FUELS REDUCTION IDIQ TREATMENTS INSPECTION FORM
ID CONTRACT CONTRACT SPECIFICATIONS
Forest Contractor (Inserted from Task Order)
District Task Order #
Inspector Unit #
Date Unit Acres
Remarks Completed Acres
Plot interval/Size
# of Plots
# Quadrants
# Pass Quadrants
Work Quality %
Plot # NE Quadrant SE Quadrant SW Quadrant NW Quadrant Plot Score Plot Score = # of pass quadrants
4 For each quadrant
5 Enter P or F (Pass or Fail)
6 If a quadrant fails enter a fail
7 code that corresponds
8 below.
10 Fail Code
11 F1= Tree not severed from stump
12 F2= Chip Depth greater than 12"
13 F3= Stump greater than 12"
14 F4= ____________________
15 F5= ____________________
16 F6= ____________________
17 F7= ____________________
18 F8= ____________________
19 F9= ____________________
Additional Remarks: Total Pass 0
Inspection for Fuels Reduction Treatments
a. Inspections will be made on a series of 1/40th acre (18.625 feet radius), or as specified in each task order, plots located at predetermined intervals across each work unit. Sufficient plots will be taken to obtain at least one percent sample of the work unit.
b. Each inspection plot will be subdivided into four (4) quadrants based on cardinal directions. Each quadrant will be evaluated for compliance with all contract specifications as stated in Section C that pertains to that individual treatment.
Work Quality Percentage
Work quality percentages are derived from data developed from inspection plots. The total number of satisfactory quadrants divided by the number of quadrants inspected determines the quality rate. This rate multiplied by 100 provides the work quality percentage.
Example:
Number of quadrants inspected= 40
Number of satisfasctory quadrants= 37
37 divided by 40 = .925 X 100 = 92.5
Work Quality Percentage = 92%
Acceptable Quality Level
Acceptance of work will be based on compliance with all Section
C.5 Specific Tasks that correspond to the treatment. A minimum basic quality of 90 percent is required.
Completed Acres
Completed acres will be measured with a handheld GPS in areas treated by the contractor.