P9_10_Caribou_steam_channel_list.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Caribou-Callahan Road Decommissioning
Solicitation number
AG-82B1-S-10-0350
Issued by

About this file

7

View the file

Other files

File Type Posted
P37_GRADE_CONTROL_STRUC.pdf PDF
P36_STREAM_CHAN_EXCAV_AFTER.pdf PDF
P6_Summary_quantities.xlsx XLSX spreadsheet
Supplemental_specs.doc DOC document
P39_DOUBLE_BERMS.pdf PDF
P4_Caribou_proj_area.pdf PDF
P35_STREAM _CHAN_ESAV_BEFORE.pdf PDF
P13_22_Caribou_worklog.xlsx XLSX spreadsheet
P5_Callahan_proj_area.pdf PDF
P32_PARTIAL_ROAD_ RECONTOUR.pdf PDF
P38_TYP_CONSTR_PATH_SECTION.pdf PDF
P23_31_Callahan_worklog.xlsx XLSX spreadsheet
P34_SURFACE_WATERBAR.pdf PDF
P1_Title_Page.doc DOC document
P2_Index.doc DOC document
P3_Vicinity_map.pdf PDF
A-002 - S-10-0350.pdf PDF
P7_8_General_notes.doc DOC document
P33_CROSS_DRAINAGE_DETAILS.pdf PDF
P11_12_Callahan_stream_channel_list.xlsx XLSX spreadsheet
A-001 S-10-0350.pdf PDF
PATH XSECT.pdf PDF
General_notes_p7_8.doc.url URL file
Stream_list_Caribou_p9_10.xlsx.url URL file
Title_Page_p1.doc.url URL file
Montana SCA Statewide.docx DOCX document
CHANN REST AFTER.pdf.url URL file
Callahan_worklog_p23_31.xlsx.url URL file
Summary_quantities_p6.xlsx.url URL file
S-10-0350 Section B - M —
SF 1447 S-10-0350.pdf PDF
Index_p2.doc.url URL file
GRADE CONTROL.pdf.url URL file
Surface Waterbar.pdf.url URL file
caribou_proj_area_p4.pdf.url URL file
CHANN REST BEFORE.pdf.url URL file
DOUBLE BERMS.pdf.url URL file
Vicinity_map_p3.jpg.url URL file
PART RECONTOUR.pdf.url URL file
Caribou_worklog_p13_22.xlsx.url URL file
callahan_proj_area_p5.pdf.url URL file
CROSS DRAINAGE DETAILS.pdf.url URL file
Supplemental_specs.doc.url URL file
Stream_list_Callahan_p11_12.xlsx.url URL file
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BID ITEM 1: CARIBOU ROAD DECOMMISSIONING
ROAD 5807
PAY ITEMSTACMP DIAM (IN)CMP LENGTH (FT)INLET ROAD FILL DEPTH (FT)OUTLET ROAD FILL DEPTH (FT)ROAD WIDTH (FT)CHAN- NEL WIDTH (FT)SPECIAL EROSION CONTROL REQUIRED?CONSTRUCTION NOTES
2116132+80183447166YesIn order to maintain ditch connection to stream channel, do not place excavated material against cutslope ahead of station. Waste excavated material back of station.
2116247+80Buried Logs45517168YesSalvage logs to scatter as woody debris on recontoured slopes. Narrow road width limits space for placing excavated fill material adjacent to channel. Excavated material may need to be placed up to 100 feet from channel.
2116151+10Buried Logs36310163NoIn order to maintain ditch connection to stream channel, do not place excavated material against cutslope ahead of station. Waste excavated material back of station.
21161116+70Buried Logs4548163YesIn order to maintain ditch connection to stream channel, do not place excavated material against cutslope back of station. Waste excavated material ahead of station. Maintain wetland area above inlet.
21162122+70363412131612YesPlace 75% of excavated material in back of station in landing area. Place remainder of excavated material on road surface only ahead of station in order to maintain ditch connection to stream channel.
21161123+95303046166YesIn order to maintain ditch connection to stream channel, do not place excavated material against cutslope ahead of station. Waste excavated material back of station.
ROAD 5811
2116242+173633612165YesPlace 75% of excavated material in back of station in landing area. Place remainder of excavated material on road surface only ahead of station in order to maintain ditch connection to stream channel.
2116243+17None34 (est new ch length)412163YesIn order to maintain ditch connection to stream channel, do not place excavated material back cutslope ahead of station. Waste excavated material ahead of station.
BID ITEM 1: CARIBOU ROAD DECOMMISSIONING
ROAD 5800
2116145+60242434165Yes
2116250+50NANA10121630 (incl. 10' flood- plain)YesOld bridge site on Caribou Ck. Deck has been removed. Remove west abutment and fill material to reestablish floodplain and channel width as flagged. Waste material beginning 75' back of station on landing area. East abutment is gone. Backslope both sides at 2:1.

Note: Special Erosion Control sites may have running water and require measures to reduce sedimentation. Pay Item 62201 will be used at these sites to remove culverts and perform finish work on stream channels including installation of grade control structures. See Supplemental Specification 211 and General Notes.

&"Arial,Bold"&14STREAM CHANNEL LIST

File details come from the government source that posted it. Updated .