Attachment II.pdf
PDF 29 KB Posted
- Attached to
- Pavement Repair and Replacement
- Solicitation number
- AG-7MN1-S-11-AA17
About this file
Attachment II Dacis Bacon Wage Determination Dona Ana County
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Corrected RFQ-AG-7MN1-S-11-AA17 Amendment 01.pdf | ||
| RFQ-AG-7MN1-S-11-AA17 Amendment 01.pdf | ||
| Attachment I.pdf | ||
| Attachment IV.pdf | ||
| RFQ AG-7MN1-S-11-AA17.pdf | ||
| Attachment III.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT II
Davis Bacon Wage Determination No. NM100003
Modification No. 1 Date of Revision 12/03/2010
Dona Ana County, New Mexico
THIS PAGE IS BLANK
http://www.wdol.gov/wdol/scafiles/davisbacon/NM3.dvb[8/13/2011 4:08:14 PM]
General Decision Number: NM100003 12/03/2010 NM3
Superseded General Decision Number: NM20080003
State: New Mexico
Construction Type: Highway
Counties: Bernalillo, Dona Ana, Los Alamos and Santa Fe Counties in New Mexico.
HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;
bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;
and other major bridges).
Modification Number Publication Date 0 03/12/2010 1 12/03/2010
SUNM1992-002 10/21/1992
Rates Fringes
CARPENTER........................$ 8.44 .44
CEMENT MASON/CONCRETE FINISHER...$ 7.86 .26
ELECTRICIAN......................$ 17.75 2.60+4%
IRONWORKER, REINFORCING..........$ 11.00 2.97
IRONWORKER, STRUCTURAL...........$ 8.00 1.29
LABORER
GROUP 1
Common laborer; carpenter tender; concrete buggy
op. (hand); concrete workers....................$ 7.25 .35
GROUP 2
Air & power tool man;
asphalt heaterman;
asphalt jointman; asphalt raker; batching plant scaleman; tenders (to cement mason & plasterer); chain sawman;
concrete power buggyman;
concrete touchup man;
concrete sawman; curbing machine, asphalt or cement; cutting torchman;
metal form setter-road;
grade setter; hod carrier; mortar mixer & mason tender; powderman or blaster tender;
sandblaster; scaler;
Vibratorman (hand type);
vibrator compactor (hand type); wagon air tract, drill & diamond driller (outside) & tender.........$ 7.25 .35
GROUP 3
Gunite pumpcrete & nozzleman; multiplate setter; manhold builder;
pipelayer; powderman-blaster-make-up............$ 7.25 .35
LINE CONSTRUCTION: Cable Splicer
AREA A
Zone I.....................$ 19.47 2.70+3.75% Zone II....................$ 21.06 2.70+3.75% Zone III...................$ 22.13 2.70+3.75%
Zone IV....................$ 24.07 2.70+3.75%
AREA B
Zone I.....................$ 15.49 1.80+3.75% Zone II....................$ 17.54 1.80+3.75%
AREA C
Zone I.....................$ 16.78 2.25+3.75% Zone II....................$ 17.23 2.25+3.75% Zone III...................$ 17.38 2.25+3.75% Zone IV....................$ 17.63 2.25+3.75%
COMMERCIAL LINE WORK
LINE CONSTRUCTION: Equipment Operator (includes helicopter operator)
AREA A
Zone I.....................$ 16.81 2.70+3.75% Zone II....................$ 18.40 2.70+3.75% Zone III...................$ 19.47 2.70+3.75% Zone IV....................$ 21.41 2.70+3.75%
COMMERCIAL LINE WORK
Line Construction: Equipment Mechanic (includes helicopter mechanic)
AREA A
Zone 1.....................$ 16.81 2.70+3.75% Zone II....................$ 18.40 2.70+3.75% Zone III...................$ 19.47 2.70+3.75% Zone IV....................$ 21.41 2.70+3.75%
COMMERCIAL LINE WORK
Line Construction: Equipment Operator and Mechanic (includes helicopter operator & mechanic)
AREA B
Zone I.....................$ 12.83 1.80+3.75% Zone II....................$ 14.53 1.80+3.75%
AREA C
Zone I.....................$ 14.31 2.25+3.75% Zone II....................$ 14.76 2.25+3.75% Zone III...................$ 14.91 2.25+3.75% Zone IV....................$ 15.16 2.25+3.75%
COMMERCIAL LINE WORK
Line Construction:
Groundman-Jackhammer
AREA A
Zone I.....................$ 12.57 2.70+3.75% Zone II....................$ 14.16 2.70+3.75% Zone III...................$ 15.23 2.70+3.75% Zone IV....................$ 17.17 2.70+3.75%
AREA B
Zone I.....................$ 10.47 1.80+3.75% Zone II....................$ 11.86 1.80+3.75%
AREA C
Zone I.....................$ 11.68 2.25+3.75% Zone II....................$ 12.13 2.25+3.75 Zone III...................$ 12.28 2.25+3.75% Zone IV....................$ 12.53 2.25+3.75%
COMMERCIAL LINE WORK
Line Construction:
Lineman/Line Technician
AREA A
Zone I.....................$ 17.70 2.70+3.75% Zone II....................$ 19.29 2.70+3.75% Zone III...................$ 20.36 2.70+3.75% Zone IV....................$ 22.30 2.70+3.75%
AREA B
Zone I.....................$ 15.05 1.80+3.75% Zone II....................$ 17.03 1.80+3.75%
AREA C
Zone I.....................$ 16.45 2.25+3.75% Zone II....................$ 16.90 2.25+3.75% Zone III...................$ 17.05 2.25+3.75% Zone IV....................$ 17.30 2.25+3.75%
COMMERCIAL LINE WORK
Line Construction: Powderman
AREA A
Zone I.....................$ 15.40 2.70+3.75% Zone II....................$ 16.99 2.70+3.75% Zone III...................$ 18.06 2.70+3.75% Zone IV....................$ 20.00 2.70+3.75%
AREA B
Zone I.....................$ 12.39 1.80+3.75% Zone II....................$ 14.03 1.80+3.75%
AREA C
Zone I.....................$ 13.82 2.25+3.75% Zone II....................$ 14.27 2.25+3.75% Zone III...................$ 14.42 2.25+3.75% Zone IV....................$ 14.67 2.25+3.75%
COMMERCIAL LINE WORK
Line Construction
UTILITY FOR ELECTRIC &
TELEPHONE UTILITIES, REA
CO-OPS, RAILROADS &
MUNICIPALITIES
Cable Splicers.............$ 18.75 2.95+3.75% Equipment operator & mechanic (includes helicopter operator & mechanic)..................$ 15.24 2.95+3.75% Groundman - Jackhammer.....$ 11.91 2.95+3.75% Lineman/Technician.........$ 17.52 2.95+3.75% Powderman..................$ 14.72 2.95+3.75%
PAINTER
Brush.......................$ 9.12 .44 Spray.......................$ 10.32 .20
Power Equipment Operator
GROUP 1
Concrete paving curing machine....................$ 7.84 .26
GROUP 10
Pipemobile op., mole op....$ 10.29 .26
GROUP 2
Belt type conveyors (material & concrete);
broom (self-propelled);
fork lift; grease truck op.; head oiler; hydro life; tractor (under 50 drawbar HP with or without attachment);
industrial locomotive brakeman; front end loader (2 CY or less);
fireman; oiler;
screedman; roller (pull type); mulching machine;
roller (self-propelled)....$ 8.04 .26
GROUP 3
Concrete paving form grader; concrete paving gang vibrator; concrete paving joint or saw machine; concrete paving subgrader; tractor with backhoe attachment;
subgrade or base finisher; power plant (electric, general or welding machine)...........$ 8.62 .26
GROUP 4
Bulldozer (including self-propelled roller with dozer attachment; batch or continuous mix plant (concrete soil-cement or asphalt); roller (steel wheel) front end loader (2 CY through 10 cy);
scraper; motor grader......$ 8.64 .26
GROUP 5
Asphalt distributor;
asphalt paving or laydown machine; asphalt retort heater; mixer, heavy duty, asphalt or soil cement; trenching machine; clam-type shaftmucker; backhoe, clamshell, dragline, gradall, shovel (under 3/4 CY); elevating grader or belt loader; cranes (crawler or mobile) under 20 ton; air compressor (300 CFM 7 over);
crushing screening & washing plants; drilling machine (cable, core or rotary); mixer, concrete (1 CY & less); pump (6" intake or over); winch truck; hoist (1 drum);
industrial locomotive motorman, lumber stacker;
tractor (50 drawbar HP or over)......................$ 8.64 .26
GROUP 6
Concrete paver mixer;
hoist (2 drum & over);
side boom; traveling crane; piledriver;
backhoe, clamshell, dragline, gradall, shovel (3/4 CY to 3 CY); cranes (crawler or mobile) 20 ton to 40 ton; front end loader (over 10 CY);
mixer concrete (over 1 CY); mechanic and/or welder.....................$ 8.79 .26
GROUP 7
Concrete slip-form paving machine; concrete paving finishing machine;
concrete paving longitudinal float;
gunite machines;
refrigerator; jumbo form or drilling; stage;
slusher; concrete paving spreader; pumpcrete machine; grout pump op.....$ 8.84 .26
GROUP 8
Mine hoist; bulldozer (multiple units); scraper (multiple units); mucking machines; backhoe, clamshell, dragline, gradall, shovel (over 3 CY); cranes (crawler or mobile)....................$ 8.99 .26
GROUP 9
Belt loader (CMI type) op.; derrick cableway......$ 9.49 .26
TRUCK DRIVER
Diesel-powered transport;
lowboy heavy equipment......$ 7.25 .26 Distributor asphalat;
transit-mix; lowboy, light equipment; off-high hauler; dump truck over 16 cubic yards; trailer semi-trailer dump................$ 7.25 .26 Dump truck, 8 to 16 cubic yards; flat bed over 1 1/2 ton.........................$ 7.25 .26 Pick-up truck 3/4 ton or under; warehouseman; dump truck under 8 cubic yards;
flat bed, 1 1/2 ton or under.......................$ 7.25 .26
AREA AND ZONE DEFINITIONS COMMERCIAL LINE WORK (excluding work done for electric & telephone utilities, REA co-ops, railroad & municipalities).
AREA A - Also applies to switching stations & substations adjacent to power plants. Catron, Chaves, Cibola, Colfax, Curry, Debaca, Grant, Guadalupe, Harding, Lincoln, Mckinley, Mora, Quay, Rio Arriba, Roosevelt, Sandoval, San Juan, San Miguel, Sierra, Socorro, Taos, Torrance, Union, Valencia, and those portions of White Sands Missile Range and Fort Bliss in Otero County, New Mexico.
ZONE 1 - Cities & Towns Basing Points & Miles from Main Post Office:
Albuquerque - 25 miles Pojoaque - 2 miles Santa Fe - 8 miles The eastern edge of the Albuquerque zone extends no further than the western boundary of the Village of Tijeras. All areas adjacent to Pojoaque that are 2 miles distance from the main post office in that town will be zoned out of Santa Fe.
ZONE II - Extending up to 20 miles beyond Zone I, EXCEPT ALBUQUERQUE, rates per hour shall be increased by 9% of the journeyman rate of Zone I.
ZONE III - Extending up to 30 miles beyond Zone I, EXCEPT ALBUQUERQUE rates per hour shall be increased by 15% of the journeyman rate of Zone I.
ZONE IV - Anything beyond 30 miles from Zone I, EXCEPT ALBUQUERQUE rates per hour shall be increased by 26% of the journeyman rate for Zone I.
For establishing the outlying free zones from the Albuquerque free zone only, Zone II shall extend up to 10 miles beyond Zone I, Zone III shall extend up to 20 miles beyond Zone I and Zone IV anything beyond 20 miles from Zone I.
FOR WORK IN LOS ALAMOS COUNTY - USE THE ZONE III RATE
AREA B - Applies to switching stations & substations adjacent to power plants in Zone I & Zone II in Dona Ana, exclusive of those portions of White Sands Missile Range and Fort Bliss in Otero, New Mexico.
ZONE I - that area within 25 miles radius from the downtown Office of El Paso, Texas, Fort Bliss & Biggs Field; the area within a 5 mile radius of any city, town or municipality within which an employer establishes or maintains his place of business; the area within 10 mile radius from the Post Office in Alamogordo, New Mexico.
ZONE II - all other areas of the jurisdiction except those specified in Zone I.
AREA C - Applies to switching stations adjacent to power plants in Eddy & Lea Cos.; the following zones listed shall be designated from the Main Post Office of Artesia, Carlsbad, Hobbs & Lovington:
Zone I - 0 to 12 miles Zone II - 12 to 22 miles Zone III - 22 to 40 miles Zone IV - 40 miles & beyond
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
| Attachments |
| THIS PAGE IS BLANK.pdf |
| Davis Bacon for Dona Ana.pdf |
| wdol.gov |
| http://www.wdol.gov/wdol/scafiles/davisbacon/NM3.dvb |
File details come from the government source that posted it. Updated .