Section 205A - Haul

DESCRIPTION

205A.0l This work shall consist of the authorized hauling of excavated Work material from its original location to its final location in the work.

MEASUREMENT

The method of measurement, as described in Section 106, will be205A.02 Method designated in the SCHEDULE OF ITEMS. The quantity of material hauled shall be based on the original in-place volume of material hauled. Haul will be measured as if excavated materials were deposlted in embankment after having been hauled the shortest feasible distance.

The haul distance will be computed between the center of mass of the ekcavated material and the center of mass of the embanked material~ Haul may be computed by either mase diagram or analytical methods as determined by the Engineer.

Haul within the roadway limite will be measured along the centerline of roadway.

Where material originates or is deposited outside the roadway, haul will include the distance by the most direct and feasible route from the roadway centerline to the point of origin or deposition.

No haUl allowance will be made for material designed to move directly across the roadway within a station.

PAYMENT

The accepted quantities will be paid for at the contract unit205A.03 Basls price for each pay item shown in the SCHEDULE OF ITEMS.

Payment will be made under:

Pay Item Pay Unit

205A(01) Haul STA. YD.

20511(02) Haul C.Y.Ml.

20S1\(03) Haul T.M.

EM 7720-100LL, page 74

Apr;} 1, 1985

Section 304

304.01 Work

MATERIALS

304.02

Source

304.03 Gradation

304.04 Quali ty

304.05 Additives

304.06 Water

304.07 Mineral Filler or Binder

CONSTRUCTION

304.08 Preparation of Roadbed

304.09 Mixing & Placing

Aggregate Base or Surface Course

This work shall consist of furnishing, hauling, and placing aggregate base or surface course on the subgrade or base or stockpile site approved by the Engineer~ Work may include additive mineral filler, or binder 6e specified in the SPECIAL PROJECT SPECIFICATIONS. Aggregate production shall be by pit-run, grid-rolling, screening, or crushing methods or furnished by the Government, 6S shown in the SCHEDULE OF ITEMS.

Materials shall be obtained from sOUrces or stockpiles SHOWN ON THE DRAWINGS or other approved sources. Grid-rolling shall utilize all suitable material that can be reduced to maximum size as shown in the SCHEDULE OF ITEMS.

Development and utilization of government-furnished sources shall be in accordance with Section 611.

Gracing requirements for crushing or screening operations shall meet the requirements of Subsection 703.06.

No gradation other than maximum size will be required for pit-run or grid-rolled material. After processing on the road, all oversize material shall pe removed from the road and disposed of as SHOWN ON THE DRAWINGS.

All aggregat e except Government'-furni shed stockpi I es or from designated sources shall meet the quality requirements of Subsection 703~06 unless otherwise required in the SPECIAL PROJECT

SPECIFICATIONS.

Chemical additives z if required, shall meet the requirements of the following subsections:

Magnesium Chloride 712.11 Calcium Chloride 712.02 Sodium Chloride 712.02 Hydrated Lime •• .. 712.03

Water development, haUling, ana application shall be in accordance with Section 207.

~"'ineral filler or binder shall be added, as specified in the SPECIAL PROJECT SPECIFICATIONS, to meet quality and/or gradation requirements. Mineral filler or binder shall be added and uniformly blended on the road when pit-run, grid-rolling, or screening methods are used or when aggregate is being furnished by the Government. Mineral filler or binder shall be uniformly blended during crushing when a crusher operation is used.

The roadbed shall be completed in accordance with Section 203 or 306 and approved in writing by the Engineer -before placing base or surface course ..

The contractor may mix the aggregate and any required additives z water, mineral filler, and binder by anyone of the three following methods unless a required method is SHOWN ON THE

DRAWINGS:

(a) Stationary Plant Method. The aggregate shall be mixed with other required materials in an approved mixer. Water shall be aaded during the mixing operation in the amoont necessary to provide the moisture content for compacting to the specified

EM 7720-100LL, page 91 April L 1985

304.10 Compaction

density. After mlxing. the aggregate shall be transported to the jobsite while it contains the proper moisture content and shall be placed on the subgrade or base course by means of an aggregate spreader.

(b) Travel Plant Method. After the aggregate for each layer has been placed with an aggregate spreader or windrow sizing device, it shall be uniformly mi$ed with other required materials by a traveling mixing plant. During mixing , water shall be added to provide the necessary moisture content for compacting~

(c) Road Mix Method. After the aggregate for each layer has been placed, it shall be mixed with other required materials at the required moisture content until the mixture is uniform throughout.

The aggregate sha) I be spread in a uniform layer, with no segregation of size, and to a loose depth that shall have the required thickness when compacted.

If the required compacted depth of any aggregate base or surface course exceeds 6 inches~ it shall be placed in two or more layers of approximately equal thickness.. If the nominal maximum particle size exceeds 3 inches, the aggregate shall be placed in layers that do not exceed twice the maximum size of the aggregate size specified.

Hauling equipment shall be operated over the surface of the previously constructed layer in a dispersed manner to minimize rutting or uneven compaction~

The aggregate shall be compacted by one of the following methods as specified on the SCHEDULE OF ITEMS, compaction A.. Aggregate shall be compacted by operating spreading and haUling equipment over the full width of each layer of the aggregate.

Compaction B. Aggregate shall be moistened or dried to a uniform moisture content suitable for compaction. Rollers meeting the requirements of Subsection 212.02(b). (cl. or (a) shall be operated over the full width of each layer until visual displacement ceases, but not fewer than three complete passes.

compaction C. Each layer of aggregate shall be compacted to a aensity of at least 95 percent of the maximum density, as determined by AASETO T 99, Method C or D.

compaction D. Each layer of aggregate shall be compacted to a density of at least 95 percent of the maximum density, as determined by AASETO T 180, Method C or D.

Compaction E. Each layer of aggregate shall be compacted to at least 95 percent of the target density as determined by the control strip in Subsection 212.03.

compaction F. Pit-run and grid-rolled produced materials shall be visually moist and compacted by operating compaction equipment defined in Subsection 212.02 over the full width of each layer until visual displacement ceases.

The surface of each layer shall be bladed during the compaction operations to remove irregUlarities and produce a smooth, even surface. When a density requirement is specified, the density of each layer will be determined in accordance with ASSHTO T 191, T 205 or T 238, T 217, T 239 or T 255, and T 224.

EM 7720-100LL, page 92 Apri 1 1, 1995

304.11 Stockpiling

304.12 Thickness Requjrements

304.13 (Reserved)

MEASUREMENT

304.14 Method

PAYMENT

304.15 Basis

If shown in the SCHEDULE OF ITEMS or if the contractor elects to produce and stockpile aggregates prior to placement# the aggregates shall be handled and stockpiled in accordance with the requjrements of Subsection 105.0]~ Stockpile sites shall be at locations as SHO\VN ON THE DRAWINGS or approved by the Engineer.

Clearing and grubbing of stockpile sites if required, shall be inL accordance with Section 201.

The thickness of the compacted nominal aggregate shall not vary more than 1/2 inch for aggregates with a maximum particle size of I inch or less, nor more than 1 inch for aggregates with a nominal maximum particle size greater than 1 lnch from 'the thickness SHOWN ON THE DRAWINGS. The compacted thickness shall not be consistently above or below the specified thickness. "

The method of measurement as described in Section 106 will be DESIGNATED in the SCHEDULE OF ITEMS.

Aggregate quantjties will include mineral filler or binder.

The accepted quantities will be paid for at the contract unit price for each pay item .~".n In the SCHEDULE OF ITEMS.

Pay Item Pay Uni t

304(01) pit RUn Aggregate, Haximum Size compaction . . C.Y •

304(02)Pit Run Aggregate, Maximum Size •
Compaction. . . . TON

304(03) Pit Run Aggregate; Maximum Size compaction L.S.

304(04) Grid-Rollea Aggregate, Maximum Size compaction c.y.

304(05) Gri a-Roll ea Aggregate, liiaxi mum Size compaction TON

304(06) Grid-Rolled Aggregate, Maximum Size Compaction L. S.

304(07) Screened Aggregate, Grading compaction C.y.

304(08) Screened Aggregate, Grading Compaction TON

304(09) screened Aggregate, Grading Compaction L.S.

304 (10) Crushed Aggregate, Type Grading compaction _______

304(11) Crushed Aggregate, Type Grading , compaction TON

304(12) cruehea Aggregate. Type ~~=-_____ Grading compaction _______ L .. S.

EM 7720-100LL. page 93 April 1. 1985

304(13) Furnishing and Applying Calcium Chloride, Type · . · . . TON

304(14) Furnishing and Applying Hydrated Lime TON

304(15) Furnishing and Applying Sodium Chloride TON

304(16) Placing Aggregate, Compaction C.Y.

304 (17) Placing Aggregate, Compaction TON

304 (18) Placing Aggregate, Compaction L.S.

304(19) Furnishing and Applying Magnesium Chloride TON

304(20) Furni shi ng and Applying Magnesium Chloride M. GALS.

304(21) Stockpiled Aggregate, Type Grading . · . · . c.y .

304(22) Stockpiled Aggregate, Type Grading . · · . . . . TON

When mat the note erials are produced and furnished "Government furnished materials" by the Forest will be added

Se to rvice, the description of the pay item. This applies only to pay items 304(16). 304(17) and 304(18).

EM 7720-100LL, page 94 Apr il 1, 1985'"

306.01

Section 306 • Reconditioning Existing Road

DESCRIPTION

CONSTRUCTION

306.02 Performance

This work shall consist of reconditioning the traveled way and shoulders of an existing roadi cleaning ditches and culverts, including in1ets and outlets: removing slide material: scarifying and shaping the traveled way and shoulders, parking areas, turnouts, and approach road connections.

The traveled way and shoulders shall be scarified and shaped at locations and to the depth and width SHOWN ON THE DRAWINGS. Any rock larger than 4 inches in its greatest dimension brought to the surface during scarification shall be removed, except as provided below.

When a base or surface course is required, provisions of (a) or

(b) shall apply,

(a) ROCKS larger than 4 inches that do not protrude above the existing surface or the subgrade more than one-third of the depth of the base Or surface course or 3 inches, whichever is less, may be left in place.

(b) Rocks with exposed surface area exceeding 2 square feet shall be removed to at least 6 inches below subgrade.

Excess materials removed shall be disposed of in areas SHOWN ON

THE DRAWINGS.

Existing bituminous surfaces, SHOWN O~ THE DRAWINGS, shall be scarified and pulverized until all lumps are reduced to the maximum size SHOWN O~ THE DRAWINGS. The bituminous pulverized aggregate shall be incorporated into the traveled way and shoulders ..

The traveled way and shoulders of intersecting roads shall be similarly treated to provide a smooth transition for the distance

SHOWN ON THE DRAWINGS.

The ditches shall be graded to the typical sections and at the locations SHOWN ON THE DRAWlNGS. Culverts shall be cleaned to drain ..

Excess and unsuitable materials removed from the roadbed, slides, culverts, and ditches shall be disposed of as SHOWN ON THE

DRAWINGS.

The traveled way and shoulders shall be shaped after scarification and compacted by one of the following, as shown in the SCHEDULE OF

ITEMS.

Compaction A. By operating equipment over full width.

compaction B. 9S percent of AASHTO T 99, Method C or D.

compaction c. 95 percent of AASHTO T ISO, Method C or 0 ..

compaction D~ Subsection 203.15, Method 3

When compaction B or C is spe~ified, the in-place density of the material shall be determined In accordance with AASHTO T 191, T 205, or T 23B: T 217, T 239, or T 255: and T 224.

(Reserved)

EM 7720-100LL. page 95 April 1, 1985

306.03

MEASUREMENT

306.04 The method of measurement, as described in Section 106, will be Method DESIGNATED in the SCHEDULE OF ITEMS.

Removal of slide material in excess of ]0 cubic yards per station will be measured as provided in Section 203.

PAYMENT

306.05 The accepted quantities will be paid for at the contract unit Basis price for each pay item shown in the SCHEDULE OF ITEMS.

Payment will be made under:

Pay Item Pal Unit

306(01) Reconditioning of Roadbed, Compaction__ MI.

306(02) Reeohdi tioning of Roadbed t Compaction__• STA.

306(03) Reconditioning of Roadbed, Compaction__ L .. S ..

EM 7720-100LL, page 96 April 1, 1985

Section 637 - Equipment Rental

637.01This work shall consist of performing bulldozer, road grader r
Workbackhoe, end loader, and dump truck work on an equipment rental

basis as directed by the Engineer through the contractor.

EQUIPMENT

637.02Equipment rented under this section shall be furnished on a fully
Requirementsoperated basIs, of modern design, and in good operating condition,

with a competent qualified operator. Exhaust stacks of all engines, except those with exhaust-driven turbochargers, shall be equipped with spark arresters that will prevent the expUlsion of sparks from the engine into the atmosphere. All equipment except dump trucks shall have rollover protective canopies.

Requirements, in addition to those listed above, are shown for each item of equipment in the following paragraphs.

637.03 (a) Large Crawler Tractor with Dozer.

Items of Equipment

(1) Engine flywheel horsepower (for torque converter models only), not less than 210 horsepower: or,

(2) Drawbar horsepower rating in first gear (for gear driven models), not less than ISO horsepower.

(3) Hydraulically controlled straight or angle blade dozer with standard blade, having a minimum lift above ground (blade straight) of 36 inches.

(4) The following shall be all heavy duty: full-length belly pan, engine guard, track roller guards, and radiator guard.

(5) Track pad grousers or cleats shall be at least 2 inches high.

(6) Rear-mounted winch, equipped with a minimum of 100 feet of 5/8 inch minimum diameter cable and two chokers, when listed in the SCHEDULE OF ITEMS.

(7) Hydraulically controlled ripper with at least one shank and having a penetration capability of at least 25 inches~ when listed in the SCHEDULE OF ITEMS.

(b) Small Crawler Tractor with DozP.'r.

(1) Engine flywheel horsepower (for torque converter models only), not less than 120 horsepower, or

(2) Drawbar horsepower rating in first gear (for gear driven models), not less than 80 horsepower~

(3) Hydraulically controlled straight or angle blade dozer with standard blade, having a minimum lift above ground (blade straight) of 36 inches.

(4) The following shall be all heavy duty: full-length belly pan, engine guard, track roller guards, and radiator guard~

(5) Track pad grousers or cleats shall be at least 1.75 inches high.

(6) Rear-mounted winch, equipped with a minimum of 100 feet of 1/2-inch cable and two chokers.

EM 7720-l00LL, page 304 April I, 1985

637.04 Moving of Equipment

637.05 Hours of Operation

637.06 Availability

MEASUREMENT

637.07 Method

PAYMENT

637.08 Basis

(4) The following shall be all heavy duty. full-length belly pan, engine guard, ·track roller .guard f and radiator guard.

(5) The track pad grousers or Cleats shal1 be at least 3/4 inch high. >

. >/1;) >The rear-mounted >winch; shall be equipped> with a minimum of 100. feet of 1/2 inch minimum"diameter cable and two chokers, when 11 stedin the SCHEDULE> OF ITEMS,

(I) Small crawler-loader with backhoe attachments.

(IJ Theengin~ shall be. rated at least 60 horsepower.

(2) Backhoe bucket width, 24 inches, with digging teeth.

(3) Backhoe reach of 14 feet.

(4 ) Thellli Ililinjm capaCity of the end loader bucket shall be

1.25 cubic yards.

(5) The following shall be all heavy duty' full-length belly pan, engine guard, track'roller guards, and radiator 9uard~

(6) >The track padgrous>ers .01:' cileat" shall be at least 1/2 Inch.

(j) Oth~r piee.'s of equipment shall be as shown In SPECIFICATIONS.

Mevi ng of the above equi pment to and ft'om the job shall· be at the expense of the contractor. Moving the equipment from one portion of the job to another after It has been initially delivered to a workin9 place wi 11 be paid for at the contract' price per hour for the particular equi'pment item moved~

The hours of operation shall be the same as the contractor's regUlar working shift, unless otherwise directed in writing by the Engineer ..

The contractor shall fur.n·ish. tli~ ~bove' equipment within three calendar days after 'being ordered',:to .do so by the Engineer.. The Engineer may release the eq~ipment whenever it is not needed.

The method of measurement, as' described in section 106, will be DESIGNATED in the SCHEDULE OF ITEMS.

Quantiti"es will· include ·th~ ~~~~~l\10utS~ to,'the nearest half hour, that the equipment fa in operation perform.ing the required work.. The actual hours the equipioeht is' in operation on the required work will be recorded daily.

The accepted quantities will be paid for at the contract unit price for each pay item shown in the SCHEDULE OF ITEMS.

Payment will be made under:

Pal. Item pay Unit

637(01) Large· Crawler ,Tractor. with Doze:r: . . . . . • HR •

637(02) Large Crawler Tract'or wfth> Do~er and' Winch HR •

637(03) Large Crawler Tractor with Dozer and Ripper HR.

637(04) Small Crawler Tractor with Dozer and Winch HR •

. E~i 7720-1 DOLl:.. page 306

April I; 1985

" (c) Road Grader.

( 1 ) The engine shall be rated at least 100 horsepower ..

(2 ) Blade assembly dimensions shall be at least 12 feet by 24 inches by 0.75 inch.

(3) The grader shall also have:

a. An operating weight of at least 20,000 pounds.

b. A wheelbase of at least 18 feet.

c. A tandem drive.

(d) Rubber-Tire End Loader.

(I) The engine shall be rated at least 100 horsepower.

(2) The minimum capacity of the end loader bucket shall be 2 cubic yards ..

(3) The end loader shall be designed and the weight distributed so the machine is balanced when the bucket is full and raised.

(4) The machine shall be equipped with a standard heavy-duty radiator guard ..

(5) The loader shall be all-wheel drive.

(e) Tractor Mounted Backhoe.

(1) Bucket width, 24 inches, with digging teeth.

(2) Rubber-tired.

(3) Diesel engine with a minimum of 70 horsepower.

(4) Backhoe reach of ]6 feet.

(f) Small Dump Truck.

(1) The engine shall be rated at least 150 brake horsepower.

(2) The dump box shall be at least 3 cubic yards struck capacity.

(g) Large Dump Truck.

(1) Minimum capacity of 10 cubic yards struck capacity.

(2) Tandem drive.

(3) Year of manufacture shall be 1975 or later.

(4) The engine shall be rated at least 185 brake horsepower.

(h) Large Crawler Loader.

(1) The engine shall be rated at least 125 horsepower.

(2) The minimum capacity of the end loader bucket shall be 2 cubi c yards ..

(3) The end loader ahall be designed and the weight distributed so that the machine is balanced when the bucket is full and raised.

EM 7720-100LL, page 305 April 1. 1985

637(05) Road Grader . . • . . . . .. HR •• 637(06)

637. (07)

637(08)

637(09.)

637(10)

637(11 )

Rubber Tired End Loader HR.

Tractor Mounted (Rubber Tired) Backhoe HR.

Lar~e Crawler Loadf;u': . . . . . HR •

Small Crawler Loader wi th Backhoe· .. HR •

. Small Dump Truck . HR • Large Dump TrucK HR.

EM 7720:"'lOOLL. page 307 April). 1985

Spec205A_85
Spec304_85
Specs306_85
Specs637_85
Spec640_85p1
Spec640_85p2