500 Obstruction Removal_Standard.pdf

PDF 103 KB Posted

Attached to
Wetland Reserve Program (WRP) Restoration Federal contract opportunity
Solicitation number
AG-6633-S-11-0007
Issued by
Department of Agriculture National Resources Conservation Service

About this file

Spec 500 Obstruction Removal

View the file

Other files for this federal contract opportunity

Other files attached to Wetland Reserve Program (WRP) Restoration, newest first.
File Type Posted
Location Map.pdf PDF
Janet Billings.pdf PDF
Raymond Gehrig.pdf PDF
P D Associates.pdf PDF
Clarice Kemper.pdf PDF
Roger Hill.pdf PDF
Diane Koch.pdf PDF
Bell.pdf PDF
Marilyn Somdahl.pdf PDF
GGMR Hunters.pdf PDF
Gaukler.pdf PDF
George Harff.pdf PDF
Donald DeFoe.pdf PDF
Vislisel.pdf PDF
327_Conservation Cover Design_ _Install_Guide.pdf PDF
Herbaceous_Veg_Est_Guide.pdf PDF
645 Upland Wildlife Habitat Management design_install_guide.pdf PDF
OSHA Safety Supplement.pdf PDF
Solicitation package 11_0007.pdf PDF
595 Pest Management design_install_guide.pdf PDF
644 Wetland Wildlife Habitat Management design_install_guide.pdf PDF
ND Wage Rates.pdf PDF
460 Land Clearing_Standard.pdf PDF
657 Wetland Restoration design_install_guide.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA-NRCS - North Dakota FOTG - Section IV - Conservation Practices

NATURAL RESOURCES CONSERVATION SERVICE

CONSERVATION PRACTICE STANDARD

OBSTRUCTION REMOVAL

(Acre)

CODE 500

DEFINITION

Removal and disposal of unwanted, unsightly or hazardous buildings, structures, vegetation, landscape features, and other materials.

PURPOSES

To safely remove and dispose of unwanted obstructions and materials in order to apply conservation practices or facilitate planned use of abandoned mine lands, farms, ranches, construction sites, and recreation areas.

CONDITIONS WHERE PRACTICE

APPLIES

On land where existing obstructions interfere with planned use and development.

CRITERIA

Obstruction removal shall be planned, designed, and carried out to meet all Federal, State, and local laws and regulations.

Rock piles, boulders, stones, fences, hedgerows, abandoned buildings and structures, trash, and similar obstructions that would interfere with planned use and development shall be removed. All debris such as broken concrete and masonry, structural steel and wood, stones, stumps, slash, and sterile or toxic soil shall be disposed of so that they will not impede subsequent work or cause damage to offsite or other areas.

Disposal shall be by burning, burying, or removing to an approved landfill in an environmentally acceptable manner.

All required gully shaping shall be performed to specified dimensions and grades. Fills shall be compacted as appropriate. The cover over buried materials shall be designed to be adequate for the planned use, treatment, and vegetation.

Appropriate erosion control practices shall be applied on disturbed areas.

PLANS AND SPECIFICATIONS

Plans and specifications shall be prepared in accordance with the criteria of this standard and shall describe the requirements for applying the practice to achieve its intended us

Conservation Practice Standard - 500 July 2002

Conservation practice standards are reviewed periodically, and updated if needed. To obtain the current version of this standard, download it from the electronic Field Office Technical Guide or contact your local NRCS office.

United States Department of Agriculture Natural Resources Conservation Service, North Dakota

STATEMENT OF WORK

Obstruction Removal (500) Issued: May 28, 2004

Contact: State Conservation Engineer at 701-530-2097

DESIGN

Deliverables:

1. Design documents that demonstrate criteria in practice standard have been met and are compatible with planned and applied practices.

a. Practice purpose(s) as identified in the conservation plan.

b. List of required permits to be obtained by the client.

c. Compliance with NRCS national and state utility safety policy (NEM part 503-Safety, Section 503.00 through 503.22).

d. Practice standard criteria related computations and analyses to develop plans and specifications including but not limited to:

i. Disposal

ii. Erosion Control

2. Written plans and specifications including sketches and drawings shall be provided to the client that adequately describes the requirements to install the practice and obtain necessary permits.

3. Certification that the design meets practice standard criteria and comply with applicable laws and regulations (NEM Subpart A, 505.03(b)(2)).

4. Design modifications during installation as required.

INSTALLATION

Deliverables:

1. Pre-installation conference with client and contractor.

2. Verification that client has obtained required permits.

3. Staking and layout according to plans and specifications including applicable layout notes.

4. Installation inspection.

a. Actual materials used

b. Inspection records

5. Facilitate and implement required design modifications with client and original designer.

6. Advise client/NRCS on compliance issues with all federal, state, tribal, and local laws, regulations and NRCS policies during installation.

7. Certification that the installation process and materials meets design and permit requirements (NEM Subpart A, 505.03(c)(1)).

CHECK OUT

Deliverables:

1. As-built documentation.

a. Extent of practice units applied

b. Drawings

c. Final quantities

2. Certification that the installation meets NRCS standards and specifications and is in compliance with permits.

3. Record progress reporting according to NRCS policy.

REFERENCES

Field Office Technical Guide (eFOTG), Section IV, Conservation Practice Standard – Obstruction Removal, 500.

National Engineering Manual NRCS National Environmental Compliance Handbook NRCS Cultural Resources Handbook

DEFINITION
PURPOSES
CONDITIONS WHERE PRACTICE APPLIES
CRITERIA
PLANS AND SPECIFICATIONS