Attachment B BETTY_Drawings_022510.pdf

PDF 3 MB Posted

Attached to
RECOVERY Road Decommissioning, Betty Cr. Road, Flathead National Forrest
Solicitation number
AG-82B1-S-10-0245
Issued by

About this file

Attachment B Drawings

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FE

LI

X C

R

EE

K

PA

IN

T C R

E E

K

HARRIS CREEK

N CREEK

UNAWAH CREEK

CANYON CREEK

B E

T T

Y C

R E

E K

34 35 36

10327

10330

10326

10328

10176

10337

10329

1652A

9854A

5334Y

5334X

10328X

10337Y

11137

10328

SLUMP

REMOVE

GATE

REMOVE

GATE

REMOVE

GATE

REMOVE

GATE

Legend

# Berms To Be Constructed

Best Route To Project

Roads To Be Decommissioned

Other USFS Roads

FE

LI

X C

R

EE

K

PA

IN

T C R

E E

K

HARRIS CREEK

LOGAN CREEK

UNAWAH CREEK

CANYON CREEK

B E

TT

Y

C R

E E

K

34 35 36

10327

10330

10326

10328

10176

10337

10329

A

1652A

9854A

5334Y

5334X

10328X

10337Y

11137

10328

SLUMP

REMOVE

GATE

REMOVE

GATE

REMOVE

GATE

REMOVE

GATE

Legend

# Berms To Be Constructed

Noxious Weed Treated Roads

Best Route To Project

Roads To Be Decommissioned

Other USFS Roads

1631 2841N 2841S 5305 9777 9783

5.744 0.525 0.547 2.405 1.000 1.440

METHOD UNIT

15101 MOBILIZATION LSQ LS ‐ ‐ ‐ ‐ ‐ ‐ 1

15102

EQUIPMENT

WASHING

LSQ LS ‐ ‐ ‐ ‐ ‐ ‐ 1

21103 EARTH BERM AQ EA 1 1 1 2 1 1 7

21104

STREAM

RESTORATION

AQ EA 14 1 3 2 5 4 29

21106 I WATERBAR, TYPE I AQ EA 119 8 7 57 14 25 230

21106 II WATERBAR, TYPE II AQ EA 0 0 1 0 0 0 1

21110

REESTABLISH ROAD

STAKES

CQ MI 5.744 0.525 0.547 2.405 1.000 1.440 11.66

25103

MACHINE‐PLACED

RIPRAP, CLASS III

VQ CY 155 3 18 9 0 15 200

62215 EXCAVATOR AQ HR 37 4 9 4 4 4 62

62216 DUMP TRUCK AQ HR ‐ ‐ ‐ ‐ ‐ ‐ 20

81501

NOXIOUS WEED

TREATMENT

AQ AC 11.1 1.0 1.1 1.4 1.9 2.8 19.3

TOTAL

ROAD NO

ROAD LENGTH

MEASUREMENT

ITEM NO. ITEM DESCRIPTION

21103 21104 21106 I 21106 II 25103 62215

Excavator Rental Hours 10 neg. 2+00 Construct Berm X 0+00 Begin Project @ Large Stream Crossing

Existing CMP 72" Remove X 25 5 Construct Weirs

3+50 Construct Waterbar X 5+20 Existing CMP Cross Drain

Do Not Remove 5+70 Construct Waterbar X

6% Ahead 7+20 Jct. with 9777 and 5305 10+20 Flat Road High Ground 11+00 Construct Waterbar X

1% Ahead 13+25 Construct Waterbar X

Flat Road Keep Ditches Open 16+00 Existing CMP, Do Not Remove 16+20 Construct Waterbar X 18+40 Construct Waterbar X 20+30 Construct Waterbar X 20+50 Dry Draw Outsloped 22+70 Existing CMP 18" Remove X 25+40 Construct Waterbar X 27+50 Construct Waterbar X 30+10 Construct Waterbar X 34+25 Existing CMP 24" Remove X 40+15 Construct Waterbar X 42+75 Construct Waterbar X 45+50 Construct Waterbar X 49+30 Existing CMP Cross Drain 49+80 Construct Waterbar X 51+80 Construct Waterbar X 54+50 Construct Waterbar X 57+50 Construct Waterbar X 57+90 Existing CMP, Clean Inlet 60+00 Construct Waterbar X 63+00 Construct Waterbar X 64+50 Existing CMP, Do Not Remove 65+00 Construct Waterbar X 67+75 Construct Waterbar X 70+75 Construct Waterbar X 72+35 Existing CMP, Clean Inlet 73+40 Construct Waterbar X 76+80 Construct Waterbar X 79+40 Construct Waterbar X 83+00 Construct Waterbar X 85+90 Construct Waterbar X 88+65 Existing Dip 94+15 Existing CMP 24" Cross Drain, Dry Draw

Do Not Remove 96+80 RD Jct 5305 on Left

STATION WORK DESCRIPTION

BID ITEM

21103 21104 21106 I 21106 II 25103 62215STATION WORK DESCRIPTION

99+40 Construct Waterbar X 100+90 Existing CMP Cross Drain

Do Not Remove 103+65 Construct Waterbar X 107+30 Construct Waterbar X 110+20 Construct Waterbar X 113+20 Construct Waterbar X 116+50 Construct Waterbar X 119+10 Dry Draw 120+10 Sag

3% Ahead 125+40 Existing CMP 18" Remove X 3 127+70 Existing CMP 24" Remove X 6 130+00 Construct Waterbar X 130+50 Existing 24" CMP, Clean Inlet and Outlet 131+30 Construct Waterbar X 133+10 Construct Waterbar X 135+00 Construct Waterbar X 137+15 Construct Waterbar X 138+75 Wide Area 139+70 Existing CMP, Clean Inlet and Outlet 140+10 Construct Waterbar X

5% Ahead 142+10 Construct Waterbar X 144+55 Existing CMP 60" Remove X 50 10

Construct Weirs 145+35 Existing Gate

Remove and Haul to Hungry Horse Contractor Responsible for Gate Existing 5" CMP, Remove 8% Ahead

145+85 Construct Waterbar X 147+80 Construct Waterbar X 150+15 Construct Waterbar X 151+85 Existing CMP 18" Cross Drain

Clean Inlet and Outlet 152+65 Construct Waterbar X 153+65 Construct Waterbar X 155+65 Construct Waterbar X 156+80 Existing CMP 18" Remove X 3 157+60 Construct Waterbar X 159+60 Construct Waterbar X 160+60 Rock Source 162+50 Construct Waterbar X 164+50 Construct Waterbar X 168+15 Construct Waterbar X 170+15 Construct Waterbar X 172+45 Construct Waterbar X

2% Ahead 174+70 Construct Waterbar X

176+70 Construct Waterbar X 177+75 Rock Source

Crest

- 1% Ahead

178+70 Construct Waterbar X 179+60 Rock Source 180+70 Construct Waterbar X

Rock Source (Big Rocks) 183+00 Existing CMP 60" Remove X 30 5

Construct Weirs 184+ 35 Construct Waterbar X 185+30 Construct Waterbar X 186+45 Existing CMP 18" Do Not Remove 187+20 Construct Waterbar X 187+60 Construct Waterbar

8% Ahead 189+60 Construct Waterbar X 190+30 Wide Area 191+40 Construct Waterbar X 192+55 Existing CMP 18" Remove X 3 193+55 Construct Waterbar X 194+05 Slump in Road/ 2 Excavator Hours 2

Construct Waterbar X 194+65 Construct Waterbar X 194+90 Construct Waterbar X 3

Add rock to Stabilize running seep 195+70 Stream Restoration X 3

4% Ahead 196+40 Construct Waterbar X 197+15 Existing CMP 18" Remove X 3 198+00 Construct Waterbar X 199+40 Construct Waterbar X

8% Ahead 201+00 Construct Waterbar X

Wide Area Ahead 202+80 Construct Waterbar X

Construct 20' Outlet Ditch 203+50 Existing CMP 18" Cross Drain

Do Not Remove 204+65 Crest

Wide Area

- 1% Ahead

206+25 Existing CMP 24" Remove X 3 207+00 Construct Waterbar X 209+00 Construct Waterbar X 209+85 Road Jct 2837 on Right

3% Ahead 212+00 Construct Waterbar X

Rock Source 214+00 Construct Waterbar X 216+00 Construct Waterbar X

218+20 Construct Waterbar X 219+00 Rock Source 220+75 Construct Waterbar X

7% Ahead 222+75 Construct Waterbar X 223+90 Existing CMP 18" Cross Drain

Do Not Remove 224+70 Construct Waterbar X 226+35 Construct Waterbar X 227+00 Wide Area

Crest

- 2% Ahead

228+35 Construct Waterbar X 229+60 Existing CMP 24" in Dry Draw

Do Not Remove 230+40 Construct Waterbar X 232+40 Construct Waterbar X 234+40 Construct Waterbar X 236+40 Construct Waterbar X

3% Ahead 238+40 Construct Waterbar X 240+00 Construct Waterbar X 242+00 Construct Waterbar X 243+10 Existing CMP Cross Drain

Clean Inlet 244+00 Construct Waterbar X 245+10 Existing CMP Cross Drain

Do Not Remove 246+00 Construct Waterbar X

7% Ahead 248+00 Construct Waterbar X 249-+50 Road Jct 10327 on Left

Wide Area 250+15 Construct Waterbar X 252+15 Existing Sag

Construct Waterbar X 7% Ahead

253+80 Existing CMP Cross Drain Do Not Remove

254+80 Construct Waterbar X 256+80 Construct Waterbar X 258+80 Construct Waterbar X 260+80 Construct Waterbar X 262+80 Construct Waterbar X 264+50 Rock Source 264+90 Construct Waterbar X

4% Ahead 266+90 Construct Waterbar X 269+00 Construct Waterbar X 271+00 Construct Waterbar X 273+00 Construct Waterbar X

274+70 Existing CMP 60" Remove X 20 5 Construct Weirs

276+40 Existing CMP 24" Remove X 3 277+20 Construct Waterbar X 278+70 Existing Sag

Construct Waterbar X 7% Ahead

280+75 Construct Waterbar X 281+60 Existing CMP 18" Do Not Remove 282+55 Construct Waterbar X 284+60 Construct Waterbar X 286+60 Construct Waterbar X 288+60 Construct Waterbar X

4% Ahead 289+40 Existing CMP 24" Do Not Remove 290+20 Construct Waterbar X 291+40 Existing Sag

Construct Waterbar X 293+30 Construct Waterbar X

3% Ahead 295+30 Construct Waterbar X 296+60 Crest

- 6% Ahead 297+30 Construct Waterbar X 299+30 Construct Waterbar X 301+30 Construct Waterbar X 303+30 Construct Waterbar X

End Project

TOTALS: 1 14 119 0 155 37

Excavator Rental Hours 4

0+00 Begin Project @ Station 28+00 Rd Jct. 9777 0+70 Existing Berm, Remove & Replace X

Road Outsloped, No Ditch 3+40 Construct Waterbar X

5% Ahead 4+35 Historic Rd Jct Left 4+80 Existing 18" CMP Cross Drain, Do Not Remove 5+10 Construct Waterbar X 7+50 Crest

-1% Ahead 7+55 Historic Rd Jct Left 9+30 Road Outsloped, No Ditch

Flat Ahead 11+40 Construct Waterbar X

-3% Ahead 13+70 Construct Waterbar X 16+70 Construct Waterbar X 18+60 Construct Waterbar X 20+60 Construct Waterbar X 21+00 Historic Rd Jct Right 23+15 Construct Waterbar X 26+40 Existing 18" CMP, Remove X 3

Burried Inlet 27+70 Existing Berm

End Project

TOTALS: 1 1 8 0 3 4

0+00 Begin Project @ Station 13+30 Rd Jct 9777 0+35 Existing Berm, Remove & Replace X 1+75 Construct Waterbar X

-3% Ahead 2+75 Existing 18" CMP, Remove X 3+85 Construct Waterbar X 5+20 Wide Area 7+00 Construct Waterbar, 15% Skew X

4% Ahead 8+70 Construct Waterbar, 15% Skew X 11+20 Construct Waterbar, 15% Skew X 13+00 Construct Waterbar, 15% Skew X 15+60 Existing Sag 15+75 Construct Waterbar X 17+50 Construct Waterbar X

15' Outlet Ditch 4% Ahead

18+75 Crest -2% Ahead

19+90 Existing Sag Drain Sag to Right

21+65 Existing Sag 5% Ahead

22+95 Crest -1% Ahead

23+30 Remove Old Grill 24+50 Existing 18" CMP Cross Drain, Remove X 3 24+85 Historic Rd Left 25+50 Crest

-3% Ahead 26+30 Begin Through Cut 27+70 Historic Rd Left 28+00 Existing 24" CMP, Remove X 15 5

Construct Weirs 28+90 Existing Berm

End Project

TOTALS: 1 3 7 1 18 9

0+00 Begin Project at Jct with Rd. # 1631 0+60 Existing Berm, Remove and Replace X

Heavy Brush Ahead 2+00 Construct Waterbar X 4+00 Construct Waterbar X 6+00 Construct Waterbar X 8+00 Construct Waterbar X 10+00 Construct Waterbar X 12+00 Construct Waterbar X

-1% Ahead 14+00 Construct Waterbar X 16+00 Construct Waterbar X

5% Ahead 18+00 Construct Waterbar X 20+00 Construct Waterbar X 22+00 Construct Waterbar X 24+00 Construct Waterbar X 26+00 Crest

-5% Ahead 26+60 Construct Waterbar in Sag X

4% Ahead 28+75 Construct Waterbar X 30+75 Construct Waterbar X 32+35 Construct Waterbar X 33+25 Existing Road Jct. Left 34+60 Construct Waterbar X 36+60 Construct Waterbar X 38+65 Construct Waterbar X 40+65 Construct Waterbar X 42+55 Construct Waterbar X

3% Ahead 44+50 Construct Waterbar X 46+50 Construct Waterbar X 48+80 Construct Waterbar X 51+00 Construct Waterbar X 52+65 Existing 18" CMP, Cross Drain

Do Not Remove 53+55 Construct Waterbar X 55+50 Construct Waterbar X 57+55 Crest

Wide Area -1% Ahead

58+80 Existing 18" CMP, Remove X 3 59+60 Construct Waterbar X

Heavy Brush Ahead 62+00 Construct Waterbar X 63+25 Existing 18" CMP

Do Not Remove 64+00 Construct Waterbar X

End Brush 64+35 Existing Historic Road Right 66+00 Construct Waterbar X 68+00 Construct Waterbar X 70+00 Construct Waterbar X 72+00 Construct Waterbar X 75+30 Crest

-5% Ahead 76+00 Existing 18" CMP, Remove X 6

Heavy Brush Ahead 76+80 Construct Waterbar X 78+80 Construct Waterbar X 80+80 Construct Waterbar X 82+80 Construct Waterbar in Sag X 84+80 Construct Waterbar X 86+80 Crest

-2% Ahead 87+65 Construct Waterbar X

End Brush 89+20 Road Jct. 9783 Left 89+80 Construct Waterbar X 91+60 Wide Area 94+40 Construct Waterbar X 96+45 Construct Waterbar X 99+00 Construct Waterbar X 101+00 Construct Waterbar X 103+00 Construct Waterbar X

-4% Ahead 104+60 Existing Sag 105+00 Construct Waterbar X 107+00 Construct Waterbar X 109+00 Construct Waterbar X 109+80 Existing Sag 111+30 Construct Waterbar X 113+30 Construct Waterbar X 115+40 Construct Waterbar X 117+70 Construct Waterbar in Sag X

-1% Ahead 119+70 Construct Waterbar X 121+70 Construct Waterbar X 123+70 Construct Waterbar X 125+70 Construct Waterbar X 127+00 Existing Gate

Remove and Haul to Hungry Horse Contractor Responsible for Gate Construct Berm X End Project

TOTALS: 2 2 57 0 9 4

0+00 Begin Project @ Jct with Rd. 38 1+55 Existing Gate

Remove and Haul to Hungry Horse Contractor Responsible for Gate Construct Berm X 3% Ahead

3+45 Existing CMP, Remove X Pipe is Completely Burried

4+20 Construct Waterbar X 5+50 Existing 18" CMP, Remove X 6+35 Construct Waterbar X 7+25 Switchback

Begin Ditch Left Historic Road Left

8+00 Construct Waterbar X 6% Ahead

9+50 Existing 18" CMP, Remove X 11+00 Construct Waterbar X

5% Ahead 13+35 Switchback

Jct with Road 2841 Lower 14+40 Wide Area

Good Spot for Equipment on Project Needs Brushing

16+50 Existing 18" CMP, Remove X 18+50 Construct Waterbar X 20+00 Construct Waterbar X

8% Ahead 21+20 Construct Waterbar X

10% Ahead 23+00 Construct Waterbar X 25+00 Construct Waterbar X 27+00 Construct Waterbar X 27+65 ``

Road Very Wide Running Ridgeline

30+10 Start Through Cut 31+30 End Through Cut 31+50 Construct Waterbar X 32+00 Crest

-2% Ahead 32+50 Begin Heavy Brush 33+20 End Heavy Brush 33+50 Sag

2% Ahead 37+00 Construct Waterbar X 39+80 Crest

-2% Ahead 42+00 Construct Waterbar X 43+75 Existing 18" CMP, Remove X

45+00 Construct Waterbar X 5% Ahead

49+00 Existing Gate Remove and Haul to Hungry Horse Contractor Responsible for Gate

50+00 Jct with Road 1631 52+80 End Project

TOTALS: 1 5 14 0 0 4

0+00 Begin Project @ Jct with Rd 5305 0+50 Construct Berm X 2+25 Construct Waterbar X

2% Ahead 5+95 Flat Area

0% Ahead 6+60 Construct Waterbar X 8+60 Construct Waterbar X 10+60 Construct Waterbar X 11+50 Existing 18" CMP, Remove X 6 12+30 Construct Waterbar X 14+00 Wide Area 14+65 Construct Waterbar X

8% Ahead 16+85 Construct Waterbar X 18+85 Construct Waterbar X 20+60 Construct Waterbar X 22+95 Crest

-2% Ahead 24+00 Existing Sag 26+00 Construct Waterbar X 27+90 Existing 18" CMP, Remove X 3 28+70 Construct Waterbar X 30+80 Construct Waterbar X 31+20 Existing 18" CMP, Remove X 3 33+00 Construct Waterbar X 35+00 Construct Waterbar X 36+25 Existing 18" CMP, Remove X 3 37+10 Construct Waterbar X 40+35 Existing 18" CMP in Dry Draw

Do Not Remove 12% Ahead

41+15 Construct Waterbar X Brush Ahead

44+00 Construct Waterbar X 46+00 Construct Waterbar X 48+00 Construct Waterbar X 50+00 Construct Waterbar X 52+00 Construct Waterbar X 53+70 Rock Source 54+00 Construct Waterbar X

6% Ahead 56+00 Construct Waterbar X 58+00 Construct Waterbar X 60+00 Construct Waterbar X

End Project 76+05 End Road

TOTALS: 1 4 25 0 15 4

COVER
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

File details come from the government source that posted it. Updated .