AG-82B1-S-10-0099_abstract.pdf
PDF 72 KB Posted
- Solicitation number
- AG-82B1-S-10-0099
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-82B1-S-10-0099_amend_3.pdf | ||
| AG-82B1-S-10-0099_amend_2.pdf | ||
| AG-82B1-S-10-0099_amend_1.pdf | ||
| Peters SPS.pdf | ||
| peters_creek.dwfx | — | |
| Canyon Creek SPS.pdf | ||
| Peters_creek_drawings.pdf | ||
| AG-82B1-S-10-0099.pdf | ||
| canyon_creek_drawings_7-12.pdf | ||
| canyon_creek_drawings_19-24.pdf | ||
| canyon_creek_drawings_13-18.pdf | ||
| canyon_creek.dwf | DWF file | |
| canyon_creek_drawings_1-6.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Abstract of Offers Solicitation No. AG-82B1-S-10-0099 Closing Date for Receipt of Proposals: 2/17/10
Issuing Office: Project Name: RECOVERY Canyon Creek Bridge Placment and Peter's Creek Culvert Replacment
Intermountain EROC
740 Simms St.
Golden, CO 80401
Funds Available:
Number of Amendments:
Unit Total Unit Total Unit Total Unit Total Unit Total
Item No. Description Qty Unit Price Price Price Price Price
Canyon Creek Bridge Replacment
15101 Mobilization 1 LS $18,600.00 $18,600.00 $13,790.00 $13,790.00 $26,400.98 $26,400.98 $21,799.84 $21,799.84 $53,700.00 $53,700.00
15713 Soil Erosion and Pollution Control 1 LS $2,000.00 $2,000.00 $2,300.00 $2,300.00 $1,356.14 $1,356.14 $3,000.00 $3,000.00 $2,400.00 $2,400.00
20102 Clearing and Grubbing 1 LS $2,000.00 $2,000.00 $770.00 $770.00 $8,798.30 $8,798.30 $2,000.00 $2,000.00 $1,000.00 $1,000.00
20304 Removal of Existing Timber Bridge 1 LS $7,000.00 $7,000.00 $6,020.00 $6,020.00 $6,726.51 $6,726.51 $8,000.00 $8,000.00 $9,500.00 $9,500.00
20404 Unclassified Borrow 360 CY $20.00 $7,200.00 $13.86 $4,989.60 $13.95 $5,022.00 $18.00 $6,480.00 $16.00 $5,760.00
20434 Roadway Excavation 1 LS $8,000.00 $8,000.00 $10,875.00 $10,875.00 $9,438.95 $9,438.95 $4,000.00 $4,000.00 $9,900.00 $9,900.00
20701 Earthwork Geotextile 180 SY $10.00 $1,800.00 $3.75 $675.00 $2.94 $529.20 $2.50 $450.00 $3.00 $540.00
20803 Structural Backfill 50 CY $50.00 $2,500.00 $80.40 $4,020.00 $36.76 $1,838.00 $35.00 $1,750.00 $26.00 $1,300.00 20806 Structural Excavation 1 LS $3,000.00 $3,000.00 $2,850.00 $2,850.00 $2,353.11 $2,353.11 $8,000.00 $8,000.00 $2,300.00 $2,300.00 25101 Placed Riprap, Class 5, Machine Placed (Govt Source)150 CY $75.00 $11,250.00 $30.33 $4,549.50 $29.45 $4,417.50 $100.00 $15,000.00 $20.00 $3,000.00 27201 Geocell Abutment Stabilization, 6-in. Depth 24.4 SY $63.00 $1,537.20 $58.80 $1,434.72 $83.69 $2,042.04 $50.00 $1,220.00 $71.00 $1,732.40 30809 Crushed Aggregate, Comp Meth 1 (govt Source)290 CY $83.00 $24,070.00 $17.50 $5,075.00 $10.93 $3,169.70 $35.00 $10,150.00 $22.00 $6,380.00 55301 Precast, Prestressed Concrete Structural Member, 3'8" Bulb-Tee4 EA $26,667.00 $106,668.00 $27,301.50 $109,206.00 $24,110.54 $96,442.16 $25,525.50 $102,102.00 $21,750.00 $87,000.00
553A01 (A) Precast Concrete Member, Grade Beam 2 EA $8,000.00 $16,000.00 $6,950.00 $13,900.00 $13,745.78 $27,491.56 $10,437.00 $20,874.00 $12,400.00 $24,800.00 553A01 (B) Precast Concrete Member, Wing Wall 4 EA $750.00 $3,000.00 $1,137.50 $4,550.00 $2,327.92 $9,311.68 $1,503.00 $6,012.00 $2,100.00 $8,400.00
55601 Type T-101 Weathering Steel Bridge Rail 112.67 LF $110.00 $12,393.70 $39.05 $4,399.76 $105.31 $11,865.28 $231.98 $26,137.19 $95.00 $10,703.65 61708 Approach Guardrail, Type IV, Class A 162.5 LF $70.00 $11,375.00 $163.70 $26,601.25 $53.21 $8,646.63 $57.60 $9,360.00 $101.00 $16,412.50 62201 Equipment Rental, Hydraulic Excavator w/. Thumb8 HR $290.00 $2,320.00 $110.00 $880.00 $133.10 $1,064.80 $125.00 $1,000.00 $125.00 $1,000.00 62202 Equipment Rental, Large Dump Truck 8 HR $170.00 $1,360.00 $90.00 $720.00 $93.78 $750.24 $95.00 $760.00 $90.00 $720.00 62503 Seeding, Dry Method 1 LS $1,000.00 $1,000.00 $525.00 $525.00 $1,219.38 $1,219.38 $1,500.00 $1,500.00 $1,100.00 $1,100.00 62509 Mulching, Dry Method 1 LS $1,000.00 $1,000.00 $1,325.00 $1,325.00 $831.40 $831.40 $1,500.00 $1,500.00 $3,300.00 $3,300.00 63501 Temporary Traffic Control 1 LS $2,500.00 $2,500.00 $1,345.00 $1,345.00 $4,546.67 $4,546.67 $2,500.00 $2,500.00 $5,500.00 $5,500.00
Total- Canyon Creek Bridge $246,573.90 $220,800.83 $234,262.22 $253,595.03 $256,448.55
Peter's Creek Culvert Replacemnt
20304 Removal of Existing 48-in. Dia. Culvert 1 LS $4,000.00 $4,000.00 $4,960.00 $4,960.00 $917.39 $917.39 $5,000.00 $5,000.00 $675.00 $675.00
20404 Unclassified Borrow, Placement Meth 3 130 CY $25.00 $3,250.00 $21.40 $2,782.00 $19.53 $2,538.90 $25.00 $3,250.00 $27.00 $3,510.00
15713 Soil Erosion and Pollution Control 1 LS 2000 $2,000.00 4760 $4,760.00 678.06 $678.06 3000 $3,000.00 2000 $2,000.00
20806 Structural Excavation 1 LS $6,500.00 $6,500.00 $7,500.09 $7,500.09 $7,869.06 $7,869.06 $8,000.00 $8,000.00 $30,270.00 $30,270.00
25101A Placed Riprap, Class 2, Method A, machine Placed (Govt Source)40 CY $65.00 $2,600.00 $33.25 $1,330.00 $32.79 $1,311.60 $78.00 $3,120.00 $20.00 $800.00
25101B Placed Riprap, Class 5, Method A, machine Placed (Govt Source)104 CY $80.00 $8,320.00 $33.25 $3,458.00 $23.27 $2,420.08 $100.00 $10,400.00 $20.00 $2,080.00
64810 Rock Weir/Step Pool 5 EA $750.00 $3,750.00 $274.00 $1,370.00 $173.54 $867.70 $300.00 $1,500.00 $383.00 $1,915.00
30809 Crushed Aggregate, Type Surfacing, Compaction B (Govt Source)42 CY $40.00 $1,680.00 $30.70 $1,289.40 $22.26 $934.92 $35.00 $1,470.00 $44.00 $1,848.00
553A02 Precast Concrete Member, Culvert Footing 134 LF $200.00 $26,800.00 $252.50 $33,835.00 $259.70 $34,799.80 $255.97 $34,299.98 $270.00 $36,180.00
15101 Mobilization 1 LS $9,000.00 $9,000.00 $4,935.00 $4,935.00 $10,542.55 $10,542.55 $10,110.75 $10,110.75 $16,500.00 $16,500.00
60304 Steel Structural Plate Arch, 14-ft Span, 4-ft 7-1/2 in. Rise, Galvanized, 0.111-in thickness66 LF $350.00 $23,100.00 $318.90 $21,047.40 $732.52 $48,346.32 $334.66 $22,087.56 $264.00 $17,424.00
62508 Seeding, Dry Method (w/ Mulch) 1 LS $840.00 $840.00 $525.00 $525.00 $1,330.24 $1,330.24 $1,500.00 $1,500.00 $550.00 $550.00
62201 Hydraulic Excavator w/; Thumb 8 HR $145.00 $1,160.00 $110.00 $880.00 $133.10 $1,064.80 $125.00 $1,000.00 $125.00 $1,000.00
Total-Peter's Creek Culvert $93,000.00 $88,671.89 $113,621.42 $104,738.29 $114,752.00
Grand Total $339,573.90 $309,472.72 $347,883.64 $358,333.32 $371,200.55
LHC Inc.
PO Box 7338
Kalispell MT 59904-0338
Cook& Sons
726 Deer Creek Rd
White Bird ID 83554
Government Estimate Thompson Contracting
PO Box 449
Libby MT 59923
Dick Anderson
705 Bridger DR Suite A
Bozeman MT 59715
Unit Total Unit Total Unit Total
Price Price Price
$17,000.00 $17,000.00 $16,000.00 $16,000.00 $14,000.00 $14,000.00
$1,605.00 $1,605.00 $3,000.00 $3,000.00 $2,500.00 $2,500.00
$535.00 $535.00 $500.00 $500.00 $3,000.00 $3,000.00
$6,634.00 $6,634.00 $2,000.00 $2,000.00 $8,000.00 $8,000.00
$15.00 $5,400.00 $18.00 $6,480.00 $20.00 $7,200.00
$3,595.00 $3,595.00 $10,000.00 $10,000.00 $3,500.00 $3,500.00
$3.75 $675.00 $3.00 $540.00 $20.00 $3,600.00
$37.00 $1,850.00 $18.00 $900.00 $40.00 $2,000.00 $5,565.00 $5,565.00 $2,500.00 $2,500.00 $1,500.00 $1,500.00
$38.00 $5,700.00 $30.00 $4,500.00 $20.00 $3,000.00 $120.00 $2,928.00 $65.00 $1,586.00 $120.00 $2,928.00 $21.50 $6,235.00 $12.00 $3,480.00 $30.00 $8,700.00
$21,115.00 $84,460.00 $19,000.00 $76,000.00 $17,981.00 $71,924.00 $9,585.00 $19,170.00 $9,000.00 $18,000.00 $32,650.00 $65,300.00 $1,525.00 $6,100.00 $1,000.00 $4,000.00 $1,110.00 $4,440.00
$99.00 $11,154.33 $145.00 $16,337.15 $145.64 $16,409.26 $85.00 $13,812.50 $95.00 $15,437.50 $87.90 $14,283.75
$112.00 $896.00 $90.00 $720.00 $150.00 $1,200.00 $107.00 $856.00 $85.00 $680.00 $125.00 $1,000.00 $885.00 $885.00 $100.00 $100.00 $1,000.00 $1,000.00 $455.00 $455.00 $400.00 $400.00 $1,000.00 $1,000.00
$2,033.00 $2,033.00 $4,000.00 $4,000.00 $2,500.00 $2,500.00 $197,543.83 $187,160.65 $238,985.01
$2,097.00 $2,097.00 $1,800.00 $1,800.00 $2,500.00 $2,500.00
$10.70 $1,391.00 $10.00 $1,300.00 $25.00 $3,250.00
3745 $3,745.00 3000 $3,000.00 1500 $1,500.00
$16,820.00 $16,820.00 $16,800.00 $16,800.00 $4,000.00 $4,000.00
$37.50 $1,500.00 $30.00 $1,200.00 $75.00 $3,000.00
$37.50 $3,900.00 $30.00 $3,120.00 $65.00 $6,760.00
$325.00 $1,625.00 $1,000.00 $5,000.00 $500.00 $2,500.00
$27.00 $1,134.00 $12.00 $504.00 $30.00 $1,260.00
$268.00 $35,912.00 $375.00 $50,250.00 $293.00 $39,262.00
$7,000.00 $7,000.00 $9,000.00 $9,000.00 $3,500.00 $3,500.00
$257.00 $16,962.00 $360.00 $23,760.00 $255.30 $16,849.80
$845.00 $845.00 $100.00 $100.00 $1,000.00 $1,000.00
$112.00 $896.00 $90.00 $720.00 $150.00 $1,200.00
$93,827.00 $116,554.00 $86,581.80
$291,370.83 $303,714.65 $325,566.81
Price Contracting
22720 US Hwy 93 N
Arlee MT 59821
Independence
4476 Indian Creek RD
Eureka MT 59917
Bairco
213 E 3rd Street
Lovell WY 82431