AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE
PAGE OF PAGES
1
11
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
01
01/19/2010
353614
CIM-0210-21F
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

Intermountain EROC 740 Simms Street Golden, CO 80401

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.

FORMCHECKBOX

AG-82B1-S-10-0087

9B. DATED (SEE ITEM 11)

01/11/10

FORMCHECKBOX

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

FORMCHECKBOX

FORMCHECKBOX

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

FORMCHECKBOX

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

FORMCHECKBOX

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 0 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Solicitation No. AG-82B1-S-10-0087, Forest Wide Campground Toilet Replacement on the Arapaho-Roosevelt N.F., is amended as follows:

See Following Pages.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
JUDY MARTIN, Contracting Officer
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105
STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 01

1) Refer to Pages 4-13, Section B, Schedule of Items, delete in its entirety and replace with the following:

B- 1 - Schedule of Items Item 1 – Columbine Campground – Existing Toilet Near Site 5

Bid

Item

Item Description
MM*
Estimated

Quantity Pay

Unit Unit

Price Amount

Bid

01442(01)
Quality Control & Quantity
LSQ
1
LS
$________
$________
01950(01)
Mobilization
LSQ
1
LS
$________
$________
02205(01)
Barrier Rocks
AQ
3
EA
$________
$________
02245(01)
Site Grading
LSQ
1
LS
$________
$________
02370(01)
Aggregate Surfacing
AQ
4
CY
$________
$________
02921(01)
Seeding & Mulching
LSQ
1
LS
$________
$________
03101(01)
Reinforced Portland Cement Concrete Sidewalk
AQ
60
SF
$________
$________
TOTAL AMOUNT BID (Item 1)
$________

Item 2 – Columbine Campground – Near Site 26 Bid

Item

Item Description
MM*
Estimated

Quantity Pay

Unit Unit

Price Amount

01442(01)
Quality Control & Quantity
LSQ
1
LS
$________
$________
01950(01)
Mobilization
LSQ
1
LS
$________
$________
02112(01)
Removal of Toilet Building, Vaults, Floors, & Sidewalks
LSQ
1
LS
$________
$________
02221(01)
Earthwork – Toilet Vault Excavation
DQ
20
CY
$________
$________
02221(02)
Earthwork – Toilet Backfill, Bedding & Compaction
DQ
5
CY
$________
$________
02245(01)
Site Grading
LSQ
1
LS
$________
$________
02370(01)
Aggregate Surfacing
AQ
1
CY
$________
$________
02921(01)
Seeding & Mulching
LSQ
1
LS
$________
$________
03101(01)
Reinforced Portland Cement Concrete Sidewalk
AQ
220
SF
$________
$________
10100(01)
Pre-fabricated Toilet, & Toilet Installation
LSQ
1
LS
$________
$________
TOTAL AMOUNT BID (Item 2)
$________

Item 3 – Denver Creek Campground West – Near Site 18 Bid

Item

Item Description
MM*
Estimated

Quantity Pay

Unit Unit

Price Amount

01442(01)
Quality Control & Quantity
LSQ
1
LS
$________
$________
01950(01)
Mobilization
LSQ
1
LS
$________
$________
02112(01)
Removal of Toilet Building, Vaults, Floors, & Sidewalks
LSQ
1
LS
$________
$________
02205(01)
Barrier Rocks
AQ
2
EA
$________
$________
02221(01)
Earthwork – Toilet Vault Excavation
DQ
20
CY
$________
$________
02221(02)
Earthwork – Toilet Backfill, Bedding & Compaction
DQ
5
CY
$________
$________
02245(01)
Site Grading
LSQ
1
LS
$________
$________
02370(01)
Aggregate Surfacing
AQ
3
CY
$________
$________
02475(01)
Dumpster Pad
LSQ
1
LS
$________
$________
02921(01)
Seeding & Mulching
LSQ
1
LS
$________
$________
03101(01)
Reinforced Portland Cement Concrete Sidewalk
AQ
140
SF
$________
$________
10100(01)
Pre-fabricated Toilet, & Toilet Installation
LSQ
1
LS
$________
$________
TOTAL AMOUNT BID (Item 3)
$________

Item 4 – Denver Creek Campground East - Near Site 9 Bid

Item

Item Description
MM*
Estimated

Quantity Pay

Unit Unit

Price Amount

01442(01)
Quality Control & Quantity
LSQ
1
LS
$________
$________
01950(01)
Mobilization
LSQ
1
LS
$________
$________
02112(01)
Removal of Toilet Building, Vaults, Floors, & Sidewalks
LSQ
1
LS
$________
$________
02205(01)
Barrier Rocks
AQ
4
EA
$________
$________
02221(01)
Earthwork – Toilet Vault Excavation
DQ
20
CY
$________
$________
02221(02)
Earthwork – Toilet Backfill, Bedding & Compaction
DQ
5
CY
$________
$________
02245(01)
Site Grading
LSQ
1
LS
$________
$________
02370(01)
Aggregate Surfacing
AQ
14
CY
$________
$________
02475(01)
Dumpster Pad
LSQ
1
LS
$________
$________
02921(01)
Seeding & Mulching
LSQ
1
LS
$________
$________
03101(01)
Reinforced Portland Cement Concrete Sidewalk
AQ
105
SF
$________
$________
10100(01)
Pre-fabricated Toilet, & Toilet Installation
LSQ
1
LS
$________
$________
TOTAL AMOUNT BID (Item 4)
$________

Item 5 – Denver Creek Campground East - Near Site 11 Bid

Item

Item Description
MM*
Estimated

Quantity Pay

Unit Unit

Price Amount

01442(01)
Quality Control & Quantity
LSQ
1
LS
$________
$________
01950(01)
Mobilization
LSQ
1
LS
$________
$________
02112(01)
Removal of Toilet Building, Vaults, Floors, & Sidewalks
LSQ
1
LS
$________
$________
02221(02)
Earthwork – Toilet Backfill, Bedding & Compaction
DQ
4
CY
$________
$________
02245(01)
Site Grading
LSQ
1
LS
$________
$________
02921(01)
Seeding & Mulching
LSQ
1
LS
$________
$________
TOTAL AMOUNT BID (Item 5)
$________

Item 6 – Echo Lake Campground - Near Site 12 Bid

Item

Item Description
MM*
Estimated

Quantity Pay

Unit Unit

Price Amount

01442(01)
Quality Control & Quantity
LSQ
1
LS
$________
$________
01950(01)
Mobilization
LSQ
1
LS
$________
$________
02112(01)
Removal of Toilet Building, Vaults, Floors, & Sidewalks
LSQ
1
LS
$________
$________
02221(01)
Earthwork – Toilet Vault Excavation
DQ
20
CY
$________
$________
02221(02)
Earthwork – Toilet Backfill, Bedding & Compaction
DQ
5
CY
$________
$________
02245(01)
Site Grading
LSQ
1
LS
$________
$________
02370(01)
Aggregate Surfacing
AQ
1
CY
$________
$________
02921(01)
Seeding & Mulching
LSQ
1
LS
$________
$________
03101(01)
Reinforced Portland Cement Concrete Sidewalk
AQ
175
SF
$________
$________
10100(01)
Pre-fabricated Toilet, & Toilet Installation
LSQ
1
LS
$________
$________
TOTAL AMOUNT BID (Item 6)
$________

Item 7 – Tunnel Campground - Near Site 49 Bid

Item

Item Description
MM*
Estimated

Quantity Pay

Unit Unit

Price Amount

01442(01)
Quality Control & Quantity
LSQ
1
LS
$________
$________
01950(01)
Mobilization
LSQ
1
LS
$________
$________
02112(01)
Removal of Toilet Building, Vaults, Floors, & Sidewalks
LSQ
1
LS
$________
$________
02205(01)
Barrier Rocks
AQ
3
EA
$________
$________
02221(01)
Earthwork – Toilet Vault Excavation
DQ
20
CY
$________
$________
02221(02)
Earthwork – Toilet Backfill, Bedding & Compaction
DQ
5
CY
$________
$________
02245(01)
Site Grading
LSQ
1
LS
$________
$________
02370(01)
Aggregate Surfacing
AQ
6
CY
$________
$________
02921(01)
Seeding & Mulching
LSQ
1
LS
$________
$________
03101(01)
Reinforced Portland Cement Concrete Sidewalk
AQ
60
SF
$________
$________
10100(01)
Pre-fabricated Toilet, & Toilet Installation
LSQ
1
LS
$________
$________
TOTAL AMOUNT BID (Item 7)
$________

Item 8 – Tunnel Campground - Near Site 7 Bid

Item

Item Description
MM*
Estimated

Quantity Pay

Unit Unit

Price Amount

01442(01)
Quality Control & Quantity
LSQ
1
LS
$________
$________
01950(01)
Mobilization
LSQ
1
LS
$________
$________
02112(01)
Removal of Toilet Building, Vaults, Floors, & Sidewalks
LSQ
1
LS
$________
$________
02221(01)
Earthwork – Toilet Vault Excavation
DQ
20
CY
$________
$________
02221(02)
Earthwork – Toilet Backfill, Bedding & Compaction
DQ
5
CY
$________
$________
02245(01)
Site Grading
LSQ
1
LS
$________
$________
02370(01)
Aggregate Surfacing
AQ
1
CY
$________
$________
02921(01)
Seeding & Mulching
LSQ
1
LS
$________
$________
03101(01)
Reinforced Portland Cement Concrete Sidewalk
AQ
115
SF
$________
$________
10100(01)
Pre-fabricated Toilet, & Toilet Installation
LSQ
1
LS
$________
$________
TOTAL AMOUNT BID (Item 8)
$________

Item 9 – Tunnel Campground - Near Site 5 Bid

Item

Item Description
MM*
Estimated

Quantity Pay

Unit Unit

Price Amount

01442(01)
Quality Control & Quantity
LSQ
1
LS
$________
$________
01950(01)
Mobilization
LSQ
1
LS
$________
$________
02112(01)
Removal of Toilet Building, Vaults, Floors, & Sidewalks
LSQ
1
LS
$________
$________
02221(01)
Earthwork – Toilet Vault Excavation
DQ
40
CY
$________
$________
02221(02)
Earthwork – Toilet Backfill, Bedding & Compaction
DQ
45
CY
$________
$________
02245(01)
Site Grading
LSQ
1
LS
$________
$________
02370(01)
Aggregate Surfacing
AQ
1
CY
$________
$________
02921(01)
Seeding & Mulching
LSQ
1
LS
$________
$________
03101(01)
Reinforced Portland Cement Concrete Sidewalk
AQ
115
SF
$________
$________
10100(01)
Pre-fabricated Toilet, & Toilet Installation
LSQ
1
LS
$________
$________
TOTAL AMOUNT BID (Item 9)
$________

Item 10 – Tunnel Campground - Near Site 16 Bid

Item

Item Description
MM*
Estimated

Quantity Pay

Unit Unit

Price Amount

01442(01)
Quality Control & Quantity
LSQ
1
LS
$________
$________
01950(01)
Mobilization
LSQ
1
LS
$________
$________
02112(01)
Removal of Toilet Building, Vaults, Floors, & Sidewalks
LSQ
1
LS
$________
$________
02221(01)
Earthwork – Toilet Vault Excavation
DQ
40
CY
$________
$________
02221(02)
Earthwork – Toilet Backfill, Bedding & Compaction
DQ
45
CY
$________
$________
02245(01)
Site Grading
LSQ
1
LS
$________
$________
02370(01)
Aggregate Surfacing
AQ
1
CY
$________
$________
02921(01)
Seeding & Mulching
LSQ
1
LS
$________
$________
03101(01)
Reinforced Portland Cement Concrete Sidewalk
AQ
460
SF
$________
$________
10100(01)
Pre-fabricated Toilet, & Toilet Installation
LSQ
1
LS
$________
$________
TOTAL AMOUNT BID (Item 10)
$________

Item 11 – Tunnel Campground – Site 16 Replacement Bid

Item

Item Description
MM*
Estimated

Quantity Pay

Unit Unit

Price Amount

01442(01)
Quality Control & Quantity
LSQ
1
LS
$________
$________
01950(01)
Mobilization
LSQ
1
LS
$________
$________
02205(01)
Barrier Rocks
AQ
2
EA
$________
$________
02245(01)
Site Grading
LSQ
1
LS
$________
$________
02370(01)
Aggregate Surfacing
AQ
19
CY
$________
$________
02462(01)
Pedestal Grill
AQ
1
EA
$________
$________
02462(02)
Fire Ring
AQ
1
EA
$________
$________
02921(01)
Seeding & Mulching
LSQ
1
LS
$________
$________
03400(01)
Wheel Stop
AQ
1
EA
$________
$________
06129(01)
Timber Border
DQ
250
LF
$________
$________
10474(01)
Spur
LSQ
1
LS
$________
$________
10474(02)
Facility Pad
LSQ
1
LS
$________
$________
10474(03)
Tent Pad
LSQ
1
LS
$________
$________
TOTAL AMOUNT BID (Item 11)
$________

* Designated Method of Measurement:

DQ - Design Quantities, AQ - Actual Quantities, LSQ - Lump Sum Quantities

Note 1: The bidder shall bid on all items. Round all prices to the nearest cent.

Note 2: Payment for bond premiums in accordance with FAR Clause 52.232-5, Payment Under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

B- 2 - Basis of Award: One contract will be awarded to the responsive and responsible bidder offering the lowest total acceptable bid.