Attachment B BETTY_Drawings_022510.pdf
PDF 3 MB Posted
- Solicitation number
- AG-82B1-S-10-0245
About this file
Attachment B Drawings
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FE
LI
X C
R
EE
K
PA
IN
T C R
E E
K
HARRIS CREEK
N CREEK
UNAWAH CREEK
CANYON CREEK
B E
T T
Y C
R E
E K
34 35 36
10327
10330
10326
10328
10176
10337
10329
1652A
9854A
5334Y
5334X
10328X
10337Y
11137
10328
SLUMP
REMOVE
GATE
REMOVE
GATE
REMOVE
GATE
REMOVE
GATE
Legend
# Berms To Be Constructed
Best Route To Project
Roads To Be Decommissioned
Other USFS Roads
FE
LI
X C
R
EE
K
PA
IN
T C R
E E
K
HARRIS CREEK
LOGAN CREEK
UNAWAH CREEK
CANYON CREEK
B E
TT
Y
C R
E E
K
34 35 36
10327
10330
10326
10328
10176
10337
10329
A
1652A
9854A
5334Y
5334X
10328X
10337Y
11137
10328
SLUMP
REMOVE
GATE
REMOVE
GATE
REMOVE
GATE
REMOVE
GATE
Legend
# Berms To Be Constructed
Noxious Weed Treated Roads
Best Route To Project
Roads To Be Decommissioned
Other USFS Roads
1631 2841N 2841S 5305 9777 9783
5.744 0.525 0.547 2.405 1.000 1.440
METHOD UNIT
15101 MOBILIZATION LSQ LS ‐ ‐ ‐ ‐ ‐ ‐ 1
15102
EQUIPMENT
WASHING
LSQ LS ‐ ‐ ‐ ‐ ‐ ‐ 1
21103 EARTH BERM AQ EA 1 1 1 2 1 1 7
21104
STREAM
RESTORATION
AQ EA 14 1 3 2 5 4 29
21106 I WATERBAR, TYPE I AQ EA 119 8 7 57 14 25 230
21106 II WATERBAR, TYPE II AQ EA 0 0 1 0 0 0 1
21110
REESTABLISH ROAD
STAKES
CQ MI 5.744 0.525 0.547 2.405 1.000 1.440 11.66
25103
MACHINE‐PLACED
RIPRAP, CLASS III
VQ CY 155 3 18 9 0 15 200
62215 EXCAVATOR AQ HR 37 4 9 4 4 4 62
62216 DUMP TRUCK AQ HR ‐ ‐ ‐ ‐ ‐ ‐ 20
81501
NOXIOUS WEED
TREATMENT
AQ AC 11.1 1.0 1.1 1.4 1.9 2.8 19.3
TOTAL
ROAD NO
ROAD LENGTH
MEASUREMENT
ITEM NO. ITEM DESCRIPTION
21103 21104 21106 I 21106 II 25103 62215
Excavator Rental Hours 10 neg. 2+00 Construct Berm X 0+00 Begin Project @ Large Stream Crossing
Existing CMP 72" Remove X 25 5 Construct Weirs
3+50 Construct Waterbar X 5+20 Existing CMP Cross Drain
Do Not Remove 5+70 Construct Waterbar X
6% Ahead 7+20 Jct. with 9777 and 5305 10+20 Flat Road High Ground 11+00 Construct Waterbar X
1% Ahead 13+25 Construct Waterbar X
Flat Road Keep Ditches Open 16+00 Existing CMP, Do Not Remove 16+20 Construct Waterbar X 18+40 Construct Waterbar X 20+30 Construct Waterbar X 20+50 Dry Draw Outsloped 22+70 Existing CMP 18" Remove X 25+40 Construct Waterbar X 27+50 Construct Waterbar X 30+10 Construct Waterbar X 34+25 Existing CMP 24" Remove X 40+15 Construct Waterbar X 42+75 Construct Waterbar X 45+50 Construct Waterbar X 49+30 Existing CMP Cross Drain 49+80 Construct Waterbar X 51+80 Construct Waterbar X 54+50 Construct Waterbar X 57+50 Construct Waterbar X 57+90 Existing CMP, Clean Inlet 60+00 Construct Waterbar X 63+00 Construct Waterbar X 64+50 Existing CMP, Do Not Remove 65+00 Construct Waterbar X 67+75 Construct Waterbar X 70+75 Construct Waterbar X 72+35 Existing CMP, Clean Inlet 73+40 Construct Waterbar X 76+80 Construct Waterbar X 79+40 Construct Waterbar X 83+00 Construct Waterbar X 85+90 Construct Waterbar X 88+65 Existing Dip 94+15 Existing CMP 24" Cross Drain, Dry Draw
Do Not Remove 96+80 RD Jct 5305 on Left
STATION WORK DESCRIPTION
BID ITEM
21103 21104 21106 I 21106 II 25103 62215STATION WORK DESCRIPTION
99+40 Construct Waterbar X 100+90 Existing CMP Cross Drain
Do Not Remove 103+65 Construct Waterbar X 107+30 Construct Waterbar X 110+20 Construct Waterbar X 113+20 Construct Waterbar X 116+50 Construct Waterbar X 119+10 Dry Draw 120+10 Sag
3% Ahead 125+40 Existing CMP 18" Remove X 3 127+70 Existing CMP 24" Remove X 6 130+00 Construct Waterbar X 130+50 Existing 24" CMP, Clean Inlet and Outlet 131+30 Construct Waterbar X 133+10 Construct Waterbar X 135+00 Construct Waterbar X 137+15 Construct Waterbar X 138+75 Wide Area 139+70 Existing CMP, Clean Inlet and Outlet 140+10 Construct Waterbar X
5% Ahead 142+10 Construct Waterbar X 144+55 Existing CMP 60" Remove X 50 10
Construct Weirs 145+35 Existing Gate
Remove and Haul to Hungry Horse Contractor Responsible for Gate Existing 5" CMP, Remove 8% Ahead
145+85 Construct Waterbar X 147+80 Construct Waterbar X 150+15 Construct Waterbar X 151+85 Existing CMP 18" Cross Drain
Clean Inlet and Outlet 152+65 Construct Waterbar X 153+65 Construct Waterbar X 155+65 Construct Waterbar X 156+80 Existing CMP 18" Remove X 3 157+60 Construct Waterbar X 159+60 Construct Waterbar X 160+60 Rock Source 162+50 Construct Waterbar X 164+50 Construct Waterbar X 168+15 Construct Waterbar X 170+15 Construct Waterbar X 172+45 Construct Waterbar X
2% Ahead 174+70 Construct Waterbar X
176+70 Construct Waterbar X 177+75 Rock Source
Crest
- 1% Ahead
178+70 Construct Waterbar X 179+60 Rock Source 180+70 Construct Waterbar X
Rock Source (Big Rocks) 183+00 Existing CMP 60" Remove X 30 5
Construct Weirs 184+ 35 Construct Waterbar X 185+30 Construct Waterbar X 186+45 Existing CMP 18" Do Not Remove 187+20 Construct Waterbar X 187+60 Construct Waterbar
8% Ahead 189+60 Construct Waterbar X 190+30 Wide Area 191+40 Construct Waterbar X 192+55 Existing CMP 18" Remove X 3 193+55 Construct Waterbar X 194+05 Slump in Road/ 2 Excavator Hours 2
Construct Waterbar X 194+65 Construct Waterbar X 194+90 Construct Waterbar X 3
Add rock to Stabilize running seep 195+70 Stream Restoration X 3
4% Ahead 196+40 Construct Waterbar X 197+15 Existing CMP 18" Remove X 3 198+00 Construct Waterbar X 199+40 Construct Waterbar X
8% Ahead 201+00 Construct Waterbar X
Wide Area Ahead 202+80 Construct Waterbar X
Construct 20' Outlet Ditch 203+50 Existing CMP 18" Cross Drain
Do Not Remove 204+65 Crest
Wide Area
- 1% Ahead
206+25 Existing CMP 24" Remove X 3 207+00 Construct Waterbar X 209+00 Construct Waterbar X 209+85 Road Jct 2837 on Right
3% Ahead 212+00 Construct Waterbar X
Rock Source 214+00 Construct Waterbar X 216+00 Construct Waterbar X
218+20 Construct Waterbar X 219+00 Rock Source 220+75 Construct Waterbar X
7% Ahead 222+75 Construct Waterbar X 223+90 Existing CMP 18" Cross Drain
Do Not Remove 224+70 Construct Waterbar X 226+35 Construct Waterbar X 227+00 Wide Area
Crest
- 2% Ahead
228+35 Construct Waterbar X 229+60 Existing CMP 24" in Dry Draw
Do Not Remove 230+40 Construct Waterbar X 232+40 Construct Waterbar X 234+40 Construct Waterbar X 236+40 Construct Waterbar X
3% Ahead 238+40 Construct Waterbar X 240+00 Construct Waterbar X 242+00 Construct Waterbar X 243+10 Existing CMP Cross Drain
Clean Inlet 244+00 Construct Waterbar X 245+10 Existing CMP Cross Drain
Do Not Remove 246+00 Construct Waterbar X
7% Ahead 248+00 Construct Waterbar X 249-+50 Road Jct 10327 on Left
Wide Area 250+15 Construct Waterbar X 252+15 Existing Sag
Construct Waterbar X 7% Ahead
253+80 Existing CMP Cross Drain Do Not Remove
254+80 Construct Waterbar X 256+80 Construct Waterbar X 258+80 Construct Waterbar X 260+80 Construct Waterbar X 262+80 Construct Waterbar X 264+50 Rock Source 264+90 Construct Waterbar X
4% Ahead 266+90 Construct Waterbar X 269+00 Construct Waterbar X 271+00 Construct Waterbar X 273+00 Construct Waterbar X
274+70 Existing CMP 60" Remove X 20 5 Construct Weirs
276+40 Existing CMP 24" Remove X 3 277+20 Construct Waterbar X 278+70 Existing Sag
Construct Waterbar X 7% Ahead
280+75 Construct Waterbar X 281+60 Existing CMP 18" Do Not Remove 282+55 Construct Waterbar X 284+60 Construct Waterbar X 286+60 Construct Waterbar X 288+60 Construct Waterbar X
4% Ahead 289+40 Existing CMP 24" Do Not Remove 290+20 Construct Waterbar X 291+40 Existing Sag
Construct Waterbar X 293+30 Construct Waterbar X
3% Ahead 295+30 Construct Waterbar X 296+60 Crest
- 6% Ahead 297+30 Construct Waterbar X 299+30 Construct Waterbar X 301+30 Construct Waterbar X 303+30 Construct Waterbar X
End Project
TOTALS: 1 14 119 0 155 37
Excavator Rental Hours 4
0+00 Begin Project @ Station 28+00 Rd Jct. 9777 0+70 Existing Berm, Remove & Replace X
Road Outsloped, No Ditch 3+40 Construct Waterbar X
5% Ahead 4+35 Historic Rd Jct Left 4+80 Existing 18" CMP Cross Drain, Do Not Remove 5+10 Construct Waterbar X 7+50 Crest
-1% Ahead 7+55 Historic Rd Jct Left 9+30 Road Outsloped, No Ditch
Flat Ahead 11+40 Construct Waterbar X
-3% Ahead 13+70 Construct Waterbar X 16+70 Construct Waterbar X 18+60 Construct Waterbar X 20+60 Construct Waterbar X 21+00 Historic Rd Jct Right 23+15 Construct Waterbar X 26+40 Existing 18" CMP, Remove X 3
Burried Inlet 27+70 Existing Berm
End Project
TOTALS: 1 1 8 0 3 4
0+00 Begin Project @ Station 13+30 Rd Jct 9777 0+35 Existing Berm, Remove & Replace X 1+75 Construct Waterbar X
-3% Ahead 2+75 Existing 18" CMP, Remove X 3+85 Construct Waterbar X 5+20 Wide Area 7+00 Construct Waterbar, 15% Skew X
4% Ahead 8+70 Construct Waterbar, 15% Skew X 11+20 Construct Waterbar, 15% Skew X 13+00 Construct Waterbar, 15% Skew X 15+60 Existing Sag 15+75 Construct Waterbar X 17+50 Construct Waterbar X
15' Outlet Ditch 4% Ahead
18+75 Crest -2% Ahead
19+90 Existing Sag Drain Sag to Right
21+65 Existing Sag 5% Ahead
22+95 Crest -1% Ahead
23+30 Remove Old Grill 24+50 Existing 18" CMP Cross Drain, Remove X 3 24+85 Historic Rd Left 25+50 Crest
-3% Ahead 26+30 Begin Through Cut 27+70 Historic Rd Left 28+00 Existing 24" CMP, Remove X 15 5
Construct Weirs 28+90 Existing Berm
End Project
TOTALS: 1 3 7 1 18 9
0+00 Begin Project at Jct with Rd. # 1631 0+60 Existing Berm, Remove and Replace X
Heavy Brush Ahead 2+00 Construct Waterbar X 4+00 Construct Waterbar X 6+00 Construct Waterbar X 8+00 Construct Waterbar X 10+00 Construct Waterbar X 12+00 Construct Waterbar X
-1% Ahead 14+00 Construct Waterbar X 16+00 Construct Waterbar X
5% Ahead 18+00 Construct Waterbar X 20+00 Construct Waterbar X 22+00 Construct Waterbar X 24+00 Construct Waterbar X 26+00 Crest
-5% Ahead 26+60 Construct Waterbar in Sag X
4% Ahead 28+75 Construct Waterbar X 30+75 Construct Waterbar X 32+35 Construct Waterbar X 33+25 Existing Road Jct. Left 34+60 Construct Waterbar X 36+60 Construct Waterbar X 38+65 Construct Waterbar X 40+65 Construct Waterbar X 42+55 Construct Waterbar X
3% Ahead 44+50 Construct Waterbar X 46+50 Construct Waterbar X 48+80 Construct Waterbar X 51+00 Construct Waterbar X 52+65 Existing 18" CMP, Cross Drain
Do Not Remove 53+55 Construct Waterbar X 55+50 Construct Waterbar X 57+55 Crest
Wide Area -1% Ahead
58+80 Existing 18" CMP, Remove X 3 59+60 Construct Waterbar X
Heavy Brush Ahead 62+00 Construct Waterbar X 63+25 Existing 18" CMP
Do Not Remove 64+00 Construct Waterbar X
End Brush 64+35 Existing Historic Road Right 66+00 Construct Waterbar X 68+00 Construct Waterbar X 70+00 Construct Waterbar X 72+00 Construct Waterbar X 75+30 Crest
-5% Ahead 76+00 Existing 18" CMP, Remove X 6
Heavy Brush Ahead 76+80 Construct Waterbar X 78+80 Construct Waterbar X 80+80 Construct Waterbar X 82+80 Construct Waterbar in Sag X 84+80 Construct Waterbar X 86+80 Crest
-2% Ahead 87+65 Construct Waterbar X
End Brush 89+20 Road Jct. 9783 Left 89+80 Construct Waterbar X 91+60 Wide Area 94+40 Construct Waterbar X 96+45 Construct Waterbar X 99+00 Construct Waterbar X 101+00 Construct Waterbar X 103+00 Construct Waterbar X
-4% Ahead 104+60 Existing Sag 105+00 Construct Waterbar X 107+00 Construct Waterbar X 109+00 Construct Waterbar X 109+80 Existing Sag 111+30 Construct Waterbar X 113+30 Construct Waterbar X 115+40 Construct Waterbar X 117+70 Construct Waterbar in Sag X
-1% Ahead 119+70 Construct Waterbar X 121+70 Construct Waterbar X 123+70 Construct Waterbar X 125+70 Construct Waterbar X 127+00 Existing Gate
Remove and Haul to Hungry Horse Contractor Responsible for Gate Construct Berm X End Project
TOTALS: 2 2 57 0 9 4
0+00 Begin Project @ Jct with Rd. 38 1+55 Existing Gate
Remove and Haul to Hungry Horse Contractor Responsible for Gate Construct Berm X 3% Ahead
3+45 Existing CMP, Remove X Pipe is Completely Burried
4+20 Construct Waterbar X 5+50 Existing 18" CMP, Remove X 6+35 Construct Waterbar X 7+25 Switchback
Begin Ditch Left Historic Road Left
8+00 Construct Waterbar X 6% Ahead
9+50 Existing 18" CMP, Remove X 11+00 Construct Waterbar X
5% Ahead 13+35 Switchback
Jct with Road 2841 Lower 14+40 Wide Area
Good Spot for Equipment on Project Needs Brushing
16+50 Existing 18" CMP, Remove X 18+50 Construct Waterbar X 20+00 Construct Waterbar X
8% Ahead 21+20 Construct Waterbar X
10% Ahead 23+00 Construct Waterbar X 25+00 Construct Waterbar X 27+00 Construct Waterbar X 27+65 ``
Road Very Wide Running Ridgeline
30+10 Start Through Cut 31+30 End Through Cut 31+50 Construct Waterbar X 32+00 Crest
-2% Ahead 32+50 Begin Heavy Brush 33+20 End Heavy Brush 33+50 Sag
2% Ahead 37+00 Construct Waterbar X 39+80 Crest
-2% Ahead 42+00 Construct Waterbar X 43+75 Existing 18" CMP, Remove X
45+00 Construct Waterbar X 5% Ahead
49+00 Existing Gate Remove and Haul to Hungry Horse Contractor Responsible for Gate
50+00 Jct with Road 1631 52+80 End Project
TOTALS: 1 5 14 0 0 4
0+00 Begin Project @ Jct with Rd 5305 0+50 Construct Berm X 2+25 Construct Waterbar X
2% Ahead 5+95 Flat Area
0% Ahead 6+60 Construct Waterbar X 8+60 Construct Waterbar X 10+60 Construct Waterbar X 11+50 Existing 18" CMP, Remove X 6 12+30 Construct Waterbar X 14+00 Wide Area 14+65 Construct Waterbar X
8% Ahead 16+85 Construct Waterbar X 18+85 Construct Waterbar X 20+60 Construct Waterbar X 22+95 Crest
-2% Ahead 24+00 Existing Sag 26+00 Construct Waterbar X 27+90 Existing 18" CMP, Remove X 3 28+70 Construct Waterbar X 30+80 Construct Waterbar X 31+20 Existing 18" CMP, Remove X 3 33+00 Construct Waterbar X 35+00 Construct Waterbar X 36+25 Existing 18" CMP, Remove X 3 37+10 Construct Waterbar X 40+35 Existing 18" CMP in Dry Draw
Do Not Remove 12% Ahead
41+15 Construct Waterbar X Brush Ahead
44+00 Construct Waterbar X 46+00 Construct Waterbar X 48+00 Construct Waterbar X 50+00 Construct Waterbar X 52+00 Construct Waterbar X 53+70 Rock Source 54+00 Construct Waterbar X
6% Ahead 56+00 Construct Waterbar X 58+00 Construct Waterbar X 60+00 Construct Waterbar X
End Project 76+05 End Road
TOTALS: 1 4 25 0 15 4
| COVER |
| 01 |
| 02 |
| 03 |
| 04 |
| 05 |
| 06 |
| 07 |
| 08 |
| 09 |
| 10 |
| 11 |
| 12 |
| 13 |
| 14 |
| 15 |
| 16 |
| 17 |
| 18 |
| 19 |
| 20 |
| 21 |
| 22 |
| 23 |
| 24 |
| 25 |
| 26 |
| 27 |
| 28 |
| 29 |
| 30 |
| 31 |
| 32 |
| 33 |
| 34 |
| 35 |
| 36 |
| 37 |
| 38 |
File details come from the government source that posted it. Updated .