Schedule B - Amendment 1

Text of this file

Solicitation Number AG-82B1-S-09-0115 Amendment 1

SECTION B - Prices/Costs Schedule of Items

Pawnee Bird Tour Project

Item Number Description Meas.

Unit

QUANTITY

UNIT

PRICE

TOTAL

151 (01) Mobilization C.Q.

LS

152(01) Construction survey and staking, tolerance E C.Q.

154(01) Contractor Testing C.Q.

157(02) Soil Erosion & Pollution Control - Silt Fence, 3 ft. high including stakes.

C.Q.

LF

158(02) Watering for dust control C.Q.

170(02) Developing Water Supply and Watering, Water C.Q.

204(01) Roadway Excavation, Compaction Method A, Finishing Method D, Tolerance A.

C.Q.

CY

207(01) Earthwork Geotextile - Type II-A Non-woven C.Q.

SY

12600

303(03) Reconditioning of Roadside Ditches C.Q.

Linear Foot 147,980

303(05) Road Reconditioning, Compaction Method B.

C.Q.

SY

180,700

306(01) Dust Pallitive, Type Magnesium Chloride.

C.Q.

Mile

324(01) Aggregate Surface Course - Grading G, Compaction Method F - Commercial Source C.Q.

30950

324(02) Aggregate Surface Course - Grading 3/8 inch Limestone, Compaction Method F - Commercial Source C.Q.

324(03) Aggregate Surface Course - Grading 3/4 inch Limestone, Compaction Method F - Commercial Source C.Q.

324(04) Aggregate Base Course - Grading Permeable Backfill, Compaction Method F - Commercial Source C.Q.

607(01) Cleaning, Reconditioning, and Repairing Existing Cattleguards C.Q.

EA

619(01) Gate, type barbed wire, size 16 feet wide, with E-Z latch.

C.Q.

EA

625(01) Turf Establishment, Seeding, Dry Method C.Q.

ACRE

0.5

635(01) Temporary Traffic Control C.Q.

TOTAL ____________________

SUPPLEMENTAL SCHEDULE OF ITEMS

Bid ItemDescriptionMethodQTYUnitUnit PriceTotal Amount
Of Meas.
1001Construction of 3-PanelLSQ1Lump Sum_________________________
Kiosk
1002Relocation of ExistingAQ8Each_________________________
Interpretive Sign Pedestal
1003Installation of InterpretiveAQ1Each_________________________
Sign Pedestal (Gov. Furnished)
1004Installation of ConcreteAQ5Each_________________________
Curb Stops
1005Construction of DrainageAQ2140Linear Feet_________________________
Ditch around Interpretive Sites

1006 Installation on Barrier Rock AQ 21 Each ___________ ______________

1007 Installation of 8” Cobble AQ 14 YD3 ___________ ______________

1008Installation of SeatingAQ30Each_________________________
Rocks

TOTAL ____________

DUNS NUMBER: ___________________

Other files

File Type Posted
attendees.pdf PDF
questions.pdf PDF
(SF-30) Amend 4.pdf PDF
Amend_2_SF_30.pdf PDF
(SF-30).pdf PDF
Plan_Profile_2.pdf PDF
Kiosk_Roof.pdf PDF
Misc_Details_I.pdf PDF
drawing3.pdf PDF
drawing10.pdf PDF
drawing12.pdf PDF
drawing4.pdf PDF
drawing11.pdf PDF
Interpretive_10_ _11.pdf PDF
Kiosk_Misc_I.pdf PDF
Interpretive_5_ _6.pdf PDF
drawing18.pdf PDF
wage determination.txt TXT text file
Site_Map.pdf PDF
SF 1442.pdf PDF
drawing21.pdf PDF
Table_of_Contents.doc DOC document
AG-82B1-S-09-0115.pdf PDF
sf24_f.pdf PDF
Interpretive_7_ _9.pdf PDF
Bird Tour Road Specifications.doc DOC document
Interpretive_4.pdf PDF
drawing2.pdf PDF
csi_specs-fina-8-17l.doc DOC document
Kiosk_3.pdf PDF
drawing14.pdf PDF
drawing6.pdf PDF
Misc_Details_III.pdf PDF
drawing7.pdf PDF
Interpretive_12_ _13.pdf PDF
location_map.doc DOC document
drawing19.pdf PDF
drawing8.pdf PDF
Misc_Details_II.pdf PDF
drawing5.pdf PDF
Kiosk_Foundation.pdf PDF
drawing13.pdf PDF
Plan_Profile_3.pdf PDF
drawing20.pdf PDF
Kiosk_Elevation.pdf PDF
drawing15.pdf PDF
drawing16.pdf PDF
drawing9.pdf PDF
drawing17.pdf PDF
Bird_Tour_Title_Sheet.pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .