AG-7335-S-13-0001

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

NRCS-OK-127335-100

STILLWATER OK 74074-2655

100 USDA, SUITE 206

USDA-NRCS - OKLAHOMA STATE OFFICE

05/06/20130002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/11/2013

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to add line item 0002 and remove and replace pages.

1. Add line item 0002, an optional item.

2. Remove page 77 and replace with pages 77 and 78.

3. Remove page 80 and replace with page 81.

4. Remove page 121 and replace with page 122.

5. Remove page 122 and replace with page 123.

6. Remove page 123 and replace with page 124.

7. Remove page 125 and replace with page 126.

8. Remove page 141 and replace with page 142.

9. Remove and replace page 3.

10. All other terms and conditions remain the same.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

SHARLA K. GOFORTH

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 11

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-7335-S-13-0001/0002

FOB: Destination

002 Optional Item - this item will be funded if 1 EA required to build an Access Road for Single Power Poles (Option Line Item) Product/Service Code: Y1QA Product/Service Description: CONSTRUCTION OF

RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Section B - Supplies or Services

Prices NRCSAR4I-52.214-1 Award Restrictions (NRCS, AMB, AUG 1987)

One award for the aggregate of all items will be made under this solicitation.

ITEM NO. SCHEDULE OF ITEMS SUPPLIES/SERVICES Spec No. ESTIMATED UNIT UNIT COST AMOUNT 0001 Wetland Restoration

1 Mobilization / Demobilization 200 1 LS $ - $ - 2 Clearing 201 1 LS $ - $ - 3 Removal of Culvert 202 1 LS $ - $ - 4 Inline Water Level Control Structure #1 244 165 LF $ - $ - 5 Inline Water Level Control Structure #2 244 201 LF $ - $ - 6 Inline Water Level Control Structure #3 244 162 LF $ - $ - 7 Water Control Structure #3b with Inline Check Valve 244 105 LF $ - $ - 8 Berumdagrass Mulch Sod 271 22 AC $ - $ - 9 Embankment (Wetland) 723 78,480 CY $ - $ -

10 Access Road Power Poles and Pump Jack 212 29,800 CY $ - $ - 11 Islands 728 4 Each $ - $ - 12 Excavated Swale 729 2,941 CY $ - $ - 13 Full Circle Deep Water Habitat 729 1 Each $ - $ - 14 Welded Steel Pipe- Barrel 52 179 LF $ - $ - 15 Welded Steel Pipe- Riser 52 3.6 LF $ - $ - 16 Steel- Underground Outlet 52 150 LF $ - $ - 17 Culvert 52 130 LF $ - $ - 18 Seeding 275 2.2 AC $ - $ - 19 Geosynthetic Turf Reinforcement 245 5,323 SY $ - $ -

0002 Optional item - Access Road for Single Power Poles 212 6519 CY $ - $ -

AG-7335-S-13-0001-0002 Pottawatomie County WRP May 6, 2013

NRCS- 2/13 212-7

OK – Dobrovolny WRP

12. ITEMS OF WORK AND CONSTRUCTION DETAILS

Items of work to be performed in conformance with this specification and the construction details are:

a. Earthfill, Access Road, Power Poles and Pump Jack

(1) This item consists of furnishing all equipment, labor, and materials necessary to construct the access road to the power poles and around the power poles and the access road to the pump jack, to the limits shown on the drawings.

(2) The road will be at least 20’ wide.

(3) The road will be wide enough to allow vehicles to drive around each power pole for maintenance.

(4) Measurement and payment shall be the quantities as staked in the field as specified in Section 11 of this specification.

(5) Items of works subsidiary to this item are:

a. Topsoil – Construction Specification 226

b. Earthfill, Access Road for Single Power Poles (Optional)

(1) This item will be an optional item. The government will determine if this item is required during construction.

(2) This item consists of furnishing all equipment, labor, and materials necessary to construct the access road to the single power poles and around the power poles to the limits shown on the drawings.

(3) The road will be at least 20’ wide.

(4) The road will be wide enough to allow vehicles to drive around each power pole for maintenance.

(5) Measurement and payment shall be the quantities as staked in the field as specified in Section 11 of this specification.

(6) Items of works subsidiary to this item are:

a. Topsoil – Construction Specification 226

Martha.Worlein Text Box

NRCS-Januray 2012 212-8 OK – Wiley WRP

c. Subsidary Earthfill

(1) This item consists of furnishing all equipment, labor, and materials necessary to fill in the location of the culvert that will be removed to an elevation of 918.0 and to slope the area in the southwest part of the property as shown on the drawings.

(2) No separate payment will be made for Earthfill. Compensation shall be included in the payment for Removal of Culvert or Embankment (Wetland) as the case may be.

Martha.Worlein Text Box

NRCS-OKLA 226-3 Dobrovolny WRP Pottowatomie County 03/2013

5. ITEMS OF WORK AND CONSTRUCTION DETAILS

Items of work to be performed in conformance with this specification and the construction details are:

a. Subsidiary Item, Topsoil

(1) This item consists of furnishing equipment, labor, and materials necessary for stripping the topsoil to a depth of six inches from areas to be excavated or covered with earthfill, salvaging, it, and spreading it over the completed earthfill areas.

(2) Spreading will be by Method 2.

(3) No separate payment will be made for Topsoil. Compensation will be included in the payment for Embankment (Wetland), Earthfill, Access Road Power Poles, or Earthfill, Access Road for Single Power Pole (optional), as the case may be.