Watercress RSI Rails.pdf
PDF 217 KB Posted
- Solicitation number
- AG-64R4-S-10-0008
About this file
Amendment No. 1- Handrail Drawings
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6" Diameter Sonotube in Compacted Backfill See sheet 3 of 3 Fence Detail sonotube placement shall be paid under wall construction concreted posts shall be paid under rail construction
Precast 31 2" Diameter holes in concrete slabs shall be incidental to the cost of the OBI Eroded River Bank Reconstruction. U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
Designer
Plotter Scale
Date
Approved
Checked
Drawn
Drawing Sheet No.
Project No.
Project Name
Drawing Title
No.
Revision/Issue Date
NOTES
Sheet of
REGION NINE
Watercress Rec. Area RSI Project
Mark Twain National Forest Poplar Bluff Ranger District
North Access Plan
A. Garrison
A. Sullivan
NTS
A. Garrison
1 4
Facilities Engineer
2" Diameter Schedule 40 Steel Pipe (.62" ID) Welded to standard 5' guardrail section
2" Diameter Steel Pin Bent in "U" shape and welded to filler rail section
4" Diameter Schedule 40 Steel Pipe Rails and Pickets
6.0
4" Max. Spacing
4" Max. Height above ground/concrete elevation
2" Diameter Schedule 40 Steel Pipe Posts
2"
2" Diameter Schedule 80 Steel Pipe Epoxied into precast 3 1
2" hole in concrete.
4.5" Min. Weld Length
Typical Guardrail Section In Concrete Slab
42"
Notes: 1: Precast 31 2" holes in concrete slabs shall be incidental to the cost of the OBI Eroded River Bank Reconstruction.
2: 21
2" Schedule 80 Pipe Sleeves and Rail Construction shall be incidental to the cost of the OBI Eroded River Bank Reconstruction Handrails 3: All steel components of railing system shall receive a minimum of 1 coat primer and 2 coats of paint with an approved exterior grade metal paint.
4" Max.
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
Designer
Plotter Scale
Date
Approved
Checked
Drawn
Drawing Sheet No.
Project No.
Project Name
Drawing Title
No.
Revision/Issue Date
NOTES
Sheet of
REGION NINE
Watercress Rec. Area RSI Project
Mark Twain National Forest 11-Point Ranger District
Guardrail Detail
A. Garrison
A. Sullivan
NTS
A. Garrison
3 4
6" Diameter Sonotube 5' on center (typical) in Compacted Backfill See sheet 3 of 3 Fence Detail sonotube placement shall be paid under wall construction concreted posts shall be paid under rail construction
Precast 31 2" Diameter 5' on center (typical) holes in concrete slabs shall be incidental to the cost of the OBI Eroded River Bank Reconstruction.
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
Designer
Plotter Scale
Date
Approved
Checked
Drawn
Drawing Sheet No.
Project No.
Project Name
Drawing Title
No.
Revision/Issue Date
NOTES
Sheet of
REGION NINE
Watercress Rec. Area RSI Project
Mark Twain National Forest 11-Point Ranger District
South Access Plan
A. Garrison
A. Sullivan
NTS
A. Garrison
2 4
42"
4" Max.
6" Diameter Sphere Will Not Pass
4" Max. Height above ground/concrete elevation
6' o.c. Max. Spacing between posts
Tread Width + 12"
34" - 38"
34" - 38" Top of stair nosing to top of rail
42" 34" - 38"
1.5" Min.
1.5" Min.
Typical Guardrail w/ ABA/ADA Handrail Section
Typical Stair Guardrail w/ ABA/ADA Handrail Section
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
Designer
Plotter Scale
Date
Approved
Checked
Drawn
Drawing Sheet No.
Project No.
Project Name
Drawing Title
No.
Revision/Issue Date
NOTES
Sheet of
REGION NINE
Watercress Rec. Area RSI Project
Mark Twain National Forest 11-Point Ranger District
Stair Guardrail Detail
A. Garrison
A. Sullivan
NTS
A. Garrison
4 4