About this file

AG-82B1-S-10-0087

View the file

Other files

File Type Posted
Amendment 01.doc DOC document
FBO Upload.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE
PAGE OF PAGES
1
3
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
02
02/03/10
353614
CIM-0210-20F
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

Intermountain EROC 740 Simms Street Golden, CO 80401

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.

FORMCHECKBOX

AG-82B1-S-10-0087

9B. DATED (SEE ITEM 11)

01/11/10

FORMCHECKBOX

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

FORMCHECKBOX

FORMCHECKBOX

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

FORMCHECKBOX

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

FORMCHECKBOX

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 0 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Solicitation No. AG-82B1-S-10-0087, Forest Wide Campground Toilet Replacement on the Arapaho-Roosevelt National Forest, is amended as follows:

See following pages.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
JUDY MARTIN, Contracting Officer
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105
STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 01

A pre-proposal meeting was held February 2, 2010 at 10:00 a.m. at the Supervisor’s Office. The following questions and answers were discussed at the site visit.

Attendees:

Name

Organization

Phone Number Jason Ruybal

USFS, Engineering

970-295-6655

Paul Draper

Eagle Feather Construction Inc.

208-522-6775 Stephanie Edelmeyer

Eagle Feather Construction Inc.

208-522-6775

Kurt Mee

CXT Inc.

303-552-1843

Michele White

USFS, Engineering

970-295-6654

Items of Discussion:

· CO will be Judy Martin, COR will be Jason Ruybal

· Davis-Bacon Wage rates apply for this contract; rates vary per county so rates will differ, depending on work location.

· County construction permits are not required for the toilet construction.

· No existing underground utilities exist around construction sites. However there are improvements in the area to be protected. On sheet 4, there is one water hydrant and line to protect at Columbine. On sheet 7, 9, and 11, there are culverts to protect in the construction vicinity.

· Contractor is responsible for reviewing access to project sites for clearance and weight restrictions to determine best means for getting toilet facilities and equipment to site. I bridge has been identified at the Tunnel site that has a weight limit of 24T/39T/39T.

· Existing vaults to be removed are concrete and are approximately 8’ x 12’ x 6’ deep.

· Note 3 on page 12 - Tunnel Campground Site 16 Replacement states to relocate barrier posts and barrier logs. There are approximately 4 barrier logs to be relocated.

· Contractor is responsible for pumping vaults and proper hauling away of waste before vault demolition begins.

· All debris generated from the site is Contractor’s responsibility and shall be removed from the project site.

· Identified all construction sites associated with contract.

· A staging area will be designated in proximity each construction site.

· All sites will be accessible to a passenger vehicle when work begins.

· Camping may be allowed at campground sites upon written request from successful contract, relevant fees and regulations apply.

· Contractor may utilize existing sanitation facilities at project locations upon written request.

File details come from the government source that posted it. Updated .