BID SCHEDULE
2014 BOURBANIS DAM EWP REPAIR
ITEM
NO.
SUPPLIES/SERVICE SPEC NO. QUANTITY UNIT UNIT PRICE BID AMOUNT
1 MOBILIZATION/DEMOBILIZATION CS‐8, CS‐5, CS‐9 1 LS $ $
2 CLEARING/GRUBBING CS‐2 5 AC $ $
3 FENCE REMOVAL CS‐2 560 LF $ $
4 EXCAVATION CS‐21 16,270 CY $ $
5 OFF‐SITE MATERIAL DISPOSAL CS‐21 10,100 CY $ $
6 EARTHFILL CS‐23 20,300 CY $ $
7 TOPSOIL CS‐26 4,050 CY $ $
8 RIPRAP CS‐61, MS‐523 90 CY $ $
9 GEOTEXTILE CS‐95, MS‐592 180 SY $ $
10 SEEDING AND MULCHING CS‐6, ND‐CPA‐9 6.0 AC $ $
TOTAL $
2014 OLSON DAM EWP REPAIR
ITEM
NO.
SUPPLIES/SERVICE SPEC NO. QUANTITY UNIT UNIT PRICE BID AMOUNT
11 MOBILIZATION/DEMOBILIZATION CS‐8, CS‐5, CS‐9 1 LS $ $
12 CLEARING/GRUBBING CS‐2 0.15 AC $ $
13 EXCAVATION CS‐21 820 CY $ $
14 EARTHFILL CS‐23 3860 CY $ $
15 TOPSOIL CS‐26 370 CY $ $
16 SEEDING AND MULCHING CS‐6, ND‐CPA‐9 0.15 AC $ $
TOTAL $
*Note: Quantities are based on in‐place cubic yards
SPECIFICATIONS
TONGUE RIVER WATERSHED
BOURBANIS DAM & OLSON DAM EWP REPAIR PROJECT
Pembina & Cavalier Counties, North Dakota
Sponsoring Agency
Pembina County Water Resource District
Location of Work
These specifications apply to the repair work and Bourbanis and Olson Dams. The sites are located as follows: Bourbanis Dam: 11-161-57, Olson Dam: 31-161-56.
http://www.novapdf.com
SPECIFICATIONS
2014 Bourbanis Dam & Olson Dam EWP Repair Project
UCONSTRUCTION SPECIFICATIONS
CS-2 Clearing and Grubbing
CS-5 Pollution Control
CS-6 Seeding, Sprigging, and Mulching
CS-8 Mobilization and Demobilization
CS-9 Traffic Control
CS-21 Excavation
CS-23 Earthfill
CS-26 Topsoil
CS-61 Rock Riprap
CS-95 Geotextile
UMATERIAL SPECIFICATIONS
MS-523 Riprap
MS-592 Geotextile
UOTHER ITEMS
ND-CPA-9 Grass Seeding Job Sheet
Bid Schedule
Inspection Plan
Construction Specification 2—Clearing and Grubbing
1. Scope The work consists of clearing and grubbing and disposal of trees, snags, logs, brush, stumps, shrubs, and rubbish from the designated areas.
2. Protection of existing vegetation Trees and other vegetation designated to remain undisturbed shall be protected from damage throughout the duration of the construction period. Any damages resulting from the contractor's operations or neglect shall be repaired by the contractor.
Earthfill, stockpiling of materials, vehicular parking, and excessive foot or vehicular traffic shall not be allowed within the drip line of vegetation designated to remain in place. Vegetation damaged by any of these or similar actions shall be replaced with viable vegetation of the same species, similar condition, and like size unless otherwise approved by the contracting officer.
Any cuts, skins, scrapes, or bruises to the bark of the vegetation shall be carefully trimmed and local nursery accepted procedures used to seal damaged bark.
Any limbs or branches 0.5 inch or larger in diameter that are broken, severed, or otherwise seriously damaged during construction shall be cut off at the base of the damaged limb or branch flush with the adjacent limb or tree trunk. All roots 1-inch or larger in diameter that are cut, broken, or otherwise severed during construction operations shall have the end smoothly cut perpendicular to the root. Roots exposed during excavation or other operations shall be covered with moist earth or backfilled as soon as possible to prevent the roots from drying out.
3. Marking The limits of the area(s) to be cleared and grubbed will be marked by stakes, flags, tree markings, or other suitable methods. Trees to be left standing and uninjured will be designated by special markings placed on the trunk about 6 feet above the ground surface.
4. Clearing and grubbing All trees not marked for preservation and all snags, logs, brush, stumps, shrubs, rubbish, and similar materials shall be cleared from within the limits of the designated areas. Unless otherwise specified, all stumps, roots, and root clusters that have a diameter of 1 inch or larger shall be grubbed out to a depth of at least 2 feet below subgrade for concrete structures and 1 foot below the ground surface at embankment sites and other designated areas.
5. Disposal All materials cleared and grubbed from the designated areas shall be disposed of at locations shown on the drawings or in a manner specified in section 7. The contractor is responsible for complying with all local rules and regulations and the payment of any and all fees that may result from disposal at locations away from the project site.
6. Measurement and payment Method 1—For items of work for which specific units prices are established in the contract, the cleared and grubbed area is measured to the nearest 0.1 acre. Payment for clearing and grubbing is made for the total area within the designated limits at the contract unit price. Such payment
(210-VI-NEH, May 2001) will constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
Method 2—For items of work for which specific unit prices are established in the contract, the length of the cleared and grubbed area is measured to the nearest full station (100 feet) along the line designated on the drawing or identified in the specifications. Payment for clearing and grubbing is made for the total length within the designated limits at the contract unit price. Such payment will constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
Method 3—For items of work for which specific unit prices are established in the contract, each tree, stump, and snag having a diameter of 4 inches or larger and each log having a diameter of 4 inches or larger and a length of 10 feet are measured before removal. The size of each tree and snag is determined by measuring its trunk at breast height above the natural ground surface. The size of each log is determined by measuring the butt and by measuring its length from butt to tip.
The size of each stump is measured at the top. Diameter is determined by dividing the measured circumference by 3.14.
Payment for clearing and grubbing of each tree, stump, and snag having a diameter of 4 inches or larger and each log having a diameter of 4 inches or larger and a length of 10 feet or larger is made at the contract unit price for its size designation as determined by the following schedule:
Measured diameter Size designation
(in) (in)
4 to 8 6 8 to 12 10 12 to 24 18 24 to 36 30 36 to 60 48 Over 60 60
The sum of such payments shall constitute full compensation for clearing and grubbing (including the clearing and grubbing of smaller trees, stumps, snags, logs, brush, shrubs, and roots), applicable permits and associated fees, and rubbish removal. Such payment shall constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
Method 4—For items of work for which specific lump sum prices are established in the contract, payment for clearing and grubbing is made at the contract lump sum price. Such payment shall constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment.
Compensation for any item of work described in the contract, but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 7.
7. Items of work and construction details
Items of work to be performed in conformance with this specification and construction details are:
a. UBid Items 2, 3, & 12, Clearing and Grubbing
(1) This item shall consist of the removal and disposal of sod, shrubs, trees, and all other debris present within the clearing limits as shown in the drawings.
(2) Clearing extents shall be staked by the NRCS Inspector prior to the commencement of clearing and grubbing work at each site, per the staking notes shown on the project drawings.
(3) Trees to be removed for the project at Bourbanis Dam will be marked. All woody debris will be hauled to a legal offsite disposal site per Section 5 of this specification. All costs associated with this work will be considered subsidiary to Bid Item 2.
(4) Limbing of unmarked trees adjacent to the work area at Bourbanis Dam, which may present a safety hazard during construction work as determined by the Contractor or NRCS Inspector, will be considered subsidiary to Bid Item 2.
(5) Sod stripped over the auxillary spillway area for the project at Bourbanis Dam will be stockpiled onsite for spreading over the lower eroded areas at the latter stages of earthfill operations. Topsoil is not present on the auxillary spillwyay, so stripping will go to the lower extents of the sod root zone only. Stockpile sod near the lower eroded area, as shown on the drawings, to be spread in the latter stages of earthfill operations. All costs associated with stripping and stockpiling sod will be considered subsidiary to Bid Item 2.
(6) An island of undisturbed soil, with mature trees and shrubs, exists within the limits of the lower eroded area at Bourbanis Dam, as shown on the drawings. In addition, unstable trees at the top of the eroded earth slopes will need to be removed to ensure safe working conditions at the construction site. Limbing of existing trees adjacent to the work area at Bourbanis Dam will also be necessary. All woody material will be trucked to a legal, offsite waste area to be procured by the Contractor. Any topsoil that can be salvaged from the lower eroded area during clearing and grubbing activities shall be stockpiled nearby, to be spread in the latter stages of earthfill operations. All costs associated with performing these activities will be considered subsidiary to Bid Item 2.
(7) Sod and topsoil stripped for the project at Olson Dam, will be stockpiled onsite for use during the project. All costs associated with performing these activities will be considered subsidiary to Bid Item 12.
(8) Measurement and payment for Bid Items 2 and 12 shall be by Method 1.
(9) The existing barb wire fence crossing the auxiliary spillway area at the Bourbanis
Dam site will be removed, and materials hauled to a legal offsite disposal site per Section 5 of this specification. The NRCS Inspector will mark the extents of fence to be removed prior to the start of work. Payment will be by the foot of fence removed, Bid Item 3.
Chapter 2 National Standard Construction Specifications Part 642 National Engineering Handbook
Construction Specification 5—Pollution Control
The work consists of installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.
2. Material All material furnished shall meet the requirements of the material specifications listed in section 8 of this specification.
3. Erosion and sediment control measures and works The measures and works shall include, but are not limited to, the following:
Staging of earthwork activities—The excavation and moving of soil materials shall be scheduled to minimize the size of areas disturbed and unprotected from erosion for the shortest reasonable time.
Seeding—Seeding to protect disturbed areas shall occur as soon as reasonably possible following completion of that earthwork activity.
Mulching—Mulching to provide temporary protection of the soil surface from erosion.
Diversions—Diversions to divert water from work areas and to collect water from work areas for treatment and safe disposition. They are temporary and shall be removed and the area restored to its near original condition when the diversions are no longer required or when permanent measures are installed.
Stream crossings—Culverts or bridges where equipment must cross streams. They are temporary and shall be removed and the area restored to its near original condition when the crossings are no longer required or when permanent measures are installed.
Sediment basins—Sediment basins collect, settle, and eliminate sediment from eroding areas from impacting properties and streams below the construction site(s). These basins are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Sediment filters—Straw bale filters or geotextile sediment fences trap sediment from areas of limited runoff. Sediment filters shall be properly anchored to prevent erosion under or around them. These filters are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Waterways—Waterways for the safe disposal of runoff from fields, diversions, and other structures or measures. These works are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Other—Additional protection measures as specified in section 8 of this specification or required by Federal, State, or local government.
4. Chemical pollution The contractor shall provide watertight tanks or barrels or construct a sump sealed with plastic sheets to collect and temporarily contain chemical pollutants, such as drained lubricating or transmission fluids, grease, soaps, concrete mixer washwater, or asphalt, produced as a by-product of the construction activities. Pollutants shall be disposed of in accordance with appropriate State and Federal regulations. At the completion of the construction work, tanks, barrels, and sumps shall be removed and the area restored to its original condition as specified in section 8 of this specification. Sump removal shall be conducted without causing pollution.
Sanitary facilities, such as chemical toilets, or septic tanks shall not be located next to live streams, wells, or springs. They shall be located at a distance sufficient to prevent contamination of any water source. At the completion of construction activities, facilities shall be disposed of without causing pollution as specified in section 8 of this specification.
(210-VI-NEH, January 2009)
5–1
5. Air pollution The burning of brush or slash and the disposal of other materials shall adhere to state and local regulations.
Fire prevention measures shall be taken to prevent the start or spreading of wildfires that may result from project activities. Firebreaks or guards shall be constructed and maintained at locations shown on the drawings.
All public access or haul roads used by the contractor during construction of the project shall be sprinkled or otherwise treated to fully suppress dust. All dust control methods shall ensure safe construction operations at all times. If chemical dust suppressants are applied, the material shall be a commercially available product specifically designed for dust suppression and the application shall follow manufacturer's requirements and recommendations. A copy of the product data sheet and manufacturer's recommended application procedures shall be provided to the engineer 5 working days before the first application.
6. Maintenance, removal, and restoration All pollution control measures and temporary works shall be adequately maintained in a functional condition for the duration of the construction period. All temporary measures shall be removed and the site restored to near original condition.
7. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, each item is measured to the nearest unit applicable. Payment for each item is made at the contract unit price for that item. For water or chemical suppressant items used for dust control for which items of work are established in section 8 of this specification, measurement for payment will not include water or chemical suppressants that are used inappropriately or excessive to need. Such payment will constitute full compensation for the completion of the work.
Method 2—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds and supported by invoices presented by the contractor that reflect actual costs. If the total of all progress payments is less than the lump sum contract price for this item, the balance remaining for this item will be included in the final contract payment. Payment of the lump sum contract price will constitute full compensation for completion of the work.
Method 3—For items of work for which lump sum prices are established in the contract, payment will be prorated and provided in equal amounts on each monthly progress payment estimate. The number of months used for prorating shall be the number estimated to complete the work as outlined in the contractor's approved construction schedule. The final month's prorate amount will be provided with the final contract payment. Payment as described will constitute full compensation for completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items, and the items to which they are made subsidiary, are identified in section 8 of this specification.
5–2
8. Items of work and construction details
Items of work to be performed in conformance with this specification and construction details are:
a. USubsidiary Item, Pollution Control
(1) The Contractor is responsible for submitting a Stormwater Pollution Prevention Plan to the ND Dept of Health, and obtaining the necessary NPDES Stormwater Construction Discharge Permit, at both the Bourbanis and Olson Dam project sites as well as any offsite borrow or waste areas where over an acre of disturbance will occur. A copy of the SWPPP and permit will be provided to the NRCS Engineer prior to the commencement of work at each location.
(2) This item shall consist of furnishing and installing staked sediment control fencing in the event construction progress is halted mid-project and a significant runoff event is forecast. The NRCS Inspector onsite will provide notice of the need for installation of this component and guidance on placement extents.
(3) If determined to be needed, sediment fence shall consist of a woven geotextile conforming to Material
Specification 592, Class II with AOS no larger than the #30 sieve. The installed height of the fence shall be approximately 30-inches with at least 6-inches anchored in the ground.
(4) No separate payment shall be made for pollution control; it is subsidiary to Items 1 & 11, Mobilization/Demobilization.
5–3
Construction Specification 6—Seeding, Sprigging, and Mulching
The work consists of preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified.
2. Material Seed—All seed shall conform to the current rules and regulations of the state where it is being used and shall be from the latest crop available. It shall meet or exceed the standard for purity and germination listed in section 7.
Seed shall be labeled in accordance with the state laws and the U.S. Department of Agriculture rules and regulations under the Federal Seed Act in effect on the date of invitations for bids. Bag tag figures are evidence of purity and germination. No seed will be accepted with a test date of more than 9 months before the delivery date to the site.
Seed that has become wet, moldy, or otherwise damaged in transit or storage will not be accepted. The percent of noxious weed seed allowable shall be as defined in the current State laws relating to agricultural seeds. Each type of seed shall be delivered in separate sealed containers and fully tagged unless exception is granted in writing by the contracting officer.
Fertilizer—Unless otherwise specified, the fertilizer shall be a commercial grade fertilizer. It shall meet the standard for grade and quality specified by State law. Where fertilizer is furnished from bulk storage, the contractor shall furnish a supplier's certification of analysis and weight. When required by the contract, a representative sample of the fertilizer shall be furnished to the contracting officer for chemical analysis.
Inoculants—The inoculant for treating legume seeds shall be a pure culture of nitrogen-fixing bacteria prepared specifically for the species and shall not be used later than the date indicated on the container or as otherwise specified. A mixing medium, as recommended by the manufacturer, shall be used to bond the inoculant to the seed. Two times the amount of the inoculant recommended by the manufacturer shall be used except four times the amount shall be used when seed is applied using a hydraulic seeder. Seed shall be sown within 24 hours of treatment and shall not remain in the hydraulic seeder longer than 4 hours.
Lime and other soil amendments—Lime shall consist of standard ground agriculture limestone, or approved equivalent. Standard ground agriculture limestone is defined as ground limestone meeting current requirements of the State Department of Agriculture. Other soil amendments shall meet quality criteria and application requirements specified in section 7.
Mulch tackifiers—Asphalt emulsion tackifiers shall conform to the requirements of ASTM D 977, Specification for Emulsified Asphalt. The emulsified asphalt may be rapid setting, medium setting, or slow setting. Nonasphaltic tackifiers required because of environmental considerations shall be as specified in section 7.
Straw mulch material—Straw mulch shall consist of wheat, barley, oat or rye straw, hay, grass cut from native grasses, or other plants as specified in section 7. The mulch material shall be air-dry, reasonably
(210-VI-NEH, May 2001) 6-1 light in color, and shall not be musty, moldy, caked, or otherwise of low quality. The use of mulch that contains noxious weeds is not permitted. The contractor shall provide a method satisfactory to the contracting officer for determining weight of mulch furnished.
Other mulch materials—Mulching materials, such as wood cellulose fiber mulch, mulch tackifiers, synthetic fiber mulch, netting, and mesh, are other mulching materials that may be required for specialized locations and conditions. These materials, when specified, must be accompanied by the manufacturer's recommendations for methods of application.
3. Seeding mixtures, sod, sprigs, and dates of planting The application rate per acre for seed mixtures, sprigs, or sod and date of seeding or planting shall be as shown on the plans or as specified in section 7.
4. Seedbed preparation and treatment Areas to be treated shall be dressed to a smooth, firm surface. On sites where equipment can operate on slopes safely, the seedbed shall be adequately loosened (4 to 6 inches deep) and smoothed. Depending on soil and moisture conditions, disking or cultipacking, or both, may be necessary to properly prepare a seedbed. Where equipment cannot operate safely, the seedbed shall be prepared by hand methods by scarifying to provide a roughened soil surface so that broadcast seed will remain in place.
If seeding is to be accomplished immediately following construction operations, seedbed preparation may not be required except on a compacted, polished, or freshly cut soil surface.
Rocks larger than 6 inches in diameter, trash, weeds, and other debris that will interfere with seeding or maintenance operations shall be removed or disposed of as specified in section 7.
Seedbed preparation shall be discontinued when soil moisture conditions are not suitable for the preparation of a satisfactory seedbed as determined by the contracting officer's technical representative
(COTR).
5. Seeding, sprigging, fertilizing, mulching, and stabilizing All seeding or sprigging operations shall be performed in such a manner that the seed or sprigs are applied in the specified quantities uniformly in the designated areas. The method and rate of seed application shall be as specified in section 7. Unless otherwise specified, seeding or sprigging shall be accomplished within 2 days after final grading is completed and approved.
Fertilizer, lime, and other soil amendments shall be applied as specified in section 7. When specified, the fertilizer and soil amendments shall be thoroughly incorporated into the soil immediately following surface application.
The rate, amount, and kind of mulching or mesh shall be as specified in section 7. Mulches shall be applied uniformly to the designated areas. They shall be applied to areas seeded not later than 2 working days after seeding has been performed. Straw mulch material shall be stabilized within 24 hours of application using a mulch crimper or equivalent anchoring tool or by a suitable tackifier. When the mulch crimper or equivalent anchoring tool is used, it shall have straight blades and be the type manufactured expressly for and capable of firmly punching the mulch into the soil. Where the equipment can be safely operated, it shall be operated on the contour. Hand methods shall be used where equipment cannot safely operate to perform the work required.
(210-VI-NEH, May 2001) 6-2
The tackifier shall be applied uniformly over the mulch material at the specified rate, or it shall be injected into the mulch material as it is being applied. Mesh or netting stabilizing materials shall be applied smoothly, but loosely on the designated areas. The edges of these materials shall be buried or securely anchored using spikes or staples as specified in section 7.
The contractor shall maintain the mesh or netting areas until all work under the contract has been completed and accepted. Maintenance shall consist of the repair of areas damaged by water erosion, wind, fire, or other causes. Such areas shall be repaired to reestablish the intended condition and to the design lines and grades required by the contract. The areas shall be refertilized, reseeded, and remulched before the new application of the mesh or netting.
6. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, each area treated is measured as specified in section 7 and the area calculated to the nearest 0.1 acre. Payment for treatment is made at the contract unit price for the designated treatment, which will constitute full compensation for completion of the work.
When specified as an item of work, mesh or netting is measured to the nearest square yard of surface area covered and accepted. Payment is made at the contract unit price and will constitute full compensation for completion of the work.
Method 2—For items of work for which specific lump sum prices are established in the contract, the quantity of work will not be measured for payment. Payment for this item is made at the contract lump sum price for the item and will constitute full compensation for the completion of the work.
Method 3—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds. Progress payments will be determined as specified in section 7. Payment of the lump sum contract price will constitute full compensation for completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment.
Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items and the item(s) to which they are made subsidiary are identified in section 7.
(210-VI-NEH, May 2001) 6-3
Items of work to be performed in conformance with this specification and construction details are:
a. UBid Items 10 & 16, Seeding and Mulching
(1) These items consist of all work necessary to complete the seeding and mulching of areas disturbed at each of the project sites.
(2) Seeding work shall be completed following construction, in the late fall after temperatures have fallen below 40 degrees for 5 consecutive days, in accordance with the NRCS ND-CPA-9 Form.
(3) The areas to be seeded shall be shaped (including removal of rocks, weeds and debris), smoothed, and firmed enough to permit uniform seeding at the specified depth.
(a) Hard compacted areas shall be loosened sufficiently to permit proper seeding. Tilled areas and areas too loose for proper seeding shall be packed sufficiently to permit uniform seeding at the specified depth.
(b) On small areas where it is not feasible to operate equipment (as approved by the engineer), rocks, weeds, and debris shall be removed and the area smoothed and packed by hand to provide an adequate seedbed.
(4) All seeded areas shall be drilled crosswise to the general slope.
(5) The seed mixture shall be drilled with a grass drill equipped with double disc furrow openers, depth bands, packer wheels, and seed box agitators. Seeding depth shall be from ¼ to ½ inch below the ground surface. The grass drill shall contain separate seed boxes for the grass mix and forb mix.
(6) All seeded areas shall be mulched. Mulching shall commence immediately after seeding and shall be diligently completed.
(a) Mulch shall consist of small grain straw.
(b) All mulch shall be free of noxious weeds.
(c) The contractor shall obtain approval from the engineer for all mulch prior to delivery to the site.
(d) Mulch shall be applied uniformly to the seeded area at the rate of 1.5 tons per acre in a manner that the majority of the material, after placement but prior to anchoring, exceeds 12 inches in length.
(e) The mulch shall be firmly anchored to a depth of 1 to 1 ½ inches every 6 to 12 inches across the slope with a mulch crimper.
(7) Areas that have been seeded and mulched and then disturbed by the contractor’s operation shall be repaired, reseeded, and mulched at the contractor’s expense per the requirements listed above.
(8) Measurement and payment will be by Method 1. The area measured will be a projection of the surface area on a horizontal plane.
(9) Any seeding or mulching required by private owners of borrow sources or waste areas will be considered subsidiary to Items 5, 6, and 7. Specifications of the seeding and mulching work at offsite locations will be negotiated by the Contractor with those individual private landowners.
(210-VI-NEH, May 2001) 6-4
US Department of Agriculture Natural Resources Conservation Service
PLANNING OR DATA SHEET FOR GRASS AND / OR LEGUME SEEDING
ND-CPA-9
October 2003
Revised 3/28/12
Name: Acres: 6.15 Tract / Field: Date:
Address: Planned Use: Design By:
County: MLRA 56 Ecological Site: Forage Suitability Group:
OR
Program:
CIN :
Companion Crop, If used:
Rate Seeding Method Grass 10 Lbs./Acre
(3) (4) (6) (8) (9) (10)
1 15.00 33.00% 6.2
2 15.00 33.00% 6.2
3 15.00 34.00% 6.2
100.00%
Date
(11)
03/21/14
Date Seeding Completed:
Total Planned PLS Pounds =
This practice meets FOTG Standards and Specifications:
5.10
Clean-Till Method - Seed into a clean-tilled, weed-free, smooth, firmly packed seedbed to ensure seed placement 1/4 to 3/4 inch depth. If erosion is a problem and / or to provide protection for late summer and late fall seedings, plant a companion crop. The companion crop may be seeded as a separate operation usually at an angle perpendicular to the direction of grass seeding. If a companion crop is used, clip to reduce competition. All seed must meet the requirements of the North Dakota State Seed Laws and Regulations and must be officially tested for purity and germination to enable pure live seed (PLS) calculations to determine proper seeding rates. Germination tests for all species must be no more than twelve months old prior to seeding.
Seedbed Preparation & Seeding Operation Performed:
Seed crosswise to the slope.
Bourbanis and Olson Dams
0.031.4
PLANNED
Total PLS seeded (column 11) will be within +/- 10% of planned PLS (column 7).
Does the seeded mix match what was planned? If not, are species seeded suited for site and meet specs?
Is the germ test date for all species within 12 months of when it was planted (not including the month of the test)?
Are the seeded species approved named varieties? If not, is the Origin within the states listed in the spec?
Was the planting completed in the required seeding window? Enter date planting completed above.
Pembina
Crop
PERCENT
IN MIXTURE
Chief, Oahe, Reliant
(2)
EWP - Emergency Watershed Program
PLANNED
Western Wheatgrass
Intermediate Wheatgrass
SEEDBED
PREPARATION:
(1)
Species Variety
4.95
FULL
SEEDING
PLS Lbs./Ac
Help to insert an image on the area above.
ACRES TO
BE SEEDED
ADDITIONAL
REMARKS:
WEED
CONTROL:
Cool season mixture planned due to good establishment compared to warm season species. Existing grass community adjacent to dam is tame, cool grass species. All species are sod-forming with moderate growth rate.
PLS lbs/ac is at the 150% rate. Also suggest 30-50 lbs of Nitrogen per ac and 10 Phosphorus per acre. Critical Area Planting of Cool-season mixture may be seeded anytime in the year. Preferably before sept 1.
Percent Purity or
Pure Seed (3)X(4)
0.0 0%
Certifying Official - NRCSNotes/Remarks:
Total Seeded PLS Pounds = 92.3
CERTIFICATION:
Oats
NRCS
NOTE: Some agricultural herbicides used have moderate to strong persistence in the soil and some herbicides do inhibit grass and/or legume germination and growth. If use of these herbicide(s) is known or suspected, be sure to check with the local county agent or consult the current NDSU-Extension Service Weed Control Guide for information on possible planting restrictions.
Contract Number:
Planned Seeding Date:
Late Fall: < 40˚ soil temp for 5 consecutive days
Weeds will be controlled by clipping or with proper herbicides as needed in accordance with product label directions and current NDSU-Extension Service recommendations.
Rodan, Walsh
Pubescent Wheatgrass
4.95
Manska, Greenleaf
Pure Live Seed Lbs/Ac
For additional design information, refer to the Herbaceous Vegetation Establishment Guide found in eField Office Technical Guide, Section I, Reference Subjects.
Insert map here, then resize.
Yellow indicates required entry, blue optional entry.
0.030.4
Percent Germination +
Hard Seed
0.0
TOTAL PLS LBS. SEEDED
(8X9X10)TOTAL PLS Lbs
(5)X(6)
Total Lbs. Bulk Seed Purchased
30.4
Section Township11 161 Critical Area Planting
(5) (7)
Range 57
No legumes or forbs are planned due to possible chemical maintenance of weeds and slope. Mechanical mowing is permitted.
Subirrigated-Wet Meadow
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) http://www.novapdf.com
Construction Specification 8—Mobilization and Demobilization
The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract. Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.
2. Equipment and material Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable; and other items specified in section 4 of this specification.
Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.
This work includes mobilization and demobilization required by the contract at the time of award. If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.
3. Payment Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.
Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating supplies.
4. Items of work and construction details
a. UBid Items 1 & 11, Mobilization/Demobilization
(1) This item shall consist of all mobilization and demobilization of equipment and personnel required for performance of the work.
(2) The Contractor shall thoroughly clean all equipment prior to mobilization to the project to assure that the equipment is free of weed seeds.
(3) Any grading and/or surfacing required on access roads in order to access the sites with equipment required for construction of the project shall be completed by the Contractor. To access Olson Dam, at least 2 miles of road will need to be graded and potentially have surfacing added depending on moisture conditions during the period of work. All costs associated with this work shall be subsidiary to Bid Item
11. Any costs for road work required to access Bourbanis Dam shall be subsidiary to Bid Item 1.
(4) Any removal of obstructions, including fencing, limbing or removal of trees, or temporary reconfiguration of gates necessary to access the sites shall be completed by the Contractor prior to commencing construction activities. Costs associated with this work, including replacement of fences and gates to original conditions, shall be subsidiary to Bid Items 1 and 11.
(5) The Contractor shall grade all access and haul roads after construction is complete to a condition equal to that which existed prior to construction. Costs associated with this work, including replacement of fences and gates to original conditions, shall be subsidiary to Bid Items 1 and 11.
(6) It is the responsibility of the Contractor to obtain the proper permits as required by the local township, county, or state departments for hauling associated with the project as well as traffic control, as defined in CS- 9. Costs incurred by the Contractor for these activities shall be considered subsidiary to Bid Items 1 and 11.
(7) Costs incurred by the Contractor to implement CS- 5, Pollution Control, shall be considered subsidiary to Bid Items 1 and 11.
Construction Specification 9—Traffic Control
The work shall consist of establishing traffic control and maintaining safe, convenient use of public roads and rights-of-way.
2. Traffic and access The contractor's operations shall cause no unnecessary inconvenience to the public. The public rights-of-way shall be maintained at all times unless interruption is authorized by proper local authority. Contractor's authorized closing or detour plans shall be provided to the engineer for approval.
Safe and adequate access shall be provided and maintained to all public protection devices and to all critical utility control locations. Facility access shall be continuous and unobstructed unless otherwise approved.
3. Storage of equipment and material in public streets Construction materials and equipment shall not be stored or parked on public streets, roads, or highways. During any material or equipment loading or unloading activities that may temporarily interfere with traffic, an acceptable detour shall be provided for the duration of the activity. Any associated expense for this activity is the responsibility of the contractor.
Excavated material, including suitable material that is intended for adjacent trench backfill or other earth backfill as specified in section 5 of this specification, shall not be stored on public streets, roads, or highways that remain in service for the public. Any waiver of this requirement must be obtained from the proper local authority and approved by the engineer. All excess and unsuitable material shall be removed from the site as soon as possible. Any spillage shall be removed from roadways before they are used by the public.
4. Street closures, detours, and barricades The contractor shall comply with the requirements of all applicable responsible units of government for closure of any street, road, or highway. The contractor shall provide the required barriers, guards, lights, signs, temporary bridges, and flaggers together with informing the public of any detours and construction hazards by the most suitable means available, such as local newspapers or radio stations. The contractor is also responsible for compliance with additional public safety requirements that may arise during construction. The contractor shall furnish, install, and, upon completion of the work, promptly remove all signs, warning devices, and other materials used in the performance of this work.
Unless otherwise specified, the contractor shall notify, in writing, the fire chief, police chief, county sheriff, state patrol, schools that operate school buses, or any other government official as may be appropriate no less than 7 days before closing, partly closing, or reopening any street, road, or highway.
Unless otherwise specified, the contractor shall furnish to the engineer a written plan showing the proposed method of signing, barricading for traffic control, and safety for street detours and closures.
(210-VI-NEH, May 2001) 9-1
All temporary detours will be maintained to ensure use of public rights-of-way is provided in a safe manner. This may include dust control, grading, and graveling as required in section 7 of this specification.
5. General and specific references All signs, signals, barricades, use of flaggers, and other traffic control and public safety devices shall conform to the general requirements set forth in the Manual of Uniform Traffic Control Devices (MUTCD) and the latest edition of Standard Highway Signs and Standard Alphabets for Highway Signs and/or OSHA Construction Industry Standards (29 CFR Part 1926), Subpart G, Signs, Signals, and Barricades unless otherwise specified in section 7 of this specification.
6. Measurement and payment For items of work for which specific lump sum prices are established in the contract, payment for the work is made at the contract lump sum price. Progress payments will be made based upon the percentage of estimated total time that traffic control will be required unless otherwise specified in section 7 of this specification. Payment will constitute full compensation for all flaggers, labor, materials, equipment, and all other items necessary and incidental to completion of the work.
Compensation for any item of work described in the contract, but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such items and items to which they are made subsidiary are identified in section 7 of this specification.
(210-VI-NEH, May 2001) 9-2
Items of work to be performed in conformance with this specification and construction details are:
a. USubsidiary Item
(1) The Contractor shall provide the signage, barricades, etc. for temporary work zone traffic control as required by the North Dakota Department of Transportation. All signs and barricades shall be in accordance with North Dakota Department of Transportation Standard Drawings D704-09 through D704-14. Drawings are available at 28TUwww.dot.nd.gov/dotnet/standarddrawings/stddrawings.aspxU28T
(2) All costs associated with traffic control design, equipment, implementation, maintenance, and removal shall be considered subsidiary to Bid Items 1 & 11, Mobilization/Demobilization.
(210-VI-NEH, May 2001) 9-3 http://www.dot.nd.gov/dotnet/standarddrawings/stddrawings.aspx
Construction Specification 21—Excavation
The work shall consist of the excavation required by the drawings and specifications and disposal of the excavated materials.
2. Classification Excavation is classified as common excavation, rock excavation, or unclassified excavation in accordance with the following definitions.
Common excavation is defined as the excavation of all materials that can be excavated, transported, and unloaded using heavy ripping equipment and wheel tractor-scrapers with pusher tractors or that can be excavated and dumped into place or loaded onto hauling equipment by excavators having a rated capacity of one cubic yard or larger and equipped with attachments (shovel, bucket, backhoe, dragline, or clam shell) appropriate to the material type, character, and nature of the materials.
Rock excavation is defined as the excavation of all hard, compacted, or cemented materials that require blasting or the use of ripping and excavating equipment larger than defined for common excavation. The excavation and removal of isolated boulders or rock fragments larger than 1 cubic yard encountered in materials otherwise conforming to the definition of common excavation shall be classified as rock excavation. The presence of isolated boulders or rock fragments larger than 1 cubic yard is not in itself sufficient cause to change the classification of the surrounding material.
For the purpose of these classifications, the following definitions shall apply:
Heavy ripping equipment is a rear-mounted, heavy duty, single-tooth, ripping attachment mounted on a track type tractor having a power rating of at least 250 flywheel horsepower unless otherwise specified in section 10.
Wheel tractor-scraper is a self-loading (not elevating) and unloading scraper having a struck bowl capacity of at least 12 cubic yards.
Pusher tractor is a track type tractor having a power rating of at least 250 flywheel horsepower equipped with appropriate attachments.
Unclassified excavation is defined as the excavation of all materials encountered, including rock materials, regardless of their nature or the manner in which they are removed.
3. Blasting The transportation, handling, storage, and use of dynamite and other explosives shall be directed and supervised by a person(s) of proven experience and ability who is authorized and qualified to conduct blasting operations.
Blasting shall be done in a manner as to prevent damage to the work or unnecessary fracturing of the underlying rock materials and shall conform to any special requirements in section 10 of this specification. When specified in section 10, the contractor shall furnish the engineer, in writing, a blasting plan before blasting operations begin.
4. Use of excavated material Method 1—To the extent they are needed, all suitable material from the specified excavations shall be used in the construction of required permanent earthfill or rockfill. The suitability of material for specific purposes is determined by the engineer. The contractor shall not waste or otherwise dispose of suitable excavated material.
Method 2—Suitable material from the specified excavations may be used in the construction of required earthfill or rockfill. The suitability of material for specific purposes is determined by the engineer.
5. Disposal of waste materials Method 1—All surplus or unsuitable excavated materials are designated as waste and shall be disposed of at the locations shown on the drawings.
Method 2—All surplus or unsuitable excavated materials are designated as waste and shall be disposed of by the contractor at sites of his own choosing away from the site of the work. The disposal shall be in an environmentally acceptable manner that does not violate local rules and regulations.
6. Excavation limits Excavations shall comply with OSHA Construction Industry Standards (29CFR Part 1926) Subpart P, Excavations, Trenching, and Shoring. All excavations shall be completed and maintained in a safe and stable condition throughout the total construction phase. Structure and trench excavations shall be completed to the specified elevations and to the length and width required to safely install, adjust, and remove any forms, bracing, or supports necessary for the installation of the work. Excavations outside the lines and limits shown on the drawings or specified herein required to meet safety requirements shall be the responsibility of the contractor in constructing and maintaining a safe and stable excavation.
7. Borrow excavation When the quantities of suitable material obtained from specified excavations are insufficient to construct the specified earthfills and earth backfills, additional material shall be obtained from the designated borrow areas. The extent and depth of borrow pits within the limits of the designated borrow areas shall be as specified in section 10 or as approved by the engineer.
Borrow pits shall be excavated and finally dressed to blend with the existing topography and sloped to prevent ponding and to provide drainage.
8. Overexcavation Excavation in rock beyond the specified lines and grades shall be corrected by filling the resulting voids with portland cement concrete made of materials and mix proportions approved by the engineer. Concrete that will be exposed to the atmosphere when construction is completed shall meet the requirements of concrete selected for use under Construction Specification 31, Concrete for Major Structures, or 32, Structure Concrete, as appropriate.
Concrete that will be permanently covered shall…