Amendment 02.doc
DOC document 66 KB Posted
- Attached to
- RECOVERY Forest Wide Campground Toilet Replacement on the Arapaho-Roosevelt National Forest
- Solicitation number
- AG-82B1-S-10-0087
About this file
AG-82B1-S-10-0087
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 01.doc | DOC document | |
| FBO Upload.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 3 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 02 |
| 02/03/10 |
| 353614 |
| CIM-0210-20F |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
Intermountain EROC 740 Simms Street Golden, CO 80401
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
FORMCHECKBOX
AG-82B1-S-10-0087
9B. DATED (SEE ITEM 11)
01/11/10
FORMCHECKBOX
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (X) |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN |
THE CONTRACT ORDER NO. IN ITEM 10A.
FORMCHECKBOX
FORMCHECKBOX
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
FORMCHECKBOX
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
FORMCHECKBOX
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 0 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Solicitation No. AG-82B1-S-10-0087, Forest Wide Campground Toilet Replacement on the Arapaho-Roosevelt National Forest, is amended as follows:
See following pages.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
| JUDY MARTIN, Contracting Officer |
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 01
A pre-proposal meeting was held February 2, 2010 at 10:00 a.m. at the Supervisor’s Office. The following questions and answers were discussed at the site visit.
Attendees:
Name
Organization
Phone Number Jason Ruybal
USFS, Engineering
970-295-6655
Paul Draper
Eagle Feather Construction Inc.
208-522-6775 Stephanie Edelmeyer
Eagle Feather Construction Inc.
208-522-6775
Kurt Mee
CXT Inc.
303-552-1843
Michele White
USFS, Engineering
970-295-6654
Items of Discussion:
· CO will be Judy Martin, COR will be Jason Ruybal
· Davis-Bacon Wage rates apply for this contract; rates vary per county so rates will differ, depending on work location.
· County construction permits are not required for the toilet construction.
· No existing underground utilities exist around construction sites. However there are improvements in the area to be protected. On sheet 4, there is one water hydrant and line to protect at Columbine. On sheet 7, 9, and 11, there are culverts to protect in the construction vicinity.
· Contractor is responsible for reviewing access to project sites for clearance and weight restrictions to determine best means for getting toilet facilities and equipment to site. I bridge has been identified at the Tunnel site that has a weight limit of 24T/39T/39T.
· Existing vaults to be removed are concrete and are approximately 8’ x 12’ x 6’ deep.
· Note 3 on page 12 - Tunnel Campground Site 16 Replacement states to relocate barrier posts and barrier logs. There are approximately 4 barrier logs to be relocated.
· Contractor is responsible for pumping vaults and proper hauling away of waste before vault demolition begins.
· All debris generated from the site is Contractor’s responsibility and shall be removed from the project site.
· Identified all construction sites associated with contract.
· A staging area will be designated in proximity each construction site.
· All sites will be accessible to a passenger vehicle when work begins.
· Camping may be allowed at campground sites upon written request from successful contract, relevant fees and regulations apply.
· Contractor may utilize existing sanitation facilities at project locations upon written request.
File details come from the government source that posted it. Updated .