J – 2 General Decision Number: MT100002 03/12/2010 MT2
Superseded General Decision Number: MT20080002
State: Montana
Construction Type: Highway
Counties: Montana Statewide.
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 03/12/2010
* SUMT 2001-001 09/30/2008
**ZONE PAY**
CEMENTS MASONS, IRON WORKERS, LABORERS, POWER EQUIPMENT
OPERATORS, TRUCK DRIVERS
The hourly wage rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the County Court House of the following towns to the center of the job:
BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HAVRE, HELENA,
KALISPELL, LEWISTOWN, MILES CITY, MISSOULA
ZONE 1: 0 to 30 miles - Free
ZONE 2: 30 to 60 miles - Base Pay +$2.50
ZONE 3: Over 60 miles - Base Pay + $4.00
CARPENTERS:
ZONE 1: 0 to 30 miles - Free
ZONE 2: 30 to 50 miles - Base Pay +$3.00
ZONE 3: Over 50 miles - Base Pay + $4.80
Rates Fringes
CARPENTER
Carpenter, Pile driver man $ 22.71 8.85
Millwright $ 24.78 8.85
CEMENT MASON/CONCRETE FINISHER $ 21.37 8.50
ELECTRICIAN
Area 1 $ 18.74 2.93+3.8%
Area 2 $ 20.13 4.76+3.8%
Area 3 $ 19.98 3.44+3.8%
Area 4 $ 19.84 3.51+3.8%
Area 5. $ 20.54 3.54+3.8%
Area 6 $ 18.02 3.44+3.8%
ELECTRICIANS AREA DESCRIPTIONS
AREA 1: Beaverhead, Deer Lodge, Granite, Jefferson, Madison, Silver Bow, and Powell
Counties
AREA 2: Big Horn, Carbon, Carter, Custer, Dawson, Fallon, Garfield, Golden Valley, Musselshell, Powder River, Prairie, Rosebud, Stillwater, Treasure, Wibaux, and Yellowstone counties
AREA 3: Blaine, Cascade, Chouteau, Daniels, Fergus, Glacier, Hill, Judith Basin, Liberty, McCone, Petroleum, Pondera, Phillips, Richland, Roosevelt, Sheridan, Teton, Toole, Valley, and
Wheatland Counties
AREA 4: Broadwater, Lewis and Clark, and Meagher Counties
AREA 5: Flathead, Lake, Lincoln, Mineral, Missoula, Ravalli, and Sanders Counties
AREA 6: Gallatin, Park, and Sweet Grass Counties
Ironworker
Flathead, Glacier, Lake, Lincoln, Mineral, Missoula and Sanders Cos $ 25.50 14.36
Remaining Counties $ 23.15 13.71
LABORER
Group 1 $ 17.18 6.75
Group 2 $ 19.97 6.75
Group 3 $ 20.17 6.75
Group 4 $ 21.07 6.75
LABORERS CLASSIFICATIONS
GROUP 1: Flag person
GROUP 2: All General Labor work; Burning Bar; Bucket man; Carpenter Tender; Caisson
Worker; Cement Mason Tender; Cement Handler (dry); Chuck Tender; Choker Setter; Concrete worker; Curb Machine-Lay Down; Crusher and Batch Plant Worker; Fence Erector; Form Setter;
Form Stripper; Heater Tender; Landscaper; Pipe Wrapper; Pot Tender; Powder man Tender; Rail and Truck Loaders and Unloaders; Riprapper; Sealants for Concrete and other materials; Sign
Erection, Guard Rail and Jersey Rail; Stake Jumper; Spike Driver; Signalman; Tail Hoseman;
Tool Checker and Houseman; Traffic Control worker
GROUP 3: Concrete Vibrator; Dumpman (Grademan); Equipment Handler; Geotextile and
Liners; High-Pressure Nozzlemen; Jackhammer (Pavement Breaker); Laser equipment; Non-riding Rollers; Pipelayer; Posthole Digger (power); Power Driven Wheelbarrow; Rigger;
Sandblaster; Sod Cutter-power; Tampers
GROUP 4: Asphalt Raker; Cutting Torch; Grade Setter; High-Scaler; Power Saws (Faller &
Concrete); Powder man ($1.00 per hour above Group 4 rate); Rock & Core Drill; Track or Truck mounted Wagon Drill; Welder including Air Arc
LINE CONSTRUCTION
Equipment Operator $ 19.16 5.05
Groundman $ 15.40 5.05
PAINTER $ 24.00 8.00
Pavement Marking/Milling and related work. Includes operating marking and all other equipment and all work involved in traffic marking including removal, surface preparation and application of pavement markings including epoxies, paints, tape, buttons, thermo- plastics and any other products applied for traffic marking purposes and for directing and regulating traffic, and cutting Rumble Strips.
POWER EQUIPMENT OPERATOR
Group 1 $ 21.52 8.00
Group 2 $ 23.55 8.00
Group 3 $ 24.41 8.00
Group 4 $ 25.10 8.00
Group 5 $ 26.44 8.00
Group 6 $ 27.13 8.00
Group 7 $ 29.23 8.00
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: A-Frame Truck Crane; Air Compressor; Auto Fine Grader; Belt Finishing Machine;
Boring Machine (small); Cement Silo, Crane; Crusher Conveyor, DW-10, 15, and 20 Tractor
Roller; Farm Tractor; Forklift; Form-Grader; Front-end Loader under 1 cu yd; Oiler, Heavy Duty
Drills; Pumpman; Oiler (All, except Cranes and Shovels)
GROUP 2: Air Doctor; Backhoe/Excavator/Shovel to & incl 3 cu yd Bit Grinder; Bituminous
Paving Travel Plant; Boring Machine, large: Broom, Self-Propelled; Concrete Bucket
Dispatcher; Concrete Conveyor; Concrete Finish Machine; Concrete Float and Spreader;
Concrete Travel Batcher; Distributor; Dozer, Rubber tired, Push, and Side Boom; Drills, Heavy
Duty (all types); Elevating Grader/Gradall; Field Equipment Serviceman; Front-end Loader 1 cu yd to and incl. 5 cu yd; Grade Setter; Hoist/Tugger (All Hydralift & Similar); Industrial
Locomotive; Motor Patrol (Except Finish); Mountain Skidder; Oiler, Cranes & Shovels;
Pavement Breaker, EMSCO; Power Saw, Self-Propelled; Pugmill; Pumpcrete/ Grout Machine;
Punch Truck; Rollers (All except Asphalt Finish and Breakdown); Ross Carrier; Rotomill under
6 ft; Trenching Machine; Washing/Screening Plant
GROUP 3: Asphalt Finish Roller; Asphalt Breakdown Roller; Asphalt Paving Machine;
Backhoe/Excavator/Shovel larger than 3 cu yd; Asphalt Screed; Concrete Batch Plant; Cableway
Highline; Concrete Curing Machine; Cranes, 24 tons & under; Cranes, Crater; Cranes, Electric
Overhead; Concrete Pump; Curb Machine/Slip Form Paver; Finish Dozer; Mechanic/Welder;
Pioneer Dozer; Rotomill 6 ft and over; Scraper, Single Engine; Scraper Twin or pulling Belly
Dump; Yo Yo Cat Front-end Loader over 5 cu yd;
GROUP 4: Asphalt/Hot Plant Operator; Cranes, 25 tons to 44 tons; Crusher Operator; Finish
Motor Patrol; Finish Scraper
SPECIAL OPERATORS:
GROUP 5: Cranes, 45 tons to and including 74 tons
GROUP 6: Cranes, 75 tons to and including 149 tons
GROUP 7: Cranes, 150 tons to and including 250 tons; Cranes over 250 tons: add $1.00 for every 100 tons over 250 tons; Crane, Stiff-Leg or Derrick; Crane, Tower all); Crane, Whirley
(all); Helicopter Hoist
TRUCK DRIVER
Group 1 $ 18.54 7.86
Group 2 $ 23.69 7.86
GROUP 1: Pilot Car
GROUP 2: Combination Truck and Concrete Mixer and Transit Mixer; Dry Batch Trucks;
Distributor Driver; Dumpman; Dump Trucks and similar equipment; Dumpster; Flat Trucks;
Lumber Carriers; Lowboys; Pickup; Powder Truck Driver; Power Boom; Serviceman; Service
Truck/Fuel Truck/Tireperson; Truck Mechanic; Trucks with Power Equipment; Warehouseman, Partsman, Cardex and Warehouse Expeditor; Water Trucks
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR
5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29
CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .