San Juan National Forest Page C1 Section C San Juan Solar Pump Conversions

SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT

C.1 SCOPE OF WORK

Work for this project consists of the construction of a water system (hydrants, valves, line, and connections) and treatment building (connection to well, building prep, building placement, and interior plumbing), This project shall be located at the Transfer Campground located on the Dolores Ranger District and the West Fork and Bridge Campgrounds located on the Pagosa Ranger District of the San Juan National Forest.

The principal features of work to be performed include, but are not limited to the following:

1. Salvage existing hand pump.

2. Adapt well for use with a pitless adapter and remove existing concrete pad.

3. Installation of water distribution piping and appurtenances from well supply to treatment building, including a daylight drain.

4. Preparation, concrete slab placement, and final grading of treatment building site.

5. Installation of all treatment building plumbing and photovoltaic wiring systems.

6. Seeding of areas disturbed by construction.

C.2 LOCATION OF WORK

This project is located in the Dolores and Pagosa Ranger District of the San Juan National Forest near the towns of Mancos, Colorado and Pagosa, Colorado. Project locations are described further in the attached project schedule and project location maps.