Sheets_11-20.pdf
PDF 2 MB Posted
- Solicitation number
- AG-82B1-S-10-0373
About this file
Drawings Sheets 11-20
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend3_SF30.doc | DOC document | |
| Amend2_SF30.doc | DOC document | |
| Amend1.doc | DOC document | |
| 01_950_152_Project_Cover.pdf | ||
| Sheets_31-34.pdf | ||
| Sheets_2-10.pdf | ||
| OWNER_Client_Survey_form.docx | DOCX document | |
| Sheets_21-30.pdf | ||
| SPS_Rd152.doc | DOC document | |
| SPS_Rd950.doc | DOC document | |
| sol_pkg.doc | DOC document | |
| Wage_DeterminationID100015_davisbacon.htm | HTM file |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CULVERT REPLACEMENT
ROADWAY CROSS SECTIONS
ROAD 950 - SOUTH FORK FALLS CREEK
CULVERT REPLACEMENT
ROADWAY CROSS SECTIONS
ROAD 950 - SOUTH FORK FALLS CREEK
ROAD 152ROAD 152ROAD 152ROAD 152
SLIDE REPAIR SLIDE REPAIR SLIDE REPAIR SLIDE REPAIR
SUMMARY OF QUANTITIES ANDSUMMARY OF QUANTITIES ANDSUMMARY OF QUANTITIES ANDSUMMARY OF QUANTITIES AND
GENERAL NOTESGENERAL NOTESGENERAL NOTESGENERAL NOTES
10101010
24242424
To Wallace, ID
To Kingston, ID
22 miles
ITEM NO. ITEM DESCRIPTION
METHOD UNIT
MEASUREMENT
Mobilization15101 ALLLump SumLSQ
TOTAL
ESTIMATED
QUANTITY
ROAD 152ROAD 152ROAD 152ROAD 152
SLIDE REPAIR SLIDE REPAIR SLIDE REPAIR SLIDE REPAIR
SUMMARY OF QUANTITIES ANDSUMMARY OF QUANTITIES ANDSUMMARY OF QUANTITIES ANDSUMMARY OF QUANTITIES AND
GENERAL NOTESGENERAL NOTESGENERAL NOTESGENERAL NOTES
11111111
24242424
SUMMARY OF QUANTITIES
GENERAL NOTES
Construction survey and staking, method I, tolerance A15201 ALLLump SumLSQ
Remove and dispose of existing pipe culvert20301 1EachAQ
Remove and dispose of existing log crib wall20304 ALLLump SumLSQ
Mechanically stabilized earth wall (Geogrid)25501 77Square YardDQ
Roadway aggregate, compaction method 1 (commercial source)30802 75TonDQ
71" span x 47" rise pipe arch culvert60202 42FootDQ
Equipment rental, hydraulic excavator with thumb attachment62201(A) 40HourAQ
Equipment rental, large dump truck62201(B) 40HourAQ
Clearing and grubbing20102 ALLLump SumLSQ
Placed riprap, class 5 (commercial source)25101 45Cubic YardDQ
Concrete headwall, wingwalls, and apron for pipe arch culvert60105 ALLLump SumLSQ
Contractor testing15401 ALLLump SumLSQ
Sign system (delineator)63301 7EachAQ
SLIDE REPAIRSLIDE REPAIRSLIDE REPAIRSLIDE REPAIR
ROADWAYROADWAYROADWAYROADWAY
PLAN AND PROFILEPLAN AND PROFILEPLAN AND PROFILEPLAN AND PROFILE
12121212
24242424
ROADWAY TYPICAL SECTION
WALLWALLWALLWALL
QUANTITIESQUANTITIESQUANTITIESQUANTITIES
13131313
24242424
MSE WALL QUANTITIES
MSE UNDERDRAIN SYSTEM
WALL PLAN
WALL PROFILE
ROAD 152ROAD 152ROAD 152ROAD 152
SLIDE REPAIRSLIDE REPAIRSLIDE REPAIRSLIDE REPAIR
WALLWALLWALLWALL
PLAN AND PROFILEPLAN AND PROFILEPLAN AND PROFILEPLAN AND PROFILE
14141414
SURVEY CONTROL COORDINATES
WALLWALLWALLWALL
TYPICAL SECTIONSTYPICAL SECTIONSTYPICAL SECTIONSTYPICAL SECTIONS
15151515
WALLWALLWALLWALL
TYPICAL SECTIONSTYPICAL SECTIONSTYPICAL SECTIONSTYPICAL SECTIONS
16161616
BEDROCK CONNECTION DETAIL
WALLWALLWALLWALL
DETAILSDETAILSDETAILSDETAILS
17171717
24242424
MSE UNDERDRAIN SYSTEM
GEOGRID DETAIL - PLAN VIEW
MSE WALL REINFORCEMENT
DIMENSION TABLE
REINFORCEMENT DETAIL
GEOCOMPOSITE DRAINAGE STRIP DETAIL - ELEVATION VIEW
| ROADS 950 and 150 NON-ERFO REPAIRS 3-23-10 11 |
| ROADS 950 and 150 NON-ERFO REPAIRS 3-23-10 12 |
| ROADS 950 and 150 NON-ERFO REPAIRS 3-23-10 13 |
| ROADS 950 and 150 NON-ERFO REPAIRS 3-23-10 14 |
| ROADS 950 and 150 NON-ERFO REPAIRS 3-23-10 15 |
| ROADS 950 and 150 NON-ERFO REPAIRS 3-23-10 16 |
| ROADS 950 and 150 NON-ERFO REPAIRS 3-23-10 17 |
| ROADS 950 and 150 NON-ERFO REPAIRS 3-23-10 18 |
| ROADS 950 and 150 NON-ERFO REPAIRS 3-23-10 19 |
| ROADS 950 and 150 NON-ERFO REPAIRS 3-23-10 20 |