AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE
PAGE OF PAGES
1
2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
01
02/03/10
350917
CIM-0413-16F
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

Intermountain EROC 740 Simms Street Golden, CO 80401

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.

FORMCHECKBOX

AG-82B1-S-10-0074

9B. DATED (SEE ITEM 11)

01/13/10

FORMCHECKBOX

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

FORMCHECKBOX

FORMCHECKBOX

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

FORMCHECKBOX

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

FORMCHECKBOX

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 0 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Solicitation No. AG-82B1-S-10-0074, Forest Wide Vault Toilet Replacement on the Salmon-Challis National Forest, is amended as follows:

See following pages.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
JUDY MARTIN, Contracting Officer
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105
STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 01

Questions and Answers:

Q: How do you or your staff plan to do the site visits and staking of the work? Specifically would you do several in one day and the contractor would be there or how would that go. Also the same on the final inspections, would those happen as the toilets are set and backfilled or would you come back later and inspect them?

A: Section C-7 Contractor requirements states the Contractor will establish a delivery schedule and give the Government 7 days notice of installation date for each site. Within that seven day period, the Government will provide the necessary staking in advance of the installation. Expectations are that the Contractor will schedule installations based on site elevations when they will be available for work. Also, to keep mobilization costs down, I would expect installations in close proximity to each other to be scheduled together in the same week. Our contract with CXT requires an inspector to be present during delivery and installation, therefore the installation and backfill will be inspected as it happens. The COR can approve the installation at that time and recommend payment, however it still must be accepted by the Contracting Officer. Campgrounds are to remain open to the fullest extent possible and public safety will take precedence over scheduling. Therefore no schedule will be accepted that includes over 24 hours between the removal of the existing vault and the installation of the new vault and building.

Q: The specifications state that 80 gallons of potable water is required to be put into the tank, is that really potable water or just clean water?

A: It just needs to be clean water, potable water is not necessary.

Q: What is the weight limits on the two bridges on the Salmon River Road?

A: Pine Creek Bridge – Type 3 Truck – Posted 28 Ton, Overload permit to 46 Ton

Type 3S2 Truck – Posted 32 Ton, Overload permit to 54 Ton

Type 3-3 Truck – Posted 35 Ton, Overload permit to 59 Ton

Clove Creek Bridge – Type 3 Truck – Posted 26 Ton, Overload permit to 43 Ton

Type 3S2 Truck – Posted 30 Ton, Overload permit to 51 Ton

Type 3-3 Truck – Posted 33 Ton, Overload permit to 56 Ton

Q: It says that some installation sites may not be accessible to toilet delivery vehicles and may require transferring the building and vault to a trailer to transport to the installation site. If a trailer is needed will the Government pay for the expense?

A: No, this is a firm-fixed price contract and all expenses should be included in the bid price. Most sites should be able to accompany the delivery vehicles, however some campgrounds may have tight curves radii that will not accommodate large flatbed trailers. Most equipment trailers used to transport an excavator to the project will support the vault and building. Refer to Specification Section 13911 for weights of vault and building units. One site, the Williams Lake installation, will require a transfer to a trailer for the installation. Other sites depend on the delivery vehicle.