Attachment_1.pdf

PDF 2 MB Posted

Attached to
Roof Repair on Miscellaneous Buildings
Solicitation number
AG-82A7-S-13-0057
Issued by

About this file

Specifications and Drawings

View the file

Other files

File Type Posted
Amendment0003.pdf PDF
ANSWERS_TO_CONTRACTOR_QUESTIONS.pdf PDF
Amendment00002.pdf PDF
Addenda_to_SF1442.pdf PDF
Attachment_4.pdf PDF
Attachment_2.pdf PDF
Attachment_3.pdf PDF
Amendment_1.pdf PDF
SF1442.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WEBER BASIN

Job Corps CCC

ROOF REPAIRS AND

REPLACEMENTS

February 2013

ROOF REPLACEMENT AND REPAIRS 010150 – 1

WEBER BASIN JOB CORPS CCC GENERAL REQUIREMENTS

SECTION 010150

GENERAL REQUIREMENTS

PART 1 – SUMMARY OF WORK

1.1 DESCRIPTION

A. The Weber Basin Job Corps Center recently endured a high wind storm which cause damage to the roofing, fascia and soffits on several of the buildings on campus. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses and permits for the work summarized as follows. See specification sections and attached documents for additional information.

1. Building 1 Administration: Complete roof removal and replacement. Remove and dispose of approximately 2,800 SF of existing asphalt shingles, edge flashing and underlayment. Inspect and replace any decayed or damaged roofing substrate.

Assume for bidding purposes the removal and replacement of 2- 4’x8’x1/2” sheets of plywood. Install new edge and valley flashing, vent boots, asphaltic underlayment, ice and snow shield, continuous ridge vent, and Architectural asphalt shingles including cap shingles. Install approximately 10 LF of pre-finished aluminum fascia. Gauge, size, color and style to match existing fascia.

2. Building 2 Wellness Center: Replacement and repair of missing shingles and installation of new downspouts. Replace approximately 40 square feet of missing shingles and underlayment in various location on the building. Install new pre-finished metal downspouts, approximately 10 LF in height. Gauge, size, color and style to match existing center standard for downspouts.

3. Building 8 Residential Living Office: Replacement and repair of missing shingles and installation of downspout. Replace approximately 80 square feet of missing shingles and underlayment in various location on the building. Install new pre-finished metal downspout, approximately 10 LF in height at one location. Gauge, size, color and style to match existing center standard for downspouts.

4. Building 10 Student Services Building: Replacement and repair of missing shingles and cap shingles. Replace approximately 60 square feet of missing shingles and underlayment in various location on east side of building. Install approximately 10 LF of cap shingles on existing ridge vent.

5. Building 11 Dining Hall: Complete roof removal and replacement. Remove and dispose of approximately 6,000 SF of existing asphalt shingles, flashing and underlayment. Inspect and replace any decayed or damaged roofing substrate.

Assume for bidding purposes the removal and replacement of 2- 4’x8’x1/2” sheets of plywood. Install new edge and valley flashing, vent boots, asphaltic underlayment, ice and snow shield, continuous ridge vent, and Architectural asphalt shingles including cap shingles. Install 120 volt heat cabling system along entire length of west side of building at roof line, in gutters and in the downspouts.

6. Building 31 Education Building: Complete roof removal and replacement.

Remove and dispose of approximately 9,000 SF of existing asphalt shingles, ROOF REPLACEMENT AND REPAIRS 010150 – 2 flashing and underlayment. Inspect and replace any decayed or damaged roofing substrate. Assume for bidding purposes the removal and replacement of 10- 4’x8’x1/2” sheets of plywood. Install new edge and valley flashing, vent boots, asphaltic underlayment, ice and snow shield, continuous ridge vent, and Architectural asphalt shingles including cap shingles. Install new pre-finished metal gutters and downspouts. Gauge, size, color and style to match existing center standard for downspouts, gutters to be box type, 4”w x 6” high. Install 120 volt heat cabling system along entire length, both sides, east and west side of building at roof line, in gutters and in the downspouts.

7. Building 32 Culinary Arts: Replacement and repair of missing shingles and installation of downspout. Replace approximately 40 square feet of missing shingles and underlayment in various location on the building. Install approximately 10 LF of pre-finished aluminum fascia. Install new pre-finished metal downspouts, approximately totaling 20 LF. Gauge, size, color and style to match existing center standard for downspouts and fascia.

1.2 LOCATION

A. This project is located at the Weber Basin Job Corps Civilian Conservation Center approximately eight miles southeast of Ogden UT. The address is 7400 West Cornia Drive, Ogden UT, 84405.

1.3 USE OF PREMISES

A. Use of Site: Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Full Government Occupancy: Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations.

C. Driveways and Entrances: Keep driveways, parking areas, loading areas and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

1.4 WORK RESTRICTIONS

ROOF REPLACEMENT AND REPAIRS 010150 – 3

A. Nonsmoking Buildings: Smoking is not permitted within the buildings or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes.

1.5 CONTRACTOR’S RESPONSIBILITIES

A. Confine storage of materials to areas as approved by the CO.

B. Provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Minimize disturbance of all undisturbed areas.

1.6 FIELD VERIFICATION

A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.

1.7 PERMITS

A. Obtain permits for electrical work or any other work required by County, State, or Federal laws or regulations.

PART 2 – DEFINITION OF ITEMS AND PAYMENT

2.1 DESCRIPTION

A. This section explains what is and what is not included in each pay item; the limits or cut-off points where one item ends and another begins; and basis of payment for work items listed in the Schedule of Items.

B. Payment: For each individual item listed here and in the Schedule of Items, payment shall be full compensation for all work related to the particular item in accordance with these specifications, and as shown on the drawings.

2.2 SCHEDULE OF ITEMS

A. Schedule of Items: The project Schedule of Items includes several sections to organize the work into Base Items and Optional Items.

1. Provide pricing for all items listed in the Schedule of Items.

2. Contract award will be made for all Base Items.

B. Base Items (BI):

1. Base Bid Item 1: Building 1 Administration, complete roof removal and replacement.

a. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to remove and

ROOF REPLACEMENT AND REPAIRS 010150 – 4

dispose of approximately 2,800 SF of existing asphalt shingles, edge flashing and underlayment. Inspect and replace any decayed or damaged roofing substrate. Assume for bidding purposes the removal and replacement of 2- 4’x8’x1/2” sheets of plywood. Install new edge and valley flashing, vent boots, asphaltic underlayment, ice and snow shield, continuous ridge vent, and Architectural asphalt shingles including cap shingles. Install approximately 10 LF of pre-finished aluminum fascia. Gauge, size, color and style to match existing fascia.

2. Base Bid Item 2: Building 2 Wellness Center, replacement and repair of missing shingles and installation of new downspouts.

a. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to replace approximately 40 square feet of missing shingles and underlayment in various location on the building. Install new pre-finished metal downspouts, approximately 10 LF in height. Gauge, size, color and style to match existing center standard for downspouts.

3. Base Bid Item 3: Building 8 Residential Living Office, replacement and repair of missing shingles and installation of downspout.

a. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to replace approximately 80 square feet of missing shingles and underlayment in various location on the building. Install new pre-finished metal downspout, approximately 10 LF in height at one location. Gauge, size, color and style to match existing center standard for downspouts.

4. Base Bid Item 4: Building 10 Student Services Building, replacement and repair of missing shingles and cap shingles.

a. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to replace approximately 60 square feet of missing shingles and underlayment in various location on east side of building. Install approximately 10 LF of cap shingles on existing ridge vent.

5. Base Bid Item 5: Building 11 Dining Hall, complete roof removal and replacement.

a. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to remove and dispose of approximately 6,000 SF of existing asphalt shingles, flashing and underlayment. Inspect and replace any decayed or damaged roofing substrate. Assume for bidding purposes the removal and replacement of 2- 4’x8’x1/2” sheets of plywood. Install new edge and valley flashing, vent boots, asphaltic underlayment, ice and snow shield, continuous ridge vent, and Architectural asphalt shingles including cap shingles. Install 120 volt heat cabling system along entire length of west side of building at roof line, in gutters and in the downspouts.

6. Base Bid Item 6: Building 31 Education Building, complete roof removal and replacement.

ROOF REPLACEMENT AND REPAIRS 010150 – 5

a. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to remove and dispose of approximately 9,000 SF of existing asphalt shingles, flashing and underlayment. Inspect and replace any decayed or damaged roofing substrate. Assume for bidding purposes the removal and replacement of 10- 4’x8’x1/2” sheets of plywood. Install new edge and valley flashing, vent boots, asphaltic underlayment, ice and snow shield, continuous ridge vent, and Architectural asphalt shingles including cap shingles. Install new pre-finished metal gutters and downspouts. Gauge, size, color and style to match existing center standard for downspouts, gutters to be box type, 4”w x 6” high. Install 120 volt heat cabling system along entire length, both sides, east and west side of building at roof line, in gutters and in the downspouts.

7. Base Bid Item 6: Building 32 Culinary Arts, replacement and repair of missing shingles and installation of fascia and downspouts.

a. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to Replace approximately 40 square feet of missing shingles and underlayment in various location on the building. Install approximately 10 LF of pre-finished aluminum fascia. Install new pre-finished metal downspouts, approximately totaling 20 LF. Gauge, size, color and style to match existing center standard for downspouts and fascia.

PART 3 – ACCICENT PREVENTION

3.1 DESCRIPTION

A. This section consists of establishing an effective accident prevention plan and providing a safe environment for personnel and visitors.

3.2 SUBMITTALS

A. Accident Prevention Plan: Before on-site work begins, submit a company approved accident prevention plan. This plan will be posted in the contract file. Design the plan to address Federal, State, and Local Occupational Safety and Health requirements that apply to this project. No progress payments will be processed until the plan is received. As a minimum the plan shall include:

1. Name, position title and contact information of company executive responsible for approving the Accident Prevention Plan.

2. Name and contact information of supervisor responsible to carry out the plan.

3. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, government personnel, and the Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers.

ROOF REPLACEMENT AND REPAIRS 010150 – 6

4. Contingency plans for emergency situations such as medical, fire, hazard material spills and other contract assessed hazard prevention and abatement requirement needs that apply to this project.

B. Certificates: Provide certificates from a mechanic that all mechanical equipment has been inspected and meets OSHA requirements.

C. Submit a copy of test reports, as required by OSHA, for personnel working with hazardous materials.

D. Submit a brief report of safety meetings and of inspections.

E. Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.

3.3 QUALITY ASSURANCE

A. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the General Provisions: In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work.

B. Qualifications of Employees: Ensure employees are physically qualified to perform assigned duties in a safe manner.

3.4 ACCIDENT REPORTING

A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires. Within 7 calendar days of a reportable accident, fill out and forward to the CO a CA-1 form, which may be obtained from CO.

B. All Other Accidents: Report all other accidents to the CO as soon as possible and assist the CO and other officials as required in the investigation of the accident.

3.5 FIRST AID FACILITIES

A. Provide adequate facilities for the number of employees and the type of construction at the site.

3.6 PERSONNEL PROTECTIVE EQUIPMENT

A. Meet requirements of NIOSH and MSHA, where applicable, as well as ANSI.

3.7 EMERGENCY INSTRUCTIONS

ROOF REPLACEMENT AND REPAIRS 010150 – 7

A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

3.8 PROTECTIVE EQUIPMENT

A. Inspect personal protective equipment daily and maintain in a serviceable condition.

Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.

B. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.

3.9 SAFETY MEETINGS

A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.

3.10 HARD HATS AND PROTECTIVE EQUIPMENT AREAS

A. The CO will designate a hard hat area. Post the hard hat area in a manner satisfactory to the CO.

B. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary protective equipment at all times. As a minimum, provide two hard hats for use by visitors. Change liners before reissuing hats.

3.11 TRAINING

A. First Aid: Provide adequate training to ensure prompt and efficient first aid.

B. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.

PART 4 – SUBMITTAL PROCEDURES

4.1 DESCRIPTION

A. This section includes administrative and procedural requirements for submittals.

4.2 DEFINITIONS

A. Action Submittals: Written and graphic information that requires Contracting Officer’s (CO's) responsive action.

ROOF REPLACEMENT AND REPAIRS 010150 – 8

B. Informational Submittals: Written information that does not require CO's approval.

Submittals may be rejected for not complying with requirements.

4.3 PROCEDURES

A. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.

1. Initial Review: Allow 10 working days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

2. If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Allow 10 working days for processing each re-submittal.

4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.

B. Identification: Place a permanent label or title block on each submittal for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space approximately 2 by 3 inches on label or beside title block to record

Contractor's review and approval markings and action taken by CO.

3. Include the following information on label for processing and recording action taken:

a. Project name.

b. Date.

c. Name and address of Contractor.

d. Name of manufacturer.

e. Unique identifier, including revision number.

f. Number and title of appropriate Specification Section.

g. Drawing number and detail references, as appropriate.

h. Other necessary identification.

C. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

D. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

E. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.

F. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.

ROOF REPLACEMENT AND REPAIRS 010150 – 9

G. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

H. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.

I. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

4.4 ACTION SUBMITTALS

A. General: Prepare and submit Action Submittals required by individual Specification Sections.

1. Number of Copies: Submit four copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Compliance with recognized trade association standards.

g. Compliance with recognized testing agency standards.

4.5 INFORMATIONAL SUBMITTALS

A. General: Prepare and submit Informational Submittals required by other Specification Sections.

1. Number of Copies: Submit two copies of each submittal, unless otherwise indicated. CO will not return copies.

2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and

ROOF REPLACEMENT AND REPAIRS 010150 – 10

certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

B. Contractor's Construction Schedule: Provide a construction schedule.

C. Cost Breakdown: Following award provide a cost breakdown schedule listing main types of work with associated costs for each bid item.

PART 5 – TEMPORARY FACILITIES AND CONTROLS

5.1 DESCRIPTION

A. This section consists of requirements for temporary facilities and controls, including utilities, support facilities, and security and protection facilities.

5.2 UTILITIES

A. Water Service: Use of Government existing water service facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion, restore these facilities to condition existing before initial use.

B. Sanitary Facilities: Use of Government sanitary facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion, restore these facilities to condition existing before initial use.

C. Electric Power and Lighting Service: Use of Government's existing electric power and lighting service will be permitted without metering and without payment of use charges, as long as equipment is maintained in a condition acceptable to CO.

D. Telephone Service: The Contractor is responsible for providing telephone service deemed necessary for the duration of the construction.

5.3 STORAGE AREAS

A. Coordinate on-site storage requirements with the Contracting Officer.

5.4 CONSTRUCTION WASTE DISPOSAL FACILITIES

A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste.

5.5 SUPPORT FACILITIES INSTALLATION

A. Locate temporary construction and support facilities for easy access.

ROOF REPLACEMENT AND REPAIRS 010150 – 11

5.6 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects. Restrict use of noisemaking tools and equipment to hours that will minimize complaints from persons or firms near Project site.

B. Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and public of possible hazard. Where appropriate and needed, provide lighting, including flashing red or amber lights.

C. Fire Protection:

1. Store combustible materials in containers in fire-safe locations.

2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.

3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.

PART 6 – EXECUTION REQUIREMENTS

6.1 DESCRIPTION

A. This section consists of general procedural requirements governing execution of the Work including, but not limited to, the following:

1. General installation of products.

2. Progress cleaning.

3. Protection of installed construction.

4. Correction of the Work.

6.2 EXAMINATION

A. Existing Conditions: Before beginning work, investigate and verify the existence and location of mechanical and electrical systems and other construction affecting the Work.

B. Acceptance of Conditions: Examine areas, and conditions, with Installer. Record observations.

1. Examine roughing-in for electrical systems to verify actual locations of connections before equipment and fixture installation.

2. Proceed with installation only after unsatisfactory conditions have been corrected.

Proceeding with the Work indicates acceptance of surfaces and conditions.

ROOF REPLACEMENT AND REPAIRS 010150 – 12

6.3 PREPARATION

A. Field Measurements: Take field measurements as required to fit the Work properly.

B. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO.

Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.

6.4 INSTALLATION

A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.

1. Make vertical work plumb and make horizontal work level.

B. Comply with manufacturer's written instructions and recommendations for installing products.

C. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.

6.5 PROGRESS CLEANING

A. General: Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.

1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.

2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).

3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.

B. Site: Maintain Project site free of waste materials and debris.

C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.

D. Waste Disposal: Burying or burning waste materials on-site will not be permitted.

Washing waste materials down sewers or into waterways will not be permitted.

6.6 PROTECTION OF INSTALLED CONSTRUCTION

A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.

ROOF REPLACEMENT AND REPAIRS 010150 – 13

6.7 CORRECTION OF THE WORK

A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.

1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.

PART 7 – OPERATIONS AND MAINTENANCE MANUALS

7.1 DESCRIPTION

A. This Section consists of administrative and procedural requirements for operation and maintenance manuals.

7.2 SUBMITTALS

A. Submit two manuals in final form at least 15 working days before final inspection.

7.3 OPERATION AND MAINTENANCE MANUALS

A. Assemble a complete set of operation and maintenance data indicating the operation and maintenance of each system, subsystem, and piece of equipment not part of a system.

Include operation and maintenance data required in individual Specification Sections and as follows:

1. Operation Data: Include emergency instructions and procedures, system and equipment descriptions, operating procedures, and sequence of operations.

2. Maintenance Data: Include manufacturer's information, list of spare parts, maintenance procedures, maintenance and service schedules for preventive and routine maintenance, and copies of warranties and bonds.

B. Organization: Unless otherwise indicated, organize each manual into a separate section for each system and subsystem, and a separate section for each piece of equipment not part of a system. Each manual shall contain a title page, table of contents, and manual contents.

C. Title Page: Enclose title page in transparent plastic sleeve. Include the following information:

1. Subject matter included in manual.

2. Name and address of Project.

3. Name and address of Job Corps.

4. Date of submittal.

5. Name, address, and telephone number of Contractor.

6. Cross-reference to related systems in other operation and maintenance manuals.

ROOF REPLACEMENT AND REPAIRS 010150 – 14

D. Table of Contents: List each product included in manual, identified by product name, indexed to content of volume, and cross-referenced to Specification Section.

E. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system, subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder.

1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, sized to hold 8-1/2-by-11-inch paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets.

a. Identify each binder on front and spine, with printed title "OPERATION

AND MAINTENANCE MANUAL," Project title or name, and subject matter of contents. Indicate volume number for multiple-volume sets.

2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section. Mark each tab to indicate contents. Include typed list of products and major components of equipment included in the section on each divider, cross-referenced to Specification Section number and title of Project Manual.

3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software diskettes for computerized electronic equipment.

4. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text.

a. If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts.

b. If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles, descriptions of contents, and drawing locations.

F. Content: Include operation and maintenance data required in individual Specification Sections and equipment descriptions, operating standards, operating procedures, operating logs, wiring and control diagrams, and license requirements.

G. Descriptions: Include the following:

1. Product name and model number.

2. Manufacturer's name.

3. Equipment identification with serial number of each component.

4. Equipment function.

5. Operating characteristics.

6. Performance curves.

7. Engineering data and tests.

8. Complete nomenclature and number of replacement parts.

ROOF REPLACEMENT AND REPAIRS 010150 – 15

H. Source Information: For each product, list name, address, and telephone number of Installer or supplier.

I. Operating Procedures: Include startup, break-in, and control procedures; stopping and normal shutdown instructions; routine, normal, seasonal, and weekend operating instructions; and required sequences for electric or electronic systems.

J. Systems and Equipment Controls: Describe sequence of operation, and diagram controls as installed.

K. Maintenance Procedures: For each system, subsystem, and piece of equipment not part of a system, include manufacturers' maintenance documentation, maintenance procedures, maintenance and service schedules, drawings and diagrams for maintenance, nomenclature of parts and components, and recommended spare parts for each component part or piece of equipment.

L. Maintenance and Service Schedules: Include service and lubrication requirements, list of required lubricants for equipment, and separate schedules for preventive and routine maintenance and service with standard time allotment.

M. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual.

1. Provide heavy paper dividers with plastic-covered tabs for each separate warranty.

Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.

PART 8 – CLOSEOUT PROCEDURES

8.1 DESCRIPTION

A. This section consists of administrative and procedural requirements for contract closeout, including, but not limited to, the following:

1. Inspection procedures.

2. Project Record Documents.

3. Final cleaning.

8.2 SUBSTANTIAL COMPLETION

A. Definition of Substantial Completion: The Date certified by the Contracting Officer when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.

ROOF REPLACEMENT AND REPAIRS 010150 – 16

B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2. Advise Contracting Officer (CO) of pending insurance changeover requirements.

3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.

4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.

5. Prepare and submit Project Record Documents, operation and maintenance manuals, Final Completion construction photographs and photographic negatives, and similar final record information.

6. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.

7. Complete startup testing of systems.

8. Submit changeover information related to Government occupancy, use, operation, and maintenance.

9. Complete final cleaning requirements, including touchup painting.

10. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for Final Completion.

8.3 FINAL COMPLETION

A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:

1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.

ROOF REPLACEMENT AND REPAIRS 010150 – 17

3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

8.4 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Preparation: Submit three copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

8.5 PROJECT RECORD DOCUMENTS

A. General: Do not use Project Record Documents for construction purposes. Protect Project Record Documents from deterioration and loss. Provide access to Project Record Documents for CO's reference during normal working hours.

B. Record Drawings: Maintain and submit one set of blue- or black-line white prints of Contract Drawings and Shop Drawings.

1. Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints.

a. Give particular attention to information on concealed elements that cannot be readily identified and recorded later.

b. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations.

2. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at the same location.

3. Note Construction Change Directive numbers, Change Order numbers, alternate numbers, and similar identification where applicable.

4. Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. Organize into manageable sets;

bind each set with durable paper cover sheets. Include identification on cover sheets.

ROOF REPLACEMENT AND REPAIRS 010150 – 18

8.6 FINAL CLEANING

A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:

1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

2. Remove tools, construction equipment, machinery, and surplus material from Project site.

3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.

Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

D. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.

END OF SECTION 010150

ROOF REPAIR AND REPLACMENT 073113-1

WEBER BASIN JOB CORPS CCC ASPHALT SHINGLES

SECTION 073113

ASPHALT SHINGLES

PART 1 – GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplemen-tary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Asphalt shingles.

2. Self Adhered Rubber Membrane.

3. Felt Underlayment.

B. Related Sections include the following:

1. Division 7 Section “Roof Accessories” for ridge vents.

2. Division 7 Section “Sheet Metal Flashing and Trim” for flashing, and drip edg-es.

1.3 DEFINITIONS

A. Roofing Terminology: Refer to ASTM D 1079 and glossary of NRCA’s “The NRCA Roofing and Waterproofing Manual” for definitions of terms related to roofing work in this Section.

1.4 SUBMITTALS

A. Product Data: For each product indicated.

B. Samples for Initial Selection: For each type of asphalt shingles, ridge and hip cap shingles indicated.

1. Include similar Samples of trim and accessories involving color selection.

C. Samples for verification: For the following products, of sizes indicated, to verify color selected.

1. Asphalt Shingle: Full-size asphalt shingle strip.

2. Ridge and Cap Shingles: Full-size ridge and hip cap asphalt shingle.

D. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency or by manufacturer and witnessed by a qualified testing agen-cy, for asphalt shingles.

E. Maintenance Data: For asphalt shingles to include in maintenance manuals.

F. Warranties: Special warranties specified in this Section.

ROOF REPAIR AND REPLACMENT 073113-2

1.5 QUALITY ASSURANCE

A. Source Limitations: Obtain ridge and shingles through one source from a single as-phalt shingle manufacturer. Obtain felt underlayment and rubber membrane through one source from a single asphalt shingle manufacturer.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Store roofing materials in a dry, well-ventilated, weathertight location according to as-phalt shingle manufacturer’s written instructions. Store underlayment rolls on end on pallets or other raised surfaces. Do not double-stack rolls.

1. Handle, store, and place roofing materials in a manner to avoid significant or permanent damage to roof deck or structural supporting members.

B. Protect unused underlayment from weather, sunlight, and moisture when left overnight or when roofing work is not in progress.

1.7 PROJECT CONDITIONS

A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit asphalt shingle roofing to be performed according to manu-facturers’ written instructions and warranty requirements.

1.8 WARRANTY

A. Warranty: Manufacturer's standard form in which manufacturer agrees to repair or re-place asphalt shingles that fail in materials or workmanship within specified warranty period. Materials failures include manufacturing defects and failure of asphalt shin-gles to self-seal after a reasonable time.

1. Material Warranty Period: 30 years from date of Substantial Completion, pro-rated, with first 5 years nonprorated.

2. Wind-Speed Warranty Period: Asphalt shingles will resist blow-off or damage caused by wind speeds up to 90 mph (45 m/s), 10 years from date of Substantial Completion.

3. Algae-Discoloration Warranty Period: Asphalt shingles shall not discolor 10 years from date of Substantial Completion.

1.9 EXTRA MATERIALS

A. Furnish extra materials described below that match products installed, are packaged with protective covering for storage, and are identified with labels describing contents.

1. Asphalt Shingles: 100 sq. ft (9.3 sq. m) of each type, in unbroken bundles.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

ROOF REPAIR AND REPLACMENT 073113-3

A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection:

1. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, products specified.

2.2 GLASS-FIBER-REINFORCED ASPHALT SHINGLES

A. Basis of Design: All new shingles under this contract must match the existing shingles for both repairs and replacements. The product used as a basis of design is as follows:

1. CertainTeed – Landmark

a. Color: Resawn Shake

b. Type: Architectural

B. Two Piece Laminated-Strip Architectural Asphalt Shingles: ASTM D 3462, laminat-ed, multi-ply overlay construction, glass-fiber reinforced, mineral-granule surfaced, and self-sealing.

1. Products:

a. Atlas Roofing Corporation; .

b. Celotex Corporation;

c. CertainTeed Corporation;

d. Elk Corporation of Dallas;

e. GAF Materials Corporation;

f. Georgia-Pacific Corporation;

g. Globe Building Materials, Inc.;

h. IKO;

i. Malarkey Roofing Company

j. Owens Corning;

k. PABCO Roofing Products;

l. TAMKO Roofing Products, Inc.;

2. Fire Rating: Class A – ASTM E 108

3. Wind Resistance: 90 mph – ASTM D 3161

4. Warranty: 30 – Year limited

5. Butt Edge: Straight cut.

6. Strip Size: Manufacturer’s standard.

7. Color and Blends: CertainTeed Landmark, “Resawn Shake”

C. Hip and Ridge Shingles: Manufacturer's standard units to match asphalt shingles.

Trim each side of lapped portion of unit to taper approximately 1 inch (25 mm).

2.3 UNDERLAYMENT MATERIALS

A. Self-Adhering Sheet Underlayment, Polyethylene Faced: ASTM D 1970, minimum of 40-mil- (1.0- mm-) thick, slip-resisting, polyethylene-film-reinforced top surface lam-inated to SBS-modified asphalt adhesive, with release paper backing; cold applied.

1. Products:

ROOF REPAIR AND REPLACMENT 073113-4

a. Carlisle Coatings & Waterproofing, Div. Have Carlisle Co. Inc.; Dri-Start “A”

b. Grace, W.R. & Co.; Grace Ice and Water Shield

c. Henry Company; Perma-Seal PE

d. Johns Manville International, Inc.; Roof Defender.

e. NEI Advanced Composite technology; AC Poly Ice and StormSeal

f. Owens Corning; WeatherLock M.

g. Polyguard products, Inc.; Polyguard Deck Guard.

h. Protector Wrap Company; Rainproof TM

i. SafSeal Innovations; SafSeal 7740

B. Felts: ASTM D 266, Type I (#15) asphalt-saturated organic felts, non-perforated.

2.4 ACCESSORIES

A. Roofing Nails: ASTM F 1667; aluminum, stainless-steel, copper, or hot-dip galva-nized steel wire shingle nails, minimum 0.120-inch- (3-mm-) diameter, barbed shank, sharp-pointed, with a minimum 3/8-inch- (9.5-mm-) diameter flat head and of suffi-cient length to penetrate 3/4 inch (19 mm) into solid wood decking or extend at least 1/8 inch (3 mm) through OSB or plywood sheathing.

1. Where nails are in contact with metal flashing, use nails made from same metal as flashing.

B. Felt Underlayment Nails: Aluminum, stainless-steel, or hot-dip galvanized steel wire with low profile capped heads or disc caps, 1-inch (25-mm) minimum diameter.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrate, areas, and conditions, with Installer present, for compliance with requirements for installation tolerance and other conditions affecting performance of work.

1. Examine roof sheathing to verify that sheathing joints are supported by framing and blocking or metal clips and that installation is within flatness tolerances.

2. Verify that substrate is sound, dry, smooth clean, sloped for drainage, and com-pletely anchored; and that provision has been made for flashing and penetrations through asphalt shingles.

3.2 UNDERLAYMENT INSTALLATION

A. Self-Adhering Sheet Underlayment: Install self-adhering sheet underlayment, wrinkle free, on roof deck. Comply with low-temperature installation restrictions of under-layment manufacturer if applicable. Install at locations indicated, lapped in direction to shed water. Lap sides not less than 6 inches (89 mm). Lap ends not less than 6

ROOF REPAIR AND REPLACMENT 073113-5

inches (150 mm) staggered 24 inches (600 mm) between courses. Roll laps with roll-

er. Cover underlayment within seven days.

1. Eaves: Extend form edges of eaves 36 inches (914 mm) beyond interior face of exterior wall.

2. Rakes: extend from edges of rake 36 inches (914 mm) beyond interior face of exterior wall.

3. Valleys: Extend from lowest to highest point on each side 36”. Provide second

36” wide layer directly on top of first layer and centered on valley.

4. Hips: Extend 18 inches (450 mm).

5. Ridges: Extend 36 inches (914 mm) each side without obstructing continuous ridge vent slot.

6. Equipment Supports and Roof-Penetrating Elements: Extend beyond penetrat-ing element 18 inches and return vertically against penetrating element not less than 4 inches (100 mm), 36” in each direction at equipment supports.

7. Roof slope Transitions: Extend 36 inches on each roof slope – lap no less than 6 inches.

B. Double-Layer Felt Underlayment: Install double layer of 15# felt underlayment on roof deck perpendicular to roof slope in parallel courses, after underlayment has been installed. Install at locations indicated. Lap sides a minimum of 2 inches (50 mm) over underlying course. Lap ends a minimum of 4 inches (100 mm). Stagger end laps between succeeding courses at least 72 inches (1830 mm). Fasten with felt underlay-ment nails.

1. Install felt underlayment on entire roof deck , on top of self-adhering sheet un-derlayment. Lap sides of felt over self-adhering sheet underlayment not less than 3 inches (75 mm) in direction to shed water. Lap ends of felt not less than 6 inches (150 mm) over self-adhering sheet underlayment.

3.3 ASPHALT SHINGLE INSTALLATION

A. Install asphalt shingles according to manufacturer's written instructions, recommenda-tions in ARMA's "Residential Asphalt Roofing Manual," and asphalt shingle recom-mendations in NRCA's "The NRCA Roofing and Waterproofing Manual."

B. Install starter strip along lowest roof edge, consisting of an asphalt shingle strip with tabs removed at least 7 inches (175 mm) wide with self-sealing strip face up at roof edge.

1. Extend asphalt shingles 1/2 inch (13 mm) over fascia at eaves and rakes.

2. Install starter strip along rake edge.

C. Install first and remaining courses of asphalt shingles stair stepping diagonally across roof deck with manufacturer's offset pattern at succeeding courses, maintaining uni-form exposure.

D. Install first and remaining courses of…