AG-6633-S-14-0004, Amendment 001, Attachment 1:
Questions (Q) and Answers (A) from the site visit on 6/26/14 are provided below.
Q: Olson Dam: If we put gravel on the access road, can it stay?
A: Yes.
Q: Are there other routes to Olson?
A: Yes, but we are providing the required route to be used by all Contractors.
Q: Bourbanis Dam: Excavation line item – who’s doing the survey?
A: NRCS is, but the Contractor is welcome to survey if they’d care to check our work.
Q: Will NRCS provide CAD topographic survey information used for payment determinations?
A: Yes.
Q: Is the Contractor required to provide as-builts?
A: No, that’s NRCS responsibility.
Q: Do we have to find a place for off-site disposal?
A: Yes. We have provided possible sources for materials, and some of those sites may be willing to accept waste materials, but none are endorsed or mandated by NRCS.
Q: Fill material at Olson: Do we have to use material from Bourbanis?
A: The Contractor may propose a substitute borrow source for earthfill on Olson Dam, subject to approval by NRCS.
Q: Was the area between the two repair sites at Bourbanis figured into the 5 acre estimate for seeding?
A: Yes, in fact both the seeding and clear/grubbing areas were conservatively estimated.
Q: Access in to Bourbanis – how wide is the easement? Is the easement over private land or is it a township road?
A: The roads to both sites are public roads owned by South Olga Township. The easement width is 66 feet (33 feet either side of the centerline).
Q: Is it ok to chip the trees instead of removing?
A: We will consider a proposal for that.
Q: OK to leave the stumps of the trees that are cleared at the top of the slope at the Bourbanis site?
A: Yes, stumps will only need to be removed when they are overhanging the slope and in the center area to be excavated.
Q: Access in to Bourbanis site – what is the distance from the bottom of the hill up to the work site so we can calculate how much gravel would be required.
A: See drawing, Attachment 2 to this Amendment for that information.
Q: Is it okay to limb trees along the road into the sites?
A: Yes, it is recognized that will be necessary for the project.
Q: Is the easement wide enough to provide a stockpile area near the end of the graveled portion of the road?
A: The easement width is 66 feet (33 feet either side of the centerline).
Q: Can we get the names of the landowners, in case we need to contact them?
A: For Bourbanis, the landowners are as follows. Refer to Attachment 2 for specific locations:
Donald & Marilyn Denault 13783 Hwy 5 Cavalier, ND 58220 701-265-3772
S. Meredith & Susan Clark PO Box 148 Cavalier, ND 58220 701-265-8141