
OTHER ELEC. DATA.
ELECTRIC UNIT HEATER SCHEDULE
MARK AREA SERVED MANUF. MODEL NUMBER BTU/HR
DIMENSION
MOUNTING ADDITIONAL DETAILS
L (IN) W (IN) D (IN)
ECH-1 ENTRY BERKO FFCH-548 13,700 23.75 23.75 7 CEILING SEE BELOW
EWH-1 STAIR B QMARK MCSSARWH4808 13,648 19.25 15.85 6.25 WALL SEE BELOW
GRILLE, REGISTER AND DIFFUSER SCHEDULE
MARK MODULE SIZE NECK SIZE FUNCTION TYPE MAX CFM
PERFORMANCE DATA AT MAX CFM SELECTION
MATERIAL MOUNTING
ADDITIONAL
DETAILS
NC AT MAX
PRESSURE DROP AT
MAX CFM (IN. W.C.)
THROW (FT) VELOCITY (FPM) MANF.
MODEL
NUMBER
THROW
PATTERN
S-1 24" x 24" 10" x 10" SUPPLY
PERFORATED
DIFFUSER
230 13 0.01 11 331 KRUEGER 6200 HORIZ. 4 WAY STEEL CEILING SEE BELOW
S-2 24" x 24" 6" x 6" SUPPLY
PERFORATED
DIFFUSER
80 10 0.01 6 320 KRUEGER 6200 HORIZ. 4 WAY STEEL CEILING SEE BELOW
S-3 12" x 12" 6" x 6" SUPPLY
PERFORATED
DIFFUSER
60 10 0.01 5 240 KRUEGER 6200 HORIZ. 4 WAY STEEL CEILING SEE BELOW
E-1 24" x 24" 8" x 8" EXHAUST
PERFORATED
DIFFUSER
100 10 0.02 --- 225 KRUEGER 6490 RETURN STEEL CEILING SEE BELOW
E-2 12" x 12" 8" x 8" EXHAUST
PERFORATED
DIFFUSER
150 10 0.05 --- 338 KRUEGER 6490 RETURN STEEL CEILING SEE BELOW
R-1 24" x 24" 18" x 18" RETURN
PERFORATED
DIFFUSER
580 10 0.02 --- 258 KRUEGER 6490 RETURN STEEL CEILING SEE BELOW
REMARKS:
1. PROVIDE MANUAL VOLUME DAMPER ON DUCKWORK IN CEILING SPACE.
2. INTEGRAL OPPOSED BLADE DAMPER FOR BALANCING AIRFLOW.
3. SEE PLANS FOR LENGTHS.
4. PROVIDE A MANUAL VOLUME DAMPER AT EACH BRANCH TAKE-OFF.
REMARKS FOR ALL:
1. SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR CEILING TYPES.
2. SUBMITTAL DATA SHALL INCLUDE N.C., THROW, VELOCITY, PRESSURE DROP AS
WELL AS ALL PHYSICAL AND INSTALLATION DATA.
NOTES:
1. PROVIDE WITH DOOR INTERLOCKING DISCONNECT SWITCH, AIR PROVING MEAN & ALL CONTROLS.
2. PROVIDE SCR WITH CONTROL BY THERMOSTAT AND DUCT PROBE.
ELECTRIC POST HEATER SCHEDULE
MARK MANUFACTURER MODEL NUMBER AIRFLOW (CFM) POWER (KW) STAGES DUCT SIZE (W"XH") VOLTAGE PHASE ADDITIONAL DETAILS
PH-1 INDEECO XUB 840 9.0 SCR 14"x14" 208 3 SEE BELOW
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
THOMAS R.
COBURN
No. 20022 PE
I S
S
E F
O R
P
LANO EN
G
IN
E E R
ON
T
M
ANA
LICENSED
3/ 8/ :1 8:
P M
M0.2
3.10.17C O N S T R U C T
IO
N D O C U M E N T S
MECH AIRSIDE SCHEDULES
16079
ALWRI RENOVATION
FOREST SERVICE / ROCKY MOUNTAIN RESEARCH STATION
EJW
REB
TRC
smoses Text Box smoses
NOTES:
1. PROVIDE ASME RATED TANK WITH 125 PSI WORKING PRESSURE AT 500F. PROVIDE WITH 3/4" VENT AND 1" DRAIN CONNECTIONS AND 3/4" TAPPING FOR TEMPERATURE SENSOR AT BOTTOM 1/3 OF TANK.
2. ALL CONNECTIONS SHALL BE FNPT
3. FIELD INSULATE TANK WITH 2" MINERAL FIBER INSULATION AND PVC JACKET.
PUMP SCHEDULE
MARK MANUFACTURER MODEL NUMBER TYPE DESCRIPTION WORKING FLUID FLOW RATE (GPM) HEAD (FT) MOTOR SPEED (RPM) EFFICIENCY
ADDITIONAL
DETAILS
P-1 ARMSTRONG 4380-1.5x1.5x8 MAIN DISTRIBUTION PUMP VERTICAL INLINE 40% PG 46 50 1760 50.5% SEE BELOW
P-2 ARMSTRONG 4380-1.5x1.5x8 MAIN DISTRIBUTION PUMP VERTICAL INLINE 40% PG 46 50 1760 50.5% SEE BELOW
ELECTRICAL DATA:
SEE MEP COORDINATION SCHEDULE FOR
STARTER/DISCONNECT AND ALL OTHER ELEC. DATA.
REMARKS:
1. PROVIDE WALL MOUNTED STAND FOR EA. PUMP
2. PROVIDE VIBRATION ISOLATION PADS UNDER PUMP.
3. PROVIDE TEKMAR CONTROLLERS REQUIRED TO DEAD-LAY AND ALTERNATE LEAD PUMP BASED ON RUNTIME HOURS.
PIPE MATERIAL SCHEDULE
SYSTEM MATERIAL SIZES INSULATION THICKNESS** ADD'L DETAILS
COMBUSTION AIR & VENT PIPING SCHEDULE 40 PVC ALL NONE ADD'L DETAILS
REFRIGERANT PIPING
REFER TO SPECIFICATIONS. ALSO REFER TO DAIKIN
INSTALLATION INSTRUCTIONS.
NATURAL GAS PIPING THREADED BLACK IRON ALL NONE PAINT ORANGE
CONDENSATE DRAIN PIPING SCHEDULE 40 PVC ALL NONE SEE BELOW
HEAT PUMP WATER SUPPLY & RETURN 'L' COPPER / STEEL ALL NONE SEE BELOW
HOT WATER SUPPLY & RETURN 'L' COPPER / STEEL
<=11/2" 11/2" WRAP WITH ASJ
SEE BELOW
>11/2" 2" WRAP WITH ASJ
** BASED ON INSULATION HAVING A CONDUCTIVITY (K) NOT
EXCEEDING 0.27 BTU PER INCH/H*FT^2*DEG F
1. PROVIDE SEISMIC BRACING OF PIPING AS REQUIRED BY LOCAL CODES.
2. INSULATION SHALL BE FIBERGLASS WITH ALL SERVICE JACKET
3. ALL SERVICE INSULATION JACKET IS TO BE SEALED AT ALL SEAMS, EDGES, ETC.
4. PROVIDE PVC COATED JACKET OVER INSULATION FOR MECHANICAL ROOM PIPING.
5. ANY CONNECTIONS THAT ARE DISSIMILAR METALS SHALL REQUIRE BRASS UNIONS OR
FLANGE SEPARATION.
PIPE MATERIAL REMARKS:
GAS-FIRED CONDENSING BOILER SCHEDULE
MARK MANUFACTURER MODEL INPUT (MBH) OUTPUT (MBH) AFUE
COMBUSTION
AIR
FLUE TURNDOWN
GAS
CONNECTION
WORKING FLUID EWT / LWT (°F) WEIGHT (LBS)
ADDITIONAL
DETAILS
B-1 BOSCH ZBR21-3 79.2 74.7 95% 3" 3" 3:1 3/4" 40% PROPYLENE GLYCOL 65° / 105°F 103.6 SEE BELOW
B-1 BOSCH ZBR21-3 79.2 74.7 95% 3" 3" 3:1 3/4" 40% PROPYLENE GLYCOL 65° / 105°F 103.6 SEE BELOW
ACCESSORIES:
1. ZERO CLEARANCE
INSTALLATION
OPTION
REMARKS:
1. ALL UNITS TO BE SEALED COMBUSTION. CONTRACTOR TO
PROVIDE PIPING FOR COMBUSTION AIR AND VENT TO
EXTERIOR. SEE PLANS FOR ROUTING.
2. FURNISH GAS REGULATOR AS REQUIRED - VENT TO
EXTERIOR.
3. INSTALL VENT AIR AND COMBUSTION AIR PER
MANUFACTURERS SPECIFICATIONS.
4. UNITS TO BE INSTALLED PER ZERO SIDE CLEARANCE
INSTALLATION.
5. PROVIDE MOUNTING KIT BY UNIT MANUFACTURER.
6. PROVIDE CONDENSATE PIPING TO NEAREST FLOOR DRAIN.
SEE PLUMBING PLAN.
CONTROLS:
ALL UNITS MUST CONFORM TO ASME STANDARD CSD-1 AND THE FOLLOWING:
• TWO HIGH TEMPERATURE LIMIT CONTROLS - ONE WITH MANUAL RESET
• BOILER >400 MBH - HIGH AND LOW GAS PRESSURE - MANUAL RESET
• LOW WATER FUEL CUTOFF SWITCH - MANUAL RESET OR IF LOW WATER SWITCH IS
NOT POSSIBLE (FORCED CIRCULATION) PROVIDE FLOW SWITCH - MANUAL RESET
• COMBUSTION AIR PROOF SWITCH
• EACH BOILER ACCEPTS NATURAL GAS IN PRESSURE RANGE OF 5-10.5 IN W.C.
ELECTRICAL DATA:
SEE MEP COORDINATION SCHEDULE FOR
STARTER/DISCONNECT AND ALL OTHER
ELEC. DATA.
DRY COOLER SCHEDULE
MARK MANUFACTURER MODEL NUMBER
HEAT OF
REJECTION (MBH)
AIR SIDE DATA FLUID SIDE DATA 'WET' WEIGHT
(LBS)
ADDITIONAL DETAILS
CFM # OF FANS FAN HP (EA.) E.A.T. GPM E.W.T. L.W.T. PRESSURE DROP FLUID
DC-1 ECO / LUVATA LFV8012-4H6-2B 220,626 19,353 2 1.75 95°F 46 115 105 11.1 FT W.C. 40% PROPYLENE GLYCOL 1,297 SEE BELOW
1. PROVIDE STAND BY UNIT MANUFACTURER, CONCRETE PAD ON GRADE, AND ANCHOR UNIT PER MANUFACTURER'S RECOMMENDATIONS.
2. COORDINATE W/ E.C. TO PROVIDE HEAT TRACE ON ALL EXPOSED HPWS&R PIPING. ACTIVATE AT 0°F (ADJ.) OR BELOW AMBIENT TEMPERATURE.
3. PROVIDE FACTORY CONTROLS.
ACCESSORIES: ELECTRICAL DATA:
SEE MEP COORDINATION SCHEDULE FOR
STARTER/DISCONNECT AND ALL OTHER ELEC. DATA.
AUTOMATIC GLYCOL FEEDER SCHEDULE
MARK MANUFACTURER MODEL NUMBER TANK VOLUME (GAL) PUMP PERFORMANCE OPERATING WEIGHT ADDITIONAL DETAILS
GLF-1 JOHN WOOD COMPANY JWGP-53-030 30 3.2 GPM @ 54.1 PSIG 390 SEE BELOW
REMARKS:
1. PROVIDE LOCKABLE NEMA 4X CONTROL PANEL AND ELECTRICAL DISCONNECT.
2. PROVIDE DRY CONTACTS TO ALARM CENTRAL CONTROL PANEL IN THE EVEN OF LOW LEVEL.
3. PROVIDE PUMP H/O/A SWITCH, AUTOMATIC PUMP PRESSURE SWITCH, & LOW LEVEL FLOAT & PUMP SHUT-OFF SWITCH.
4. PROVIDE PRESSURE RELIEF VALVE, CHECK VALVE, & STRAINER BY UNIT MANUFACTURER.
ELECTRICAL DATA:
SEE MEP COORDINATION SCHEDULE FOR
STARTER/DISCONNECT AND ALL OTHER
ELEC. DATA.
EXPANSION TANK SCHEDULE
MARK MANUFACTURER MODEL NUMBER TOTAL VOLUME (GAL)
ACCEPTANCE VOLUME
(GAL)
SYSTEM SYSTEM PRESSURE (PSI)
SYSTEM VOLUME
(GAL)
ADDITIONAL DETAILS
ET-1 ARMSTRONG A200-L 53 53 HEATING WATER 27 700 SEE BELOW
BUFFER TANK SCHEDULE
MARK MFGR MODEL
VOLUME
(GAL)
HEIGHT (IN) DIA (IN)
HEAT PUMP WATER
CONNECTION SIZE (NPS)
HEAT PUMP WATER
CONNECTION QTY
REMARKS
BT-1 JOHN WOOD JSTR-22-033 120 64.75 24 2-1/2" 4 SEE NOTES
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
THOMAS R.
COBURN
No. 20022 PE
I S
S
E F
O R
P
LANO EN
G
IN
E E R
ON
T
M
ANA
LICENSED
3/ 8/ :1 8:
P M
M0.3
3.10.17C O N S T R U C T
IO
N D O C U M E N T S
MECH WATERSIDE SCHEDULES
16079
ALWRI RENOVATION
FOREST SERVICE / ROCKY MOUNTAIN RESEARCH STATION
EJW
REB
TRC
smoses Text Box smoses
VRF FAN COIL SCHEDULE
VRF FAN COIL SCHEDULE
MARK MFGR MODEL NUMBER UNIT TYPE
HEAT
RECOVERY
BOX
SUPPLY FAN
CORRECTED COOLING
CAPACITY
CORRECTED
HEATING
CAPACITY
(MBH)
ELECTRICAL DATA
REMARKS
CFM ESP (in W.C.)
TOTAL
(MBH)
SENSIBLE
(MBH)
VOLTAGE PHASE
FC 001A LG ARNU123BGA4 DUCTED HIGH STATIC HRU-2 586 0.23 7.7 6.6 11.3 208 1 SEE NOTES
FC 001B LG ARNU053TRC4 4-WAY CASSETTE HRU-2 265 N/A 3.5 3.0 5.1 208 1 SEE NOTES
FC 001C LG ARNU123TRC4 4-WAY CASSETTE HRU-2 307 N/A 7.9 6.8 11.9 208 1 SEE NOTES
FC 001D LG ARNU123TRC4 4-WAY CASSETTE HRU-1 307 N/A 7.7 6.6 11.3 208 1 SEE NOTES
FC 005A LG ARNU073TRC4 4-WAY CASSETTE HRU-1 265 N/A 4.8 4.1 7.2 208 1 SEE NOTES
FC 005B LG ARNU073TRC4 4-WAY CASSETTE HRU-1 265 N/A 4.8 4.1 7.0 208 1 SEE NOTES
FC 102A LG ARNU183TTC4 1-WAY CASSETTE HRU-6 470 N/A 12.2 10.5 19.1 208 1 SEE NOTES
FC 102B LG ARNU073TUC4 1-WAY CASSETTE HRU-4 290 N/A 4.8 4.2 7.6 208 1 SEE NOTES
FC 102C LG ARNU073SBL4 WALL MOUNTED FAN COIL HRU-5 307 N/A 4.9 4.2 7.8 208 1 SEE NOTES
FC 102D LG ARNU073TUC4 1-WAY CASSETTE HRU-5 290 N/A 4.9 4.2 7.9 208 1 SEE NOTES
FC 103 LG ARNU123TUC4 1-WAY CASSETTE HRU-5 353 N/A 8.0 6.9 12.9 208 1 SEE NOTES
FC 104 LG ARNU073TUC4 1-WAY CASSETTE HRU-6 290 N/A 4.8 4.1 7.4 208 1 SEE NOTES
FC 105 LG ARNU093SBL4 WALL MOUNTED FAN COIL HRU-6 247 N/A 4.8 4.1 7.5 208 1 SEE NOTES
FC 106 LG ARNU073SBL4 WALL MOUNTED FAN COIL HRU-4 247 N/A 4.8 4.1 7.5 208 1 SEE NOTES
FC 107 LG ARNU073SBL4 WALL MOUNTED FAN COIL HRU-4 247 N/A 4.8 4.1 7.5 208 1 SEE NOTES
FC 108 LG ARNU073SBL4 WALL MOUNTED FAN COIL HRU-4 247 N/A 4.8 4.1 7.5 208 1 SEE NOTES
FC 109 LG ARNU073SBL4 WALL MOUNTED FAN COIL HRU-3 247 N/A 4.9 4.2 7.8 208 1 SEE NOTES
FC 110 LG ARNU073SBL4 WALL MOUNTED FAN COIL HRU-3 247 N/A 4.9 4.2 7.8 208 1 SEE NOTES
FC 112 LG ARNU153SBL4 WALL MOUNTED FAN COIL HRU-5 0 N/A 7.6 7.5 11.1 208 1 SEE NOTES
NOTES: COOLING CAPACITIES ARE BASED ON 75F DB / 63F WB ENTERING CONDITIONS. HEATING CAPACITIES ARE BASED ON 70F DB ENTERING CONDITION. EACH FANCOIL SHALL BE CONTROLLED BY A SIMPLE WIRED ROOM CONTROLLER.
MARK MFGR MODEL NUMBER UNIT TYPE
ELECTRICAL DATA
REMARKS
VOLTAGE PHASE
HRU-1 LG PRHR032A THREE PORT 208 1 SEE NOTES
HRU-2 LG PRHR032A THREE PORT 208 1 SEE NOTES
HRU-3 LG PRHR022A TWO PORT 208 1 SEE NOTES
HRU-4 LG PRHR042A FOUR PORT 208 1 SEE NOTES
HRU-5 LG PRHR042A FOUR PORT 208 1 SEE NOTES
HRU-6 LG PRHR032A THREE PORT 208 1 SEE NOTES
NOTES: INSTALL HEAT RECOVERY BOXES TO ALLOW ACCESS FOR MAINTENANCE AND REPAIR.
NOTES:
1. REFER TO VRV REFRIGERANT PIPING SCHEMATIC FOR
REFRIGERANT LINE SIZES AND ROUTING DETAILS.
2. FOLLOW MANUFACTURER'S INSTALLATION MANUAL
PRECISELY TO ENSURE PROPER OPERATION.
3. FINAL UNIT SELECTIONS NEED TO BE VERIFIED BY
MANUFACTURER PRIOR TO ORDERING EQUIPMENT.
WATER SOURCE HEAT RECOVERY UNIT - VARIABLE REFRIGERANT VOLUME SCHEDULE
MARK MFGR. MODEL # UNITS TYPE
CONDENSER
WATER
FLUID
TYPE
WATER
FLOW
(GPM)
WATER
PRESSURE
DROP
(FT W.C.)
COOLING DATA HEATING DATA
VOLTAGE &
PHASE
MCA REMARKS
CORRECTED
TOTAL
CAPACITY
(BTU/HR)
EWT/LWT
(F)
TOTAL
CAPACITY
(BTU/HR)
EWT/LWT
(F)
HP-1
LG ARWB432BAS4
ARWB072BAS4
WATER SOURCE
VRF HEAT PUMP
40% PROPYLENE
GLYCOL
20.3 3.7
168,000 105 / 111.7 189,000 68 / 56.9
208 V / 3 PH 35.0 SEE BELOW
HP-2 ARWB096BAS4 25.4 5.3 208 V / 3 PH 35.5 SEE BELOW
ELECTRICAL DATA:
SEE MEP COORDINATION SCHEDULE
FOR STARTER/DISCONNECT AND ALL
OTHER ELEC. DATA.
CONTROLS:
1. PROVIDE I-TOUCH CONTROLLER.
2. ROUTE CABLING INFRASTRUCTURE FROM ITOUCH CONTROLLER TO SWITCH
ROOM FOR FUTURE NETWORK CONNECTION.
ACCESSORIES:
1. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY ACCESSORIES FOR A
FULLY FUNCTIONING SYSTEM.
2. PROVIDE SHUT-OFF AND SCHRADER VALVE BETWEEN SHUT-OFF AND UNIT FOR ALL
PIPES CONNECTING TO UNIT.
3. PROVIDE ALL REFNET FITTINGS AS REQUIRED IN PIPING NETWORK.
4. FILTER/DRYER.
5. HIGH/LOW PRESSURE SWITCH.
6. CRANKCASE HEATER.
7. EVAP. FREEZE T-STAT.
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
THOMAS R.
COBURN
No. 20022 PE
I S
S
E F
O R
P
LANO EN
G
IN
E E R
ON
T
M
ANA
LICENSED
3/ 8/ :1 8:
P M
M0.4
3.10.17C O N S T R U C T
IO
N D O C U M E N T S
MECH VRF SCHEDULES
16079
ALWRI RENOVATION
FOREST SERVICE / ROCKY MOUNTAIN RESEARCH STATION
EJW
REB
TRC
smoses Text Box smoses
M.E.P. COORDINATION SCHEDULE
MARK DESCRIPTION
ELECTRICAL DATA CONTROL
NOTES
STARTER/DISCONNECT
LOAD VOLT-PH TYPE DIV TYPE DIV
B-1 BOILER 205 W 120V - 1PH INT 23/23 - MSS 26/26
B-2 BOILER 205 W 120V - 1PH INT 23/23 - MSS 26/26
FC 001A HIGH STATIC DUCTED COIL 2.65 FLA 208V - 1PH T 23/23 - MSS (2P) 26/26
FC 001B CASSETTE FAN COIL 0.2 FLA 208V - 1PH T 23/23 - MSS (2P) 26/26
FC 001C CASSETTE FAN COIL 0.2 FLA 208V - 1PH T 23/23 - MSS (2P) 26/26
FC 001D CASSETTE FAN COIL 0.2 FLA 208V - 1PH T 23/23 - MSS (2P) 26/26
FC 005A CASSETTE FAN COIL 0.2 FLA 208V - 1PH T 23/23 - MSS (2P) 26/26
FC 005B CASSETTE FAN COIL 0.2 FLA 208V - 1PH T 23/23 - MSS (2P) 26/26
GLF-1 GLYCOL FEEDER 1/3 HP 115V -1PH INT 23/23 4 NA -
HP-1 HEAT PUMP 28.0 FLA 208V - 3PH INT 23/23 - FD 26/26
HP-2 HEAT PUMP 28.4 FLA 208V - 3PH INT 23/23 - FD 26/26
HRU 1 3 PORT HEAT RECOV.UNIT 0.12 FLA 208V - 1PH INT 23/23 - MSS (2P) 26/26
HRU 2 3 PORT HEAT RECOV.UNIT 0.12 FLA 208V - 1PH INT 23/23 - MSS (2P) 26/26
DWH-1 HOT WATER HEATER 1500 W 120V - 1PH INT 22/22 4 NA 26/26
PP-1 HOT WATER RECIRCULATION PUMP FRAC. HP 120V - 1PH INT 22/22 4 NA 26/26
P-1 MAIN DIST. PUMP 2 HP 208V - 3PH UC 23/23 - MSS (3P) 26/26
P-2 MAIN DIST. PUMP 2 HP 208V - 3PH UC 23/23 - MSS (3P) 26/26
SP-1 ALT. 4 - SUMP PUMP 8 FLA 208V - 1PH INT 22/22 - MSS (2P) 26/26
ECH-1 ELECTRIC CEILING HEATER 19.2 FLA 208V - 1 PH INT 23/23 1 INT 23/26
EWH-1 ELECTRIC WALL HEATER 19.2 FLA 208V - 1 PH INT 23/23 1 INT 23/26
FC 102A 1-WAY CASSETTE 0.3 FLA 208V - 1 PH T 23/23 - MSS(2P) 26/26
FC 102B 1-WAY CASSETTE 0.18 FLA 208V - 1 PH T 23/23 - MSS(2P) 26/26
FC 102C WALL MOUNT FAN COIL 0.16 FLA 208V - 1 PH T 23/23 - MSS(2P) 26/26
FC 102D 1-WAY CASSETTE 0.18 FLA 208V - 1 PH T 23/23 - MSS(2P) 26/26
FC 103 1-WAY CASSETTE 0.18 FLA 208V - 1 PH T 23/23 - MSS(2P) 26/26
FC104 1-WAY CASSETTE 0.18 FLA 208V - 1 PH T 23/23 - MSS(2P) 26/26
FC 105 WALL MOUNT FAN COIL 0.16 FLA 208V - 1 PH T 23/23 - MSS(2P) 26/26
FC 106 WALL MOUNT FAN COIL 0.16 FLA 208V - 1 PH T 23/23 - MSS(2P) 26/26
FC 107 WALL MOUNT FAN COIL 0.16 FLA 208V - 1 PH T 23/23 - MSS(2P) 26/26
FC 108 WALL MOUNT FAN COIL 0.16 FLA 208V - 1 PH T 23/23 - MSS(2P) 26/26
FC 109 WALL MOUNT FAN COIL 0.16 FLA 208V - 1 PH T 23/23 - MSS(2P) 26/26
FC 110 WALL MOUNT FAN COIL 0.16 FLA 208V - 1 PH T 23/23 - MSS(2P) 26/26
FC 112 WALL MOUNT FAN COIL 0.16 FLA 208V - 1 PH T 23/23 - MSS(2P) 26/26
HRU 3 2 PORT HEAT RECOV.UNIT 0.08 FLA 208V - 1 PH INT 23/23 - MSS(2P) 26/26
HRU 4 4 PORT HEAT RECOV.UNIT 0.16 FLA 208V - 1 PH INT 23/23 - MSS(2P) 26/26
HRU 5 4 PORT HEAT RECOV.UNIT 0.16 FLA 208V - 1 PH INT 23/23 - MSS(2P) 26/26
HRU 6 3 PORT HEAT RECOV.UNIT 0.12 FLA 208V - 1PH INT 23/23 - MSS(2P) 26/26
ERV-1 ENERGY RECOVERY VENT. 5.2 MCA 208V - 3PH INT 23/23 - FD 26/26
DC-1 DRY COOLER 11.4 FLA 208V - 3PH INT 23/23 - FD 26/26
PH-1 POST HEATER 9 KW 208V - 3PH T 23/23 - FD 26/26
CONTROL TYPE DIVISION OF RESPONSIBILITIES:
BAS
C
CO
INT
L
PS
T
UC
NA
BUILDING AUTO CONTROL
CARBON MONOXIDE DETECTORS
CONTINUOUS OPERATION
INTEGRAL CONTROLS
LIGHT SWITCH
PRESSURE SWITCH
THEMOSTAT
UNIT CONTROLLER
NOT APPLICABLE
22/22 22/26 23/23 23/26 26/26
FURNISHED AND INSTALLED BY DIV. 22, WIRED BY DIV.
FURNISHED AND INSTALLED BY DIV. 22, WIRED BY DIV.
FURNISHED AND INSTALLED BY DIV. 23, WIRED BY DIV.
FURNISHED AND INSTALLED BY DIV. 23, WIRED BY DIV.
FURNISHED AND INSTALLED BY DIV. 26, WIRED BY DIV.
STARTER/DISCONNECT TYPE NOTES:
FD
CSFD
RVSS
VFD
MSS
MOCP
FW
NA
FUSED DISCONNECT
COMBINATION STARTER/DISCONNECT - HOA
REDUCED VOLTAGE SOLID-STATE
VARIABLE FREQUENCY DRIVE - HOA
MANUAL STARTER SWITCH
MOTOR OVER-CURRENT PROTECTION
FACTORY-WIRED SINGLE PT. CONNECTION
NOT APPLICABLE
1.
2.
3.
4.
5.
6.
7.
INTEGRAL DISCONNECTS AND OVERLOADS
INTEGRAL OVERLOADS
INTEGRAL OVERLOADS, RECEPTACLE
RECEPTACLE
SINGLE POINT CONNECTION
PROVIDE RECEPTACLE AND DATA CONNECTION FOR
PANEL
MOUNT ON UNI-STRUT IN FRONT OF UNIT
GENERAL NOTES:
1. ALL DUCT SMOKE DETECTORS FURNISHED BY DIV. 26, INSTALLED BY DIV. 23 AND WIRED BY DIV. 26. DIV 26 SHALL WIRE
ALL FANS TO SHUT DOWN WHEN ALARM IS INITIATED BY ANY DUCT SMOKE DETECTOR.
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
THOMAS R.
COBURN
No. 20022 PE
I S
S
E F
O R
P
LANO EN
G
IN
E E R
ON
T
M
ANA
LICENSED
3/ 8/ :1 8:
P M
M0.5
3.10.17C O N S T R U C T
IO
N D O C U M E N T S
MEP COORDINATION SCHEDULE
16079
ALWRI RENOVATION
FOREST SERVICE / ROCKY MOUNTAIN RESEARCH STATION
EJW
REB
TRC
smoses Text Box smoses
UP
A
B
(E)
OPEN
OFFICE
AREA
WOMEN'S
RESTROOM
MEN'S
RESTROOM
(E)
MECH.
RM.
2 2
(E)
CONFERENCE
(E)
OPEN
OFFICE
AREA
KEY NOTES:#
A. IT IS THE INTENT OF THIS PROJECT TO DEMOLISH THE ENTIRE EXISTING
MECHANICAL SYSTEMS. COORDINATE ALL UTILITY OUTAGES WITH THE
OWNER PLANNING DESIGN AND CONSTRUCTION THROUGHOUT THE
DURATION OF CONSTRUCTION.
B. ALL EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING SHOWN AS DARK
AND DASHED SHALL BE DEMOLISHED. EXISTING MECHANICAL EQUIPMENT
SHOWN LIGHT WITH SOLID LINES IS TO REMAIN UNCHANGED.
C. PRESENT ALL DEMOLISHED EQUIPMENT TO THE OWNER FOR SALVAGE.
REMOVE ANY UNWANTED EQUIPMENT FROM SITE.
D. COORDINATE WITH THE GENERAL CONTRACTOR TO PATCH AND REPAIR THE
FLOORS, ROOF AND WALLS ASSOCIATED WITH THE MECHANICAL DEMOLITION.
MECHANICAL DEMO NOTES
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
THOMAS R.
COBURN
No. 20022 PE
I S
S
E F
O R
P
LANO EN
G
IN
E E R
ON
T
M
ANA
LICENSED
3/ 8/ :1 8:
P M
MD2.0
3.10.17C O N S T R U C T
IO
N D O C U M E N T S
BASEMENT MECH. DEMO PLAN
16079
ALWRI RENOVATION
FOREST SERVICE / ROCKY MOUNTAIN RESEARCH STATION
EJW
REB
TRC
: 1/4" = 1'-0"MD2.0MD2.0
9 BASEMENT MECHANICAL DEMO PLAN
1. U.N.O., (D) ALL (E) HVAC DUCTWORK, PIPING, EQUIPMENT, AND CONTROLS.
2. U.N.O., (D) ALL (E) BASEBOARD HEATERS, WIRING, & CONTROLS, TYP.
NORTH
smoses Text Box smoses
DN
A
B
STAIR
A
STAIR
B
2 2
KEY NOTES:#
A. IT IS THE INTENT OF THIS PROJECT TO DEMOLISH THE ENTIRE EXISTING
MECHANICAL SYSTEMS. COORDINATE ALL UTILITY OUTAGES WITH THE
OWNER PLANNING DESIGN AND CONSTRUCTION THROUGHOUT THE
DURATION OF CONSTRUCTION.
B. ALL EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING SHOWN AS DARK
AND DASHED SHALL BE DEMOLISHED. EXISTING MECHANICAL EQUIPMENT
SHOWN LIGHT WITH SOLID LINES IS TO REMAIN UNCHANGED.
C. PRESENT ALL DEMOLISHED EQUIPMENT TO THE OWNER FOR SALVAGE.
REMOVE ANY UNWANTED EQUIPMENT FROM SITE.
D. COORDINATE WITH THE GENERAL CONTRACTOR TO PATCH AND REPAIR THE
FLOORS, ROOF AND WALLS ASSOCIATED WITH THE MECHANICAL DEMOLITION.
MECHANICAL DEMO NOTES
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
THOMAS R.
COBURN
No. 20022 PE
I S
S
E F
O R
P
LANO EN
G
IN
E E R
ON
T
M
ANA
LICENSED
3/ 8/ :1 8:
P M
MD2.1
3.10.17C O N S T R U C T
IO
N D O C U M E N T S
1ST FLOOR MECH. DEMO PLAN
16079
ALWRI RENOVATION
FOREST SERVICE / ROCKY MOUNTAIN RESEARCH STATION
EJW
REB
TRC
: 1/4" = 1'-0"MD2.1MD2.1
9 FIRST FLOOR MECHANICAL DEMOLITION PLAN
1. U.N.O., (D) ALL (E) HVAC DUCTWORK, PIPING, EQUIPMENT, AND CONTROLS.
2. U.N.O., (D) ALL (E) BASEBOARD HEATERS, WIRING, & CONTROLS, TYP.
NORTH
smoses Text Box smoses
A
B
KEY NOTES:#
A. IT IS THE INTENT OF THIS PROJECT TO DEMOLISH THE ENTIRE EXISTING
MECHANICAL SYSTEMS. COORDINATE ALL UTILITY OUTAGES WITH THE
OWNER PLANNING DESIGN AND CONSTRUCTION THROUGHOUT THE
DURATION OF CONSTRUCTION.
B. ALL EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING SHOWN AS DARK
AND DASHED SHALL BE DEMOLISHED. EXISTING MECHANICAL EQUIPMENT
SHOWN LIGHT WITH SOLID LINES IS TO REMAIN UNCHANGED.
C. PRESENT ALL DEMOLISHED EQUIPMENT TO THE OWNER FOR SALVAGE.
REMOVE ANY UNWANTED EQUIPMENT FROM SITE.
D. COORDINATE WITH THE GENERAL CONTRACTOR TO PATCH AND REPAIR THE
FLOORS, ROOF AND WALLS ASSOCIATED WITH THE MECHANICAL DEMOLITION.
MECHANICAL DEMO NOTES
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
THOMAS R.
COBURN
No. 20022 PE
I S
S
E F
O R
P
LANO EN
G
IN
E E R
ON
T
M
ANA
LICENSED
3/ 8/ :1 8:
P M
MD2.2
3.10.17C O N S T R U C T
IO
N D O C U M E N T S
ROOF MECHANICAL DEMO PLAN
16079
ALWRI RENOVATION
FOREST SERVICE / ROCKY MOUNTAIN RESEARCH STATION
EJW
REB
TRC
: 1/4" = 1'-0"MD2.2MD2.2
9 ROOF MECHANICAL DEMOLITION PLAN
1. (D) (E) PACKAGED ROOFTOP AIR HANDLING UNIT, CURB, AND ALL ASSOCIATED GAS
CONTROLS, WIRING, AND CONDENSATE PIPING. COORDINATE WITH G.C. TO PATCH ROOF.
TYP. 2.
2. (D)(E) ROOF-MOUNTED EXHAUST FAN. COORDINATE WITH G.C. TO PATCH ROOF.
NORTH
smoses Text Box smoses
A
B
(E)
OPEN
OFFICE
AREA
WOMEN'S
RESTROOM
MEN'S
RESTROOM
(E)
MECH.
RM.
HRU-2
(E)
CONFERENCE
6"ø
10"x12"
6"ø
6"ø 6"ø
4"ø
10"x10"
6"ø
6"x6" 6"x6"
FC
001B
FC
001C
FC
001D
FC
005A
FC
005B (E)
OPEN
OFFICE
AREA
(E)
OPEN
OFFICE
AREA
10"ø
E-1
T
FC 001
A,B,C,D
T FC 005A,B
S-1
S-1
E-1
R-1
E-2
E-2
S-3
S-3
6"ø
FC
001A
8"x12"
E-2
33"x7"
41"x8"
18"x8"
6"ø 6"ø
6"ø 8"ø8"ø
8"ø
6"x8"6"x8"
"x
4"ø
4 4
3"ø
3"ø
3"ø
3"ø
"x
8"x8"
"x
B-2
B-1 BT-1
P-1 P-2
HP-1
HP-2
ET-1 GLF-1
HRU-1
DHW-1
KEY NOTES:#
A. IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO
FIELD COORDINATE THE ROUTING OF ALL DUCTWORK AND PIPING WITH ALL
OTHER TRADES.
B. BUILDING IN GENERAL HAS LIMITED SPACE AND IS CONGESTED. IT SHALL BE
THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO REVIEW
DRAWINGS FOR ALL DISCIPLINES AND PROVIDE ALL LABOR AND MATERIALS
REQUIRED FOR A COMPLETE INSTALLATION.
C. DO NOT RUN ANY DUCTWORK OR PIPING OVER ELECTRICAL PANELS FROM
PANEL TO STRUCTURE ABOVE AND FROM PANEL ACCESS SPACE TO 80"
ABOVE FINISHED FLOOR.
D. COORDINATE THE INSTALL OF GRILLES, REGISTERS AND DIFFUSERS WITH
THE ARCHITECTURAL REFLECTED CEILING PLANS AND THE ELECTRICAL
LIGHTING PLANS.
E. VERIFY THE LOCATION OF ALL THERMOSTATS AND SENSORS WITH THE
ENGINEER AND ARCHITECT PRIOR TO INSTALLATION. INSTALL THERMOSTATS
48" ABOVE FINISHED FLOOR PER ADA REQUIREMENTS.
F. PROVIDE AND INSTALL SEISMIC BRACING FOR ALL EQUIPMENT, DUCTWORK
AND PIPING PER THE REQUIREMENTS OF THE 2012 INTERNATIONAL BUILDING
CODE.
G. FLEXIBLE DUCTWORK FROM BRANCH DUCTS TO GRILLES, REGISTERS AND
DIFFUSERS SHALL BE LIMITED TO 5FT MAX.
H. PROVIDE AND INSTALL FIRE, SMOKE AND COMBINATION SMOKE/FIRE
DAMPERS WHERE DUCTWORK PASSES THROUGH FIRE RATED ASSEMBLIES.
I. SEAL ALL DUCT AND PIPE PENETRATIONS THROUGH FIRE RATED ASSEMBLIES
WITH A UL APPROVED FIRE STOP SYSTEM.
J. PROVIDE ACCESS DOORS TO ALLOW SERVICE AND INSPECTION OF
EQUIPMENT, VALVES, DAMPERS AND DEVICES INSTALLED ABOVE NON-
REMOVABLE CEILINGS.
K. PROVIDE FLUSH CUP REMOTE DAMPER ACTUATORS FOR BALANCE DAMPERS
INSTALLED IN IN-ACCESSIBLE LOCATIONS.
L. ALL RECTANGULAR DUCTWORK DOWN-STREAM OF VAV BOXES SHALL HAVE
1" ACOUSTIC LINER.
GENERAL MECHANICAL NOTES
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
THOMAS R.
COBURN
No. 20022 PE
I S
S
E F
O R
P
LANO EN
G
IN
E E R
ON
T
M
ANA
LICENSED
3/ 8/ :1 8:
P M
M2.0
3.10.17C O N S T R U C T
IO
N D O C U M E N T S
BASEMENT MECH. HVAC PLAN
16079
ALWRI RENOVATION
FOREST SERVICE / ROCKY MOUNTAIN RESEARCH STATION
EJW
REB
TRC
: 1/4" = 1'-0"M2.0M2.0
9 BASEMENT MECHANICAL HVAC PLAN
NORTH
1. 12"Ø EA DUCT UP IN CHASE. ROUTE AS FAR NORTH IN CHASE AS COORDINATION WITH
PLUMBING & DUCTWORK ALLOWS.
2. 10"Ø OA DUCT UP IN CHASE. AFTER 8"Ø TAKEOFF, TRANSITION TO 8"Ø MAIN AND DROP
UNDER EXHAUST DUCT IN MECHANICAL ROOM AS REQUIRED. ROUTE AS FAR NORTH IN
CHASE AS COORDINATION WITH PLUMBING & DUCTWORK ALLOWS.
3. 3"Ø VENT AND FLUE DOWN IN CHASE TO B-1 & B-2. TERMINATE THROUGH ROOF IN
CONCETRIC VENT KIT IF MANUFACTURER ALLOWS. ROUTE AS FAR NORTH IN CHASE AS
COORDINATION WITH PLUMBING ALLOWS.
4. ALL FAN COILS AND HRUS TO BE LOCATED IN DROP CEILING.
smoses Text Box smoses
A
B
(E)
OPEN
OFFICE
AREA
WOMEN'S
RESTROOM
MEN'S
RESTROOM
(E)
MECH.
RM.
HRU-2
(E)
CONFERENCE
FC
001B
FC
001C
FC
001D
FC
005A
FC
005B
(E)
OPEN
OFFICE
AREA
(E)
OPEN
OFFICE
AREA
3/4"ø CND
1"ø CND
1"ø CND
3/4"ø CND
3/4"ø CND
1"ø CND
1"ø CND
FC
001A
3/4"ø CND
E L E
C T
R
IC
A L
P A
N E
L S
DOOR
SWING
FIRE RISER
SUMP
PUMP
ACCESS
C H
A S
E
W A
T E
R S
E R
V
IC
E
E L E
C D
IS
C
O N
N E
C T
S
B-1 B-2 BT-1
P-1 P-2
HP-1
HP-2
3/4"ø CND 1"ø CND
REFRIGERANT LIQUID, SUCTION
& MIXED GAS PIPING (TYP).
REFRIGERANT LIQUID &
SUCTION (TYP).
3/4"ø CND
GLF-1ET-1DHW-1
HRU-1
KEY NOTES:#
A. IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO
FIELD COORDINATE THE ROUTING OF ALL DUCTWORK AND PIPING WITH ALL
OTHER TRADES.
B. BUILDING IN GENERAL HAS LIMITED SPACE AND IS CONGESTED. IT SHALL BE
THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO REVIEW
DRAWINGS FOR ALL DISCIPLINES AND PROVIDE ALL LABOR AND MATERIALS
REQUIRED FOR A COMPLETE INSTALLATION.
C. DO NOT RUN ANY DUCTWORK OR PIPING OVER ELECTRICAL PANELS FROM
PANEL TO STRUCTURE ABOVE AND FROM PANEL ACCESS SPACE TO 80"
ABOVE FINISHED FLOOR.
D. COORDINATE THE INSTALL OF GRILLES, REGISTERS AND DIFFUSERS WITH
THE ARCHITECTURAL REFLECTED CEILING PLANS AND THE ELECTRICAL
LIGHTING PLANS.
E. VERIFY THE LOCATION OF ALL THERMOSTATS AND SENSORS WITH THE
ENGINEER AND ARCHITECT PRIOR TO INSTALLATION. INSTALL THERMOSTATS
48" ABOVE FINISHED FLOOR PER ADA REQUIREMENTS.
F. PROVIDE AND INSTALL SEISMIC BRACING FOR ALL EQUIPMENT, DUCTWORK
AND PIPING PER THE REQUIREMENTS OF THE 2012 INTERNATIONAL BUILDING
CODE.
G. FLEXIBLE DUCTWORK FROM BRANCH DUCTS TO GRILLES, REGISTERS AND
DIFFUSERS SHALL BE LIMITED TO 5FT MAX.
H. PROVIDE AND INSTALL FIRE, SMOKE AND COMBINATION SMOKE/FIRE
DAMPERS WHERE DUCTWORK PASSES THROUGH FIRE RATED ASSEMBLIES.
I. SEAL ALL DUCT AND PIPE PENETRATIONS THROUGH FIRE RATED ASSEMBLIES
WITH A UL APPROVED FIRE STOP SYSTEM.
J. PROVIDE ACCESS DOORS TO ALLOW SERVICE AND INSPECTION OF
EQUIPMENT, VALVES, DAMPERS AND DEVICES INSTALLED ABOVE NON-
REMOVABLE CEILINGS.
K. PROVIDE FLUSH CUP REMOTE DAMPER ACTUATORS FOR BALANCE DAMPERS
INSTALLED IN IN-ACCESSIBLE LOCATIONS.
L. ALL RECTANGULAR DUCTWORK DOWN-STREAM OF VAV BOXES SHALL HAVE
1" ACOUSTIC LINER.
GENERAL MECHANICAL NOTES
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
THOMAS R.
COBURN
No. 20022 PE
I S
S
E F
O R
P
LANO EN
G
IN
E E R
ON
T
M
ANA
LICENSED
3/ 8/ :1 8:
P M
M2.1
3.10.17C O N S T R U C T
IO
N D O C U M E N T S
BASEMENT MECH. PIPING PLAN
16079
ALWRI RENOVATION
FOREST SERVICE / ROCKY MOUNTAIN RESEARCH STATION
EJW
REB
TRC
: 1/4" = 1'-0"M2.1M2.1
9 BASEMENT MECHANICAL PIPING PLAN
NORTH
1. 2-1/2" HPR UP IN CHASE TO DC-1.
2. 1" CONDENSATE DOWN FROM FIRST FLOOR IN CHASE.
3. 1-1/4" CONDENSATE DOWN TO FS-1.
4. REFRIGERANT LIQUID, SUCTION & MIXED GAS PIPING UP TO FIRST FLOOR.
5. REFRIGERANT PIPING SHOWN IS DIAGRAMATIC & IS FOR ILLUSTRATIVE
PURPOSES ONLY. MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL
REFRIGERANT PIPING LOCATIONS & PROVIDE UPDATED REFRIGERANT PIPING
DIAGRAM BASED ON ACTUAL INSTALLATION LENGTHS.
smoses Text Box smoses
A
B
STAIR
A
RGEG
SCIENTIST
RGEG
SCIENTIST
RGEG
SCIENTIST
ABA
UNI-SEX
RESTROOM
OPEN
OFFICE
AREA
RECEPTION
RGEG
SCIENTIST
OPEN
OFFICE
AREA
102CONFERENCE
ROOM
RGEG
SCIENTIST
RGEG
SCIENTIST
STAIR
B
DIRECTOR
OFFICE
1 2
HRU-3
HRU-4
HRU-5
HRU-6
ENTRY
12"ø 12"ø 10"ø
8"ø
10"ø
8"ø
10"ø
8"ø
8"ø 8"ø
6"ø
6"ø
6"ø
6"ø
E-1
E-2
T
FC 103
TFC 112
TFC 104
T
FC 105
T
FC 106
T
FC 107
T FC 108TFC 109TFC 110
T
FC
102A
T
FC
102B
T
FC
102C
T
FC
102D
6"ø
6"ø6"ø6"ø
6"ø
8"ø
EWH-1
ECH-1
FC
102A
FC
102B
FC
102D
FC
FC
FC
FC
FC
FC
FC
FC
FC
102C
FC
S-2
S-2
S-2
S-2
S-2
S-2
S-2
S-2
S-2
S-2
6"ø
6"ø
8"ø
DC-1
S-2
4 4 4 4
5 5 5
6" CONCRETE HOUSEKEEPING PAD. EXTEND MIN. 6"
BEYOND FOOTPRINT OF EQUIPMENT. SEE
STRUCTURAL FOR INSTALLATION DETAILS. FIELD
COORDINATE EXACT INSTALLATION LOCATION.
A. IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO
FIELD COORDINATE THE ROUTING OF ALL DUCTWORK AND PIPING WITH ALL
OTHER TRADES.
B. BUILDING IN GENERAL HAS LIMITED SPACE AND IS CONGESTED. IT SHALL BE
THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO REVIEW
DRAWINGS FOR ALL DISCIPLINES AND PROVIDE ALL LABOR AND MATERIALS
REQUIRED FOR A COMPLETE INSTALLATION.
C. DO NOT RUN ANY DUCTWORK OR PIPING OVER ELECTRICAL PANELS FROM
PANEL TO STRUCTURE ABOVE AND FROM PANEL ACCESS SPACE TO 80"
ABOVE FINISHED FLOOR.
D. COORDINATE THE INSTALL OF GRILLES, REGISTERS AND DIFFUSERS WITH
THE ARCHITECTURAL REFLECTED CEILING PLANS AND THE ELECTRICAL
LIGHTING PLANS.
E. VERIFY THE LOCATION OF ALL THERMOSTATS AND SENSORS WITH THE
ENGINEER AND ARCHITECT PRIOR TO INSTALLATION. INSTALL THERMOSTATS
48" ABOVE FINISHED FLOOR PER ADA REQUIREMENTS.
F. PROVIDE AND INSTALL SEISMIC BRACING FOR ALL EQUIPMENT, DUCTWORK
AND PIPING PER THE REQUIREMENTS OF THE 2012 INTERNATIONAL BUILDING
CODE.
G. FLEXIBLE DUCTWORK FROM BRANCH DUCTS TO GRILLES, REGISTERS AND
DIFFUSERS SHALL BE LIMITED TO 5FT MAX.
H. PROVIDE AND INSTALL FIRE, SMOKE AND COMBINATION SMOKE/FIRE
DAMPERS WHERE DUCTWORK PASSES THROUGH FIRE RATED ASSEMBLIES.
I. SEAL ALL DUCT AND PIPE PENETRATIONS THROUGH FIRE RATED ASSEMBLIES
WITH A UL APPROVED FIRE STOP SYSTEM.
J. PROVIDE ACCESS DOORS TO ALLOW SERVICE AND INSPECTION OF
EQUIPMENT, VALVES, DAMPERS AND DEVICES INSTALLED ABOVE NON-
REMOVABLE CEILINGS.
K. PROVIDE FLUSH CUP REMOTE DAMPER ACTUATORS FOR BALANCE DAMPERS
INSTALLED IN IN-ACCESSIBLE LOCATIONS.
L. ALL RECTANGULAR DUCTWORK DOWN-STREAM OF VAV BOXES SHALL HAVE
1" ACOUSTIC LINER.
GENERAL MECHANICAL NOTES
KEY NOTES:#
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
THOMAS R.
COBURN
No. 20022 PE
I S S
E F
O R
P
LAN
O EN
G
IN
E E R
ON
T
M
AN
A
LICENSE
D
/1
/2
:0
:5
A
M
M2.2
3.10.17C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
1ST FLOOR MECH. HVAC PLAN
16079
ALWRI RENOVATION
FOREST SERVICE / ROCKY MOUNTAIN RESEARCH STATION
EJW
REB
TRC
: 1/4" = 1'-0"M2.2M2.2
9 FIRST FLOOR MECHANICAL HVAC PLAN
NORTH
1. 14"Ø OA DUCT UP TO ERV-1 ON ROOF. TRANSITION TO ERV DISCHARGE
CONNECTION AS REQUIRED. AFTER FIRST FLOOR BRANCH TAKE-OFFS, TRANSITION
TO 10"Ø DOWN IN CHASE. ROUTE AS FAR NORTH IN CHASE AS COORDINATION WITH
PLUMBING & DUCTWORK ALLOWS.
2. 14"Ø EA DUCT UP TO ERV-1 ON ROOF. TRANSITION TO ERV INLET CONNECTION AS
REQUIRED. AFTER FIRST FLOOR BRANCH TAKE-OFFS, TRANSITION TO 12"Ø DOWN IN
CHASE. ROUTE AS FAR NORTH IN CHASE AS COORDINATION WITH PLUMBING &
DUCTWORK ALLOWS.
3. 3"Ø VENT AND FLUE DOWN IN CHASE TO B-1 & B-2. TERMINATE THROUGH ROOF IN
CONCETRIC VENT KIT IF MANUFACTURER ALLOWS. ROUTE AS FAR NORTH IN CHASE
AS COORDINATION WITH PLUMBING ALLOWS.
4. SPRAYFOAM INSULATE ALL STALLS ON EXTERIOR WALLS WHERE CONDENSATE AND
REFRIGERANT IS ROUTED.
5. THERMOSTAT WIRE TO BE RUN TO TRENDWAY "TRENDWALL" CHASE.
6. DUCT ROUTED IN OPEN WEB JOISTS. SPRAY FOAM TO ALLOW CLEAR PASSAGE OF
DUCT WHERE APPLICABLE.
7. DC-1 MOUNTED ON GRADE. MAINTAIN ALL MANUFACTURERS RECOMENDED
CLEARANCES.
smoses Text Box smoses
A
B
STAIR
A
RGEG
SCIENTIST
RGEG
SCIENTIST
RGEG
SCIENTIST
108ABA
UNI-SEX
RESTROOM
OPEN
OFFICE
AREA
RECEPTION
RGEG
SCIENTIST
OPEN
OFFICE
AREA
CONFERENCE
ROOM
RGEG
SCIENTIST
RGEG
SCIENTIST
STAIR
B
DIRECTOR
OFFICE
HRU-3
HRU-4
HRU-5
HRU-6
ENTRY
EWH-1
ECH-1
FC
102A
FC
FC
FC
102B
FC
FC
FC
FC
FC
102C
FC
102D
FC
FC
FC
3/4"ø CND
1"ø CND
1"ø CND
3/4"ø CND
1"ø CND
3/4"ø CND
1"ø CND
3/4"ø CND
3/4"ø CND 1"ø CND
1"ø CND
1"ø CND
3/4"ø CND
DC-1
REFRIGERANT LIQUID,
SUCTION & MIXED GAS
PIPING (TYP).
REFRIGERANT LIQUID
& SUCTION (TYP).
KEY NOTES:#
A. IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO
FIELD COORDINATE THE ROUTING OF ALL DUCTWORK AND PIPING WITH ALL
OTHER TRADES.
B. BUILDING IN GENERAL HAS LIMITED SPACE AND IS CONGESTED. IT SHALL BE
THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO REVIEW
DRAWINGS FOR ALL DISCIPLINES AND PROVIDE ALL LABOR AND MATERIALS
REQUIRED FOR A COMPLETE INSTALLATION.
C. DO NOT RUN ANY DUCTWORK OR PIPING OVER ELECTRICAL PANELS FROM
PANEL TO STRUCTURE ABOVE AND FROM PANEL ACCESS SPACE TO 80"
ABOVE FINISHED FLOOR.
D. COORDINATE THE INSTALL OF GRILLES, REGISTERS AND DIFFUSERS WITH
THE ARCHITECTURAL REFLECTED CEILING PLANS AND THE ELECTRICAL
LIGHTING PLANS.
E. VERIFY THE LOCATION OF ALL THERMOSTATS AND SENSORS WITH THE
ENGINEER AND ARCHITECT PRIOR TO INSTALLATION. INSTALL THERMOSTATS
48" ABOVE FINISHED FLOOR PER ADA REQUIREMENTS.
F. PROVIDE AND INSTALL SEISMIC BRACING FOR ALL EQUIPMENT, DUCTWORK
AND PIPING PER THE REQUIREMENTS OF THE 2012 INTERNATIONAL BUILDING
CODE.
G. FLEXIBLE DUCTWORK FROM BRANCH DUCTS TO GRILLES, REGISTERS AND
DIFFUSERS SHALL BE LIMITED TO 5FT MAX.
H. PROVIDE AND INSTALL FIRE, SMOKE AND COMBINATION SMOKE/FIRE
DAMPERS WHERE DUCTWORK PASSES THROUGH FIRE RATED ASSEMBLIES.
I. SEAL ALL DUCT AND PIPE PENETRATIONS THROUGH FIRE RATED ASSEMBLIES
WITH A UL APPROVED FIRE STOP SYSTEM.
J. PROVIDE ACCESS DOORS TO ALLOW SERVICE AND INSPECTION OF
EQUIPMENT, VALVES, DAMPERS AND DEVICES INSTALLED ABOVE NON-
REMOVABLE CEILINGS.
K. PROVIDE FLUSH CUP REMOTE DAMPER ACTUATORS FOR BALANCE DAMPERS
INSTALLED IN IN-ACCESSIBLE LOCATIONS.
L. ALL RECTANGULAR DUCTWORK DOWN-STREAM OF VAV BOXES SHALL HAVE
1" ACOUSTIC LINER.
GENERAL MECHANICAL NOTES
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
THOMAS R.
COBURN
No. 20022 PE
I S
S
E F
O R
P
LANO EN
G
IN
E E R
ON
T
M
ANA
LICENSED
3/ 8/ :1 8:
P M
M2.3
3.10.17C O N S T R U C T
IO
N D O C U M E N T S
1ST FLOOR MECH. PIPING PLAN
16079
ALWRI RENOVATION
FOREST SERVICE / ROCKY MOUNTAIN RESEARCH STATION
EJW
REB
TRC
: 1/4" = 1'-0"M2.3M2.3
9 FIRST FLOOR MECHANICAL PIPING PLAN
1. HPR UP & DOWN IN CHASE TO DC-1.
2. 1" CONDENSATE DOWN IN CHASE TO FS-1.
3. DC-1 MOUNTED ON GRADE. MAINTAIN ALL MANUFACTURERS RECOMENDED
CLEARANCES.
4. REFRIGERANT LIQUID, SUCTION & MIXED GAS PIPING DOWN TO BASEMNET
FLOOR.
5. REFRIGERANT PIPING SHOWN IS DIAGRAMATIC & IS FOR ILLUSTRATIVE
PURPOSES ONLY. MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL
REFRIGERANT PIPING LOCATIONS & PROVIDE UPDATED REFRIGERANT PIPING
DIAGRAM BASED ON ACTUAL INSTALLATION LENGTHS.
smoses Text Box smoses
B
ERV-1
PH-1
KEY NOTES:#
A. IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO
FIELD COORDINATE THE ROUTING OF ALL DUCTWORK AND PIPING WITH ALL
OTHER TRADES.
B. BUILDING IN GENERAL HAS LIMITED SPACE AND IS CONGESTED. IT SHALL BE
THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO REVIEW
DRAWINGS FOR ALL DISCIPLINES AND PROVIDE ALL LABOR AND MATERIALS
REQUIRED FOR A COMPLETE INSTALLATION.
C. DO NOT RUN ANY DUCTWORK OR PIPING OVER ELECTRICAL PANELS FROM
PANEL TO STRUCTURE ABOVE AND FROM PANEL ACCESS SPACE TO 80"
ABOVE FINISHED FLOOR.
D. COORDINATE THE INSTALL OF GRILLES, REGISTERS AND DIFFUSERS WITH
TH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .