AG-82B1-S-10-0127_amend_2.pdf
PDF 548 KB Posted
- Solicitation number
- AG-82B1-S-10-0127
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-82B1-S-10-0127_amend_3.pdf | ||
| Rd_895_drawings.pdf | ||
| Rd38_Drawings.pdf | ||
| Rd38_Drawings.dwf | DWF file | |
| Rd_895_drawings.dwf | DWF file | |
| AG-82B1-S-10-0127_amend_1.pdf | ||
| nfsr_ 38.dwf | DWF file | |
| nfsr_ 895.dwf | DWF file | |
| nfsr_38_drawings.pdf | ||
| nfsr_38_specifications.pdf | ||
| nfsr_895_drawings.pdf | ||
| AG-82B1-S-10-0127.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 21
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
Two (2) 3/16/10 359535/359536 CIM-0110-02R/CIM-0110-05R
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service Intermountain EROC 740 Simms St.
Golden, CO 80401
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-82B1-S-10-0127
9B. DATED (SEE ITEM 11)
3/9/10
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
See the attached description of the solicitation changes
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Stephen M. Patton, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The solicitation is changed as follows:
1. The solicitation cover sheet is deleted and the attached cover sheet is substituted.
2. The SF-1442 form is deleted and the attached SF-1442 is substituted.
3. The Schedule of items (Section B) is deleted and the attached Schedule of Items is substituted.
4. The drawings for both the NFSR #38 and the NFSR #895 Projects are deleted and the attached drawings are substituted.
5. Provision L-9, AGAR 452.215-71, Instructions for the Preparation of Technical and Business Proposals, paragraph (b) (4), is changed to read as follows:
(4) Proposed Project Execution: Project plan to accomplish work including quarry development plans and scheduling of various work items and subcontractors.
Offeror shall provide the Government an outline for how the work will be completed on each project, separate and independent of the other and not in combination.
Offeror shall provide the Government with a proposed timeline for when different segments of the work will be completed. Offeror’s proposals shall comply with all contract requirements stated herein, and the time constraints identified in the solicitation, including, but not limited to the constraints identified in Section F, Project Specifications, and Drawings. Specifically address (a) quarry development plans outlined in Specification 611.02 - Development of Pits & Quarries; (b) timelines for pursuing and completing the various segments of work, acknowledging the anticipated constraints associated with other third-party contracts occurring in the area; and (c) the anticipated beginning and completion date for the project. Part or all of the Offeror’s proposal on this item may be included in the awarded contract and, if incorporated, will be enforced as contract requirements.