Minton Lookout Specs.doc
DOC document 413 KB Posted
- Attached to
- Kootenai National Forest, Minton Peak lookout
- Solicitation number
- AG-8281-S-10-0417
About this file
Attachment A Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Clarifications.docx | DOCX document | |
| drawings.zip | ZIP file | |
| Expierence Questionnaire.doc | DOC document | |
| SF 18.pdf | ||
| AG-82B1-S-10-0417.docx | DOCX document | |
| General Decision Number.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARRA
Minton Peak Lookout Reconstruction 4/10
SECTION 01010 – SUMARY OF WORK
PART 1 - GENERAL
1.1 DESCRIPTION OF WORK
Paragraph is below an example from Division 15 Section "Hydronic Piping." Usually include a summary paragraph when the Section title does not clearly indicate its extent. In the example below, the inclusion of condensate drain piping is not obvious without the "Summary" Paragraph.
A. Summary: The contractor shall furnish all labor, equipment, transportation, supervision, operating supplies, materials and incidentals, unless noted otherwise, to complete the following at the Minton Peak Lookout:
1. Dismantle and dispose of the existing lookout structure and shed, salvaging materials as designated in these specifications.
2. Reconstruct a new lookout in its place using the attached drawings and these specifications.
1.2 PROJECT LOCATION
A. The project is located on the top of Minton Peak, in Sanders County, Montana. T24N; R33W; Section 24.
B. Directions to Minton Peak: From Trout Creek Montana turn southwest on Cedar Street off of Montana Hwy 200. Turn right (northwest) on Pine Street. Travel 1.8 miles and continue onto Martin Creek Road for another 4.4 miles. Turn left at Minton Peak Road (FDR 322). Travel 6.6 miles to the junction with Minton Peak Lookout Road. Turn right and proceed for 0.9 miles to the Lookout.
1.3 PROSECUTION AND PROGRESS
A. The estimated start work date is July 20, 2010.
B. There will be no pre-bid tour for this project. Prospective bidders are encouraged to visit the site prior to submitting a bid.
C. Prior to start work a prework conference will be held.
D. All work under this contract to be completed by September 1, 2011.
E. Submittals: The contractor shall submit the following at the prework conference.
1. A list of proposed subcontractors and their intended work
2. A proposed work schedule
3. A safety plan
F. Weekend and Holiday Work Restrictions: No on-site work shall be performed on weekend or federal holidays unless otherwise authorized by the CO.
1.4 CODES, STANDARDS, AND PERMITS
A. Comply with these specifications, project drawings, and all applicable local, State, and National laws, codes, standards, and regulations. Comply with all health and safety codes for personnel and public.
1.5 USE OF PREMISES
A. Toilet facilities are NOT available at the work site at this time. We plan to construct an outhouse at the site during the summer of 2010. Upon completion, this outhouse will be available to the contractor.
B. Electrical Power is not available at the site.
1. Contractor shall supply electrical generator and extension cords as needed for the work.
C. Water
1. Potable water is NOT available at the work site. The contractor is responsible for providing all water required to complete this project, drinking or otherwise.
D. Camping will be allowed at the worksite in areas designated by the CO during periods of active work. Coordinate with the CO a minimum of 14 days prior to start of work.
E. The contractor may store materials in areas approved by the CO. The contractor shall be responsible for materials and equipment stored at the site.
F. The contractor shall maintain the project area in a neat, orderly, and safe condition at all times. All construction debris and other waste to be cleaned up at the end of each working day and placed in suitable containers.
G. Disposal of debris:
1. Dispose of all material removed by this project that is not designated for reuse, salvage, or disposal by Forest Service.
2. Burning of waste materials is not permitted on the project or Forest Service property.
3. Dispose of waste material in a legal manner off of Forest Service property in accordance with Local, State, and Federal Regulations.
1.6 PROTECTION OF PROPERTY
A. The contractor shall conduct his work in a manner that will protect the existing property at the site as set forth under Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.
B. Noxious Weeds
1. In order to prevent the spread of noxious weeds the contractor shall clean all construction equipment prior to moving it to the project area. This cleaning shall remove all soil, plant parts, seeds, vegetative matter, or other debris that could contain or hold seeds. Only construction and maintenance equipment and the equipment necessary to transport said equipment, so cleaned and inspected by the Forest Service will be allowed within the project area. All subsequent move-ins of equipment to the project area shall be treated in the same manner as the initial move-in. This requirement does not apply to service vehicles, water trucks, pickups, cars, and/or similar vehicles (does apply to excavation equipment).
2. Contractor shall employ whatever cleaning methods are necessary to ensure that construction and maintenance equipment is free of noxious weeds. Equipment shall be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.
3. Unless otherwise agreed, Contractor shall give the Forest Service at least 24 hours notice when equipment is ready for inspection. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.
4. New infestations of noxious weeds of concern to Forest Service and identified by either Contractor or Forest Service, on the project area or on the access routes, shall be promptly reported to the other party. Contractor and Forest Service shall agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.
1.7 GOVERNMENT FURNISHED MATERIALS
A. Window Sash (including glass) – 19 total. They will need to be sized to fit window openings and will require priming and painting.
B. Door – One total. The door will need to be sized to fit the opening and will require priming and painting. Door does not include jams.
C. Window Sills – Four Total. They will need to be notched around the wall framing and mitered to fit at the corners. They will require priming and painting.
D. Door Sill – One total. Size to fit, prime and paint.
1.8 MEASUREMENT AND PAYMENT
A. Payment will be included in the bid item to which this work relates.
B. There will be no separate pay item for mobilization (including equipment washing). The contractor should figure the mobilization costs into the individual bid items as necessary.
Retain first paragraph below if Contractor is required to provide structural design for products or systems specified. Use similarly worded paragraphs titled "Performance Requirements" where other types of performance requirements are appropriate.
PART 2 - PRODUCTS (Not Applicable) PART 3 - EXECUTION (Not Applicable)
END OF SECTION 01010
SECTION 01732 - SELECTIVE DEMOLITION
PART 4 - GENERAL
4.1 SECTION REQUIREMENTS
A. Unless otherwise indicated, demolished materials become Contractor's property. Remove from Project site.
B. Items indicated to be removed and salvaged remain Forest Service property. The contractor shall store the salvaged materials on site and protected from the weather until repossessed by the Forest Service.
C. Comply with EPA regulations and disposal regulations of authorities having jurisdiction.
D. It is not expected that hazardous materials will be encountered in the Work. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify the CO. Hazardous materials will be removed by Forest Service.
E. The Forest Service will furnish an asbestos inspection showing that there are no asbestos containing materials present in the lookout.
F. Lead Based Paint – The lookout was constructed in 1940. The building has not been tested for lead based paint but based on the buildings age it is assumed lead based paint is present. Proceed with the work as if lead based paint is present unless contractor testing shows otherwise.
G. This lookout has been evaluated and determined NOT eligible for the National Register of Historic Places (i.e. not historic).
PART 5 - PRODUCTS
5.1 EXISTING BUILDINGS
A. Minton Peak Lookout
B. Storage shed located under the cabin of the lookout.
5.2 MATERIALS TO BE SALVAGED
A. Hip Roof Block
B. Storage Shed – take apart and store on site. Forest Service will remove and reassemble.
PART 6 - EXECUTION
6.1 DEMOLITION
A. Conduct demolition operations and remove debris to prevent injury to people and damage to adjacent buildings and site improvements.
B. Provide and maintain shoring, bracing, or structural support to preserve building stability and prevent movement, settlement, or collapse during the demolition process.
C. Promptly remove demolished materials from Owner's property and legally dispose of them. Do not burn demolished materials.
D. This building has been subject to rodent infestation (pack rats). Contractor must take precautions for hantavirus during the demolition.
E. The radials of the existing grounding system may be left in place and used to augment the new lightning protection system provided they are adequately buried and in good condition.
F. Remove the entire lookout structure, including the foundation piers.
END OF SECTION 01732
SECTION 02300 - EARTHWORK
PART 7 - GENERAL
7.1 SECTION REQUIREMENTS
A. Unauthorized excavation consists of removing materials beyond indicated subgrade elevations or dimensions without direction by the CO. Unauthorized excavation and remedial work shall be at Contractor's expense.
B. Work under this section is associated with excavation and backfilling for the concrete footing for the new lookout as well as removing the existing footings.
C. Soil conditions have not been evaluated and it is uncertain at what depth bedrock will be encountered. Coordinate excavation work with the CO in order to facilitate any adjustments to these plans and specifications.
PART 8 - PRODUCTS
8.1 MATERIALS
A. Satisfactory Backfill: It is anticipated that there will be adequate suitable backfill material at the site.
PART 9 - EXECUTION
9.1 EARTHWORK
A. Protect subgrades and foundation soils from softening and damage by water, freezing temperatures, or frost.
B. Explosives: Do not use explosives.
C. Excavate to subgrade elevations unless obstructions are encountered. Work with the CO to adjust for any unforeseen obstructions.
D. Do not over excavate areas of footings. Footings should be placed on undisturbed soil.
E. Place backfill and fill in layers not more than 6 inches in loose depth at moisture content suitable for compaction. Compact each layer with three complete passes using a mechanical tamping device (whacker packer).
F. Grade areas to a smooth surface to cross sections, lines, and elevations indicated.
G. Do not proceed with Concrete work without approval of the excavation by the CO.
H. Remove surplus satisfactory soil and waste material, including unsatisfactory soil, trash, and debris, and legally dispose of it off Owner's property.
END OF SECTION 02300
SECTION 03300 - CAST-IN-PLACE CONCRETE
PART 10 - GENERAL
10.1 SECTION REQUIREMENTS
A. Submittals: Concrete mix designs.
B. Contractor shall get the CO to approve form work and rebar prior to placing concrete.
PART 11 - PRODUCTS
11.1 MATERIALS
A. Deformed Reinforcing Bars: Refer to the drawings for size and spacing. Bars shall be in good condition and free from rust (some light spots of rust are acceptable).
B. Portland Cement: ASTM C 150, Type I or II.
C. Fly Ash: ASTM C 618, Type C or F.
D. Aggregates: ASTM C 33, uniformly graded.
If retaining first paragraph below, coordinate with other types of slab reinforcing.
E. Air-Entraining Admixture: ASTM C 260.
11.2 MIXES
A. Proportion normal-weight concrete mixes to provide the following properties:
Select or revise mix properties below to suit Project. Distinguish locations of each concrete mix if more than one.
1. Compressive Strength: 3000 psi at 28 days.
2. Slump Limit: 4 to 5 inches at point of placement.
3. Air Content: 5.5 to 7.0 percent.
PART 12 - EXECUTION
12.1 CONCRETING
A. Construct formwork according to the drawings.
B. Accurately position, support, and secure reinforcement.
C. Place concrete in a continuous operation and consolidate using mechanical vibrating equipment.
D. Protect concrete from physical damage, premature drying, and reduced strength due to hot or cold weather during mixing, placing, and curing.
E. Formed Surface Finish: Smooth-formed finish for concrete exposed to view, rough-formed finish elsewhere.
Retain required finishes in first paragraph below, revising locations as needed.
F. Slab Finishes: Stair Landing - Nonslip-broom finish.
G. Protect concrete from damage. Repair surface defects in formed concrete and slabs.
H. Repair slabs not meeting surface tolerances by methods agreed to by the CO.
END OF SECTION 03300
SECTION 06100 - ROUGH CARPENTRY
PART 13 - GENERAL (Not Applicable)
PART 14 - PRODUCTS
14.1 WOOD PRODUCTS, GENERAL
A. Lumber: Provide dressed lumber, S4S, 15 percent maximum moisture content for 2-inch nominal thickness or less, marked with grade stamp of inspection agency.
B. Engineered Wood Products: Acceptable to authorities having jurisdiction and for which current model code research or evaluation reports exist that show compliance with building code in effect for Project.
14.2 LUMBER
A. Dimension Lumber: The following grades are per inspection agency indicated:
Select one grade requirement and one or more species group in subparagraphs below for each application depending on availability and suitability for Project. Designate load-bearing walls on Drawings.
1. Framing Other Than Non-Load-Bearing Partitions: Douglas fir-larch, Number 1 or Select Structural, unless noted otherwise on the drawings.
Retain subparagraph below for better appearance for exposed work.
2. Exposed Framing: Douglas fir-larch, Number 1 or Select Structural, unless noted otherwise on the drawings.
14.3 ENGINEERED WOOD PRODUCTS
A. Engineered wood products with allowable design stresses, as published by manufacturer, that meet or exceed those indicated. Manufacturer's published values shall be demonstrated by comprehensive testing.
14.4 PANEL PRODUCTS
A. Plywood Wall Sheathing:
1. Exterior Sheathing: ¾” Marine grade plywood
2. Interior Sheathing: ½” A/C plywood.
B. Plywood Roof Sheathing: Exterior grade plywood – ¾” CDX.
C. Plywood Underlayment: ½” A/C plywood with fully sanded face.
D. Plywood Subflooring: ¾” Marine grade plywood.
E. Plywood Gussets: Exterior grade plywood – 5/8” CDX.
14.5 MISCELLANEOUS PRODUCTS
A. Fasteners: Size and type indicated. Where rough carpentry is exposed to weather, in ground contact, or in area of high relative humidity, provide fasteners with hot-dip zinc coating.
1. Power-Driven Fasteners: CABO NER-272.
2. Bolts: As indicated on the drawings.
B. Metal Framing Anchors: Hot-dip galvanized steel of structural capacity, type, and size indicated.
C. Building Paper: Asphalt-saturated organic felt complying with ASTM D 226, Type II (No. 30 asphalt felt), unperforated.
D. Adhesives for Field Gluing Panels to Framing: APA AFG-01.
PART 15 - EXECUTION
15.1 INSTALLATION
A. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Locate nailers, blocking, and similar supports to comply with requirements for attaching other construction.
B. Securely attach rough carpentry to substrates, complying with the following:
1. CABO NER-272 for power-driven fasteners.
2. Published requirements of metal framing anchor manufacturer.
3. Table 602.3(1), "Fastener Schedule for Structural Members," and Table 602.3(2), "Alternate Attachments," in the International One- and Two-Family Dwelling Code.
C. Fastening Methods: Comply with recommendations in APA Form No. E30K and the following:
1. Subflooring: Glue and nail to framing.
2. Sheathing: Nail to framing.
3. Underlayment: Staple to subflooring.
4. Plywood gussets (roof framing): Glue and nail to framing.
END OF SECTION 06100
SECTION 06185 - STRUCTURAL GLUED-LAMINATED TIMBER
PART 16 - GENERAL
16.1 SECTION REQUIREMENTS
Retain first paragraph below if manufacturer is required to design glulams.
A. Submittals: Product Data including beam specifications, dimensions, and beam composition.
Delete subparagraph below if glulams are designed by Architect.
1. Include structural analysis data.
B. Standards: Comply with ANSI/AITC A 190.1, "Structural Glued Laminated Timber."
C. Comply with AITC 111, "Recommended Practice for Protection of Structural Glued Laminated Timber During Transit, Storage, and Erection."
PART 17 - PRODUCTS
17.1 STRUCTURAL GLUED-LAMINATED UNITS
A. Species: Douglas fir-Larch.
Retain paragraph above and delete first two paragraphs below if manufacturer is to design glulams. Delete above and retain either or both paragraphs below if glulams are designed by Architect.
B. Appearance: Architectural grade.
C. Adhesive: wet-use type.
D. Seal Coat: Glu-Lams will require treatment with a preservative. The make-up of this sealant is listed in section 09910 Painting, under Clear Wood Preservative.
17.2 CONNECTORS
A. General: Fabricate from structural-steel complying with ASTM A 36/A 36M; steel bars complying with ASTM A 575, Grade M 1020; and steel sheet complying with ASTM A 570, Grade 33. Finish with rust-inhibitive primer and paint.
Paragraphs below are examples only. Delete types not required and revise to suit products selected.
B. Beam Seats: ¾” thick x 8” x 6 ¾” wooden bearing plates.
PART 18 - EXECUTION
18.1 INSTALLATION
A. Install structural glued-laminated timber for a close fit and neat appearance of joints. Carefully trim ends, mark and drill for bolts, and seal cuts with end sealer.
B. Handle and temporarily support members to prevent visible surface damage. When hoisting members into place, use padded slings, and protect corners with wood blocking.
C. Brace members as they are placed to maintain safe condition until full stability is provided.
END OF SECTION 06185
SECTION 06200 - FINISH CARPENTRY
PART 19 - GENERAL (Not Applicable)
PART 20 - PRODUCTS
20.1 MATERIALS, GENERAL
A. Lumber: DOC PS 20 and grading rules of inspection agencies certified by American Lumber Standards Committee Board of Review.
B. Composite Decking:
1. Provide composite decking material that meets the dimensions listed in these specifications and on the drawings.
a. Rhino Deck (color = Sand).
b. Approved Equal.
2. Install decking materials using the fasteners and methods recommended by the manufacturer.
3. Hidden fastener systems will not be required.
20.2 EXTERIOR FINISH CARPENTRY
If retaining first paragraph below, select one texture, grade, and species.
A. Exterior Lumber Trim (including Shutters): Smooth-textured, Clear Douglas Fir.
B. Lumber Siding: Kiln-dried, No. 1 or Select Structural Douglas Fir / Larch matching the profile on the drawings.
20.3 INTERIOR STANDING AND RUNNING TRIM
A. Interior Softwood Lumber Trim: Kiln-dried, No. 1 or Select Structural Douglas Fir / Larch matching the profiles and dimensions shown on the drawings.
20.4 STAIRS AND RAILINGS
A. Exterior Treads: 1 ½” thick, made from composite decking material.
B. Exterior Risers: 3/4-inch thick cut to fit, made from composite decking material.
C. Exterior Guard Railings (around cat walk): Kiln-dried, No. 1 or Select Structural Douglas Fir / Larch – 2 x 6 Nominal D. Exterior Hand Rail (on stairs): Kiln-dried, No. 1 or Select Structural Douglas Fir / Larch – sized to meet codes for graspable hand rails.
20.5 MISCELLANEOUS MATERIALS
A. Fasteners for Exterior Finish Carpentry: hot-dip galvanized steel.
PART 21 - EXECUTION
21.1 INSTALLATION
A. Prime and backprime lumber for painted finish exposed on the exterior.
B. Install finish carpentry level, plumb, true, and aligned with adjacent materials. Scribe and cut to fit adjoining work. Refinish and seal cuts.
C. Install standing and running trim with minimum number of joints practical, using full-length pieces from maximum lengths of lumber available. Stagger joints in adjacent and related trim. Cope at returns and miter at corners.
D. Nail siding at each stud. Seal joints at inside and outside corners and at trim locations.
E. Select and arrange paneling for best match of adjacent units. Install with uniform tight joints.
END OF SECTION 06200
SECTION 07318 – COMPOSITE ROOFING SHINGLES
PART 22 - GENERAL
22.1 DESCRIPTION OF WORK
A. Furnish and install composite shingles and accessories in accordance with TAMKO’s Composite Shingle Standards. Roof Support (Structural) Systems are not included in this section.
B. Shingles shall have a 7” exposure.
22.2 SECTION REQUIREMENTS
A. Submittals:
1. Product Data: Submit TAMKO Lamarite Shake Composite Shingle specification and installation guide.
2. Shop drawings: Submit small-scale roof plan and details as needed. Indicate details of flashing conditions, anchoring methods and penetrations.
3. Samples: Submit actual shingle along with sample of color.
22.3 REGULATORY REQUIREMENTS
A. Comply with all applicable local, state, or national building codes.
22.4 DELIVERY, STORAGE, AND HANDLING
A. TAMKO Lamarite Composite Shingles should be kept in a dry place and stacked as shipped. It is recommended that Lamarite Shake Shingles be stored in temperatures above 45 degrees F.
22.5 WARRANTY:
A. Provide 50 year manufacturer’s limited warranty against manufacturing defects which result in leaks.
Retain below if fire-retardant-treated shingles are required.
PART 23 - PRODUCTS
23.1 APPROVED MANUFACTURER
A. TAMKO Roofing Products, Inc. (EPOCH Composite Products, a TAMKO company)
B. Alternative products with physical characteristics equal to or better than Lamarite may be accepted. Contractor should get approval from the CO prior to submitting a bid on an alternate composite shingle roofing system.
Coordinate lengths of shingles and shakes with roof slopes.
23.2 COMPOSITE SHINGLE MATERIALS
A. Shingle Description: Lamarite Shake Composite Shingles are manufactured from colorized mineral filled polymer. Lamarite Shake Composite Shingles simulate the look of wood shakes. Lamarite Shingles are available in three sizes, 18” x 12”, 18” x 7” and 18” x 5” and are suitable for installation with exposures of 7”, 7 ½”, and 8”.
23.3 ACCESSORY PRODUCTS
A. Underlayment: General Requirements
1. Moisture Guard Plus – TAMKO’S fiberglass reinforced self-adhering SBS modified asphalt underlayment with fine mineral surfacing. Install over entire roof deck.
B. Flashing Metal: 26 gauge
C. Nails: Corrosion-resistant, 3/8” head x 1 ½” length, ring shank roofing nails.
D. Sealant: Contractor grade one part urethane sealant.
E. Metal Drip Edge: Use a Style D metal drip edge.
PART 24 - EXECUTION
24.1 EXAMINATION AND PREPARATION
A. Color Variation: All Lamarite Shake Composite Shingles come with shade variation. Shade variation has been designed into the shingles to provide a more realistic, random appearance. Install shingles to avoid creating a color pattern on the roof. Lamarite shingles are intended to have random shade variations when installed.
B. Application Temperature: Although temperatures below 45 degrees F. will not harm shingles, cold temperatures may cause difficulty with the installation, including increased breakage during fastening. If Lamarite Shingles have been stored in temperatures below 45 degrees F., it is recommended that the shingles be restored to a temperature above 45 degrees F. prior to installation. Lamarite Shingles will expand and contract with heat and cold and must be properly spaced to avoid buckling. Lamarite shingles have been designed with spacer tabs on the sides to help assure proper spacing. It is recommended that Lamarite Shake Shingles be stored in temperatures above 45 degrees F.
C. Nailing: This lookout should be considered to be in a high wind area. Lamarite Shingles are for application to roof decks capable of receiving and retaining nails that penetrate ¾” into the roof deck. Each shingle should be applied with two corrosion-resistant, ring shank, 3/8” head x 1 ½” length, roofing nails using a pneumatic nail gun set to 100 psi. Do not allow the end of the nail gun to punch the product. Do not use staples. Drive nail heads flush with the shingle surface. Frequently check both the depth and pressure setting on the nail gun so nails are not over-driven. Over-driving nails may cause shingles to lift and will adversely affect the appearance of the roof. Shingles can also be hand nailed using two corrosion-resistant roofing nails.
D. Cutting: To cut a shingle, it is recommended to score the back side of the shingle with a utility knife or comparable tool. Alternatively, a circular saw with a carbide blade (two teeth per inch) can be used to cut the shingle.
E. Roof Deck: Roof deck must be smooth, dry, and free from warped surfaces. Metal drip edges should be installed at eaves.
F. Metal Flashing: Metal flashings should be used where the roof abuts the metal chimney to help prevent leaks. Members that protrude through the roof should be flashed at all intersecting angles. Metal flashing should be a minimum of 26-gauge metal.
G. Ventilation: There will be no ventilation of the roof.
24.2 INSTALLATION
A. Underlayment: An underlayment must be applied over the entire deck before installation of the Lamarite shingles. Dust, dirt, loose nails, and any protrusions must be removed prior to application of the underlayment. Apply the underlayment only in fair weather when the air temperatures are above 35 degrees F. and the deck is dry. Align the first course of the underlayment on the lower edge of the roof, parallel to the eaves. Install successive courses from low to high point, lapping each course 3 ½” over the lower course so that laps will shed water. End seams should be overlapped 6” and staggered so that end seams in one course do not align with end seams in an adjacent course. If left exposed, underlayment may be adversely affected by moisture and weathering. Underlayment and Lamarite Shake Shingles must be applied together.
B. Starter Course, Preformed Starter: Begin by cutting the preformed starter into two 10” x 6” pieces (discard one piece) install the remaining 10” x 6” piece so that it extends ¼” over the eve edges. Install full size 10” x 12” preformed starter across the eave maintaining the correct eave overlap. Important: ensure to maintain ¼’ space between the starter pieces.
C. Shingle Application:
1. Important: Spacer tabs are manufactured into the side edges of Lamarite Shingles to insure the proper ¼” spacing. The tabs should be clipped only from exposed edges. Do not clip the tabs between adjacent shingles. Failure to properly space Lamarite shingles may result in buckling and will adversely affect the appearance of the roof.
2. When the starter courses are complete, clip spacer tabs from the outside edge of a Lamarite Shake shingle. In addition, the outside edge of the shingles along the hip must be cut to match the angle of the hip. Place the first shingle directly on top of the starter course, aligning the edges with the bottom and rake or hip edges of the starter shingle. Fasten each full shingle with two nails. Place one nail in each of the appropriate nailing locations (two nails maximum per shingle). Continue installing shingles across the roof, aligning the bottom of each shingle with the bottom of the starter course.
3. To begin the second course of shingles, cut one Lamarite Shake shingle into two 18” x 6” pieces. Begin the course with the 6” piece with the spacer tabs on the inside edge and the cut/sawed edge on the outside. Align the exposure marks on the side of the shingle with the top edge of the underlying shingle to create the proper weather exposure. Continue to install full size Lamarite Shingles across the roof. When shingles are uniform exposure and properly installed the exposure marks will align with the tops of the shingles below and horizontally with the exposure marks on the adjacent shingles.
4. The third course of shingles should begin in the same manner as the first, with a full size shingle. Alternate courses using full size shingles and 10” x 6” pieces as the first shingle in each successive course to prevent the spaces between the shingles in one course from aligning with the spaces in adjacent courses.
5. Note: If chalk lines are used, do not use permanent chalk as it may adversely affect the appearance of the roof. As work progresses up roof slopes care should be taken to minimize traffic over completed areas.
D. Hip and Ridge Application:
1. Using Moisture Guard Plus underlayment, fasten an 8” wide cap over all hips so that one half of the cap underlayment rests on each side of the hip.
2. Use a preformed hip and ridge: Cut a 10” long piece from a Lamarite prefabricated Hip and Ridge Shingle to use as a starter shingle. Fasten the 10” piece to the lowest point of the hip using two corrosion-resistant roofing nails of sufficient length to penetrate ¾” into or completely through the decking. One nail should be placed in each of the appropriate nailing locations (two per shingle). Fasten a full size Lamarite hip and Ridge Shingle directly over and completely covering the 10” starter shingle. Continue installing full size Hip and Ridge Shingles along the hip with the same weather exposure as the field of the roof (7”).
END OF SECTION 07318
SECTION 07720 - ROOF ACCESSORIES
PART 25 - GENERAL
25.1 SECTION REQUIREMENTS
A. Submittals: Product Data and Shop Drawings for metal Chimney and related products.
PART 26 - PRODUCTS
26.1 MATERIALS
A. Provide Stainless Steel Chimney and accessories.
26.2 ROOF ACCESSORIES
A. Stainless Steel Chimney for wood stove. Wood stove is not part of this contract.
1. Products:
a. Selkirk, Ultra-Temp 6” (Flat Ceiling) components including:
1) Roof Termination Kit
2) Chimney Pipe
3) Attic Insulation shield
4) Roof Flashing
5) Finish Support package
6) Smoke Pipe Adapter
7) Universal Roof Brace Kit
8) Universal Roof Support Kit
b. Approved Equal.
26.3 INSTALLATION
A. Installation: Unless otherwise indicated, install roof accessory items according to construction details of NRCA's "Roofing and Waterproofing Manual." Coordinate with installation of roof deck, vapor barriers, roof insulation, roofing, and flashing to ensure combined elements are secure, waterproof, and weather tight.
B. Follow all manufacturers guidelines and recommendations regarding the installation of the chimney and all related components.
END OF SECTION 07720
SECTION 08550 - WOOD WINDOWS
PART 27 - GENERAL
27.1 SECTION REQUIREMENTS
A. Window Sash and Sills will be Government Furnished and will need to be fit to the openings and Installed.
PART 28 - PRODUCTS
28.1 WOOD WINDOWS
A. Government Furnished.
Determine Project location's basic wind speed and positive and negative design pressures for window locations before selecting product designations in first five paragraphs below.
B. Trim: Provide indicated trim; refer to the drawings for size and layout.
Delete first paragraph below if no bow or bay window units are required.
PART 29 - EXECUTION
29.1 INSTALLATION
A. Set units level, plumb, and true to line, without warp or rack of frames and panels and anchor securely in place.
B. Set sill members in bed of sealant or with gaskets, as indicated, to provide weathertight construction.
C. Adjust operating panels, screens, and hardware for smooth operation and weathertight closure. Lubricate hardware and moving parts.
END OF SECTION 08550
SECTION 09640 - WOOD FLOORING
PART 30 - GENERAL
30.1 SECTION REQUIREMENTS
A. Submittals: Product Data and material Samples.
B. Laminate Hardwood Flooring.
1. Certification: Provide flooring that carries NALFA Certification seal.
PART 31 - PRODUCTS
31.1 WOOD FLOORING
A. Engineered-Wood Strip Laminate Flooring
1. Products:
a. Mohawk; Aria Maple , WEC26-10
b. Approved equal: Contractor should get approval from the CO prior to bidding if submitting a bid based on an alternate product.
For a proprietary or semiproprietary specification, delete descriptive requirements below that are determined by product designations inserted above.
2. Species: Maple
3. Color: Natural Maple
4. Thickness: 1/2”
5. Width: 4”.
6. Length: Manufacturer's standard.
7. Edges: Kissed – Kissed
8. Installation: Glue, Floating
9. Finish: Aluminum Oxide Matte Finish.
10. Warranty: 25 year.
31.2 ACCESSORY MATERIALS
A. Underlayment: Use underlayment recommended by the flooring manufacturer for wooden subfloor that offers the most resistance to moisture.
B. Wood Flooring Adhesive: As recommended by manufacturer.
C. Wood Trim: As indicated on the drawings.
PART 32 - EXECUTION
32.1 INSTALLATION
A. Comply with flooring manufacturer's written instructions, but not less than recommendations in NOFMA's "Installing Hardwood Flooring."
B. Provide expansion space at walls and other obstructions and terminations of flooring between 5/16” to 3/8”.
C. Engineered-Wood Flooring: Install floating floor according to manufacturers installation instructions.
D. Wood Trim: Nail shoe molding or other trim to wall; do not nail to flooring.
END OF SECTION 09640
SECTION 09910 - PAINTING
PART 33 - GENERAL
33.1 SECTION REQUIREMENTS
A. Summary: Paint exposed surfaces, unless otherwise indicated.
1. Paint the back side of access panels and shutters.
2. Do not paint prefinished items, items with an integral finish, operating parts, and labels, unless otherwise indicated.
3. Surfaces NOT to be painted:
a. All concrete surfaces
b. Roofing
c. Window Glass
d. Items Requiring Preservative Mix (Beams and Sill Framing).
e. Components of the Lightning Protection System.
B. Submittals:
1. Furnish Color chips (for approval by C.O.) on all proposed paint prior to delivering to the site.
2. If substitute materials are requested by Contractor, submit, not less than seven days before beginning work, a complete list in triplicate of all substitute materials proposed for use together with manufacture’s specifications.
C. Obtain block fillers and primers for each coating system from same manufacturer as finish coats.
D. Extra Materials: Deliver to Forest Service 1 gallon of each color and type of finish coat paint used on Project, in containers, properly labeled and sealed.
33.2 DELIVERY, STORAGE, AND HANDLING
A. Deliver material to site in the original containers with labels intact.
PART 34 - PRODUCTS
34.1 MATERIALS
A. Crack/split filler.
1. Premium quality elastomeric compound, knife grade or caulk grade, as recommended by paint manufacturer for compatibility.
B. Paint Thinner.
1. If required, as recommended by paint manufacturer for compatibility.
C. Primer.
1. Acrylic primer/sealer by Columbia Paint, or approved equal, as recommended by paint manufacturer for compatibility.
D. Rust Inhibitive primer.
1. As recommended by paint manufacturer for compatibility.
E. Paint – For wood surfaces.
1. Shall be 100% acrylic latex exterior paint, Columbia Paint Solid Color or approved equal. All products shall be manufacturer’s top quality, premium grade. All components shall be compatible as recommended by the paint manufacturer for the application indicated.
F. Paint – For metal surfaces (Footing Tie Straps)
1. Shall be an Acrylic Enamel paint suitable for painting metal.
34.2 COLOR AND SHEEN SCHEDULE
A. Color
1. Refer to the FINISH SCHEDULE in the drawings.
2. Paint Colors will be selected by the C.O. and matched by the contractor.
B. Sheen
1. Provide semi-gloss paints for all areas.
PART 35 - EXECUTION
35.1 PREPARATION
A. Remove hardware lighting fixtures and similar items that are not to be painted. Mask items that cannot be removed. Reinstall items in each area after painting is complete.
B. Comply with paint manufacturer’s written instructions for surface preparation, environmental, and substrate conditions, product mixing, and application.
C. Allow surfaces to dry thoroughly (a minimum of 48 hours or in accordance with manufacturer’s written instructions) prior to applying primer.
35.2 SCAFFOLDING AND PROTECTION
A. Furnish, maintain and remove all scaffolding, ladders and planks required for this work, and all drop cloths for the protection of stairs, catwalk, floors, finish materials, and building fixtures. Scaffolding shall meet OSHA requirements.
35.3 APPLICATION
A. Apply coatings by brush, roller, air-less sprayer or other applicators according to coating manufacturer’s written instructions.
1. Use rollers and brushes for exterior painting and where the use of other applicators is not practical.
2. Use rollers and brushes for finish coat on interior walls and ceilings.
3. If paint is applied with an air-less sprayer, the paint shall be back rolled or brushed to provide uniform application and texture.
4. Areas not to be painted shall be covered and protected.
5. Apply paint only when air temperature is above 50 deg. F.
B. Pigmented (Opaque) Finishes: Completely cover surfaces to provide a smooth, opaque surface of uniform appearance. Provide a finish free of cloudiness, spotting, holidays, laps, brush marks, runs, sags, or other surface imperfections.
1. One coat of primer/sealer shall be applied to all surfaces to be painted, including bare wood.
2. A minimum of two finish coats of paint shall be applied, as required, to produce a uniform surface appearance.
Delete transparent finishes below if not applicable. Indicate locations in finish schedules.
C. Clear Wood Preservative:
1. Use this treatment for the following areas:
a. Glu-Lam Beams – three coats.
b. Sill Framing members (refer to drawings) – three coats.
2. Preservative Mix:
a. 1 part boiled linseed oil
b. 1 part mineral spirits
c. 1 ounce of paraffin, grated with cheese grater, per gallon of preservative
3. Directions:
a. To mix four gallons of preservative use at least a 5-gallon bucket.
b. Start with only the 2 gallons of mineral spirits.
c. Grate and add in the 4 ounces of paraffin (note: all ingredients need to be above 70 degrees for the paraffin to melt into the mineral spirits completely).
d. Add the linseed oil (note: the linseed oil must be boiled; otherwise, the mixture will never dry).
e. Add the remaining linseed oil to the spirits and paraffin, mixing well.
f. Use a garden sprayer or brush to apply the mixture, wearing the appropriate safety equipment.
35.4 CLEAN-UP
A. Contractor shall ensure that all paint spots, spills, and slop-over areas are removed from hardware, floors, window glass, and other surfaces not to be painted.
B. Contractor shall replace all fixtures, covers, or any other items removed for painting. All masking used shall be removed.
C. Contractor shall not discharge paint, thinner or cleanup liquids on the ground.
END OF SECTION 09910
SECTION 264114 - LIGHTNING PROTECTION FOR MOUNTAIN TOP STRUCTURES
PART 36 - GENERAL
36.1 SUMMARY
A. Section includes lightning protection for mountain top structures. The lightning protection system shall consist of the following:
Edit the following to reflect the existing lightning protection system at the mountain top structure.
1. Main protective system - Air terminals, down conductors, equal potential rings, bonding exterior metal objects, and connection to the grounding system.
2. Grounding system - Radials, ground electrodes, ground enhancement materials.
3. Tower grounding - Connection to the grounding system, and possibly air terminals, main down conductors, bonding metal objects, and guy wire bonding/grounding.
4. Single point entrance - Single bonding point for entering the building and from there a single entrance point going between floors. All systems (AC, DC, Telephone, Lightning, antennae, gas, etc.) all enter the building at the same location and are attached to ground at this point.
5. Special areas
a. Personnel locations - Living quarters require interior equal potential ring(s), single point entrance, and interior interconnection (bonding) of metals.
b. Telecommunications equipment locations – Not Applicable.
c. Metal piping systems – Horizontal systems bonding at that level, Vertical systems bonded both top and bottom, and each level they pass through.
B. Drawings: There will be no government provided architectural drawings specific to the Lightning Protection System.
1. The site may have areas of solid rock, which are not reflected in the drawings. Locate devices and apparatus appropriately.
C. Sub-Contracting:
1. It is anticipated that a sub-contractor who is skilled and certified in the installation of lightning protection systems will perform the work under this section of the contract.
36.2 SUBMITTALS
First two paragraphs below are defined in Division 01 Section "Submittal Procedures" as "Action Submittals."
A. Product Data:
1. For each type of product indicated unless referred to by name.
2. For any substitutions for equipment referred to by name.
B. Documentation: Submit required documentation to the Contracting Officer.
C. Shop Drawings:
1. For air terminals and mounting accessories.
2. Layout of the lightning protection system, along with details of the components to be used in the installation.
Remaining paragraphs are defined in Division 01 Section "Submittal Procedures" as "Informational Submittals."
Coordinate first paragraph below with qualification requirements in Division 01 Section "Quality Requirements" and as supplemented in "Quality Assurance" Article.
D. Qualification Data: For qualified Installer and manufacturer. Include data on listing or certification by UL.
Retain first paragraph below for air terminals mounted on single-ply membrane roofing.
E. Certification, signed by Contractor, that components attached to the roof are appropriate for use with the composite roofing materials.
F. Comply with recommendations in NFPA 780, Annex D, "Inspection and Maintenance of Lightning Protection Systems," for maintenance of the lightning protection system.
G. Other Informational Submittals: Plans showing dimensioned As-Built locations of grounding features, including the following:
1. Ground rods.
2. Ground loop conductor.
3. Areas of G.E.M. materials.
4. Any grounding plates required.
36.3 QUALITY ASSURANCE
A. Installer Qualifications: Certified by UL or LPI as a Master Installer/Designer, trained and approved for installation of units required for this Project.
B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 780, "Definitions" Article.
36.4 MEASUREMENT AND PAYMENT
A. The work in this section shall be measured and paid for by one or more of the following methods as shown in the Schedule of Items:
1. Incidental to the building item or included as part of other pay items or separate as shown in the Schedule of Items. No separate measurement or payment will be made.
2. Furnish and Install Lightning Protection System - Lump Sum including full compensation for all labor, materials, and incidentals necessary to complete the work as shown on the drawings including removal and disposal, all wiring, bonding, trenching, bedding, backfill, testing, and all other incidentals necessary for a functional system.
36.5 REMOVAL AND DISPOSAL
A. The work in this section will be incidental to the installation of the new lightning protection system.
B. The contractor shall remove all components of the existing lightning protection system.
C. All materials designated for removal shall be disposed of off National Forest lands, in accordance with Local, State, and Federal regulations. It would be preferable if these items were re-used or re-cycled.
PART 37 - PRODUCTS
37.1 LIGHTNING PROTECTION SYSTEM COMPONENTS
See Editing Instruction No. 2 in the Evaluations for discussion of whether the requirement of complying with NFPA 780 should be retained. Specified standards stipulate minimum size requirements for components, depending on selected metal and class of building. To require components larger than minimum size, add requirements here.
A. Comply with UL 96 and NFPA 780.
B. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. East Coast Lightning Equipment Inc.
2. ERICO International Corporation.
3. Harger.
4. Heary Bros. Lightning Protection Co. Inc.
5. Independent Protection Co.
6. Preferred Lightning Protection.
7. Robbins Lightning, Inc.
8. Thompson Lightning Protection, Inc.
C. Roof-Mounted Air Terminals: NFPA 780, Class II, copper unless otherwise indicated, extending at least 10 inches above the object to be protected.
See Editing Instruction No. 1 in the Evaluations for cautions about naming manufacturers. Retain one of first two subparagraphs and list of manufacturers below. See Division 01 Section "Product Requirements."
D. Conductors: Copper.
1. Down, Exterior Equal Potential Ring, Ground Loop and Radial Conductors: NFPA 780, Class II, main conductor.
The Class I main conductors are oversized for normal Class II areas and are not a mistake.
2. Interior Equal Potential Ring Conductors, Typical: NFPA 780, Class I, main conductor.
3. Bonding Conductors for Wood Stoves, Refrigerators, and Similar Sized Objects and Alidades and Electronic Equipment: NFPA 780, Class I, main conductor.
4. Bonding Conductors, Typical: NFPA 780, Class II, bonding conductor.
E. Connectors.
1. Welded Connectors: Exothermic-welding kits of types recommended by kit manufacturer for materials being joined and installation conditions.
2. Mechanical Connectors: Bolted or crimp type allowed.
3. Mechanical Joint Compound: Noalox or equal.
Copper-clad, steel ground rods are the most common grounding electrodes. See Editing Instruction No. 4 in the Evaluations for assistance in selecting ground rod material. UL 94 and NFPA 780 allow the use of ground rods 1/2 inch (12.7 mm) in diameter and 96 inches (2400 mm) long. Sectional rods are used when electrodes longer than 10 feet (3 m) are required.
F. Grounding Electrodes.
1. Ground Rods: Copper-clad steel, round ; 3/4 inch in diameter by 10 feet long.
2. Ground Plates: Copper 24 inches by 24 inches meeting NFPA 70 250.52(A)7.
G. Ground Enhancement - GEM (ground enhancement material) from Erico Products (1-440-248-0100).
If the site contains telecommunications and a bulkhead does not exist. Coordinate with CIO (or whatever they are calling themselves today, IRM, IST, ISO, Telecommunications).
A list of equipment requiring surge suppression must accompany the specs and delete the un-needed items. Coordinate with CIO (or whatever they are calling themselves today, IRM, IST, ISO, Telecommunications).
PART 38 - EXECUTION
See Editing Instruction No. 2 in the Evaluations for discussion of whether the requirement of complying with NFPA 780 should be retained. Specified standards stipulate minimum size requirements for components, depending on selected metal and class of building. To require components larger than minimum size, add requirements here.
A. Install lightning protection components and systems according to UL 96A and NFPA 780.
B. Install conductors with direct paths from air terminals to ground connections. Bends in conductors shall be no sharper than 90-degrees with an 8 inch minimum radius.
1. Protection for conductors shall be provided where required.
2. Metal parts shall not be substituted for conductors except as noted herein.
C. Cable Connections: Use crimped or bolted connections for all conductor splices and connections between conductors and other components.
1. Use exothermic-welded connections between all Class II main conductor underground portions of the system.
2. Down conductors shall be continuous without splice above ground.
3. Where equal potential ring or bonding conductor joins a down conductor or radial, it shall bend (8 inch minimum radius) downward and meet the continuous straight down conductor on both sides at a 45 degree angle.
4. Where a grounding conductor joins a down conductor radial, it shall approach the radial at a 45-degree angle, pointing toward the surge origin (mountain top structure).
Retain first paragraph below for single-ply membrane roofing.
D. Air Terminals on Single-Ply Membrane Roofing: Not Applicable.
Delete first two paragraphs below if NFPA 780 compliance is specified; retain if specifying bonding requirements that exceed minimum UL 96A requirements. See Editing Instruction No. 3 in the Evaluations. Coordinate with Drawings for counterpoise requirements if any.
E. Down conductors shall be provided at all four building corners with each air terminal having at least two paths to ground.
F. Equal Potential Rings for Non-Metallic Structures.
1. Roof-level equal-potential ring shall be installed at the roof level, secured to the building fascia.
2. Interior equal potential rings shall be installed near floor level at each enclosed level unless specified otherwise, and either interior to the level around the exterior wall, or mounted on the exterior of the wall.
a. Ring shall form a complete circle and be bonded to only one down conductor.
b. Ring may cross from interior to exterior at locations such as doorways to avoid tripping hazards.
c. Bond to down conductor to create as close as possible a single point grounding reference point for the level. Take into consideration, stove pipe, fuel lines, electrical wiring, and coax systems if applicable.
G. Grounding - Shall be at the base and around the perimeter of the structure and shall consist of radials, ground ring, and grounding electrodes.
1. Trenching - Trenches shall be not less than 18 inches. The Contracting Officer may approve shallower burial depth if conditions warrant but in no case (except solid rock) will it be less than 6 inches.
a. GEM shall be used at:
1) Each down conductor/radial connection: two 25 pound bags, spread about 2 inches thick at conductors, 36 inches along ground loop each direction and, 72 inches along radial.
2) Each ground plate: One and a half 25 pound bags, one to form a flat bed for the plate, the rest poured over the plate connection and around the plate edges.
b. Backfill: Where limited soil exists, the best available soils shall be used to cover the radials nearest the structure.
2. Ground Loop: Install ground-level, potential equalization conductor and extend around the perimeter of the lookouts.
Retain one of the next two paragraphs. The first may not allow the use of the ground ring as an interior equal potential ring.
a. Bury ground ring not…