Text version
Example
FUELS REDUCTION IDIQ TREATMENTS INSPECTION FORM
ID CONTRACT CONTRACT SPECIFICATIONS
Forest Shoshone Contractor Eric's (Inserted from Task Order)
District Wind River Task Order # XXXX
Inspector McWilliams Unit # FTXX mastication
Date 12/2/2009 Unit Acres 5
Remarks Completed Acres 5
Plot interval/Size 150' / 1/40 acre
# of Plots 20
# Quadrants 80
# Pass Quadrants 74
Work Quality % 92.50%
Plot # NE Quadrant SE Quadrant SW Quadrant NW Quadrant Plot Score Plot Score = # of pass quadrants
1 P P F1 P 3
2 F2 P P P 3
3 P P P F1 3
4 P F2 P P 3 For each quadrant
5 P P P P 4 Enter P or F (Pass or Fail)
6 P P P P 4 If a quadrant fails enter a fail
7 F3 P P P 3 code that corresponds
8 P P P P 4 below.
9 P P P P 4
10 P P P P 4 Fail Code
11 P P P P 4 F1= Tree not severed from stump
12 P P P P 4 F2= Chip Depth greater than 12"
13 P P P P 4 F3= Stump greater than 12"
14 P P P P 4 F4= ____________________
15 P P P P 4 F5= ____________________
16 P F1 P P 3 F6= ____________________
17 P P P P 4 F7= ____________________
18 P P P P 4 F8= ____________________
19 P P P P 4 F9= ____________________
20 P P P P 4
Additional Remarks: Total Pass 74
Example
Inspection for Fuels Reduction Treatments
a. Inspections will be made on a series of 1/40th acre (18.625 feet radius), or as specified in each task order, plots located at predetermined intervals across each work unit. Sufficient plots will be taken to obtain at least one percent sample of the work unit.
b. Each inspection plot will be subdivided into four (4) quadrants based on cardinal directions. Each quadrant will be evaluated for compliance with all contract specifications as stated in Section C that pertains to that individual treatment.
Work Quality Percentage
Work quality percentages are derived from data developed from inspection plots. The total number of satisfactory quadrants divided by the number of quadrants inspected determines the quality rate. This rate multiplied by 100 provides the work quality percentage.
Example:
Number of quadrants inspected= 40
Number of satisfasctory quadrants= 37
37 divided by 40 = .925 X 100 = 92.5
Work Quality Percentage = 92%
Acceptable Quality Level
Acceptance of work will be based on compliance with all Section
C.5 Specific Tasks that correspond to the treatment. A minimum basic quality of 90 percent is required.
Completed Acres
Completed acres will be measured with a handheld GPS in areas treated by the contractor.