IPNF SPECIAL PROJECT SPECIFICATION
NON-ERFO FLOOD REPAIR-WEST
101.02 Delete in its entirety and substitute the following:
Pay Items & Pay Units
"& .......................................... And
AC .......................................... Acre
AL. ......................................... Aluminum
ASP......................................... Asphalt
AVAIL.................................... Available
BARR ..................................... Barrier
BKN ....................................... Broken
BST......................................... Bituminous Surface Treatment
CATTLEGD ........................... Cattleguard
CLEAR (CLG) ....................... Clearing
CLEAR/GRUB ....................... Clearing & Grubbing
CMP ....................................... Corrugated Metal Pipe
COMP ..................................... Compaction
CONC ..................................... Concrete
CONST ................................... Construction (Construct)
CTD ........................................ Coated (Coating)
CUSH ..................................... Cushion
CY (CU YD) ........................... Cubic Yard
CY MI (CYM) ........................ Cubic Yard Mile
DIA ......................................... Diameter
DL .......................................... Double Lane
DWGS .................................... Drawings
EA .......................................... Each
EMB ....................................... Embankment
EXC ........................................ Excavation
F&I ......................................... Furnish & Install
FDN ........................................ Foundation
FT ........................................... Foot (Feet)
FUNC ..................................... Function
GAL ........................................ Gallon
GR. ......................................... Grade
GRUB ..................................... Grubbing
HDPE ..................................... High Density Polyethylene
HOR ....................................... Horizontal
HR .......................................... Hour
HT .......................................... Height
I .............................................. Install
IN ............................................ Inches
INCL....................................... Including (Includes)
IND ........................................ Individual
JCT ......................................... Junction
L ............................................. Logs
LBS......................................... Pounds
LDG ........................................ Loading
LF (LIN FT ............................. Linear (lineal) Foot
LS ………………………….. Lump Sum
LT ………………………….. Left
MAT'L ................................... Material
M ............................................ Metal
MAX ...................................... Maximum
MBF ....................................... One Thousand Feet Board Measure
MGALS.................................. One Thousand Gallons
MHD ...................................... Method
MI ......................................... Mile
MIN ........................................ Minimum
MISC ...................................... Miscellaneous
MP .......................................... Mile Post
MSF ...................................... One Thousand Square Feet
OTBC ..................................... Open Top Box Culvert
P M ......................................... Placement Method
PVC ........................................ Polyvinylchloride
RD .......................................... Road
RECOND ............................... Reconditioning
RECONST ............................. Reconstruction (Reconstruct)
REFL ...................................... Reflectorized
RT .......................................... Right
STMP (STP) ........................... Stump(s)
SB .......................................... Self Balance
SEC ........................................ Section
SF ........................................... Square Foot (Feet)
SL ........................................... Single Lane
SLD ....................................... Solid
ST ........................................... Slash Treatment
STA ....................................... Station (100 Feet)
STA YD ................................. Station Yard
STL ....................................... Steel
STR (STRUC) ........................ Structural
SY (SQ YD) ........................... Square Yard
SZ ........................................... Size
T&L ....................................... Tops & Limbs
TBR ........................................ Timber
TH .......................................... Thickness
TM ......................................... Ton Mile
TO .......................................... Turnout
TOL ........................................ Turnout Left
TOR ....................................... Turnout right
TRS ........................................ Trees
UOT ....................................... Utilization of timber
VERT ..................................... Vertical
W............................................ Width
W/ .......................................... With
W/O ....................................... Without
X-SEC .................................... Cross Section
YD .......................................... Yard
F04 – SPS 101 –1 (03/01/10 )
REGIONAL SPECIAL PROJECT SPECIFICATION
Section 102 - Definitions
Add the following:
"Noxious Weeds or Weeds. Any exotic plant species established or that may be introduced in the State which may render land unfit for agriculture, forestry, livestock, wildlife, or other beneficial uses and which is designated by the State's Department of
Agriculture, or by the County's weed management district, or by other appropriate agencies having jurisdiction, or as listed on the current "All States Noxious Weed List."
Shop Drawings. Incidental design sheets and/or drawings which the Contractor is required to submit to the Forest Service. Shop drawings shall conform to the contract requirements, but they are not part of the contract drawings. They may be drawings, diagrams, schedules, performance charts, brochures, and similar data prepared by the
Contractor, subcontractor, manufacturer, suppliers, or distributors that illustrate how specific portions of the work are to be fabricated or installed.
Weed Management District. A weed management district is any area of land identified for the purpose of weed management or control. Such an identified land area may be, but is not limited to one of the following: a project or job site, a County, two or more
Counties, or a National Forest."
R01-85 SPS 102-1 (4/96)
SPECIAL PROJECT SPECIFICATION
Section 104 - Maintenance for Traffic
104.01 Add the following section:
Roads To Be
Constructed "Project roads may be closed by the Contractor in accordance with the closure table below. The Contractor shall notify the Contracting Officer a minimum of fourteen (14) days prior to any road closures or scheduled delays. The Contractor must open the road as rapidly as possible to allow passage of emergency vehicles."
Road Closure Table
Road: ALL ROADS
Time Periods Maximum Delays
Monday – Friday (6:00 a.m. – 6:00 p.m.) -------------------- Closed
Monday – Friday (6:00 p.m. – 6:00 a.m.)* ------------------ Open to Traffic
Weekends – (Sat. & Sun) and Holidays *-------------------- Open to Traffic
*Exceptions:
No road closures allowed the Friday before Memorial Day is observed, the day before Independence Day (July 4), and the Friday before Labor Day.
104.03 Add the following to this section:
Construction
Signs "At a minimum, the Construction Sign Plan as SHOWN ON THE DRAWINGS, indicates the anticipated signing during construction activities. These signs shall be furnished and installed by the Contractor as staked or directed by the
Contracting Officer. The Contractor shall have the responsibility for furnishing, installing, maintaining and removing construction warning signs in conformance with the latest revision of the Manual of Uniform Traffic Control Devices. Signs shall be covered or removed when not necessary to warn of hazards. Install
“Road Closed” signs at major road junctions either side of each work site so as to provide road users adequate warning of the road closure. Additional signs shall be furnished, installed and maintained by the Contractor where appropriate, to provide for the safe passage of public traffic."
SPS 104-1 (03/01/10)
MEASUREMENT
104.04 Add the following:
Method
“The method of measurement, as described in Section 106, will be
DESIGNATED IN THE SCHEDULE OF ITEMS.”
PAYMENT
104.05 Add the following:
Basis
“Construction signing, posts and maintenance of construction signs under this section shall be considered subsidiary to Pay Item 601 - Mobilization and no separate payment shall be made.”
SPS 104-1 (03/01/10)
Section 106 - Measurement & Payment
106.03
Units of Under "(a) Cubic Yard, " add the following:
Measurement
"(4) Material, Compacted in Place. The measurement computed using measurements of material in the compacted state on the project. Statistically random measurements of length, depth, and width for computation of quantities shall be made along the project when Actual Quantities are shown on the
SCHEDULE OF ITEMS."
Add the following to the end of this section:
“(j) Lump Sum. The quantities that denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.”
106.04
Methods of Add the following:
Measurement
"The Variation of Quantity Clause does not apply to items paid for on a Designed
Quantity (DQ) or Lump Sum Quantity (LSQ) basis."
SPS106-1 (03/01/10)
Section 201 - Clearing and Grubbing
DESCRIPTION
201.02 Replace (a) with:
Clearing and "(a) Undisturbed stumps outside the roadway or in embankment areas, provided
Grubbing they do not extend more than 1-foot above the original ground nor closer than 1-foot to the finished subgrade and do not interfere with the placement or compaction of embankments."
"(c) Stable trees up to 6 inches in diameter and uncut vegetation less than 3 feet in height and less than 3 inches in diameter within the clearing limits but beyond the roadway that do not interfere with visibility."
Delete the first sentence of the fifth paragraph and replace with the following:
"Trees within the clearing limits may be felled outside the area being cleared."
201.03 Add the following to the first paragraph after the first sentence:
Utilization of Timber "All merchantable logs 6 inches in diameter or greater on the small end with a length equal to or greater than 9 feet shall be cut and decked in standard commercial lengths not to exceed 33 feet.
201.05
Slash
Treatment (b) Specific Methods.
Delete (4) Scattering and replace with the following:
"(4.1) Scattering
(FELL OUTSIDE CLEARING LIMITS AND SCATTER)
In the area SHOWN ON THE DRAWINGS, right-of-way timber may be felled outside the clearing limits. Tops and limbs cut from merchantable trees and unmerchantable material may be left outside the clearing limits. Construction slash remaining within the clearing limits shall be scattered on embankments or outside the clearing limits without damaging standing trees. Logs and stumps shall be placed away from the trees, positioned so they will not roll, and shall not be placed on top of one another.
Construction slash shall be limbed and scattered to reduce slash concentration.”
SPS 201 – 1 (03/01/10)
201.06 Add the following:
“Items not shown in the SCHEDULE OF ITEMS will not be measured.”
SPS 201 – 2 (03/01/10)
Section 202 - Removal of Structures and Obstructions
CONSTRUCTION
202.02 Add the following to the first paragraph:
Performance
“Removal of metal pipe in live streams shall be done between July 15 and
October 1, unless otherwise approved by the Contracting Officer.”
202.03 Add to this section:
Removal of
Bridges, "All metal pipe designated for removal shall become the property of the
Culverts, Contractor and shall be removed from National Forest System lands and disposed and Other of in accordance with Federal, State, and Local laws. Woody debris from the
Structures removal of log culverts and open top culverts shall be treated with the clearing debris and disposed of by using the same methods required for the adjacent right-of-way clearing."
SPS 202-1 (03/01/10)
Section 203 - Excavation & Embankment
203.01 Insert the word "haul" after the word "roadway" on the first line.
Work
203.04 Add the following to the last sentence:
Clearing &
Grubbing "..., unless specifically allowed under Section 201."
203.08 Add the following:
Finishing
Roadbed "For simplification, out-sloping and in-sloping of the travelway have not been reflected the construction staking, however, they will be required as SHOWN ON THE
DRAWINGS.
203.15
Embankment Add the following to Method 2, paragraph 6:
Placing
Methods "The use of a backhoe bucket or a similar method approved by the Contracting Officer is acceptable for compaction for embankment placement."
SPS 203-1 (03/01/10)
Section 204 - Soil Erosion & Water Pollution Control
204.01 Delete the entire subsection and substitute the following:
"This work consists of special temporary and/or permanent construction measures as SHOWN ON THE DRAWINGS and/or listed in this specification to control soil erosion and water pollution. Such measures may include (but are not limited
to) filter windrows, slash blankets, brush barriers, drainage devices, earth berms, earthen water bars, sediment basins, aggregate base/surfacing, rock ditches, riprap, seeding, mulching, and/or straw bales.
This work shall also include special construction methods SHOWN ON THE
DRAWINGS to control erosion at control areas."
MATERIALS
204.02 Delete the 2nd paragraph and substitute the following:
Requirements
"All other materials shall meet commercial grade standards and shall be approved before being incorporated into the project."
204.03 Delete the 1
st paragraph and substitute the following:
Performance
Prior to the start of construction, the contractor shall submit to the Contracting
Officer an Erosion Control Plan detailing permanent and temporary erosion control measures. Submit the Erosion Control plan proposal at least 14 days before operations begin to the Contracting Officer for approval.
The Erosion Control Plan shall reflect the special concerns and measures necessary to protect resources and government improvements. The Erosion
Control Plan shall, at a minimum:
1. Describe the construction activities and sequence of implementation relating to specific erosion control measures.
2. Describe the location and type of permanent controls to be implemented during construction.
3. Described the location and type of temporary controls to be implemented during construction.
4. For work in stream channels with flowing water include a detailed dewatering plan.
SPS 204-1 (03/01/10)
5. Include procedures and temporary control measures to be implemented to minimize sediment delivery during re-watering of any culvert with streambed simulation material.
6. For work in stream channels without flowing water describe the level of ground and vegetative disturbance and measures to reduce potential sediment delivery.
7. Describe what monitoring will take place.
8. Describe the measures that will be taken to minimize erosion and sediment delivery from material stockpiles.
9. Describe methods and measures that will be taken to minimize erosion and sediment delivery to adjacent streams and waterways from any proposed borrow source.
Delete the 2nd paragraph and substitute the following:
"Erosion control measures shall be incorporated into the project no later than the dates specified in Table 204.1. Variations in this schedule must be approved in writing by the Contracting Officer."
Add the following after the 3rd paragraph:
"The following construction requirements shall apply:
a.- Earthwork. Clearing and grubbing, excavation, borrow and embankment operations shall be scheduled and performed so that grading operations and permanent erosion control measures can follow without interference or be constructed within the time periods listed in Table 204.1.
b.- Stream Courses. Temporary culvert installations will not be permitted in live streams unless approved individually in writing by the
Contracting Officer. If such approval is granted, temporary culverts shall be offset a sufficient distance so that installation of the permanent culvert can be completed without removal of the temporary culvert. Temporary culverts shall not be removed until flowing water is completely confined to the permanent culvert.
Diversion of live streams to allow work in the streambed shall be performed in such a manner as necessary to prevent erosion. Dikes of sufficient height to divert the flow without being overtopped shall be constructed in the stream above the drainage structure. Water shall be conveyed around the work area by a non-eroding conduit. Watertight pipes, tubing, or lined trenches may be used. Trench or pipe outlet areas shall be protected with plastic or other material approved by the Contracting Officer to insure that diverted water does not cause erosion as it returns to the stream.
SPS 204-2 (03/01/10)
Equipment shall not operate in the stream unless authorized by the
Contracting Officer. This does not include a one time crossing of the stream to begin installation. After installation of the permanent drainage structure is completed, all dikes, temporary culverts, basins, and trenches shall be removed and the area restored to near natural condition. Other methods may be used when approved by the Contracting Officer.
c.- Wet Conditions. The contractor shall conduct operations so as to minimize erosion and not develop conditions that will cause erosion.
Work may continue during wet conditions as long as erosion and rutting is controlled.
d.- End of Construction Season and prior to Move-out. Any rutted areas and other damaged areas shall be smoothed, sloped and graded to drain. All temporary stream course diversion conduits and temporary culverts shall be removed and the stream returned to its natural channel. All erosion control measures required under this specification shall be functional and approved by the Contracting Officer. The seeding method prescribed in Section 625 shall be used on all areas where work has been completed.
e.- Slash Blanket. Tops and limbs shall be windrowed or piled in openings outside the roadway without damage to the standing timber. After
Item 203 - Excavation & Embankment is essentially complete and approved by the Engineer, slash (tops and limbs) shall be uniformly scattered on the embankment then compressed with a backhoe or other mechanical means to form a protective blanket to reduce soil erosion.
f. Use certified weed free straw bales for erosion control. Break apart bales and scatter in loose layers no more than 2” thick after work is completed.
Add the following to the fifth paragraph:
“Upon completion of construction at each site, all temporary dewatering materials and equipment are to be removed from Government property at the site.”
204.04 Add the following to the first paragraph:
"Items not shown in the SCHEDULE OF ITEMS will not be measured."
SPS 204-3 (03/01/10)
204.05 Add the following:
"Other erosion control work required under this specification and not shown in the SCHEDULE OF ITEMS is considered incidental to pay items in the Section listed in Table 204.1."
TABLE 204.1
SECTION DURATION DESCRIPTION OF WORK TIMING OF CONSTRUCTION
Permanent
Culvert Catch Basins and Ditch Transitions
Concurrently with culvert installation.
Inslope/Outslope as shown on drawings.
Continuously as road is roughed to grade.
Ditches
Within 2 days of roughing to grade.
Within 1 days after 10/1 (Date).
Incidental to 201 or 625
Special Construction Methods. Specific locations and requirements shown on the drawings, and/or described in the Special Project Specifications.
As described on the drawings and/or in the Special Project Specifications.
Drainage Dip Locations shown on the drawings.
Prior to the end of the construction season for all areas roughed to grade.
Temporary
Uncompleted Roads. The total length of all roads with uncompleted excavation and embankment, including pioneer roads, shall not exceed 1 site after 10/1 (Date).
See description of work.
Culvert Catch Basins and Ditch Transitions
Within 2 days of construction activity or sooner when specified in writing by the Engineer.
Temporary
Sediment Basins Locations determined by the
Contracting Officer.
Prior work in or near stream courses..
Slash Blanket Locations shown on the drawings.
When embankments are approved by the Engineer
SPS 204-4 (03/01/10)
TABLE 204.1(Cont.)
SECTION DURATION DESCRIPTION OF WORK TIMING OF CONSTRUCTION
Aggregate Base/Surfacing The total length of all areas of disturbed earth (including pioneer roads and completed subgrades) on which gravel has not been placed shall not exceed 1 Site after 10/1 .(Date)
This requirement may be waived by the Engineer based on a review of the Contractor's operations, methods, and progress in controlling erosion and keeping erosion control features current as described in this specification. Such waiver, if given, shall be in writing.
See description of work.
Culverts
Live Streams
At time of initial crossing of live streams.
Culvert Inlet/Outlet
Riprap
Concurrently with culvert installations in live streams:
by the end of construction season in other areas.
Seeding
As specified in Section 625
SPS 204-5 (03/01/10)
Section 205A - Haul
205A.02 Delete the last sentence of this subsection.
Methods
205A.03 Delete this subsection and replace with the following:
"When no pay item for 205A is specified, the payment for haul shall be included as a subsidiary items to Sections 203, 206A, and 619. No separate payment shall be made under Item 205A.”
SPS 205A-1 (03/01/10)
Section 206A - Excavation for Culverts & Minor Structures
206A.03 Add the following to the first paragraph:
Excavation
“Minor Structure Excavation (Riprap) in live streams shall be done between July 15 and October 1, unless otherwise approved by the Contracting Officer.”
206A.04 Delete the second sentence in the Subsection.
Utilization of
Excavated Materials
206A.08 Add the following to the first paragraph:
"(c) Excavation for pipe culverts with diameter of 36 inches or smaller and for pipe arches 42 inches by 29 inches or smaller and drop inlets shall not be measured."
206A.09 After the first sentence, add:
"Payment for excavation for pipe culverts with diameter of 36 inches or smaller and for pipe arches 42 inches by 29 inches or smaller and drop inlets shall be included as a subsidiary item to Section 603. No separate payment shall be made under this
Section or under Section 603."
“Payment for excavation required for Removal of Structures & Obstructions shall be included as a subsidiary item to Section 202. No separate payment shall be made under this Section or under Section 202."
SPS 206A-1 (03/01/10)
Section 304 – Aggregate Base or Surface Course
304.08 Add the following to this Subsection:
Preparation
Of Roadbed “The subgrade receiving aggregate shall be compacted in accordance with Subsection
306.02, Compaction A.
304.12
Thickness Add the following to this Subsection:
“Compensation will not be made for thickness exceeding the specified thickness.”
SPS 304-1 (03/01/10)
Section 306 - Reconditioning Existing Road
306.01 Add: "removal of earthen barrier, construct earth barriers, and catch basins" following "outlets"
306.02 Delete the first two paragraphs including (a) and (b) of the second paragraph
Performance and replace with the following:
"Scarification of the traveled way and shoulders is not required. Any rock protruding less than two inches may be left in place. Rock protruding in excess of two inches shall be removed or the tops blasted. Resulting holes in the roadway or shoulders shall be backfilled with compacted suitable material."
F04-SPS 306-1 (03/01/10)
Section 601 - Mobilization
601.01
Work. Replace the first sentence with the following:
“This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project work site.
Preparatory work shall include cleaning of all equipment used at the project site. The
Contractor is required to clean all construction equipment prior to entry on the project site. This cleaning shall remove all dirt, plant parts and material that may carry noxious weed seeds into the area. Only construction equipment inspected by the Contracting
Officer shall be allowed to operate within the project area. All subsequent move-ins of equipment shall be treated the same as the initial move-in. Truck beds and dump boxes hauling to the project site must also be cleaned prior to entering the work area.
Prior to initial move-in, the Contractor shall make all construction equipment available for inspection by the Contracting Officer at an agreed upon location. The Contractor shall provide the Contracting Officer at least 24 hours advance notification when equipment is ready for inspection.”
601.02 The method of measurement, as described in Section 106, will be DESIGNATED IN
Method THE SCHEDULE OF ITEMS.
601.03 “Payment for signing shall be included as a subsidiary item to this Section. No separate
Basis payment shall be made under this Section or under Section 104.”
SPS 601 – 1 (03/01/10)
Section 603 - Metal Pipe
603.03 Delete the second sentence, last paragraph, and add:
"Pipe should not be ordered until culvert locations are DESIGNATED ON
THE GROUND and the correct lengths are determined and approved by the
Contracting Officer."
603.03 Delete the second paragraph and replace with the following:
Excavation
“Installation of metal pipe in live streams shall be done between July 15 and
October 1, unless otherwise approved by the Contracting Officer.”
603.06
Joining Pipes Replace the last sentence of the first paragraph with the following:
"Dimpled bands shall not be used unless approved by the Contracting Officer in writing."
603.08
Backfilling At the end of the second paragraph, after "Method A or B," add:
"or C"
After Method B, add:
"Method C - Compaction shall be obtained by a minimum of two passes with a mechanical tamper, approved by the Contracting Officer, for each 6-inch layer
(loose thickness) of backfill unless otherwise SHOWN ON THE DRAWINGS."
SPS 603 - 1 (03/01/10)
Section 611 - Development of Pits and Quarries
611.11 Delete in entirety and add the following:
611.12 Add the following:
“Payment for excavation and/or sorting of material required for Riprap from the designated sorts shall be included as a subsidiary item to Section 619. No separate payment shall be made under this Section or under Section 619."
SPS 611-1 (03/01/10 )
Section 619 - Riprap
619.01 Delete this subsection and substitute the following:
"This work shall consist of furnishing and/or sorting, hauling, and placing stone riprap for bank and roadway protection in accordance with these specifications at the locations and in reasonably close conformity with the lines, grades, and dimensions shown on the drawings or established by the Contacting Officer.”
619.02 Delete this subsection after the third paragraph and substitute the following:
Hand-Placed, Machine-Placed, "Riprap shall meet the following gradation requirements for the size specified;
& Dumped Riprap and shall be used at the locations SHOWN ON THE DRAWINGS:
Class of Equivalent Cubical Percent of Total Weight
Riprap Dimension or Type Smaller than the Given Size
Facing Riprap
200 lbs. . . . . .13 inches
75 lbs. . . . . . 9 inches
25 lbs. . . . . . 6 inches. . . . .. . . . not to exceed 10
Light Riprap
500 lbs. . . . . .18 inches
200 lbs. . . . . .13 inches
25 lbs. . . . . . 6 inches. . . . . . . . not to exceed 10
1/4 Ton Riprap
1000 lbs. . . . . 22 inches
500 lbs. . . . . 18 inches
75 lbs. . . . . 9inches. . . . . . . . not to exceed 10
1/2 Ton Riprap
2000 lbs. . . . . 27 inches
1000 lbs. . . . . 22 inches
200 lbs. . . . . 13 inches. . . . . . . . not to exceed 10
1 Ton Riprap
4000 lbs. . . . . 34 inches
2000 lbs. . . . . 27 inches
500 lbs. . . . . 18 inches. . . . . . . . not to exceed 05
SPS 619-1 (03/01/10)
Control of gradation will be by visual inspection. Any difference of opinion between the Contracting Officer and the Contractor shall be resolved by dumping and checking the gradation of two random truck loads of stone. The Contractor shall provide mechanical equipment, a sorting site, and labor needed to assist in checking gradation at no additional cost to the government.
619.10 Delete this subsection and substitute the following:
General
"Slopes to be protected by riprap shall be free of brush, trees, stumps, and other objectionable material and shall be dressed to a smooth surface. “Payment for clearing shall be included as a subsidiary item to this Section. No separate payment shall be made under this Section or under Section 201.” A toe trench as
SHOWN ON THE DRAWINGS shall be dug and maintained until the riprap is placed. The riprap blanket shall be constructed to its full thickness as the placement proceeds up the slope.
619.20 Add the following:
Methods
619.21 Add the following:
Pay Item Pay Unit
619(03)A Machine-Placed Riprap, Class Facing. . . . . . C.Y.
619(03)B Machine-Placed Riprap, Class Light. . . . . . . C.Y.
619(03)C Machine-Placed Riprap, Class ¼ Ton . . . . . . C.Y.
619(03)D Machine-Placed Riprap, Class ½ Ton . . . . . . C.Y.
619(03)E Machine-Placed Riprap, Class 1 Ton . . . . . . C.Y.
SPS 619-2 (03/01/10)
Section 625 - Seeding and Mulching
625.01 Add the following:
"All disturbed areas as well as finished cut and fill slopes are to be treated."
625.03 Add:
Seeding
Seasons "Time of application shall be as specified:
During the Months marked with an 'X' below:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC
x x x x x x
Should climatic conditions permit, application may be performed outside the months marked above upon written approval by the Engineer."
625.05
Application The following is added:
Methods for Seed, "The kinds of seed to be furnished and the amounts to be applied in terms of
Fertilizer, pure live seed (PLS) shall be as follows:
& Limestone
High Mountain brome “Bromar”……… 5
Annual rye……………
*Alsike clover…................... 2 TOTAL
Slender Wheatgrass "Pryor".......... 3 19# PLS/ACRE
Hard Fescue "Durar"
High Elevation Mix Substitutes:
Blue widlrye “Arlington” or “Elkton” @ 5 #/Acre for slender wheatgrass
Stream wheatgrass “Sodar”@ 3 #/Acre for Creeping Foxtail.
*Steam wheatgrass “Sodar” @ 1 #/Acre for alsike clover if treating weeds w/herbicides or if use of
Alsike clover would conflict with other resource values(e.g. grizzly bear habitat).
SPS 625 – 1 (03/01/10)
Pounds of seed to be furnished per acre shall be obtained by dividing the pounds of pure live seed (PLS) required per acre by the product of the percent purity and percent germination.
Example: 5(# PLS/acre) = 6.55 pounds commercial seed per acre.
0.90 x 0.85 (where purity=90% and germination=85%)
Certified, blue-tagged seed shall be used where a name variety or culivar is specified.
Blue tags which are removed to mix the seed shall be provided to the Forest.
All seed purchased will be certified to be free of the noxious weed seeds from weeds listed on the current "All States Noxious Weeds List".
Test results from a certified seed analyst and seed analysis labels attached to the bags will be provided to the Forest Service. Lab testing for noxious weeds will be conducted prior to seed mixing. Only after a finding and documentation in writing of no weeds on the current "All States Noxious Weeds List" will the seed be accepted and used.
Seed shall be applied by the dry method. Fertilizer shall be applied at the rate of 200 pounds per acre in one application(s) by the dry method and have a chemical analysis as listed below:
Nutrient Percent Nutrient Percent
Nitrogen, N . . . 16 Potassium, K. . 16
Phosphorus, P205. 16 Sulphur, S. . . 0
625.06
Application of Mulch Delete in entirety.
625.11 Add the following:
625(20) Seeding, Dry Method (without Mulch). . . . . L.S.
SPS 625 – 2 (03/01/10)
Section 633 - Signs
Delete this section in its entirety and replace with the following:
633.01 This work shall consist of installing only or furnishing and installing markers, Work delineators, signs, sign supports, panels, and posts or removing and disposing of existing signs, posts and hardware.
633.02 Traffic control sign details not SHOWN ON THE DRAWINGS shall meet the
Traffic Control requirements of the Manual on Uniform Traffic Control Devices (MUTCD).
Sign Details
633.03 Materials shall meet the requirements of the following subsections in 85 SPS 718:
Sign Panels .............................................................................. 718.01
Posts ........................................................................................ 718.02
Fittings ..................................................................................... 718.03
Reflective Sheeting. .................................................…........... 718.04
Paint......................................................................................... 718.05
Silk-Screen Inks...................................................................... 718.06
Edge Film................................................................................ 718.07
Letters, Numerals, Arrows, Symbols, Borders ...........…....... 718.08
Delineators ............................................................................. 718.09
The contractor will furnish to the Contracting Officer certification that all materials comply with the specified requirements.
All concrete shall meet the requirements of Section 602, Method B or C as SHOWN
IN THE DRAWINGS.
Reinforcing steel as SHOWN IN THE DRAWINGS shall meet the requirements of
Subsection 709.01.
SPS 633 - 1 (3/1/10)
NON-ERFO FLOOD REPAIR WEST SIDE
633.04 Fabrication of all parts shall be accomplished in a uniform manner. All panel
Fabrication of fabrication, including cutting, punching, and drilling of holes, shall be completed
Sign Panels prior to final surface preparation and application of the sheeting except where required for the fabrication of die cut or sawed letters on processed and mounted signs. Workmanship shall be high quality with no visible defects in the finished product.
(1) Sign Panel Preparation. Sign panels shall be cut from the specified substrate material that is flat, free of warp, or any defects which interrupt smooth continuity of the panel surface. All panels shall be prepared precisely as described in writing by the substrate and sheeting manufacturers.
Sign panels less than 4 feet by 8 feet shall be cut from a single sheet of substrate material without joints.
Sign panels larger than 4 feet by 8 feet shall be fabricated in sections using three-quarter inch thick HDO substrate material. Individual panel sections shall be prepared to be joined using doweled butt joints. Dowels shall be
3/8-inch threaded bolt stock 4 1/2 inches in length placed 2 inches from each side and every 12 to 15 inches along the joint. Actual joining of the individual panels will occur during sign installation.
Dimensions for panels will conform to the current MUTCD standards and be approved by the Contracting Officer, with a tolerance of + 1/4 inch.
(2) Beveling. All edges of sign panels shall be slightly rounded or beveled to eliminate edge sharpness.
(3) Drilling. Holes shall be drilled at the locations and to the sizes AS
SHOWN ON THE DRAWINGS. All holes shall be deburred. Field drilling of holes in any part of the Structural assembly will not be permitted without the approval of the Contracting Officer.
(4) Surface and Edge Finishing. All core-gap holes on HDO plywood signs shall be filled with an exterior wood dough, sanded with a medium grit
(50-60) sandpaper to produce a smooth surface, and the edges shall receive one coat of paint prior to application of background sheeting.
SPS 633 - 2 (3/1/10)
(5) Sheeting, Legend, Border, and Symbol Application. All sheeting, legend, borders, and symbols shall be applied precisely as prescribed in writing by the sheeting manufacturer. Background sheeting shall be pressure sensitive.
The entire face of the sign panel shall be covered with one unspliced sheet if the panel is less than 48 inches in either dimension. Only horizontal splicing shall be used on each section. Materials shall be color matched and splice shall not coincide with any legend. The top piece shall overlap the bottom piece by ½-inch minimum.
All letters, layout, and spacing requirements shall conform to the
MUTCD, "Standard Alphabets for Highway Signs," FHWA, current edition or AS SHOWN ON THE DRAWINGS. The following tolerances shall apply:
(a) Letters, numerals, and symbols shall be horizontally aligned to a tolerance of + 1/8 inch.
(b) Letters, numerals, and symbols shall be vertically aligned to a tolerance of + 1/16 inch.
(c) Spacing between lines shall not exceed a tolerance of + 1/8 inch.
(6) Silk-Screening. All silk-screening operations shall be accomplished precisely as prescribed in writing by the manufacturers of the ink and the sheeting. Messages and borders of a color darker than the background shall be applied by direct screen process. Messages and borders of a color lighter than sign background shall be produced by the reverse screen process. The screening shall be done in a manner which results in uniform colors and tone, with sharply defined edges of legend and border and without blemishes on the sign background.
Silk-screened inks shall be color matched to eliminate any visual difference between silk-screened material and applied material of the same color on the same sign.
(7) Durability Treatment. All signs shall receive a durability treatment. After all legends, borders, and symbols have been applied, the sign panel shall receive one cycle through the heat vacuum applicator at a temperature of approximately 190 degrees F.
SPS 633 - 3 (3/1/10)
(8) Trimming and Edge Finishing. After all sheeting, legends, borders, and symbols have been applied to the substrate, all excess material shall be trimmed flush with the edge of the sign panel. Sheeting may overlap
HDO plywood substrate sign edges by one-eighth inch. The edges of
HDO substrate panels shall be finished with a second coat of paint applied in accordance with the recommendation of the paint manufacturer.
(9) Edge Film. When SHOWN ON THE DRAWINGS, edge tape shall be applied over the entire top edge of the panel precisely in accordance with tape manufacturer's written instructions.
(10) Maker's Mark. A decal showing the contractor's identification or trademark and the date of manufacture shall be installed on the back upper left-hand corner of each sign.
633.05 Delineator posts shall be driven at locations and to the depth SHOWN ON THE
Delineator Posts DRAWINGS. The delineator shall be attached to the post in accordance with the and Housing manufacturer's direction.
633.06 Sign supports shall be erected plumb and in accordance with the details SHOWN ON
Sign Erection THE DRAWINGS. Lengths of supports shall be such to accommodate the minimum sign height requirements AS SHOWN ON THE DRAWINGS (in the sign plan).
The sign panels shall be securely fastened to the posts as SHOWN ON THE
DRAWINGS. To reduce specular glare, the sign panel face shall be erected in accordance with MUTCD, Section 2A-26.
633.07 Sign assemblies to be removed shall be SHOWN IN THE DRAWINGS. Signs to be
Sign Removal replaced shall be removed no longer than 8 hours prior to the installation of replacement signs. All sign material removed shall become the property of the Forest
Service. Posts shall be removed to a minimum of 3 inches below natural ground line.
Post holes remaining shall be backfilled with suitable material and compacted.
633.08 The method of measurement, as described in Section 106, will be DESIGNATED in
Method the SCHEDULE OF ITEMS.
Quantities of sign face area will be computed using the sign dimensions SHOWN ON
THE DRAWINGS.
No deduction in sign face area will be made for rounded corners. The area for irregularly shaped signs, such as "Stop" signs, will be computed by multiplying the extreme width by the extreme height of the sign face.
SPS 633 - 4 (3/1/10)
For sign removal, an assembly of posts and signs shall be considered as only one sign when these materials are integrally connected and standing at one location.
633.09 The accepted quantities will be paid for at the contract unit price for each pay item
Basis shown in the SCHEDULE OF ITEMS.
Payment will be made under:
633(01) Wood Posts . . . . . . . . . . . . . . . . . . . . . . . . . . . . L.F.
633(02) Steel Posts . . . . . . . . . . . . . . . . . . . . . . . . . . . . L.F.
633(03) Aluminum Posts . . . . . . . . . . . . . . . . . . . . . . . L.F.
633(04) Aluminum Sign Panels . . . . . . . . . . . . . . . . . S.F.
633(05) HDO Plywood Sign Panels . . . . . . . . . . . . . . S.F.
633(06) Fiberglass Sign Panels . . . . . . . . . . . . . . . . . . .S.F.
633(07) Delineators . . . . . . . . . . . . . . . . . . . . . . . . . . . .EA.
633(08) Sign . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA.
633(09) Sign Removal . . . . . . . . . . . . . . . . . . . . . . . . . .EA.
633(10) Sign and Post(s), Installation only . . . . . . . EA.
633(11) Regulatory Signs . . . . . . . . . . . . . . . . . . . . . . . EA.
633(12) Warning Signs & Markers . . . . . . . . . . . . . . EA.
633(13) Signs and Posts, Advanced Warning EA.
633(14)L Signs and Post, Object Marker, Type III (OM-3L), Color Yellow &
Black, Furnish and Install
EA.
633(14)R
633(15)
Signs and Post, Object Marker, Type III (OM-3R) Color Yellow & Black, Furnish and Install
Warning Sign and Post, Road Narrows (W5-1), Furnish and Install
SPS 633 – 5 (03/01/10)
EA.
E.A.
Section 637 - Equipment Rental
EQUIPMENT
637.03
Items of Add the following:
Equipment
"(k) Hydraulic Excavator
(1) - Minimum 150 flywheel horsepower.
(2) - Tracked, crawler type.
(3) - Bucket must be equipped with hydraulic "thumb".
(4) - Bucket capacity 1.75 cubic yards.
(5) - Hydraulically operated.
(6) - Maximum undercarriage width 11’ 6” feet.
(7) - Minimum operating weight of 50,000 lbs.
(8) - Maximum operating weight of 75,000 lbs.
(9) - Minimum digging depth of 20 feet.
(10) - 1998 model or newer.
(11) - No fluid leaks, machine will do instream work.
(12) - Equipped with a framed mounted hook/eye to accommodate attachment of a cable, chain or choker.
(13) - Capability of 2 speed travel may be preferred for some projects.
* Or similar type of equipment approved by the Contracting Officer.
(l) Road Grader
(1) - 12 or 14 foot moldboard with sharp cutting bits.
(2) - Minimum of 50 percent of original tread depth.
(3) - Four-way flashing or flashing amber warning light.
(4) - Backup warning device.
(5) - Minimum flywheel horsepower 140.
(6) - Minimum weight 28,000 pounds.
(7) - Minimum 7 tooth under carriage or rear ripper bar for scarifying. This item will not be used for extensive ripping.
(8) - 1998 model or newer.
SPS 637-1 (03/01/10 )
(m) End Dump Truck, Large
(1) - Shall meet all safety standards as set by the State of Idaho and the U.S.
Forest Service and shall be licensed to haul designated materials within the State of Idaho.
(2) - 12 to 16 cubic yards rated capacity.
(3) - End dump with removable tailgate.
(4) - Single unit tandem drive axle.
(5) - Hydraulic hoist.
(6) - No Fluid leaks.
(7) - Equipped with CB radio for driver safety.
(8) - Backup warning device.
(9) - Spare tire shall be located on truck or at project site and shall have a minimum of 50 percent of original tread.
(10) - 1998 model or newer.
(n) Wheeled Front-End Loader
(1) - Flywheel horse power 125-160, spark arrested or turbo charged.
(2) - Articulated.
(3) - Minimum bucket capacity of 3 cubic yards - both straight edge and rock teeth may be required.
(4) - ROPS rollover protection.
(5) - Backup warning device.
(6) - Four-way flashing amber warning light.
(7) - 50 percent of original tread depth on tires.
(8) - 1998 model or newer.
637.08 Add the following;
"Pay Item Pay Unit
637(12) Hydraulic Excavator . . . . . . . . . . . . . . . . . . . . HR.
637(13) Road Grader . . . . . . . . . . . . . . . . . . . . . . . . . . . HR.
637(14) End Dump Truck…….. . . . . . . . . . . . . . . . . . . HR.
637(15) Wheeled Front-End Loader . . . . . . . . . . . . . . . HR.
SPS 637-2 (03/01/10)
REGIONAL SPECIAL PROJECT SPECIFICATION
Section 713 - Roadside Improvement Materials
713.04 Replace the first paragraph with the following paragraph:
Seed
The kinds of grass, legumes, and cover-crop seed furnished shall be those stipulated in the SPECIAL PROJECT SPECIFICATIONS. All seed shall meet the requirements of
Federal Specification-JJJ-S-181 which shall be amended as follows:
All seed purchased shall be certified to be free of noxious weed seeds from weeds listed on the current "All States Noxious Weeds List."
Replace the second paragraph with the following paragraph:
Seed shall be furnished separately or in mixture in standard containers with (1) seed name; (2) lot number; (3) net weight; (4) percentages of purity and of germination (in case of legumes, percentage of germination to include hard seed); and (5) percentage of maximum weed seed content clearly marked for each kind of seed. The contractor shall furnish the Contracting Officer duplicate signed copies of a statement certifying that each lot of seed has been tested by a certified seed analyst. This statement shall include (1) name and address of laboratory, (2) date of test, (3) lot number for each kind of seed, and
(4) results of tests as to name, percentages of purity and of germination, and percentage of weed content for each kind of seed furnished, and, in case of a mixture, the proportions of each kind of seed. Laboratory testing for noxious weeds shall be conducted prior to seed mixing. Only after a finding and documentation, in writing, of no weeds on the current "All States Noxious Weeds List," will the seed be accepted and used. Legume seed shall be inoculated with approved cultures in accordance with the instructions of the manufacturer. Seed analysis labels attached to the bags shall be provided to the Forest
Service.
R01-85 SPS 713 –1 (4/96)
Section 718 - Sign Materials
Delete this section in its entirety and replace with the following:
718.01 Sign panels shall be cut from the specified substrate material shown in the
Sign Panels SCHEDULE OF ITEMS that is flat and free of warp or any defects which interrupt smooth continuity of the panel surface. The face side shall have a retro-reflective sheeting surface.
(a) High Density Overlay (HDO) Plywood. Both sides of the high density overlay
(HDO) plywood shall be Douglas-fir, exterior type, Product Standard PS-1
(current edition), with a B grade or better veneer on both faces. Surfacing overlay material shall be high density 90-90 resin-impregnated fiber, permanently fused under heat and pressure to the base panel. The material must be suitable for sign manufacturing and must be compatible with reflective sheeting adhesive. No marks, blemishes, or damage of any kind will be allowed. Overlay color shall be cocoa brown. Each panel shall be edge-branded HDO B-B G1 EXT APA PS 1. The Contractor shall supply the
Contracting Officer with APA certification that the plywood meets all the above requirements.
Minimum 1/2-inch plywood shall be used for signs less than 24 inches in longest dimension. Five-eighths-inch material shall be used for all other signs cut from a single sheet. Three-quarter-inch plywood shall be used for all signs requiring joining.
(b) Aluminum. The aluminum substrate shall be alloy 5052-H38 or 6061-T6 from flat sheet stock conforming to the requirements of ASTM B 209.
Unless otherwise SHOWN ON THE DRAWINGS, the minimum panel thickness shall be 0.080 inches for all signs 30 inches or less in any dimension.
Sign panels larger than 30 inches in any dimension shall be a minimum thickness of 0.125 inches.
(c) Fiberglass Reinforced Plastic. Fiberglass reinforced plastic shall comply with the recommendations of the Fiber Glass Reinforced Panel Council publication
"Recommended Traffic Control Sign Panel Specifications." Unless SHOWN
ON THE DRAWINGS the color of the material shall be brown, matching
Federal Standard 595a, Color No. 20059.
Reinforced fiberglass panels for signs up to and including 36 inches in any dimension shall be 0.135 inches thick. Reinforced fiberglass shall not be used for signs larger than 36 inches in the unsupported dimension unless otherwise
SPECIFIED AND/OR SHOWN ON THE DRAWINGS.
SPS 718 - 1 (3/1/10 )
NON-ERFO FLOOD REPAIR EAST SIDE
718.02 Posts shall be wood, aluminum, steel, or other material as specified.
Posts
(a) Wood Posts. Wood posts shall meet the dimensional requirements SHOWN
ON THE DRAWINGS and as specified in Subsection 633.06 or as approved by the Contracting Officer.
(b) Steel Posts. Steel posts shall meet the requirements of ASTM A 499, galvanized in accordance with AASHTO M 111.
Minimum weight per foot will be as SHOWN ON THE DRAWINGS.
The posts shall have 7/16-inch holes drilled or punched along the centerline of the web before galvanizing. The punching or drilling should begin 1 inch from the top of the post, at 2-inch centers for the upper 5 feet of the post.
(c) Aluminum Posts. Aluminum posts shall be standard shapes as SHOWN ON
THE DRAWINGS and shall be aluminum alloy 6061-T6 or 6351-T5, meeting the requirements of ASTM B 221.
718.03 Lag screws, washers, clip angles, wood screws, shear plates, U-bolts, clamps, bolts, Fittings nuts, and other fasteners shall be galvanized steel, cadmium-plated steel, aluminum alloy, or as SHOWN ON THE DRAWINGS.
Galvanizing of steel hardware shall be in accordance with AASHTO M 232. High-strength steel bolts, nuts, and washers shall meet the requirements of ASTM A 325, except as SHOWN ON THE DRAWINGS.
718.04 All reflective materials (sheeting, legend, borders, and symbols) shall conform with
Reflective the "Standard Specifications for Construction of Roads and Bridges on Federal
Sheeting Highway Projects," FP, current edition, and ASTM D 4956. Sheeting shall be pressure sensitive high intensity, grade Type III . Colors shall be as specified in the
MUTCD.
No more than 12 months shall elapse from the date of manufacture to the date of application.
718.05 Paint shall be ready-mixed, exterior type,…