Amendment_0001.pdf

PDF 98 KB Posted

Attached to
Newtown Trailhead Improvement Project Federal contract opportunity
Solicitation number
AG-8191-S-16-0002
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

AMENDMENT 0001

View the file

Other files for this federal contract opportunity

Other files attached to Newtown Trailhead Improvement Project, newest first.
File Type Posted
Amendment_0003.pdf PDF
Pre-bid_meeting_sign-in_sheet.pdf PDF
Amendment_0002.pdf PDF
Photos.docx DOCX document
SPECIFICATIONS.docx DOCX document
NewtownTH-Drawings_Final.pdf PDF
WD_AZ21.pdf PDF
Prescott_Fire_Plan.doc DOC document
Past_Performance_Questionnaire.docx DOCX document
AG-8191-S-16-0002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-8191-S-16-0002

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PRESCOTT AZ 86303

344 SOUTH CORTEZ

PRESCOTT NATIONAL FOREST

04/22/2016000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/22/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Newtown Trailhead Improvement Project

The purpose of this amendment is to respond to Questions and Answers from emails and the pre-bid site visit schedule on May 13, 2016

1. This is a Request for Quotes (RFQ). We are requesting Performance Questionnaires (at least 2) and examples of similar work on which to evaluate your work. Technical capability and past performance together will be given equal importance as price.

2. Clarification of drawings- overall parking lot dimensions are roughly 244¿ x 110¿.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JONI DUTCHER

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-8191-S-16-0002/000001

3. Are we to move the existing gate? No the gate is to be removed and salvaged and a new gate shall be fabricated and installed.

4. Do we need to rip rap along the entire new ditch? No. Just the area as indicated on the plans. Approximately 35¿ long and 2¿ on each side of the flow line, this area shall also have slopes < 5% for the rancher to drive over with trailers.

5. What is the purpose of not disturbing within the island? This is for aesthetic reasons, once disturbed it takes a long time to revegetate and then often get just weeds.

6. What is the purpose of the rocks? The boulders help define where the trailers park to most efficiently use the space.

7. If you do not accept the additive bid item for the fence what will you do? We will go out to fence contractors directly and may have to redesign it if it is too costly.

8. Is there much grading? Final grade should follow existing, mostly just removing vegetation and surface rock. There is a small amount of fill up to 4¿ in one area to maintain grades of < 5%.

(shown in section X2). The point file given for layout does not give elevations. (The point file was mistakenly omitted on FBO.gov and will be posted with these questions.)

9. Have you had a survey done? Can we get a copy?

Originally said yes could give copy, but in reviewing my data what I have is already shown on the drawings. Contours on sheets 2 and 3 and cross sections on sheet 4.

10. Where is the control point? Is it a brass cap? Existing Brass cap monument is shown on drawing sheet 2 and is approximately 228¿ south of existing gate.

11. Is the existing boundary fence on a section line? Yes

12. Are these the boulders to be used? Yes the boulders currently along the wire FS boundary

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-8191-S-16-0002/000001

fence are the ones that can be used in the parking lot.

13. Can we drive a vehicle to pick up the boulders? Yes. But I would ask that you try not to destroy too much of the native vegetation.

14. Are you doing anything to the existing wire fence? No, it will remain as is except for the

24¿ of it that you are to remove and dispose of.

15. Why are we changing the direction of the drainage? We are changing it to minimize erosion and future maintenance of the new parking are and the road leading to it.

16. Do we need a permit to re-direct the drainage? No it is not necessary.

17. The soil and rock that we strip out, does the

FS want it or do we get rid of it? The soil can be used to fill holes from grubbing and any excess can be spread outside the limits of the parking area. The rock can be disposed of similarly or used as rip rap. Neither shall be left in pile. If there is too much material to waste on site, it should be brought to the attention of the COR. We may do a modification to pay for the removal of material off site, but it would need to be agreed upon prior to the work being done.

18. Is testing required on the compaction? Who will be inspecting? Testing is not required, see specification 02200. It is expected that water and compaction equipment shall be used to obtain

95% Standard Proctor. Ann May will be inspecting and watching for any deformity of surface when equipment passes over the material.

19. Is there going to be a Forest Service person on site? Yes, Ann May will be on site as needed to inspect, probably daily or every other day.

Quality assurance is the responsibility of the contractor.

20. What is the gravel surfacing? 4¿ compacted depth lime treated MAG Spec AB, see Specification

02240.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

4 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-8191-S-16-0002/000001

21. Do you need testing on the aggregate? Only the spec sheet of the aggregate gradation from the source is required.

22. Is the pipe for the fencing un- coated? Yes it is unpainted, with the intent to weather over time.

23. Why schedule 10 and schedule 40 on the fence?

Generally schedule 10 is adequate but on the side adjacent to the cattle gathering area it was suggested a little stronger would be better so went with sch. 40 on the that run.

24. Why the gap in the fence? This is for the future location of an ATV cattle guard and a horse gate. COR will mark the exact location and distance for the gap prior to installation of the fence.

25. Being in a residential area, are there any restrictions to hours of work? Work should be between the hours of 7 AM and 7PM.

26. Can equipment stay on site? Yes, but contractor is responsible for securing it.

27. Can we have someone stay in a trailer on site to watch over equipment? Probably, but It is at the discretion of the District Ranger and she was unavailable to ask at this time. Contractor will need to submit a request.

28. Is there a hydrant nearby for water? The closest water is at the water tower on Kachina just of Hwy69. It can be a little expensive.

Another alternative is to get a construction meter from Prescott Valley.

29. Do you want to save the cactus (Agave)? No all vegetation within the limits of the new parking area are to be removed and disposed of off Forest land.

30. Is a spill kit necessary on site at all times? Initially said yes, but later learned that no it is not necessary.

31. On the fencing, how far apart you would like the steel posts? Maximum distance of 10¿ between

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

5 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-8191-S-16-0002/000001

posts.

32. Is attendance to the Pre-bid tour mandatory?

No you do not have to have attended the Pre-bid in order to bid on the contract.

33. When is closing date? Bids are due by 9:00 on May 31, 2016. They can be submitted via e-mail or directly to Joni Dutcher at Prescott National

Forest, 2971 Willow Creek Rd, Bldg #4, Prescott, AZ 86301

Period of Performance: 06/06/2016 to 08/31/2016

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)