Watercress RSI Prebid Meeting Notes 07.docx

DOCX document 13 KB Posted

Attached to
Watercress Recreation Area Site Improvement Project - Mark Twain National Forest
Solicitation number
AG-64R4-S-10-0008
Issued by

About this file

Amendment No. 1 - Pre-proposal Site Visit Notes

View the file

Other files

File Type Posted
AG-64R4-S-10-0008.Watercress.RSI.RFP.Amend.2.pdf PDF
AG-64R4-S-10-0008.SF-30.Amend.1.rtf RTF text file
Watercress RSI Rails.pdf PDF
1WatercressCoverSheet 1 .pdf PDF
21CXTFlushToiletSitePlan 1 .pdf PDF
33BeachViewingPlatformPlan 1 .pdf PDF
22CXTFlushToiletDetail 1 .pdf PDF
32AccessibleBoardwalkPlan 1 .pdf PDF
24OutDoorShowerPlanDetails 1 .pdf PDF
10HostSitePlanDetail 1 .pdf PDF
30Informal3PanelKioskDetails 1 .pdf PDF
19SiteUtilityPlanSouth 1 .pdf PDF
14CampingSpurDPlanDetail 1 .pdf PDF
18SocialCoreAreaDetails 1 .pdf PDF
20SiteUtilityPlanNorth 1 .pdf PDF
26SiteUtilitySystemDetails-PRV-DrainHostSewer 1 .pdf PDF
29Informal3PanelKioskPlanDetails 1 .pdf PDF
23CXTFlushToiletFloorPlan 1 .pdf PDF
34LandingPlatformPlan 1 .pdf PDF
Wage Determination No. MO100001.docx DOCX document
2BidScheduleDescription 1 .pdf PDF
12CampingSpurBPlanDetail 1 .pdf PDF
15CampingSpurEPlanDetail 1 .pdf PDF
35-37ErosionWallPLansDetails 1 .pdf PDF
SpecificationsWatercressRSI_20100212.doc DOC document
25SiteUtilitySystemDetails 1 .pdf PDF
31BoardwalkPlatformSitePlan 1 .pdf PDF
28SiteUtilitySystemDetails_Trenches 1 .pdf PDF
13CampingSpurCPlanDetail 1 .pdf PDF
7LoopRoadCrossSections-B 1 .pdf PDF
3ExistingSiteConditionPlan 1 .pdf PDF
AG-64R4-S-10-0008.Watercress.RSI.RFP.Proposal.Copy.doc DOC document
9LoopRoadCrossSections-D 1 .pdf PDF
RecEvalCriteriaWatercressRSI 1 .doc DOC document
8LoopRoadCrossSections-C 1 .pdf PDF
6LoopRoadCrossSections-A 1 .pdf PDF
17CXTToiletBArea 1 .pdf PDF
38PaintingStripingPlan 1 .pdf PDF
5LoopRoadSpurStakingPlan 1 .pdf PDF
16CXTToiletParkingAreaPlan 1 .pdf PDF
27SiteUtilitySystemDetails_Valve_ElectricPedestal 1 .pdf PDF
4ComprehensiveSitePlan 1 .pdf PDF
11CampingSpurAPlanDetail 1 .pdf PDF
AG-64R4-S-10-0008.Watercress.RSI.RFP.Offerors.Copy.doc DOC document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Watercress RSI Pre-proposal Site Visit Notes 07/21/2010 Written By: Adam Garrison –COR Attendees:

Shaun BassC&M Contractors573-996-3113cmcont@wildblue.net
Jason PoorPace Construction717-372-2544jpoore@paceconstructionstl.com
Amy SullivanMark Twain National Forest573-341-7464adsullivan@fs.fed.us
Adam GarrisonMark Twain National Forest573-341-7438agarrison@fs.fed.us
Ken OlsenMark Twain National Forest573-996-2153kolsen@fs.fed.us

Meeting Summary and Questions:

Met with the Contractors and went over base and optional items, then we walked the project and looked at different portions as we walked.

Estimated at delivery time of 60-90 days from date of order of CXT toilet building.

Utilities are schematic, electrical plan shall be the responsibility of the Contractor and shall be designed, reviewed, and stamped/approved by an electrical engineer registered in the state of Missouri.

I told the Contractor that the electrical panel replacement project was being advertised if they were interested.

Q: What types of railings/guards/fence post footings will be built for the river access/retaining structures?

A: Holes shall be cast in concrete slabs for rail posts and sonotubes placed in backfill (locations shown in new details) and cost shall be incidental to the cost of the construction of the optional retaining structures. Cost to construct railings/guards will be paid under Item 06 Division 10: Specialties Work, 5. Eroded River Bank Reconstruction Handrails (OBI). Updated drawings are attached. Note that all concrete flatwork associated with retaining structure that will support hand/guardrails shall be increased in thickness from 4” to 6”.

Q: Where does asphalt sealant on access road begin?

A: Begins after the Park Service Office at the Forest Service Watercress Campground sign.

Q: Is the host site electrical a base or optional bid item?

A: See Item 08 for description of base and optional items.

Q: Will the Contractor be responsible for relocating the existing fee tube and kiosk near the host site?

A: No, a new fee tube will be supplied by the Forest Service. The exiting tube and kiosk will remain.