Moscow Greenhouse Hazardous Materials Survey September 2011.pdf
PDF 9 MB Posted
- Attached to
- Amend 4
- Solicitation number
- AG-82FT-S-12-0014
About this file
Hazardous Material Report
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 5.pdf | ||
| Amendment 4.pdf | ||
| Roofer Wage Rate.txt | TXT text file | |
| SF 30 Bid Guarantee Amount Change.pdf | ||
| Amendment 2.pdf | ||
| SF30.pdf | ||
| RFP FINAL.doc | DOC document | |
| Attach 02 DRAWINGS.pdf | ||
| Attach 01 Specifications 9 MAY 12.doc | DOC document | |
| Attach 04 Customer Evaluation Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mr. Richa Facilities Rocky Mo 1221 Sou Moscow, 208-883-2
Dear Mr. T
S authorized Research services d
T Subpart E
(NESHAP
demolition report sum are illustra
B States En Certified B Seattle, W National V Lab Code Assurance included i
Existing C materials was attac greenhou system w inside a w ard Tucker Manager ountain Resea th Main Stree Idaho 83843
Tucker:
TRATA, A P
d asbestos Station gree dated August he asbestos E and 40 CF P) to evaluate
n. Lead in p mmarizes ST ated on Plate ulk material nvironmental Building Inspe Washington f Voluntary Lab e 102063-0, e Program (L n Appendix A
Construction uspect ACMs observed. T ched to the fra se abuts the ill be replaced wood framed arch Station et
Professional inspection an enhouse reno 26, 2011.
inspection wa FR 61 Subp e suspect as paint samples TRATA’s sam
1, Sample Lo sampling wa Protection A ector with ST for analysis b boratory Accr and the Am LQAP), Labor A. The accred n Description s were identif he greenhous amework with wooden hea
d. The head gypsum wal
Services Co nd lead pain ovation. Serv as performed part M, Natio sbestos conta s were collec pling activitie ocation Plan.
ASB
as performed Agency (EPA) TRATA. Mate by polarized reditation Pro merican Indu ratory ID 101 ditation includ n fied on site b se is supporte h metal bracke ad house to t house is a wo lboard constr
Sept File:
RE:
Asbe Sam Rock Gree Mosc orporation, (S nt sampling vices were pe d referencing onal Emission aining materia cted to meet es and presen
BESTOS SUR
on Septemb )/Asbestos H erial bulk sam light microsc ogram (NVLA ustrial Hygien
861. Person ded is for the c ased upon o ed by steel an ets, window p the north. ST ood framed b ructed mecha tember 23, 20
ROCSTA M
estos Inspec mpling ky Mountain R enhouse Ren cow, Idaho
STRATA), is supporting t erformed refe
AHERA EPA
ns Standards als (ACMs) in hazard comm nts analytical
RVEY
ber 7, 2011 b Hazard Emerg mples were de copy (PLM).
AP) for bulk a ne Associati nnel and labo current calen ur renovation nd aluminum putty and/or g TRATA unde building, the e anical room w
M11099A ction and Le
Research Sta ovation presenting t he proposed erencing our p
A Regulations s for Hazard n site structu munication re test results.
by Mr. Shaw gency Respo elivered to N NVL is acc asbestos fibe on (AIHA) L oratory accred dar time perio n project unde framework.
glazing were n erstands the h existing HVAC where the gre ad Paint ation the results o d Rocky Mou proposed sco s 40 CFR Pa dous Air Pollu ures schedule equirements.
Sample loca wn Ringo, a U onse Act (AH VL Laborator credited unde r analysis, N Laboratory Q ditation copie od only.
erstanding an Greenhouse not observed head house H C system is ho eenhouse bo of our untain ope of rt 763 utants ed for This ations
United
HERA)
ries in er the
VLAP
Quality es are nd the glass . The
HVAC
oused oiler is attached t were obse
Visual Ins
O conducted which the applied d silicone a
Physical
E area had Non-friabl been pulv matrix. T were not a
Sample C
B Regulatio performed equipmen reduce a collected homogeno
Material S
M for analys “Test Met the EPA r properties birefringe mineral a and copie layer iden
Summary
A weight. T to the AC Regulator to a steel, cem erved in the h spection
Our field activ d to locate an e suspect ma uring the sam nd metal were
Assessment ach identified sustained an le means tha verized or oth The blown in assessed as
Collection ased upon th ns 40 CFR d on each ide nt while samp irborne fibers from 4 sus ous areas ide
Gypsum wa Chimney In Blown Insul Fiberglass i
Sample Anal
Material bulk s sis. Samples thod for the D recommende s for mater nce, sign of e nd were used es of the cha ntification and y of Asbesto
Analytical testi Therefore, the CMs identified ry Discussion mentatious m head house at vities began b nd identify ho terial appear me general t e considered t d homogenou d to assess w t the ACM ca herwise deter attic insulati friable.
he visual insp Part 763 S entified suspe pling. Additi s released d pect homoge entified in the allboard and j sulation lation insulation pap lysis samples, acc s were analyz Determination d method for ial identifica elongation, an d to identify a ain-of-custody material com os Analytical ng identified e boiler chimn d in the proje section below material insula ttic.
by visually o omogenous a rs to be unifo time period.
suspect. Ph us area was p whether the s annot be crum riorated so th on was asse ection, samp ubpart E.
ect ACM. ST onally, samp uring sample enous areas project area:
oint compoun per companied by zed using PL n of Asbestos r bulk sample ation purpose nd extinction asbestos type y forms are i mposition as s
Results
3 of the 12 s ney insulation ect area is p
w. An analyti ated chimney.
bserving buil areas. AHERA orm in texture
Materials ot otographic do physically ass uspect mater mbled or redu at the asbest essed as friab ling strategies Random sam
TRATA perso pling procedu e collection.
in the proje nd y chain-of-cus LM coupled w in Bulk Build e analysis util
es. These angle, are ch es present in ncluded in A sample percen amples as co is regulated rovided in th ical summary
Asbest
. Blown in ce lding materia A defines ho e, color, wear ther than con ocumentation sessed to ob rial should be uced to a pow tos is no long ble, the rema s were estab mpling, modi nnel utilized ures included Twelve (12 ect area. T stody forms, with dispersio ding Materials izing the uniq properties haracteristica n the samples Appendix B.
nt by weight.
ontaining grea as an ACM.
is letter’s Ide y table is prov
Rocky Mou tos Inspection an
Fi ellulose and fi als. Our visu mogenous ar r and is belie ncrete, wood n is included in serve what, i e classified fria wder by hand ger likely to b aining observ lished to mee fied by phys appropriate p using engin
2) material b The following were sent to n staining as s” (EPA 600/R que optical an including: r ally unique to
s. Laboratory The laborato ater than 1 pe Additional d entified ACMs vided in Appen untain Research nd Lead Paint Sa le: ROCSTA M1 berglass insu ual inspection reas as an a eved to have , glass, fiber n Plate 2.
if any, damag able or non-fr d pressure, ha be bound with ved suspect A et the AHERA sical access, personal prot neering contr ulk samples g summarize
NVL Labora s detailed in E R-93/116). P nd crystallogr refractive ind each asbest y analytical r ory records d ercent asbest iscussion per s section afte ndix B.
Station ampling 11099A ulation n was rea in been glass, ge the riable.
as not hin its ACMs
A EPA
, was ective ols to were es the atories EPA’s
PLM is raphic dices, ti-form esults denote tos by rtinent er the
Regulato
U regulation considere compositi determine classified to remova protection
E building m concerned or has be become f crumbled, demolition gaskets, r mastics.
containing powder by
29 CFR 1
Class I a surfacing
Class II a insulation wallboard
Class III surfacing
Class IV but do no II and III a
Identified
T product).
work requ intact and Because removed energized ory Discussio
Under current ns, material c ed an ACM. M on may eithe e the actual as an ACM o al or other i n.
PA NESHAP
materials prio d with regulat een subject t riable; and C , pulverized, n or renovatio resilient floor
Category II g more than y hand pressu
926.1101 De
asbestos wo ACM/potentia asbestos wo or surfacing
, floor tile and asbestos w
ACM/PACM,
asbestos w t disturb ACM activities.
d ACMs he ACM chim The chimney uiring asbesto d be disposed the boiler is intact and s d systems we on
EPA and Un containing gre Materials that er be classif percentages or non-ACM.
mpacts that
Ps regulations or to beginnin ted ACM (RA to sanding, g ategory II non or reduced to on activities.
covering, as non-friable A
1 percent as ure (e.g. asbe efinitions (OS ork means ac al ACM (PAC ork means a material. Th d sheeting, ro work means may be distu ork means m M or PACM a mney insulat y insulation is os worker trai d as ACM at s also likely imilarly dispo re excluded fr nited States eater than on t have historic fied as an a s of asbestos
Materials co may result s require ident ng any renov
ACM) including grinding, cutt n-friable ACM o a powder b
Category I sphalt roofing ACMs includ bestos that, w estos cement
SHA)
ctivities invol
CM).
activities invo his includes, b oofing and sid repair and m urbed.
maintenance nd activities t ion is consid s considered ined personn a permitted to contain A osed. STRA rom sampling
Occupationa ne percent by cally containe ssumed ACM s contained ontaining less in an asbes tification, clas vation or dem g: all friable A ing, or abrad
M that has a h y forces expe non-friable A products, an e any mater when dry, ca products).
ving the rem lving the rem but is not lim ing and shing maintenance and custodia to clean up d dered a Cate TSI and its r
el. STRATA landfill accor
ACM compon ATA did not c g during the in
Asbest l Safety and y weight asb ed greater tha M, or be furt in their com s than one pe tos fiber rele ssification and molition activi ACM; Catego ding; Categor high probabili ected to act o ACMs include nd pliable as rial, excluding annot be crum moval of therm moval of ACM mited to, the r gles, and con operations w al activities du ust, waste an egory II non-f removal will b
A recommends rding to local nents, STRAT collect boiler nspection.
Rocky Mou tos Inspection an
Fi
Health Adm bestos (asbes an one percen ther sampled mposition and ercent asbesto ease are reg d strict consid ity. NESHAP ry I non-friabl ry II non-fria ity of becomin on the materi e asbestos-c bestos-conta g Category I mbled, pulver mal system
M which is n removal of as struction mas where ACM, uring which e nd debris resu friable ACM be considered s that this ma l, state and fe TA recomme r component untain Research nd Lead Paint Sa le: ROCSTA M1 ministration (O sti-form mine nt asbestos in d and analyz d subsequent os that are su gulated for w deration of ex Ps regulation le ACM that w ble ACM tha ng, or has be ial in the cou containing pa ining sealant non-friable ized or reduc insulation (TS ot thermal sy sbestos-conta stics.
including TS employees co ulting from Cl
(asbestos ce d Class I Asb aterial be rem ederal regula ends the boil samples bec
Station ampling
OSHA)
ral) is n their zed to tly be ubject worker xisting ns are will be at has ecome rse of cking, ts and
ACM,
ced to
SI) or ystem aining
SI and ontact lass I, ement bestos moved ations.
er be cause
Le Paint sam EPA Met (AIHA) La samples results. L roll-up do lead. Dem Construct exposed t hour perio surfaces.
applied (i.
without du any contra
M the projec not be ass the identi Electrical access to at the tim areas bet restricted Rocky Mo
O consulting Idaho. Th exclusivel ead paint sam mples were de hod Number aboratory Qua he scope of s representativ
Laboratory an
Sample Numb
PbP-1
PbP-2
PbP-3
PbP-4
PbP-5
PbP-6 he silver pain oor are consid molition work tion Standard to lead at con od without ad Lead particle .e., torch cutt ust collector, actor or any e
Materials with ct area. Mate sumed to be his letter is lim fication of as and energize all building c me of the insp tween walls, by activity a ountain Resea
Our services g and samplin his acknowled ly for the use mpling was p elivered to N
7000B. NV
ality Assuranc services for th ve of painted alytical test re
Table 1: P ber
S
Gree
T
Silver pa nt applied to dered lead ba must comply
d. Under 29 ncentrations dequate prote es in significa ting, welding) pellet or san employee who one or more erials not sam negative. Qu mited to the m sbestos cont ed systems w components.
pection and th ceilings and and use limita arch Station, consist of p ng principles dgment is in l e of the Rocky
LEAD P
performed on VL Laborator
VL is accredi ce Program (L he lead testin surfaces. T esults and ch
Paint Sample
Material/Lo
Silver paint on en paint on bo
Tan paint on r
Blue exterio aint applied to
Gray exteri greenhouse ased paints b y with 29 Cod
9 CFR 1926
greater than ction. Cautio ant concentrat or if paint is d blasting). I o may be req
EVALUAT
positive asbe mpled as part uantity estima materials and aining mater were not eva Asbestos or his report, inc d floors, area ations. The including repa professional o and practice ieu of all expr y Mountain R
PAINT TESTI
September 7 ries for analy ted under th LQAP), Labor ng was to visu Table 1 sum ain of custody es and Analy ocation boiler ducts oiler room doo oll-up door or paint o greenhouse s or paint steel support because they de of Federal .62, employe 50 microgram on must be us tions can be r pulverized a
Information a uired to work
TION LIMITAT
estos results s t of the scope ates are to pro activities des ials and lead luated. Destr lead containi cluding but no as inaccessib repair of sam air of roof dam opinions mad s, as they ex ress or implie
Research Stat
Asbest
ING
7, 2011 by M ysis by flame he American ratory ID 1018 ually observe mmarizes pain y forms are a ytical Test Re
Mg/Kg r <4
5,8 steel 37,0 ts and the ta y contain grea l Regulations ers must ass ms per cubic sed when de released from and released about lead pa k on lead-cont
TIONS
should be ass e of services ovide order of scribed in this d containing ructive sampl ng materials ot limited to:
ble without d mpling locatio mage from sa de in accord xist at the tim ed warranties tion; we cann
Rocky Mou tos Inspection an
Fi
Mr. Shawn Rin atomic abso Industrial Hy 861.
painted surfa nt samples a available in Ap esults g Lead Lea
Pa an paint appli ater than 5,0 s (CFR) 1926 sure that no meter avera molishing or m paint into th into the air (i int content m taining surfac sumed to be p performed fo f magnitude in s letter and is paints within ling was not may exist in Energized s estructive sa ons is the re ampling activi dance with g me of this lette
. This letter h not be respon untain Research nd Lead Paint Sa le: ROCSTA M1 ngo with STR rption (FAA) ygiene Assoc aces and to c and analytica ppendix C.
ad Based aint Y/N
N
N
Y
N
Y
N ed to the no 00 mg/Kg or
6.62, OSHA’s employee w ged over an renovating pa he air if high h .e., power sa must be provid ces.
positive throu or this projec nformation on s intended to n the project performed to areas inacce systems, inte ampling and esponsibility o ities.
generally acc er and in No has been pre nsible for any
Station ampling
RATA.
using ciation collect al test rthern 0.5% Lead will be eight-ainted heat is anding ded to ughout ct may nly.
aid in area.
o gain ssible rstitial areas of the cepted rthern pared other use of thi letter can our site w lead conta the inspec local regu
W contact us
Enclosure s letter. This not be relied work, and shou he scope of aining paints, ction. The O ulations and e
We appreciate s.
es: Plate 1 Plate 2 Appen Appen Appen s letter should upon outside uld not be reli services for , collection of rofino School ensuring that t e the opportu
1: Sam 2: Pho dix A: Lab dix B: Asb dix C: Lea d be read an e the context ied on to repr this project w f bulk materia l District is re they are in co nity to assist mple Location otographic Do boratory Accre bestos Analyt ad Analytical L nd implemente of the letter.
resent conditio were limited t al samples, an sponsible for ompliance with t you on this
Since
STR
Shaw Proje n Plan ocumentation editation and A ical Laborator Laboratory Te
Asbest ed in its entir The informa ons at a subs to visual obs nd reporting r identifying a h said regulat project. If y erely, RATA, Inc.
wn Ringo ect Manager
Asbestos Insp ry Test Result est Results an
Rocky Mou tos Inspection an
Fi rety. Individu ation is relev stantially later servation of s analytical tes all appropriate tions.
you have any pector Certific ts and Chain o d Chain of Cu untain Research nd Lead Paint Sa le: ROCSTA M1 ual sections o ant to the da r date.
suspect ACM st results as p e federal, stat y questions, p cation Informat of Custody Fo ustody Forms
Station ampling of this ates of s and part of te and please tion orms
Note: Sample locations are approximate.
Rocky Mountain Research Station Greenhouse
Sample Location Map
ROCSTA M11099A Figure 1
GWB-1- Asbestos Sample Location
0 10 feet
PbP-1- Lead Paint Sample Location
GWB-1
GWB-2
GWB-3
PbP-1
TSI-1-3
I-1
I-2
I-3
IPB-1
IPB-2
IPB-3
PbP-2
PbP-3
PbP-4 PbP-6
PbP-5
VICINITY MAP
NOT TO SCALE
Site Location
Photograp File: ROCST
Greenhouse Rocky Moun
Photograph
Photograph phic Docume
TA M11099A
e Renovation ntain Research S
1: Boiler and d
3: Non-ACM w ntation
Station, Moscow, ductwork.
wallboard and jo
Idaho oint compound
Photogra
. Photogra supports.
aph 2: ACM TS aph 4: Lead bas
SI/Chimney.
sed paint on gr
Septembe F reenhouse stee er 2011 Figure 2 el
APPENDIX A
Laboratory Accreditation and Asbestos
Inspector Certification Information
APPENDIX B
Asbestos Analytical Laboratory Test Results and Chain of Custody Forms
Summary of Suspect ACM Samples and Analytical Test Results
Sample # Building Name
Sample Location
Material Type Color Location Quantity
Quant descriptor
Comments Sample results
ACM?
GWB-1 Head House Storage
Area
Gypsum Wallboard and Joint
Compound Misc Off White 820 SF
Sample 1 of
No Asbestos Detected
No
GWB-2 Head House Storage
Area
Gypsum Wallboard and Joint
Compound Misc Off White 820 SF
Sample 2 of
No Asbestos Detected
No
GWB-3 Head House Storage
Area
Gypsum Wallboard and Joint
Compound Misc Off White 820 SF
Sample 3 of
No Asbestos Detected
No
TS!-1 Head House Boiler Room
Chimney Insulation
TSI Gray 20 LF Sample 1 of
4%
Chrysotile Yes
TSI-2 Head House Boiler Room
Chimney Insulation
TSI Gray 20 LF Sample 2 of
3%
Chrysotile Yes
TSI-3 Head House Boiler Room
Chimney Insulation
TSI Gray 20 LF Sample 3 of
4%
Chrysotile Yes
I-1 Head House Attic Blown Insulation Misc Brown 945 SF Sample 1 of
No Asbestos Detected
No
I-2 Head House Attic Blown Insulation Misc Brown 945 SF Sample 2 of
No Asbestos Detected
No
I-3 Head House Attic Blown Insulation Misc Brown 945 SF Sample 3 of
No Asbestos Detected
No
IBP-1 Head House Attic Fiberglass
Insulation Paper Misc Tan/Black 945 SF
Sample 1 of
No Asbestos Detected
No
IBP-2 Head House Attic Fiberglass
Insulation Paper Misc Tan/Black 945 SF
Sample 2 of
No Asbestos Detected
No
IBP-3 Head House Attic Fiberglass
Insulation Paper Misc Tan/Black 945 SF
Sample 3 of
No Asbestos Detected
No
APPENDIX C
Lead Analytical Laboratory Test Results and Chain of Custody Forms
File details come from the government source that posted it. Updated .