RECOVERY: Road 950 and Road 152 Non-ERFO Repairs, Idaho Panhandle NF
Solicitation number
AG-82B1-S-10-0373
Issued by

About this file

Amendment No. 1

View the file

Other files

File Type Posted
Amend3_SF30.doc DOC document
Amend2_SF30.doc DOC document
Sheets_11-20.pdf PDF
01_950_152_Project_Cover.pdf PDF
Sheets_31-34.pdf PDF
Sheets_2-10.pdf PDF
OWNER_Client_Survey_form.docx DOCX document
Sheets_21-30.pdf PDF
SPS_Rd152.doc DOC document
SPS_Rd950.doc DOC document
sol_pkg.doc DOC document
Wage_DeterminationID100015_davisbacon.htm HTM file
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IPNF Sandpoint Ranger District Office AG-0281-S- 08-0031

Idaho Panhandle National Forests Amendment No. 1 RECOVERY: Road 950 and 152 Non-ERFRO Repairs. IPNF AG 82B1-S- 10-0373 Idaho Panhandle National Forests Amendment No. 1

1. CONTRACT ID CODE
PAGE OF PAGES

AMENDMENT OF SOLICITATION OF CONTRACT

1
3 +
2. AMENDMENT NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
1
5/26/2010
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

USDA Forest Service Intermountain EROC 740 Simms Street Golden CO 80401 USDA Forest Service Intermountain EROC 740 Simms Street Golden CO 80401

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.
X
AG-82B1-S-10-0373

9B. DATED (SEE ITEM 11)

5/10/2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt offers __ is extended, __X_ is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning _0_ copies of the amendment; (b)By acknowledging the receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

()
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify Authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor

is not,
XX
IS required to sign this document and return
1
copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

RECOVERY Road 950 and 152 Non-ERFO Repairs, Coeur d Alene River Ranger District, Idaho Panhandle National Forests, is hereby amended to include the attached notes from the pre-proposal meeting held May 26, 2010.

Due date has NOT been extended

One copy of this Amendment must be signed and returned as acknowledgment.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

RITA J. LOPER

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

BY

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

30-10

STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE

Prescribed by GSA

FAR (48 CFR) 53.24

Preproposal Meeting-Site Visit, Coeur d Alene River Ranger District, Idaho Panhandle National Forests

List of Attendees:

Peg and Marc Daugherty, Daugherty Ent Inc.

Pat Cook, COR USFS

Jayme Berard, Inspector-USFS

Rita Loper, CO-USFS

We met at the site of Road 152 Slide Repair, Rita Loper reviewed the HUBZone set-aside certification requirement; the June 7 due date for proposals; and the evaluation process including instructions in Section L and evaluation criteria in Section M, pointing out the requirement for past performance on sub-contractors.

Pat Cook and Jayme Berard emphasized safety due to the steepness of the site. Reviewed the Drawings: Sheet 14 Wall and Plan Profile; Sheet 20 Culvert Plan and Profile; and Sheet 21 Concrete Headwall Details. It was noted there would be another ongoing contract in the area, adjacent or below the Road 152 site, at the Jack Waite mine location. COR Pat Cook, emphasized the bedrock and talked about the bedrock connection detail on page 16.

Q. Where is the designated waste material site located.

A. Just below the Road 152 site, on the road to the Jack Waite mine site.

We did not visit Road 950-South Fork Falls Creek site. The site is accessible by walking in approximately 1.1 miles, note there are two earth barriers at the at the start of the road,. The work required is straight forward, it was noted however there are stream restrictions in place July 15 to October 1.