Attachment I Specifications/Statement of Work and Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Corrected RFQ-AG-7MN1-S-11-AA17 Amendment 01.pdf | ||
| RFQ-AG-7MN1-S-11-AA17 Amendment 01.pdf | ||
| Attachment IV.pdf | ||
| Attachment II.pdf | ||
| RFQ AG-7MN1-S-11-AA17.pdf | ||
| Attachment III.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment I
Specifications/Statement of Work and Drawings
Pavement Repair and Replacement
USDA, ARS, Southwestern Cotton Ginning
Research Laboratory
Mesilla Park, New Mexico
RFQ: AG-7MN1-S-11-AA17
August 12, 2011
THIS PAGE IS BLANK
RFQ No. AG-7MN1-S-11-AA17
STATEMENT OF WORK/SPECIFICATIONS
For
Pavement Repair and Replacement
Mesilla Park, New Mexico
TABLE OF CONTENTS
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENTS
C-1 SPECIFICATION CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01010 - SUMMARY OF WORK
SECTION 01050 - FIELD ENGINEERING
SECTION 01300 - SUBMITTALS
SECTION 01400 - QUALITY CONTROL
SECTION 01545 - PROTECTION OF WORK AND PROPERTY
SECTION 01560 - TEMPORARY FACILITIES
SECTION 01600 - MATERIAL AND EQUIPMENT
SECTION 01620 - STORAGE AND PROTECTION
SECTION 01710 - CLEANING
SECTION 01711 - CONTRACT CLOSEOUT
Enclosures:
August 12, 2011
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01010 - SUMMARY OF WORK
A. GENERAL: It is the intent of these general conditions, specifications, together with the contract, to include all labor, materials, equipment, transportation, permits and fees, temporary protection and supervision necessary to complete the required work. All work shall be done under the direction of and completion to the satisfaction of the Contracting Officers Representative (COR) and Contracting Officer (CO)
1. Project Description: The work consists of pavement repair and replacement project at the
USDA, ARS, Southwestern Cotton Ginning Research Laboratory (SWCGRL), Mesilla Park, New Mexico.
Work includes:
The purpose of the project is to repair damaged asphalt in four areas; install new asphalt in front of wagon storage building; crack and slurry seal the parking area in front of main building and west pavement areas; crack seal the pavement area on the East side of Storage Building; and remove asphalt under the Storage Building canopy and replace with a new six-inch concrete slab with footings. All paving and construction permits and requirements must be acquired and or met by the contractor. All new construction is to meet current local, state, and federal codes, and all new installed asphalt paving is to meet New Mexico Department of Transportation Specifications.
The contractor is responsible for damage to facilities or equipment during removal and installation operations. Contractor is required to repair damage to a condition such as existed prior to damage.
This project consists of three parts, as shown in the attached figures and following description.
Part 1 (See Figure Part 1)
The contractor shall:
1. Remove and dispose of the damaged asphalt and subgrade material in the four paved sectors shown by black ovals on Figure Part 1. The oval on the north side of the main ginning laboratory building is approximately 400 square feet in area. The three ovals on the east and south side of the storage building are approximately 380 square feet altogether. It is recommended that contractors verify the locations and dimensions of the areas to be repaired prior to developing their bids.
2. Replace damaged subgrade material and install three-inches of new hot mix asphalt concrete (HMAC) in all four damaged areas.
3. Sweep the entire parking area on the north side of main ginning laboratory building.
4. Blow out each crack and hot pour joint sealant RoadSaver 222 or equivalent in cracks in entire parking lot north of main ginning laboratory building.
5. Blow out each crack and hot pour joint sealant RoadSaver 222 or equivalent in cracks in paved area east and south of the storage building, as shown by hatching on Figure Part 1.
6. Apply slurry seal over entire parking area, including the repaired asphalt area, north of the main ginning laboratory building. The other paved areas shall not be slurry sealed.
7. Clean the construction area. All waste material becomes the property of contractor and is to be properly disposed of, off of Government property, in accordance with local, state, and federal regulations. If the waste material is reused, reclaimed, or recycled, the contractor shall advise SWCGRL of the approximate quantities reused, reclaimed, or recycled so that SWCGRL may file appropriate environmental reports.
Part 2 (See Figure Part 2)
1. Remove crusher rock and subgrade material to a depth of eight inches in front of the wagon storage area, marked “New HMAC at Gravel Area” on Figure Part 2.
2. Prep new subgrade material for prime coat and installation of new three inches HMAC in front of Wagon Storage area.
3. Sweep entire pavement area west and south side of main ginning laboratory building, as shown by the hatched sector of Figure Part 2. The entire parking area shall be crack and slurry sealed.
4. Blow out each crack and hot pour joint sealant RoadSaver 222 or equivalent in cracks over the entire pavement area west and south side of main ginning laboratory building, as shown by the hatched sector of Figure Part 2.
5. Apply slurry seal over entire pavement area, including the new HMAC area.
6. Clean the construction area. All waste material becomes the property of contractor and is to be properly disposed of, off of Government property, in accordance with local, state, and federal regulations. If the waste material is reused, reclaimed, or recycled, the contractor shall advise SWCGRL of the approximate quantities reused, reclaimed, or recycled so that SWCGRL may file appropriate environmental reports.
Part 3 (See Figure Part 3 & Part 3-Detail)
1. Sawcut, remove, and dispose of existing asphalt under the storage building canopy, identified as “Construction Area” on Figure Part 3.
2. Remove and dispose of existing subgrade material to a depth of 36 inches and backfill with engineered fill with 95% compaction/density.
3. Install 12-inch by 18-inch footing with #4 boxed rebar on north, south, and east sides of slab area, as shown in Figure Part 3 - Detail.
4. Drill into the existing footing on the east side of the storage building to pin the new concrete slab with #4 smooth rebar, four-feet on center, at a depth of six inches into the existing footing and twelve inches into new concrete.
5. Prep and install #4 rebar, twelve-inches on center, in a grid pattern in both directions, of entire pour area.
6. Pour six-inch, 3000 pounds per square inch, fibermesh reinforced concrete slab. The slab is to be hard trowel finished.
7. Clean construction area. All waste material becomes the property of contractor and is to be properly disposed of, off of Government property, in accordance with local, state, and federal regulations. If the waste material is reused, reclaimed, or recycled, the contractor shall advise SWCGRL of the approximate quantities reused, reclaimed, or recycled so that SWCGRL may file appropriate environmental reports.
2. Pre Bid Meeting Site Visit: Because of site-specific conditions, the government recommends interested parties visit SWCGRL prior to submitting bids. A pre bid meeting is scheduled for August 30, 2011 at 1:30 p.m. Mountain Time at the site where the work will be preformed; for directions to the site please contact Tye Lightfoot, Contracting Officer’s Representative (COR), (575) 526-6381, Email: Tye.Lightfoot@ars.usda.gov. The address is: USDA, ARS, SWCGRL, 300 East College Drive, Mesilla Park, NM 88047.
3. Codes and Standards: The Contractor shall comply with all applicable local, state and federal codes and Industry Standards, (i.e. UBC, UPC, NFPA, UL, ACI, NEC, NEMA, ANSI, ASTM, AWWA, etc) and health and safety codes, in effect at the time of award of contract and for the location where the work is to be performed.
4. Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the responsibility of the Contractor.
5. Installation: It shall be the responsibility of the Contractor for pavement repair and replacement in accordance with the manufacturers’ recommendations and Industry Standards. If any item specified herein and/or on the drawings conflicts with applicable codes and recommendations, the contractor shall bring it to the attention of the Contracting Officer for immediate resolution.
SECTION 01050 - FIELD ENGINEERING/INSPECTION OF SITE
A. The Contractor shall be responsible for verifying site conditions, making quantity take-offs, obtaining accurate measurement of existing conditions, and performing any act or operation which may be necessary to properly bid the work and complete the same as depicted and specified. Failure to verify the existing site conditions shall not relieve the Contractor of the responsibility to complete the work as required.
SECTION 01300 - SUBMITTALS
A. Manufacturer's descriptive literature sufficient to determine conformance of the proposed product to the contract requirements shall be submitted to the CO for review and approval. The descriptive literature shall be annotated/highlighted to show its conformance with contract requirements.
B. Installation procedures supplied by the manufacturer.
SECTION 01400 - QUALITY CONTROL
A. GENERAL: To satisfy the requirement for Quality Control, the work performed under this contract shall be subject to continuous audit by the COR. Quality control is the exclusive responsibility of the Contractor.
B. FINAL ACCEPTANCE: Acceptance of the completed work will be based upon its conformance to the contract.
C. WARRANTY: The warranty period for workmanship shall be for one (1) year from the date the government accepts the work.
SECTION 01525 - SAFETY REQUIREMENTS
A. The Contractor shall implement, and provide to the Contracting Officer (CO) for review, a site specific, SITE SAFETY AND HEALTH PLAN in accordance with all local, state and federal regulations. The plan shall address, at a minimum all responsible parties by name, all safety/health hazards, personal protective equipment and other hazard controls, all required training, emergency procedures, and other required information to perform the work. The plan shall be implemented by contractor supervisor signature. Two copies shall be provided to the Contracting Officer and one copy will be maintained at the site. In the event of changing site conditions or hazards, the plan shall be appended in writing and a copy of the change provided to the CO and COR.
SECTION 01545 - PROTECTION OF WORK AND PROPERTY
A. The Contractor shall protect the work, the site, and all existing property and structures within the limit of construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor’s expense, to pre-damaged condition to the satisfaction of the COR.
B. Safety and health matters, as they relate to the work, are the exclusive responsibility of the
Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities for protection and security.
SECTION 01560 - TEMPORARY FACILITIES
A. Temporary utilities (water and electricity) may be furnished to the Contractor by the
Government, if so requested. Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through is own negligence.
B. Should the Contractor require any power or utility shutdown during construction, he shall receive approval for such shutdown from the COR three working days prior to this need.
SECTION 01600 - MATERIALS AND EQUIPMENT
A. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturers’ latest standard design, process or system.
B. All materials and equipment to be incorporated in the work shall be handled and stored by the manufacturer, fabricator, supplier and Contractor before, during and after shipment in a manner to prevent warping, twisting, breaking, chipping, rusting and any injury, theft or damage of any kind whatsoever to the materials and equipment. All materials and equipment furnished by Contractor shall be subject to inspection and approval by the CO/COR.
C. EXECUTION:
(a) The Contractor shall provide the necessary tools, equipment, labor, shoring, scaffolding, coordination, and related materials necessary for the pavement repair and replacement.
(b) Erection techniques employed by the Contractor must be in accordance with the manufacturing company's suggested erection procedures.
SECTION 01710 - CLEANING
A. Upon completion of project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the
COR.
SECTION 01711 - CONTRACT CLOSEOUT
A. SUBMITTALS REQUIRED PRIOR TO FINAL PAYMENT
(1) General and Subcontractors one (1) year warranty on work.
(2) All warrantees from manufacturers covering equipment.
(3) O&M manuals for any equipment.
****END OF SECTION***
COLLE
GE DR
IVE
GINNIN
G
LABOR
ATORY
STORA
GE
BUILD
ING
GENERAL NOTES:
1. ALL PERMITS AND REQUIREMENTS MUST BE
ACQUIRED AND OR MET BY THE CONTRACTOR.
2. NEW CONSTRUCTION TO MEET CURRENT LOCAL, STATE, AND
FEDERAL CODES.
3. DAVIS-BACON ACT WILL APPLY FOR WAGE-RATES.
4. CONTRACTOR WILL SUPPLY ALL LABOR, SUPERVISION,
PARTS, MATERIALS, SUPPLIES, TOOLS, EQUIPMENT, AND
THE TRANSPORTATION OF ALL EQUIPMENT TO THE JOB SITE.
5. CONTRACTOR TO REMOVE & DISPOSE OF ANY WASTE
MATERIAL IN ACCORDANCE TO CURRENT STANDARDS &
REGULATIONS.
6. VISITATION OF SITE BY CONTRACTOR PRIOR TO CONSTRUCTION
IS HIGHLY RECOMMENDED.
CONSTRUCTION NOTES:
1. SAW CUT AND REMOVE EXISTING ASPHALT UNDER METAL BUIDLING.
3. CONTRACTOR TO BACKFILL WITH ENGINEERED FILL WITH 95% COMPACTION
6. POUR 6" 3000 PSI FIBERMESH REINFORCED CONCRETE SLAB WITH #4 REBAR
7. ALL WASTE MATERIAL IS TO BECOME THE PROPERTY OF
CONTRACTOR AND IS TO BE PROPERLY DISPOSED OF, OFF
GOVERNMENT PROPERTY, IN ACCORDANCE TO CURRENT
EXISTING REGULATIONS.
S
W E
Part 3
12" O.C. BOTH DIRECTIONS.
2. CONTRACTOR TO REMOVE AND WASTE EXISTING SUBGRADE MATERIAL
4. CONTRACTOR TO INSTALL 12"X18" FOOTING WITH #4 BOXED REBAR - DETAIL A
TO A DEPTH OF 3'.
ON NORTH, SOUTH AND EAST SIDES OF SLAB AREA. SEE DETAIL DRAWING
STORA
GEMODUL
E
BUILD
INGSHOP
STORAGE
WAGON
CONSTRUCTION AREA
5. DRILL INTO EXISTING STORAGE BLDG. FOOTING FOR INSTALATION OF #4 SMOOTH REBAR 4' O.C.
STORA
GE
BUILD
ING
Part 3 - Detail
CONSTRUCTION AREA
SCALE: N.T.S.
1' 6" 15
3"
1'-0"
3"3" 6"
FOOTING DETAIL 1
SHOWN WITH FOOTING
INTO EXISTING FOOTING
#4 SMOOTH REBAR PINNED
4' O.C.
CONSTRUCTION NOTES:
1. INSTALL 12"X18" DEEP FOOTING ON 3 SIDES OF
CONCRETE AREA WITH #4 BOXED REBAR
2. INSTALL #4 REBAR 12" O,C, BOTH DIRECTIONS
3. INSTALL #4 SMOOTH REBAR INTO EXISTING BUILDING FOOTING
4' O.C. MIN. 6" INTO FOOTING 12" INTO NEW CONCRETE
4. POUR 6" SLAB 3000 PSI FIBERMESH REINFORCED CONCRETE
SLAB
| Attachments |
| THIS PAGE IS BLANK.pdf |
| SOW Mesilla Park Paving FINAL 2011-08-13 |