RECOVERY Upper North Fork Bridge Repairs, Clearwater National Forest, Idaho
Solicitation number
AG-82B1-S-10-0365
Issued by

About this file

Solicitation Schedule

View the file

Other files

File Type Posted
0365.pdf PDF
SF 30.pdf PDF
FWBM_FSSS_100percent.docx DOCX document
Additional ARRA Clauses.doc DOC document
ARRA Clauses.doc DOC document
ID15_04162010 Wage Determination.pdf PDF
Kelly Creek Bridge 100 .pdf PDF
Lake Creek Bridge 100 .pdf PDF
SF 1442 AG-82B1-S-10-0365.pdf PDF
Kelly Forks Bridge 100 .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INTERMOUNTAIN EMERGENCY RECOVERY OPERATION CENTER

INSTRUCTIONS

ISSUING OFFICE: U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

INTERMOUNTAIN EROC

740 SIMMS STREET

GOLDEN, CO 80401

FAX (303) 275-5299

SOLICITATION NO.: AG-82B1-S-10-0365

OFFERS ARE SOLICITED FOR: RECOVERY –UPPER NORTH FORK BRIDGE REPAIRS

IMPORTANT – NOTICE TO OFFEROR:

AT A MINIMUM, OFFEROR SHALL SUBMIT THE FOLLOWING DOCUMENTS BACK WITH THEIR RESPONSE TO THIS

SOLICITATION:

1. SF-1442 Solicitation, Offer, and Award (Complete, date, and sign)

2. Section B – Schedule of Items (Page 6). (Complete Unit Price and Amount)

3. Section K – Representations and Certifications (Pages 46-55). (Complete the Representations and

Certifications electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov)

5. Bid Guarantee –A bid guarantee is required.

6. Acknowledgement of Amendments IT IS REQUIRED THAT YOU WRITE THE SOLICITATION NUMBER ON THE OUTSIDE OF YOUR ENVELOPE.

Return to: USDA, Forest Service Intermountain EROC/ ATTN: PHYLLIS R. COBURN-HARRIEL 740 Simms Street Golden, CO 80401

REF SOL#: AG-82B1-S-10-0365

IT IS REQUIRED THAT ALL CONTRACTOR’S BE REGISTERED IN THE CENTRAL CONTRACTOR

REGISTRATION DATABASE PRIOR TO AWARD UNDER THIS SOLICITATION. SEE CLAUSE

FAR 52.204-7 CENTRAL CONTRACTOR REGISTRATION FOR DETAILS ON HOW TO APPLY.

ALL SOLICITATIONS SHALL BE ISSUED THROUGH FEDBIZOPS. NO PAPER SOLICITATIONS SHALL BE

ISSUED. IT IS THE OFFERORS RESPONSIBILITY TO WATCH FOR ANY AND ALL AMENDMENTS TO THE

SOLICITATION, WHICH SHALL BE ISSUED ELECTRONICALLY THROUGH FEDBIZOPS

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 5 of 47

TABLE OF CONTENTS

SECTION B1a: SUPPLIES OR SERVICES/PRICES

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

SECTION E--INSPECTION AND ACCEPTANCE

SECTION F – DELIVERIES OR PERFORMANCE

SECTION H – SPECIAL CONTRACT REQUIREMENTS

SECTION I – CONTRACT CLAUSES

SECTION J: List of Documents, Exhibits, and Other Attachments

SECTION K: Representations, Certifications, and Other Statements of Offerors or Respondents

SECTION L: Instructions, Conditions, and Notices to Offerors or Respondents

SECTION M: Evaluation Factors for Award

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 6 of 47

SECTION B1a: SUPPLIES OR SERVICES/PRICES

UPPER NORTH FORK BRIDGE MAINTENANCE

Kelly Forks Bridge (Bridge No. 255 - 0.0)

Clearwater National Forest

North Fork Ranger District

Clearwater County, ID

B-1a SCHEDULE OF ITEMS

ITEM DESCRIPTION

METHOD

OF

MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization LSQ LS 1 $ ______ $ ______

20304 Removal of Logs & Debris LSQ LS 1 $ ______ $ ______

25101 Placed Riprap, Class 6 AQ CY 280 $ ______ $ ______

55213 Reseal Expansion Joints CQ LF 64 $ ______ $ ______

57301 Minor Bridge Repairs (Install Cables & Clamps)

LSQ LS 1 $ ______ $ ______

62201 Equipment Rental, Hydraulic Excavator with Thumb

AQ HR 16 $ ______ $ ______

62202 Equipment Rental, Large Dump Truck AQ HR 12 $ ______ $ ______

SUBTOTAL:

B-2a NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 7 of 47

SECTION B1b: SUPPLIES OR SERVICES/PRICES

Kelly Creek Bridge (Bridge No. 581 - 0.0)

Clearwater National Forest

North Fork Ranger District

B-1b SCHEDULE OF ITEMS

OF

MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization LSQ LS 1 $ ______ $ ______

20305 Removal of Structures & Obstructions (Remove Timber Running Planks)

LSQ LS 1 $ ______ $ ______

55703 Treated Structural Timber And Lumber CQ MFBM 15.44 $ ______ $ ______

55215 Patch Concrete Pier Caps LSQ LS 1 $ ______ $ ______

55216 Repair Grout Fillets around Bearing Plates

LSQ LS 1 $ ______ $ ______

B-2b NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under payments under 151.01 Mobilization.

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 8 of 47

SECTION B1c: SUPPLIES OR SERVICES/PRICES

Lake Creek Bridge (Bridge No. 250 - 67.0)

Clearwater National Forest

North Fork Ranger District

B-1c SCHEDULE OF ITEMS

OF

MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization LSQ LS 1 $ ______ $ ______

20305 Removal of Structures & Obstructions (Remove Existing Bridge Rail & Curb)

LSQ LS 1 $ ______ $ ______

20806 Structure Excavation LSQ LS 1 $ ______ $ ______

25117 Placed Riprap (Reestablish Riprap at Pier No. 2)

LSQ LS 1 $ ______ $ ______

25302 Gabions, Galvanized or Aluminum CQ CY 12 $ ______ $ ______

30140 Aggregate Base, Government Furnished, Compaction Method 2

CQ CY 8 $ ______ $ ______

40403 Minor Hot Asphalt Concrete CQ SY 25 $ ______ $ ______

55203 Structural Concrete Class A(AE) (Patch Pier Wall)

LSQ LS 1 $ ______ $ ______

55601 T101 Bridge Railing CQ LF 212 $ ______ $ ______

55609 Bridge Approach Railing, Type I, Class A

CQ LF 150 $ ______ $ ______

55607 Terminal Section, Class B CQ EA 4 $ ______ $ ______

62201 Equipment Rental, Hydraulic Excavator with Thumb

AQ HR 16 $ ______ $ ______

62202 Equipment Rental, Large Dump Truck AQ HR 8 $ ______ $ ______

B-2c NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under payments under 151.01 Mobilization.

TOTAL ALL ITEMS: $ ______

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 9 of 47

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C-1 - PROJECT DESCRIPTION AND LOCATION

a. Description of Work. This contract will consists of bridge repairs on three bridges Kelly Forks, Kelly Creek, and Lake Creek Bridges.

Kelly Forks Bridge Repairs: This work will consists of removing log debri at bridge piers, placing riprap at piers for scour mitigation, resealing the bridge expansion joints, and minor bridge retrofits to mitigate against scour failure. This work will also include all other labor, materials and supplies needed to complete the work as required by the contract, plans, and specifications.

Kelly Creek Bridge Repairs: This work will consists of removing and replacing the bridge running planks, and repairing concrete spalls on the bridge piers. This work will also include all other labor, materials and supplies needed to complete the work as required by the contract, plans, and specifications.

Lake Creek Bridge Repairs: This work includes removing the existing rail, post, curb and edge of bridge deck, installing new T101 bridge railing, installing new approach guardrail, repairing approach fill, repairing a concrete pier wall, and removing and re-establishing riprap at a concrete pier wall. This work will also include all other labor, materials and supplies needed to complete the work as required by the contract, plans, and specifications.

b. Project Location.

Kelly Forks Bridge: From U.S. Highway 12, turn north onto State Highway 11, at Greer Junction. Travel north on State Highway 11 to milepost 23, just south of Pierce, ID. At approximately milepost 23, turn east onto USFS Road 250. Travel on USFS Road 250 to the intersection of USFS Road 250 and USFS Road 255 at mile post 46.4, (Kelly Forks Bridge).

Kelly Creek Bridge: From U.S. Highway 12, turn north onto State Highway 11, at Greer Junction. Travel north on State Highway 11 to milepost 23, just south of Pierce, ID. At approximately milepost 23, turn east onto USFS Road 250. Travel on USFS Road 250 to the intersection of USFS Road 250 and USFS Road 255 at mile post 46.4, (Kelly Forks Work Center). Travel USFS Road 255 to the intersection of USFS Road 255 and USFS Road 581 at milepost 11. Turn south (Right) onto USFS Road 581 to the project site.

Lake Creek Bridge: From U.S. Highway 12, turn north onto State Highway 11, at Greer Junction. Travel north on State Highway 11 to milepost 23, just south of Pierce, ID. At approximately milepost 23, turn east onto USFS Road 250. Travel on USFS Road 250 to the intersection of USFS Road 250 to milepost 64.4 (Lake Creek Bridge).

c. Price Range. ($100,000 - $250,000)

d. Pre-Bid Tour. No pre-bid tour is planned. For more information phone Travis Mechling 208-476-8210.

e. Start Work. It is estimated that work will begin on July 12, 2010. Contract time will run continuously with no shutdown for normal winter season.

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 10 of 47

f. Period of Performance. (See Part I, Section F, Clause 52.211-10).

g. Construction Timing. All work must be completed by September 3, 2010. All in stream work must be completed between the dates of July 1 and August 15. No work shall be performed on the weekend.

C-2 - GOVERNMENT FURNISHED MATERIAL

Kelly Forks Bridge (255 – 0.0)

• Riprap Source – Government Furnished, from Garner Point Quarry, located in Section 13, Township 39 North, Range 9 East.

Lake Creek Bridge (250 – 67.0)

• Aggregate Base – Government Furnished, from Kelly Forks stockpile, located near milepost 46.3 on Primary Forest Route 250, in Section 13, Township 39 N, Range 9 E.

• Gabion Rock – Commercial Source – There is no available Government source for gabion rock for this project.

• Riprap – Reuse existing riprap from site.

C-3 - STANDARD SPECIFICATIONS

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, U.S.

Customary Units are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract. Copies of these Specifications are available on the internet at www.wfl.fha.dot.gov/design/specs/fp03.htm

C-4 - FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS

Forest Service supplementary specifications are included as a separate APPENDIX of this solicitation. The supplementary specifications applicable to this project are listed in Part III, Appendix A.

C-5 – DRAWINGS

(Entitled “KELLY FORKS BRIDGE”)

The following drawings are a part of this solicitation and any resulting contract:

Title Page

Cover Sheet

General Notes, Estimated Quantity Table & General Bridge Photos

Bridge Plan and Elevation & listed Work Items 2

Foundation and Riprap Plan 3

Repair Details 4

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 11 of 47

(Entitled “KELLY CREEK BRIDGE”)

(Entitled “LAKE CREEK BRIDGE”)

Title Page

Cover Sheet

Bridge Plan and Elevation, Estimated Quantity Table & Listed Work Items

General Notes, General Bridge Photos & Running Plank Details

Pier Cap Details 3

Photos of Pier Caps 4

Title Page

Cover Sheet

General Notes, Estimated Quantity Table & General Bridge Photos

Bridge Plan and Elevation & Listed Work Items 2

Repair Details 3

Repair Details 4

T101 Bridge Railing Details 5

USFS DWG. NO. R1902, Standard Bridge w-Beam Approach Guardrails (Sheet 1 of 2)

USFS DWG. NO. R1902, Standard Bridge w-Beam Approach Guardrails (Sheet 2 of 2)

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 12 of 47

SECTION E--INSPECTION AND ACCEPTANCE

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 13 of 47

SECTION F – DELIVERIES OR PERFORMANCE

FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

…commence work under this contract within 10 calendar days after the effective date of Notice to Proceed…

…complete the entire work ready for use no later than September 3, 2010.

FAR 52.211-18 Variation in Estimated Quantity (APR 1984)

Add the following:

Adjustment of contract prices as described in this section shall not apply to Section 622, Rental Equipment, Item 62201, Hydraulic Excavator with Thumb and 62202, Large Dump Truck. The Government reserves the right to reduce or eliminate entirely the work under this item with no adjustment in contract unit price.

52.242-14 Suspension of Work. (APR 1984)

452.236-75 Maximum Workweek - Construction Schedule. (NOV 1996)

Within [ ] calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following in writing for approval:

(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposes to carry out the work.

The maximum workweek that will be approved will be submitted to the COR and approved by the CO.

(End of clause)

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 14 of 47

SECTION H – SPECIAL CONTRACT REQUIREMENTS

FAR 52.236-4 Physical Data (APR 1984)

Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the plans and in the specifications are the result of site investigations by Forest Service specialists making physical determination based on surface observations.

(b) Weather Conditions. Normal snow conditions indicate a work season from approximately June 15 to October 15.

(c) Transportation Facilities.

Kelly Forks Bridge: From U.S. Highway 12, turn north onto State Highway 11, at Greer Junction.

Travel north on State Highway 11 to milepost 23, just south of Pierce, ID. At approximately milepost 23, turn east onto USFS Road 250. Travel on USFS Road 250 to the intersection of USFS Road 250 and USFS Road 255 at mile post 46.4, (Kelly Forks Bridge).

Kelly Creek Bridge: From U.S. Highway 12, turn north onto State Highway 11, at Greer Junction.

Travel north on State Highway 11 to milepost 23, just south of Pierce, ID. At approximately milepost 23, turn east onto USFS Road 250. Travel on USFS Road 250 to the intersection of USFS Road 250 and USFS Road 255 at mile post 46.4, (Kelly Forks Work Center). Travel USFS Road 255 to the intersection of USFS Road 255 and USFS Road 581 at milepost 11. Turn south (Right) onto USFS Road 581 to the project site.

Lake Creek Bridge: From U.S. Highway 12, turn north onto State Highway 11, at Greer Junction.

Travel north on State Highway 11 to milepost 23, just south of Pierce, ID. At approximately milepost 23, turn east onto USFS Road 250. Travel on USFS Road 250 to the intersection of USFS Road 250 to milepost 64.4 (Lake Creek Bridge).

(d) Material Sources.

Kelly Forks Bridge (255 – 0.0)

• Riprap Source – Government Furnished, from Garner Point Quarry, located in Section 13, Township 39 North, Range 9 East.

Lake Creek Bridge (250 – 67.0)

• Aggregate Base – Government Furnished, from Kelly Forks stockpile, located near milepost 46.3 on Primary Forest Route 250, in Section 13, Township 39 N, Range 9 E.

• Gabion Rock – Commercial Source – There is no available Government source for gabion rock for this project.

• Riprap – Reuse existing riprap from site.

(e) Traffic Control Contractor shall submit a traffic control plan to the C.O., conforming to the MUTCD and section 635 of the FP03, for their approval at least 15 days before start of work. The Contractor will be responsible for all labor, materials, equipment, and supplies necessary to accommodate traffic

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 15 of 47 coming from all directions during construction. Temporary traffic control shall be incedental to bid item 15101 (Mobilization). The contractor will be allowed to impede traffic at each site as stated below.

Kelly Forks Bridge: The Contractor shall have at a minum one lane open to traffic at all times.

Kelly Creek Bridge: The Contractor will be allow to delay traffic for up to 1 hour in both directions. Between delays the Contractor must let all traffic through prior to furthure traffic delays.

Lake Creek Bridge: Contractor shall have at a minum one lane open to traffic at all times.

LANDSCAPE PRESERVATION

(a) Do not remove, deface, injure, or destroy trees, shrubs, lawn, or natural features not designated for treatment. Confine operations to within the clearing limits or other areas designated in the contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Retrieve material which falls outside of these limits and dispose of, or incorporate in the work as directed by the Contracting Officer.

Preserve the scenic and natural environment along this construction project.

(b) Do not allow objectionable material to enter any stream, river, lake, or other body of water. Retrieve material which falls in these areas and dispose of, or incorporate in the work as directed by the Contracting Officer, and repair damage to vegetation or structures outside the project limits as directed by the Contracting Officer.

(c) Do not operate equipment or otherwise disturb the natural vegetation and soil beyond the construction limits.

ENVIRONMENTAL PROTECTION

The contractor is required to have a spill plan. The plan will contain a description of the specific hazardous materials, procedures, and spill containment that will be used, including inventory, storage, and handling.

All vehicles carrying fuel will have specific equipment and materials needed to contain or clean up any incidental spills at the project site.

All pumps and generators used in or near streams will have appropriate spill containment structures and/or absorbent pads in place during use.

When storage facilities for oil or oil products are on site, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or any other body of water. If a spill of petroleum product should occur in water, immediately notify the Contracting Officer and appropriate state agencies.

Service all equipment only in the areas approved by the Contracting Officer. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Meet all applicable EPA requirements (40 CFR

112) including certification by a registered professional engineer.

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 16 of 47

Contractor shall ensure that all personnel involved in handling and packaging the hazardous waste are trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures, and spills. Provide handling and personal protective equipment appropriate to ensure safe handling of the hazardous waste according to 29 CFR 1910.120). Notify the Forest Service of all hazardous material that may be brought onto the National Forest.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. The contractor must clean up spills or leaks in a manner that complies with Federal, state, and local laws and regulations and to the satisfaction of the CO. Any spills resulting in a detectable sheen on water shall be reported to the EPA National Response Center (1-800-424-8802). Any spills over 25 gallons will be reported to the Idaho Division of Environmental Quality and cleanup will be initiated within 24 hours of the spill. When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

Equipment Fuel/Oil Leakage.

All equipment used for instream work will be cleaned of external oil, grease, dirt and mud; and leaks repaired; prior to arriving at the project site. All equipment will be inspected by the Contracting Officer’s Representative before unloading at site. Any leaks or accumulations of grease will be corrected before entering streams or areas that drain directly to streams or wetlands.

Equipment used for in-stream or riparian work (including chainsaws and other hand power tools) will be fueled and serviced in an area approved by the CO. When not in use, vehicles will be stored in the designated staging area. The staging area should be in an area that will not deliver fuel, oil, etc. to streams.

Oil-absorbing floating booms, and other equipment such as pads and absorbent “peanuts” appropriate for the size of the stream, will be available on-site during all phases of construction. For small streams with few pools or slack water, booms may not be effective. Use pads and straw bales to anchor booms if necessary. Booms will be placed in a location that facilitates an immediate response to potential petroleum leakage.

NOXIOUS WEED CONTROL

In order to prevent the potential spread of noxious weeds into work areas, Contractor shall be required to use weed-free equipment.

The following is considered proof of weed-free equipment:

The Contractor will be required to clean all construction equipment prior to entry on to national forest land. This cleaning shall remove all dirt and plant parts and material that could carry noxious weed seeds into the work area. Only clean construction equipment inspected by the Forest Service will be allowed to operate within the work area. All subsequent move-ins of construction equipment shall be treated in the same manner as initial move-in.

Straw/Hay Bales shall be certified as “Weed Free”. The source field shall be inspected and certified by the county extension agent from the county that the straw/hay is grown. Each shipment onto the forest shall be accompanied by a certification tag stating that it is weed free. The contractor shall furnish the forest service with a statement of certification.

FIRE CONTROL (FS 236-1)

(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 17 of 47 of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.

(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or his employees, the Contractor when requested by the Contracting Officer shall place his employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.

Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area. An equitable adjustment in contract time may be made for this period.

(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to his operation under the contract.

(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement.

Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.

(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:

One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with a 4 BC or higher rating.

One - shovel, round point #0 lady or equal.

One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.

One - water container (at least 1-gallon capacity), not required with stationary equipment.

(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.

(4) Powersaws. For each powersaw used in connection with this contract, the following will be provided:

One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.

One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.

Any fueling or refueling of a powersaw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw shall be moved at least 10 feet from place of fueling before starting.

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 18 of 47

(5) Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.

(6) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.

(7) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site when all combustible debris and vegetation is cleared away within a radius of 25 feet.

Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.

(8) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.

(9) Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.

All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.

(10) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.

(11) Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.

When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:

(i) All high fire risk operations could be terminated at 1300 local time.

(ii) All burning could be stopped, including debris burning fires.

(iii) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.

(12) Pump and Trailer. NOT USED

(13) Burning. Before starting any open burning, the Contractor shall comply with the following:

(i) Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage.

(ii) Submit a burning permit from the District Ranger.

(iii) Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke.

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 19 of 47

(iv) Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires.

(v) Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period.

(vi) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his discretion, prohibit all open burning for definite periods within specific areas of the National Forest

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 20 of 47

SECTION I: Contract Clauses

52.202-1 Definitions. (JUL 2004)

52.203-3 Gratuities. (APR 1984)

52.203-5 Covenant Against Contingent Fees. (APR 1984)

52.203-6 Restrictions on Subcontractor Sales to the Government. (SEP 2006)

52.203-7 Anti-Kickback Procedures. (JUL 1995)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (JAN

1997)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (JAN 1997)

52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (SEP 2007)

52.204-4 Printed or Copied Double-Sided on Recycled Paper. (AUG 2000)

52.204-9 Personal Identity Verification of Contractor Personnel. (SEP 2007)

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (SEP 2006)

52.214-27 Price Reduction for Defective Cost or Pricing Data - Modifications - Sealed Bidding. (OCT

1997)

52.214-28 Subcontractor Cost or Pricing Data - Modifications - Sealed Bidding. (OCT 1997)

52.219-3 Notice of Total HUBZone Set-Aside. (JAN 1999)

52.219-14 Limitations on Subcontracting. (DEC 1996)

52.219-16 Liquidated Damages - Subcontracting Plan. (JAN 1999)

52.222-3 Convict Labor. (JUN 2003)

52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (JUL 2005)

52.222-6 Davis-Bacon Act. (JUL 2005)

52.222-7 Withholding of Funds. (FEB 1988)

52.222-8 Payrolls and Basic Records (Deviation, Jan. 2010).

PAYROLLS AND BASIC RECORDS (Deviation, Jan 2010)

(a) Payrolls and basic records relating thereto shall be maintained by the Contractor during the course of the work and preserved for a period of 3 years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in section

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 21 of 47

1(b)(2)(B) of the Davis-Bacon Act), daily and weekly number of hours worked, deductions made, and actual wages paid. Whenever the Secretary of Labor has found, under paragraph (d) of the clause entitled Davis-Bacon Act, that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis- Bacon Act, the Contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.

(b)

(1) The Contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the Contracting Officer. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29CFR 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee (e.g., the last four digits of the employee’s social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH-347 is available for this purpose from the Wage and Hour Division Web site at http://www.dol.gov/whd/forms/wh347instr.htm or its successor site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker, and shall provide them upon request to the Contracting Officer, the contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to the Contracting Officer.

(2) Each payroll submitted shall be accompanied by a “Statement of Compliance,” signed by the Contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify --

(i) That the payroll for the payroll period contains the information required to be maintained under paragraph (a) of this clause and that such information is correct and complete;

(ii) That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in the Regulations, 29 CFR Part 3; and

(iii) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract.

(3) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfy the requirement for submission of the “Statement of Compliance” required by subparagraph (b)(2) of this clause.

(4) The falsification of any of the certifications in this clause may subject the Contractor or subcontractor to civil or criminal prosecution under Section 1001 of Title 18 and Section 3729 of Title 31 of the United States Code.

(c) The Contractor or subcontractor shall make the records required under paragraph (a) of this clause available for inspection, copying, or transcription by the Contracting Officer or authorized representatives of the Contracting Officer or the Department of Labor. The Contractor or subcontractor shall permit the Contracting Officer or representatives of the Contracting Officer or the Department of Labor to interview employees during working hours on the job. If the Contractor or subcontractor fails to submit required records or to make them available, the Contracting Officer may, after written notice to the Contractor, take such action as may be necessary to cause the suspension of any further payment. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12.

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 22 of 47

(End of Clause)

52.222-9 Apprentices and Trainees. (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)

52.222-11 Subcontracts (Labor Standards). (JUL 2005)

52.222-12 Contract Termination - Debarment. (FEB 1988)

52.222-13 Compliance with Davis-Bacon and Related Act Regulations. (FEB 1988)

52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

52.222-15 Certification of Eligibility. (FEB 1988)

52.222-21 Prohibition of Segregated Facilities. (FEB 1999)

52.222-26 Equal Opportunity. (MAR 2007)

52.222-27 Affirmative Action Compliance Requirements for Construction. (FEB 1999)

52.222-50 Combating Trafficking in Persons. (FEB 2009)

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(DEC 2007)

52.223-5 Pollution Prevention and Right-to-Know Information. (AUG 2003)

52.223-6 Drug-Free Workplace. (MAY 2001)

52.223-14 Toxic Chemical Release Reporting. (AUG 2003)

52.223-15 Energy Efficiency in Energy-Consuming Products. (DEC 2007)

52.227-1 Authorization and Consent. (DEC 2007)

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. (DEC 2007)

52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)

52.228-2 Additional Bond Security. (OCT 1997)

52.228-11 Pledges of Assets. (SEP 2009)

52.228-12 Prospective Subcontractor Requests for Bonds. (OCT 1995)

52.228-14 Irrevocable Letter of Credit. (DEC 1999)

52.228-15 Performance and Payment Bonds - Construction. (NOV 2006)

52.229-3 Federal, State, and Local Taxes. (APR 2003)

52.232-5 Payments under Fixed-Price Construction Contracts. (SEP 2002)

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 23 of 47

52.232-17 Interest. (OCT 2008)

52.232-23 Assignment of Claims. (JAN 1986)

52.232-27 Prompt Payment For Construction Contracts. (OCT 2008)

52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration. (OCT 2003)

52.233-1 Disputes. (JUL 2002)

52.233-3 Protest after Award. (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)

52.236-2 Differing Site Conditions. (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)

52.236-5 Material and Workmanship. (APR 1984)

52.236-6 Superintendence by the Contractor. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

(APR 1984)

52.236-10 Operations and Storage Areas. (APR 1984)

52.236-11 Use and Possession Prior to Completion. (APR 1984)

52.236-12 Cleaning Up. (APR 1984)

52.236-13 Accident Prevention. (NOV 1991)

52.236-13 Accident Prevention. (NOV 1991) - Alternate I (NOV 1991)

52.236-14 Availability and Use of Utility Services. (APR 1984)

52.236-15 Schedules for Construction Contracts. (APR 1984)

52.236-17 Layout of Work. (APR 1984)

52.236-21 Specifications and Drawings for Construction. (FEB 1997)

52.236-21 Specifications and Drawings for Construction. (FEB 1997) - Alternate I (APR 1984)

52.236-21 Specifications and Drawings for Construction. (FEB 1997) - Alternate II (APR 1984)

(a) The Contractor shall keep on the work site a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto. Anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawings and specifications, the specifications shall govern. In case of discrepancy in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the Contracting Officer, who shall promptly make a determination in writing. Any adjustment by the Contractor

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 24 of 47 without such a determination shall be at its own risk and expense. The Contracting Officer shall furnish from time to time such detailed drawings and other information as considered necessary, unless otherwise provided.

(b) Wherever in the specifications or upon the drawings the words "directed", "required", "ordered", "designated", "prescribed", or words of like import are used, it shall be understood that the "direction", "requirement", "order", "designation", or "prescription", of the Contracting Officer is intended and similarly the words "approved", "acceptable", "satisfactory", or words of like import shall mean "approved by," or "acceptable to", or "satisfactory to" the Contracting Officer, unless otherwise expressly stated.

(c) Where "as shown," as indicated", "as detailed", or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise. The word "provided" as used herein shall be understood to mean "provide complete in place," that is "furnished and installed".

(d) Shop drawings means drawings, submitted to the Government by the Contractor, subcontractor, or any lower tier subcontractor pursuant to a construction contract, showing in detail (1) the proposed fabrication and assembly of structural elements, and (2) the installation (i.e., fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the contractor to explain in detail specific portions of the work required by the contract. The Government may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.

(e) If this contract requires shop drawings, the Contractor shall coordinate all such drawings, and review them for accuracy, completeness, and compliance with contract requirements and shall indicate its approval thereon as evidence of such coordination and review. Shop drawings submitted to the Contracting Officer without evidence of the Contractor's approval may be returned for resubmission. The Contracting Officer will indicate an approval or disapproval of the shop drawings and if not approved as submitted shall indicate the Government's reasons therefor.

Any work done before such approval shall be at the Contractor's risk. Approval by the Contracting Officer shall not relieve the Contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with the requirements of this contract, except with respect to variations described and approved in accordance with (f) below.

(f) If shop drawings show variations from the contract requirements, the Contractor shall describe such variations in writing, separate from the drawings, at the time of submission. If the Contracting Officer approves any such variation, the Contracting Officer shall issue an appropriate contract modification, except that, if the variation is minor or does not involve a change in price or in time of performance, a modification need not be issued.

(g) The Contractor shall submit to the Contracting Officer for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. Three sets (unless otherwise indicated) of all shop drawings, will be retained by the Contracting Officer and one set will be returned to the Contractor. Upon completing the work under this contract, the Contractor shall furnish [Contracting Officer complete by inserting desired amount] sets of prints of all shop drawings as finally approved. These drawings shall show changes and revisions made up to the time the equipment is completed and accepted.

52.236-26 Preconstruction Conference. (FEB 1995)

52.242-13 Bankruptcy. (JUL 1995)

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 25 of 47

52.243-4 Changes. (JUN 2007)

52.246-21 Warranty of Construction. (MAR 1994)

52.248-3 Value Engineering - Construction. (SEP 2006)

52.249-2 Termination for Convenience of the Government (Fixed-Price). (MAY 2004)

52.249-10 Default (Fixed-Price Construction). (APR 1984)

52.253-1 Computer Generated Forms. (JAN 1991)

52.204-7 Central Contractor Registration. (APR 2008)

(a) Definitions. As used in this clause--

"Central Contractor Registration (CCR) database" means the primary Government repository for Contractor information required for the conduct of business with the Government.

"Data Universal Numbering System (DUNS) number" means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

"Data Universal Numbering System +4 (DUNS+4) number" means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

"Registered in the CCR database" means that--

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and

(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record "Active". The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation "DUNS" or "DUNS +4" followed by the DUNS or DUNS +4 number that identifies the offeror's name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number--

(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if

Upper North Fork Bridge Repairs Sol#: AG-82B1-S-10-0365

Clearwater National Forest Page 26 of 47 located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S.

Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company Physical Street Address, City, State, and Zip Code.

(iv) Company Mailing Address, City, State and Zip Code (if separate from physical).

(v) Company Telephone Number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering.