AG-82FT-S-17-0005AME000001.pdf
PDF 696 KB Posted
- Attached to
- ALWRI Renovation Federal contract opportunity
- Solicitation number
- AG-82FT-S-17-0005
About this file
AG-82FT-S-17-0005AME000001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-82FT-S-17-0005AME000002.pdf | ||
| Solicitation_AG-82FT-S-17-0005.doc.pdf | ||
| Attachment_6_-_Wage_Determination.pdf | ||
| Attachment_5_-_Mechanical_(M0.1-M9.4)_Plumbing_(P0.1-P9.1)_Fire(F0.1-F9.1)_Electrical_(DE1.1-E9.4).pdf | ||
| Attachment_3_-_Cover.pdf | ||
| Attachment_1_-_Project_Manual_Volume_1.pdf | ||
| Attachment_4_-_Architectural_(A0.1-A9.1)_&_Structural_(S2.0-S2.2)_Drawings.pdf | ||
| Attachment_2_-_Project_Manual_Volume_2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-82FT-S-17-0005
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
82FT
FORT COLLINS CO 80526
240 W PROSPECT STREET
ROCKY MOUNTAIN RESEARCH STATION
USDA FOREST SERVICE
03/21/2017000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/21/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ALWRI Renovation
Amendment 000001 is as follows:
1. Provide responses to questions that were submitted prior to April 12th and Q&A from the
Site Visit.
2. Provide the Aldo Site Plan, the ALWRI Structural Addendum Item and the Fire Protection
Cabinets Attachments.
3. Attach the Site Visit Sign In Sheet.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
ANTHONY O. SALAS
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-82FT-S-17-0005/000001
4. Changed the response due date to 4/20/2017 in
Federal Business Opportunities.
Period of Performance: 06/19/2017 to 01/19/2018
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
AG-82FT-S-17-0005
Aldo Leopold Wilderness Research Institute Renovation
Amendment No. 000001, dated 04/12/17 Page 1 of 2
Aldo Leopold Wilderness Research Intitute Renovation Solicitation Number AG-82FT-S-17-0005
Amendment 0001 – Questions and Answers
GENERAL
Q1.) Please see our attached request(s) for prior approval and associated submittals for the Aldo Leopold Renovation.
A1.) Substitution/Prior Approval requests will not be approved or considered prior to contract award. Many items in the specifications and drawings show Brand Name products as a Basis of Design. All of these products shall allow for an approved equal. Substitutions for these products may be submitted for review and approval after the contract is awarded.
Q2.) Is fence around the site a requirement or optional?
A2.) Optional, however, construction operations shall be addressed in proposal response per Section L. In addition, a site plan and safety plan will be a required submittal for approval prior to mobilization.
Q3.) What are the extents for the construction operation?
A3.) Refer to attached site map for limits.
Q4.) Will the building be occupied during construction?
A4.) No, the building will be unoccupied and all items removed prior to construction.
Q5.) When is the proposal due?
A5.) Proposal must be submitted to the CO by 4/20 at 11:00 am Mountain Daylight time, unless otherwise changed in a future amendment. Electronic proposal are acceptable.
Q6.)The solicitation states the deadline for questions is 4/17. I thought I heard you say 4/13 at the walk through. Can you clarify which is correct?
A6.) All questions are to be submitted by April 17th, 2017 per the solicitation section L-12.
Q7.)Is this a Green Globes project?
A7.) No.
Q8.) Please advise as to the amount of the bid bond “BID GUARANTEE” , typically a percentage of the bid, as this is a limiting factor and constraint of trade and we would be unable to provide a proposal based upon your RFP.
A8.) The bid guarentee is addressed in section I-12 of the soliciation.
Q9.)Will there be a requirement for the Montana 1% gross receipts?
A9.) Contract does not provide tax requirements. These are contractors responsibility.
Q10.) Contractor is listed as responsible for paying the building permit but will Contractor also be responsible for paying the city Intake Review fees or have the drawings already been submitted to the city for permit?
A10.) City permit is not required, with the exception of the fire sprinkler system.
Q11.) Specification 017300 calls for some site surveying and property surveys. Will this be required?
A11.) Only as the contractor deems necessary for any utility tie-in or other work called out in the drawings.
Q12.) Can you tell me if there is any asbestos associated with this project? Thank you A12.) No
Amendment No. 000001, dated 04/12/17 Page 2 of 2
ARCHITECTURAL
Q13.) Will there be a roller window shades spec in an upcoming addendum?
A13.) No
Q14.) Are the panels above the windows to be addressed with the storefront Alternate 5?
A14.) The panels are to stay in place. They may be modified as needed for the installation of the new windows if Alternate 5 is awarded. Coordinate with CO.
Q15.) Is there a radon system in building?
A15.) No.
Q16.) Is there enough space in the ceiling for the mechanical?
A16.) Refer to drawing AD5.1 keynote 9, AD7.0 keynote 1, AD7.1 keynote 1 and A5.1. All trades are required to coordinate.
Q17.) Is plenum required to be re-drywalled?
A17.) No.
Q18.) The existing carpet tile is pressure treated adhesive and cannot be removed in it’s entirity, is the expection to patch or place underlayment?
A18.) After carpet removal, prep floor to meet product and manufacturers requirements for installation of new.
Q19.) On the demolition plans please clarify general note number 10?
A19.) Uniform appearance means all finishes must be consistent, professional quality and meet all contract requirements and specifications of new construction.
Q20.) What do the windows sit on 1st floor?
A20.) Refer to A5.2 Detail 12.
Q21.) What is the existing window well construction?
A21.) Masonary block
Q22.)In the restrooms elevations on sheet A6.1, it shows the horizontal A.D.A. grab bars and their mounting heights however it does not show a vertical grab as required by A.D.A., please advise if this is required.
A22.) Yes, include vertical grab bars per IBC requirements in all 3-restrooms.
Q23.) There are fire extinguisher cabinets with fire extinguishers on plan. But there are no specs. And there is not enough info in elevation 14/A.01. Please provide specs for type of cabinet and type of fire extinguisher.
A23.) Refer to attached Specification 104413 – FIRE PROTECTION CABINETS.
Q24.) At the walk through at the Leopold bld. at the University of Montana, the gal taking questions said that carpet substitutions were fine from one of the manufactures listed in the specs as long as the performance ratings were comparable. The link below is to the carpet tile that was used as your basis of design and I have attached the data sheet of a Mohawk carpet tile for comparison. Would you look at it and let me know if this would be an acceptable alternative carpet?
A24.) Substitution/Prior Approval requests will not be approved or considered prior to contract award. Many items in the specifications and drawings show Brand Name products as a Basis of Design. All of these products
Amendment No. 000001, dated 04/12/17 Page 3 of 2 shall allow for an approved equal. Substitutions for these products may be submitted for review and approval after the contract is awarded. Products that meet all the salient characteristics of the specified product will be approved.
Q25.) Detail 2/A8.1 shows caulking at the exterior of the window frames. Does this occur under the base bid, or only as part of Alternate 5?
A25.) This is required as part of the new atrium work and applies to windows 102.2 and 102.3.
Q26.) Is there some type of trim or flooring termination at the first floor level of detail 11/A8.1?
A26.) Refer to A2.1F detail 13.
Q27.) The plans indicate that the existing drywall on the 1st floor exterior / perimeter walls is to remain and be skim coated. Is that correct? I am not sure that is realistic since we are removing and replacing insulation and electrical components at these walls.
A27.) On Sheet AD2.1 add General Note “Demo all exterior wall finishes as required to accommodate work on A5.2 detail 11 and A5.1 keynote 9.”
ELECTRICAL
Q28.) Clarify the electrical requirements on the sump pump.
A28.) Refer to sheet E2.1 keynote 3. Coordinate with mechanical contractor.
Q29.) Clarify the photocell that is noted on the soffit.
A29.) Delete photocell on E7.2.
Q30.) Can we get information on the trendwall system for the electrical and data tie-in?
A30.)
STRUCTURAL
Q31.) One more question that we had from our walk. The wall along the East stairwell appears to be full height from the basement to the 1st floor and the drawings show the lower section being demolished at the new mechanical room. Can we get a detail for how to support the wall that continues above through
Amendment No. 000001, dated 04/12/17 Page 4 of 2 the 1st floor in the next addendum?
A31.) Refer to Structural Addendum from BCE dated 4/10/17.
Q32.) Drawing A2.1 shows the mechanical pad for the DC-1 equipment and references to the structural & mechanical drawings for more info. M2.2 calls for a 6” slab but then references to the structural for more details on rebar/subgrade/etc but the structurals do not have any information on this pad. Can you please provide info on subgrade & rebar requirements, if any, for the mechanical housekeeping pad?
A32.) Provide a 6” thick slab with #4 @ 12” o/c each way (5’-6” x 11’-6” – verify with unit size + 6” on all sides). Thickened the edges to 10” around the perimeter – min. 12” at base.
FIRE SPRINKLER
Q33.) How is the fire sprinkler design handled?
A33.) The contract provides performance requirements and contractor is responsible to coordinate with fire sprinkler installer and fire department for complete design to be submitted to CO for review and final approval.
Q34.) The open plenum return areas for the HVAC system are shown with fire sprinklers. Does that remove the requirement to make those spaces a 1hr rated assembly with GWB on the ceiling joists or will we have to add GWB to the ceiling joists?
A34.) Refer A0.1 Life Safety Floor Plans.
ADDITIONAL INFORMATION
The US Forest Service is actively pursuing additional funding for Solar PV. There is potential for this to be added to the contract after award. Pricing would be handled through a formal price request and modification.
Refer to attached Sign-In Sheet from the pre-bid walk.
feet meters clkegel Callout Approved construction boundary (yellow). Additional space requests will have to be requested and approved by CO after award.
clkegel Polygonal Line
STRUCTURAL ADDENDUM ITEM
ALWRI RENOVATION PROJECT - 04/10/17
SHEET S2.1
– EXISTING MAIN FLOOR FRAMING PLAN (5/S2.1) - At the west stair opening, there is no reference to removal of the existing stair wall in the basement as noted on AD2.0. Removal of the wall will require supplemental support for the existing stair opening header and also for the non-bearing wall from the main level to roof.
- MAIN FLOOR FRAMING PLAN – NEW WORK (13/S2.1) – No supplement framing shown. Please install a new double 1 ¾” x 16” LVL at the location of this basement wall removal. Span the LVL’s from the north concrete wall to the new framed wall at the south end of the new mechanical room. Hanger the existing header from the new LVL’s with typical face hanger. Hanger the new LVL’s from the existing north concrete wall with Simpson HU416 face hanger with 4 – 3/16” diameter “drill & drive” concrete nails each side (pre-drill/enlarge existing hole opening).
A&E ARCHITECTS P.C. FOREST SERVICE (FS)
A/E PROJECT. 16079.00 ALDO LEOPOLD RENOVATION
MISSOULA, MONTANA
FIRE PROTECTION CABINETS 104413 - 1
SECTION 104413 - FIRE PROTECTION CABINETS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes fire-protection cabinets for portable fire extinguishers.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.3 CLOSEOUT SUBMITTALS
A. Maintenance data.
1.4 COORDINATION
A. Coordinate size of fire-protection cabinets to ensure that type and capacity of fire extinguishers indicated are accommodated.
B. Coordinate sizes and locations of fire-protection cabinets with wall depths.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Fire-Rated Fire-Protection Cabinets: Listed and labeled to comply with requirements in ASTM E 814 for fire-resistance rating of walls where they are installed.
2.2 FIRE-PROTECTION CABINET
A. Cabinet Type: Suitable for fire extinguisher.
1. Basis-of-Design Product: Subject to compliance with requirements, provide Larsen’s
Manufacturing Company’s Architectural Series Fire Extinguisher Cabinets Model Number 2409-5R, or comparable product.
B. Cabinet Construction: Nonrated.
C. Cabinet Material: Cold-rolled steel sheet.
FIRE PROTECTION CABINETS 104413 - 2
D. Semirecessed Cabinet: One-piece combination trim and perimeter door frame overlapping surrounding wall surface with exposed trim face and wall return at outer edge (backbend).
1. Square-Edge Trim: 1-1/4- to 1-1/2-inch backbend depth.
E. Cabinet Trim Material: Same material and finish as door.
F. Door Material: Steel sheet.
G. Door Style: Fully glazed panel with frame.
H. Door Glazing: Tempered float glass (clear).
I. Door Hardware: Manufacturer's standard door-operating hardware of proper type for cabinet type, trim style, and door material and style indicated.
J. Accessories:
1. Identification: Lettering complying with authorities having jurisdiction for letter style, size, spacing, and location. Locate as indicated.
a. Identify fire extinguisher in fire-protection cabinet with the words "FIRE
EXTINGUISHER.”
1) Location: Applied to cabinet glazing.
2) Application Process: Pressure-sensitive vinyl letters.
3) Lettering Color: Black.
4) Orientation: Vertical.
K. Materials:
1. Cold-Rolled Steel: ASTM A 1008/A 1008M, Commercial Steel (CS), Type B.
a. Finish: Baked enamel or powder coat.
b. Color: As selected by Contracting Officer from full range of industry colors and color densities.
2. Tempered Float Glass: ASTM C 1048, Kind FT, Condition A, Type I, Quality q3, 3 mm thick, Class 1 (clear).
2.3 FABRICATION
A. Fire-Protection Cabinets: Provide manufacturer's standard box (tub) with trim, frame, door, and hardware to suit cabinet type, trim style, and door style indicated.
FIRE PROTECTION CABINETS 104413 - 3
PART 3 - EXECUTION
3.1 INSTALLATION
A. Prepare recesses for semirecessed fire-protection cabinets as required by type and size of cabinet and trim style.
B. Install fire-protection cabinets in locations and at mounting heights indicated or, if not indicated, at heights acceptable to authorities having jurisdiction.
C. Fire-Protection Cabinets: Fasten cabinets to structure, square and plumb.
D. Identification: Apply vinyl lettering at locations indicated.
E. Adjust fire-protection cabinet doors to operate easily without binding. Verify that integral locking devices operate properly.
END OF SECTION 104413
| SF-30 |
| Q&A |
| Aldo Site Plan |
| ALWRI Structural Addendum Item - 4-10-17 |
| 104413 SF - FIRE PROTECTION CABINETS |
| ALWRI Site Visit Sign In Sheet |
File details come from the government source that posted it. Updated .