GENERAL DECISION MT20100001 06-04-2010 MT1.pdf
PDF 37 KB Posted
- Attached to
- Kootenai National Forest Trailhead Construction Federal contract opportunity
- Solicitation number
- AG-82B1-S-10-0375
About this file
GENERAL DECISION MT20100001 06-04-2010 MT1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-82B1-S-10-0375 FSSS.pdf | ||
| AG-82B1-S-10-0375 Other maps files for Kootenai trailheads.pdf | ||
| AG-82B1-S-10-0375 solicitation_coversheet.pdf | ||
| AG-82B1-S-10-0375 Body.pdf | ||
| AG-82B1-S-10-0375 Maps for Kootenai trailheads.pdf | ||
| AG-82B1-S-10-0375 SF 18.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL DECISION: MT20100001 06/04/2010 MT1
Date: June 4, 2010
General Decision Number: MT20100001 06/04/2010
Superseded General Decision Number: MT20080001
State: Montana
Construction Type: Heavy
Counties: Montana Statewide.
HEAVY CONSTRUCTION PROJECTS
ZONE DEFINITIONS
CARPENTERS, *CEMENT MASONS, LABORERS, AND TRUCK DRIVERS
The zone hourly rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the nearest County Court House of the folowing listed towns to the center of the job:
BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HAVRE, HELENA,
KALISPELL, LEWISTOWN, MILES CITY, MISSOULA
Zone 1: 0 to 30 miles - Base Pay
Zone 2: 30 to 60 miles - Base Pay + $2.95
Zone 3: Over 60 miles - Base Pay + $4.70
*CEMENT MASONS ZONES: The above cities plus DILLON, GLASGOW, GLENDIVE, SIDNEY
Modification Number Publication Date
0 03/12/2010
1 04/09/2010
2 05/21/2010
3 06/04/2010
CARP0028-002 05/01/2009
Rates Fringes
Carpenters: (Zone 1)
Carpenter & Pilebuck........$ 23.25 8.90
MILLWRIGHT.......................$ 27.25 8.90
CARP0028-004 06/01/2006
Diver Tender.....................$ 27.27 7.80
Diver............................$ 56.54 7.80
DEPTH PAY (Surface Diving)
050 to 100 feet $2.00 per foot
101 to 150 feet $3.00 per foot
151 to 220 feet $4.00 per foot
221 ft & deeper $5.00
* ELEC0044-001 06/01/2010
Line Construction
(1) Lineman.................$ 37.73 4.75%+10.61
(2) Equipment Operator......$ 25.13 10.95
(3) Experienced Groundman...$ 20.27 10.33
ELEC0233-001 08/01/2009
Blaine, Broadwater, Cascade, Chouteau, Fergus, Glacier, Hill, Judith Basin, Lewis & Clark, Liberty, Meagher, Petroleum, Phillips, Pondera, Teton, Valley, and Wheatland Counties
ELECTRICIAN......................$ 27.96 4.75%+9.36
ELEC0233-002 08/01/2009
BEAVERHEAD, DEER LODGE,GRANITE, JEFFERSON, MADISON, POWELL, AND
SILVER BOW COUNTIES
ELECTRICIAN......................$ 26.10 4.75%+10.80
ELEC0532-001 06/01/2009
GALLATIN, PARK, AND SWEET GRASS COUNTIES
ELECTRICIAN......................$ 26.61 4.725%+9.00
ELEC0532-003 06/01/2009
BIG HORN, CARBON, CARTER, CUSTER, DANIELS, DAWSON, FALLON,
GARFIELD, GOLDEN VALLEY, McCONE, MUSSELSHELL, POWDER RIVER, PRAIRIE, RICHLAND, ROOSEVELT, ROSEBUD, SHERIDAN, STILLWATER, TREASURE, WIBAUX AND YELLOWSTONE COUNTIES
ELECTRICIAN......................$ 29.55 4.25%+9.50
ELEC0768-001 03/01/2008
FLATHEAD, LAKE, LINCOLN, MINERAL, MISSOULA, RAVALLI, AND
SANDERS COUNTIES
ELECTRICIAN......................$ 27.10 10.71
ENGI0400-001 05/01/2009
Power Equipment Operator
(Zone 1)
Group 1.....................$ 23.47 9.50
Group 2.....................$ 23.94 9.50
Group 3.....................$ 24.34 9.50
Group 4.....................$ 25.00 9.50
Group 5.....................$ 25.50 9.50
Group 6.....................$ 26.60 9.50
Group 7.....................$ 27.10 9.50
ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:
The zone hourly rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the nearest County Court
House of the folowing listed towns to the center of the job:
BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL,
MISSOULA
Zone 1: 0 to 30 miles - Base Pay
Zone 2: 30 to 60 miles - Base Pay + $3.50
Zone 3: Over 60 miles - Base Pay + $5.50
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Air Compressor; Auto Fine Grader; Belt Finishing
Machine; Boring Machine, small; Cement Silo; Crane, A-Frame
Truck Crane; Crusher Conveyor; DW-10, 15, and 20 Tractor
Roller; Farm Tractor; Forklift; Form Grader; Front-end
Loader under 1 cu yd; Heavy Duty Drills; Herman Nelson
Heater; Mulching Machine; Oiler, all except Cranes. &
Shovels; Pumpman.
GROUP 2: Air Doctor; Backhoe/Excavator/Shovel to and including 3 cu yd; Bit Grinder; Bituminous Paving Travel
Plant; Boring Machine, large; Broom, self-propelled;
Concrete Travel Batcher; Concrete Float & Spreader;
Concrete Bucket Dispatcher; Concrete Finish Machine;
Concrete Conveyor; Distributor; Dozer, Rubber- Tired, Push
& Side Boom; Elevating Grader/Gradall; Field Equipment
Serviceman; Front-end Loader 1 cu yd to including 5 cu yd;
Grade Setter; Heavy Duty Drills, all types; Hoist/Tugger, all; Hydralift & similar; Industrial Locomotive; Motor
Patrol, except Finish; Mountain Skidder; Oiler - Cranes &
Shovels; Pavement Breaker, EMSCO; Power Saw, self-propelled; Pugmill; Pumpcrete/Grout Machine; Punch
Truck; Roller, other than Asphalt; Roller, Sheepsfoot, self- propelled; Roller, 25 tons and over; Ross Carrier;
Rotomill under 6 ft; Trenching Machine; Washing/Screening
Plant.
GROUP 3: Asphalt Paving Machine; Asphalt Screed;
Backhoe/Excavator/Shovel over 3 cu yd; Cableway Highline;
Concrete Batch Plant; Concrete Curing Machine; Concrete
Pump; Cranes, Creter; Cranes, Electric Overhead; Cranes, 24 tons and under; Curb Machine/Slip Form Paver; Finish Dozer;
Front-end Loader over 5 cu yd; Mechanic/Welder; Pioneer
Dozer; Roller, Asphalt (Breakdown & Finish); Rotomill, over
6 ft; Scraper, single, twin, or pulling Belly Dump; Yo-Yo
Cat.
GROUP 4: Asphalt/Hot Plant Operator; Cranes, 25 tons to 44 tons; Crusher Operator; Finish Motor Patrol; Finish Scraper.
GROUP 5: Cranes, 45 tons to including 74 tons;
GROUP 6: Cranes, 75 tons to including 149 tons; Crane, Whirley (all).
GROUP 7: Cranes, 150 tons to including 250 tons (add $1.00 for every 100 tons over 250 tons); Crane, Stiff-Leg or
Derrick; Helicopter Hoist; Crane, Tower (all).
IRON0014-002 07/01/2009
FLATHEAD, GLACIER, LAKE, LINCOLN, MINERAL, MISSOULA, AND
IRONWORKER.......................$ 25.34 16.58
IRON0732-009 06/01/2009
REMAINING COUNTIES
IRONWORKER.......................$ 25.30 16.31
LABO1686-001 05/01/2008
LABORER (Zone 1)
Group 1.....................$ 17.14 6.72
Group 2.....................$ 20.10 6.72
Group 3.....................$ 20.24 6.72
Group 4.....................$ 21.00 6.72
LABORER CLASSIFICATIONS
GROUP 1: Flagperson
GROUP 2: All General Labor work; Burning Bar; Bucket man;
Carpenter Tender; Caisson Worker; Cement Mason Tender;
Cement Handler (dry); Chuck Tender; Choker Setter; Concrete worker; Curb Machine-Lay Down; Crusher and Batch worker;
Fence Erector; Form Setter; Form Stripper; Heater Tender;
Landscaper; Pipe Wrapper; Pot Tender; Powderman Tender;
Rail and Truck Loaders and Unloaders; Riprapper; Sealants for concrete and other materials; Sign Erection, Guard Rail and Jersey Rail; Stake Jumper; Spike Driver; Signalman;
Tail Hoseman; Tool Checker and Houseman; Traffic Control worker.
GROUP 3: Concrete Vibrator; Dumpman (Grademan); Equipment
Handler; Geotextile and Liners; High-Pressure Nozzleman;
Jackhammer (Pavement Breaker); Laser Equipment; Non-Riding
Rollers; Pipelayer; Posthole Digger (Power); Power Driven
Wheelbarrow; Rigger; Sandblaster; Sod Cutter-Power.
GROUP 4: Asphalt Raker; Cutting Torch; Grade Setter; High-
Scaler; Power Saws (Faller & Concrete); Powderman ($1.00 per hour above Group 4 rate); Rock & Core Drill; Track or
Truck mounted Wagon Drill; Welder including Air Arc
PAIN0260-001 07/01/2002
BLAINE, BROADWATER, CASCADE, CHOUTEAU, DANIELS, FERGUS,
GARFIELD, GLACIER, GRANITE (South of a line running East & West through the Southern city limits of Phillipsburg), HILL, JEFFERSON, JUDITH BASIN, LEWIS AND CLARK, LIBERTY, McCONE, MEAGHER, PETROLEUM, PHILLIPS, PONDERA, POWELL (South of a line running East & West through the Southern City limits of
Helmsville), RICHLAND, ROOSEVELT, SHERIDAN, TETON, TOOLE, VALLEY, AND WHEATLAND COUNTIES
PAINTER..........................$ 13.85 1%+3.45
PAIN0260-002 07/01/2002
FLATHEAD, GRANITE (North of a line running East & West through the Southern city limits of Phillipsburg), LAKE, LINCOLN, MINERAL, MISSOULA, POWELL (North of a line running East & West through the Southern city limits of Helmsville), RAVALLI, AND
PAINTER..........................$ 16.85 1%+3.45
PAIN1922-001 06/01/2009
BEAVERHEAD, BIG HORN, CARBON, CARTER, CUSTER, DAWSON, DEER
LODGE, FALLON, GALLATIN, GOLDEN VALLEY, JEFFERSON, MADISON,
MUSSELSHELL, PARK, POWDER RIVER, PRAIRIE, ROSEBUD, SILVER BOW,
STILLWATER, SWEET GRASS, TREASURE, WIBAUX, AND YELLOWSTONE
COUNTIES
PAINTER (Industrial, includes industrial plants, tanks, pipes, bridges)..................$ 21.00 0.00
PLAS0119-001 05/01/2008
STATEWIDE (except Deer Lodge, Jefferson, Powell, and Silver Bow
Counties)
Cement Masons: (Zone 1)
Area 1......................$ 18.83 6.96
Area 2......................$ 20.24 6.86
AREA 1: STATEWIDE (except Deer Lodge, Jefferson, Powell, and
Silver Bow Counties)
AREA 2: DEER LODGE, JEFFERSON, POWELL, AND SILVER BOW
COUNTIES
PLUM0030-003 09/01/2009
BIGHORN, BLAINE, CARBON, CARTER, CASCADE, CHOUTEAU, CUSTER,
DANIELS, DAWSON, FALLON, FERGUS, GARFIELD, GOLDEN VALLEY, HILL,
JUDITH BASIN, LIBERTY, McCONE, MEAGHER, MUSSELSHELL, PETROLEUM, PHILLIPS, PONDERA, POWDER RIVER, PRAIRIE. RICHLAND, ROOSEVELT, ROSEBUD, SHERIDAN, STILLWATER, TETON, TOOLE, TREASURE, VALLEY, WHEATLAND, WIBAUX AND YELLOWSTONE COUNTIES
PLUMBER
Commercial..................$ 28.25 13.40
Industrial - Power
Generating Plants...........$ 30.60 13.40
PLUM0041-001 07/01/2009
BEAVERHEAD, BROADWATER, DEER LODGE, GALLATIN, GRANITE,
JEFFERSON, LEWIS AND CLARK, MADISON, PARK, POWELL, SILVER BOW,
AND SWEET GRASS COUNTIES
PLUMBER..........................$ 28.60 10.75
PLUM0459-001 05/01/2010
FLATHEAD, GLACIER, LAKE, LINCOLN, MINERAL, MISSOULA, RAVALLI,
AND SANDERS
PLUMBER..........................$ 27.51 12.08
TEAM0002-001 05/01/2008
Truck drivers: (Zone 1)
Group 1.....................$ 14.14 5.92
Group 2.....................$ 18.84 5.92
TRUCK DRIVERS CLASSIFICATIONS:
GROUP 1: Pilot Car
GROUP 2: All Combination Trucks and Concrete Mixers;
Distributor Driver; All Dry Batch Trucks; Dumpman, Gravel
Spreader Box Operator; All Dump Trucks and similar equipment including DW 20, DW 21, or Euclid Tractor;
Dumpsters; Flat Trucks; Servicemen; Lowboys, Four-Wheel
Trailers; Float Semi-Trailer; Lumber Carriers, Lift Trucks
& Fork Lifts; Pick-up Driver hauling material; Powder
Truck (Bulk Unloader type); Power Boom; Service Truck
Dirvers, Fuel Truck Drivers, Tiremen; All Water Tank
Drivers; Petroleum Products Drivers; Trucks with Power
Equipment such as Winch, A-Frame Truck, Crane, Hydralift, Gout-Crete Truck, and Combination Mulching, Seeding &
Fertilizing Truck; Truck Mechanic
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .