ND Wage Rates.pdf
PDF 13 KB Posted
- Attached to
- Wetland Reserve Program (WRP) Restoration Federal contract opportunity
- Solicitation number
- AG-6633-S-11-0007
About this file
ND Wage Rates
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Location Map.pdf | ||
| Janet Billings.pdf | ||
| Raymond Gehrig.pdf | ||
| P D Associates.pdf | ||
| Bell.pdf | ||
| Marilyn Somdahl.pdf | ||
| GGMR Hunters.pdf | ||
| Gaukler.pdf | ||
| Clarice Kemper.pdf | ||
| Roger Hill.pdf | ||
| Diane Koch.pdf | ||
| George Harff.pdf | ||
| Donald DeFoe.pdf | ||
| Vislisel.pdf | ||
| 327_Conservation Cover Design_ _Install_Guide.pdf | ||
| Herbaceous_Veg_Est_Guide.pdf | ||
| 500 Obstruction Removal_Standard.pdf | ||
| 645 Upland Wildlife Habitat Management design_install_guide.pdf | ||
| OSHA Safety Supplement.pdf | ||
| Solicitation package 11_0007.pdf | ||
| 595 Pest Management design_install_guide.pdf | ||
| 644 Wetland Wildlife Habitat Management design_install_guide.pdf | ||
| 460 Land Clearing_Standard.pdf | ||
| 657 Wetland Restoration design_install_guide.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: ND100015 11/05/2010 ND15
Superseded General Decision Number: ND20080015
State: North Dakota
Construction Type: Heavy
Counties: Adams, Barnes, Benson, Billings, Bottineau, Bowman, Burke, Cavalier, Dickey, Divide, Dunn, Eddy, Emmons, Foster, Golden Valley, Grant, Griggs, Hettinger, Kidder, La Moure, Logan, McHenry, McIntosh, McKenzie, McLean, Mercer, Mountrail, Nelson, Oliver, Pembina, Pierce, Ramsey, Ransom, Renville, Richland, Rolette, Sargent, Sheridan, Sioux, Slope, Stark, Steele, Stutsman, Towner, Traill, Walsh, Ward, Wells and Williams Counties in North Dakota.
HEAVY CONSTRUCTION PROJECTS (including Sewer & Water Line Construction & Drainage Projects and Excluding Industrial and Processing Plants and Refineries)
Modification Number Publication Date 0 03/12/2010 1 04/02/2010 2 05/28/2010 3 06/04/2010 4 10/01/2010 5 10/08/2010 6 10/15/2010 7 11/05/2010
* ELEC0714-009 07/01/2010
ADAMS, BILLINGS, BOTTINEAU, BOWMAN, BURKE, DIVIDE, DUNN,
EMMONS, GOLDEN VALLEY, GRANT, HETTINGER, MCHENRY, MCKENZIE,
MCLEAN, MERCER, MOUNTRIAL, OLIVER, PIERCE, RENVILLE, ROLLETTE,
SHERIDAN, SOIUX, SLOPE, STARK, WARD, & WILLIAMS COUNTIES:
Rates Fringes
CABLE SPLICER....................$ 35.47 7.87+10.5%
ELECTRICIAN......................$ 35.07 7.87+10.5%
ELEC1426-012 06/01/2010
BARNES, BENSON, CAVALIER, DICKEY, EDDY, FOSTER, GRIGGS, KIDDER,
LAMOURE, LOGAN, MCINTOSH, NELSON, PEMBINA, RAMSEY, RANSOM,
RICHLAND, SARGENT, STEELE, STUTSMAN, TOWNER, TRAILL, WALSH, &
WELLS COUNTIES:
ELECTRICIAN
CABLE SPLICER...............$ 26.68 11.07
ELECTRICIAN.................$ 25.41 10.92
5/17/2011mhtml:file://S:\Service_Center\NRCS\ADMIN\Program Contract Info\EWP OR WRP Eas...
ENGI0049-037 10/01/2010
Power equipment operators:
GROUP 1.....................$ 22.45 12.65
GROUP 2.....................$ 21.55 12.65
GROUP 3.....................$ 21.30 12.65
GROUP 4.....................$ 21.15 12.65
GROUP 5.....................$ 20.30 12.65
POWER EQUIPMENT OPERATORS CLASSIFICATIONS:
GROUP 1: All Terrain Vehicle Cranes 80 tons and over, Hydro, Cranes, 80 Tons and over, Crane Operator with 135' boom and Over, Gantry Crane Operator, & Traveling Tower Crane.
GROUP 2: All Terrain Vehicle Cranes over 20 tons and up to 80 tons, Hydro Cranes 20 tons up to 80 tons, Creter Crane, & Crane Operator up to 135' Boom.
GROUP 3: All Terrain Vehicle Cranes thru 20 tons, Hydro Cranes thru 20 tons, Tractor with boom attachment.
GROUP 4: Push Tractor Roller
GROUP 5: Tractor pulling Compaction or Areating Equipment
SUND2000-007 05/04/2000
Rates Fringes
CARPENTER
CARPENTER (Including Form building & Concrete Forms).$ 13.98
Concrete Finisher/Cement Mason...$ 14.37 3.67
Ironworker
REINFORCING.................$ 17.03
Laborers:
Common......................$ 9.96 Pipelayers..................$ 10.48
PAINTER (Brush and Spray)........$ 18.14
Power equipment operators:
Backhoes....................$ 14.00 3.74 Bobcat......................$ 12.82 2.35 Bulldozer...................$ 14.06 4.00 Excavator...................$ 12.05 Front End Loader............$ 13.15 3.17 Mechanic....................$ 15.16 5.31 Motor Grader................$ 14.74 4.51 Scraper.....................$ 13.85 4.25 Self Propelled Packer.......$ 11.55 4.25 Sheepsfoot..................$ 12.57 3.23 Skidster....................$ 11.06 2.05
TRUCK DRIVER
Dump........................$ 11.39 3.60 Semi........................$ 11.52 .23 Tandem......................$ 11.14 1.63
TEAM0638-001 10/01/2010
Rates Fringes
TRUCK DRIVER
ARTICULATED OFF ROAD HAULER.$ 22.97 9.95
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .